Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Written Comments

CommentsFiled by Save The SoundNo files listed
Part of docket 25-08-06Closed
  • Electric
Annual EV Charging Program Review - Year 5

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)

As listed on the current system

Written Comments - 09/19/2025 [25-08-06] (Save The Sound)

This filing on the current system (opens in a new tab)