Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing, Order No. 6

compliance with Order No. 6 of the December 17, 2025 Final Decision in Docket No. 25-08-05.

Compliance filingFiled by Connecticut Green BankNo files listed
Part of docket 25-08-05Closed
  • Electric
Annual Energy Storage Solutions Program Review - Year 5

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Compliance Filings, 12/23/2025 [25-08-05] Order No.6 / Connecticut Green Bank / compliance with Order No. 6 of the December 17, 2025 Final Decision in Docket No. 25-08-05.

This filing on the current system (opens in a new tab)