Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Request for Extension of Time to Complete Construction Plan Improvements

Motion No. 001

Filed by Crown Castle Fiber LLC, now doing business as Arium Networks

Part of

Application for Approval of a Construction Plan to Install Wireless Facilities Within Certain Public Rights-of-Way

Type of filing
Motion (Motion No. 001)
Date filed
August 5, 2026
Filed by
Crown Castle Fiber LLC, now doing business as Arium Networks
Files
Not listed yet

As listed on the current system

Motion No. 001 08/05/2026 (Crown Castle Fiber LLC, now doing business as Arium Networks) - Request for Extension of Time to Complete Construction Plan Improvements [25-02-12]

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)