Utility Dockets and Filings

Qcells requests PURA review in consultation with CT DEEP whether millions of dollars of potentially stranded investment in Connecticut are an unintended consequence of discontinuing the Front-of-the-Meter (FTM) Energy Storage Solutions (ESS) program.

CorrespondenceFiled by Qcells North AmericaNo files listed
Part of docket 25-02-14Closed
  • Electric
Renewable Energy Tariff Program Successor Study

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Corres. 10/31/2025 [25-02-14] (Qcells North America) - Qcells requests PURA review in consultation with CT DEEP whether millions of dollars of potentially stranded investment in Connecticut are an unintended consequence of discontinuing the Front-of-the-Meter (FTM) Energy Storage Solutions (ESS) program.