Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Engineering Audit Plan (for May 12-14, 2025)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 04/29/2025 [25-01-03] (PURA) - Engineering Audit Plan (for May 12-14, 2025)

This filing on the current system (opens in a new tab)