Brief, 11/12/2026 03:18:51 PM (Eversource Energy)

Files1

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
  1. Page 16 of 38

    § 16-245e(l) governs the recovery of the RRB Charge. Specifically, Conn. Gen. Stat. § 16-254e(l), as amended by the Act, states: Subject to the reconciliation process set forth in this subsection, the costs of any rate reduction bonds, including all principal, interest, premium, costs and arrearages on such bonds, shall be recovered through the competitive transition assessment pursuant to section 16-245g. (emphasis added) As noted, the Company is proposing to recover the Financed Utility Services, including the Storm Costs, through the RRB Charge, which is a reconciling component of the CTA, in accordance with § 16-245e(l) (Exh. CLP-REGULATORY-1, at 12). The RRB Charge will be calculated to recover all debt service on the Rate Reduction Bonds, as well as ongoing transaction costs (Exh. CLP-REGULATORY-1, at 12). As set forth in the proposed Financing Order, the RRB Charge will be calculated to cover: (i) the principal (in accordance with the expected amortization schedule set forth at pricing) and interest on, the RRBs; (ii) ongoing transaction costs (including the Servicing Fee, the Administration Fee, RRB Trustee fees and expenses, rating agency fees, legal, accounting and auditing fees, SPE independent managers’ fees and any indemnity obligations that are anticipated to be payable under the RRB Transaction documents on or prior to the next RRB payment date); (iii) the cost of establishing and maintaining any credit enhancement required for the RRBs, including replenishment of any amounts drawn from the Capital Subaccount such that the balance is equal to the targeted level; and (iv) to pay any amounts of previous RRB payment requirements not satisfied in the previous payment period for any reason (Exh. CLP-TREASURY-1, at 22 – 23). The projected RRB Charge will be calculated using assumptions set forth in the Issuance Advice Letter and each subsequent true-up filing (as described below), which shall include but not be limited to projected kWh usage, expected charge-offs and expected weighted average days sales outstanding (Exh. CLP-TREASURY-1, at 22 – 23; Exh. CLP-GOLDMAN-1, at 52). The RRB - 14 -
  2. Page 17 of 38

    Charge will be billed until the SPE has collected RRB Charges sufficient to discharge the total RRB payment requirements (Exh. CLP-TREASURY-1, at 3). CL&P proposes to file the initial RRB Charge for each rate class with the Issuance Advice Letter after the RRBs are priced, but prior to their issuance, in compliance with the proposed Financing Order (Exh. CLP-TREASURY-1, at 24). CL&P requests PURA’s approval of the method for determining the initial RRB Charge so that the RRB Charge set forth in the Issuance Advice Letter will automatically become effective as of such filing (Exh. CLP-TREASURY-1, at 24; RRU-014). 17 As discussed in more detail below, the Petition includes a proposed rate design for the RRB Charge that shall be assessed to all customers at a rate that is applied equally to all customers of the same customer class (Exh. CLP-REGULATORY-1, at 21; EOE-009). Consistent with the Securitization Law, the RRB Charge must be sufficient to recover all amounts approved by PURA, including to pay the principal of and the interest and any credit enhancement or premium on the Rate Reduction Bonds as the same shall become due and payable, and to pay all reasonable and necessary expenses relating to the RRB Transaction. Conn. Gen. Stat. § 16-245g(d). The RRB Charge is to be adjusted periodically, but not less frequently than annually, as specified in the proposed Financing Order. Conn. Gen. Stat. § 16-245i(c). The initial RRB Charge will include: (1) the securitized amount; (2) estimated annual ongoing transaction costs; (3) payments of principal and interest on the RRBs; (4) the number of days after a customer is billed that RRB Charge is deemed collected (based on historical collections experience); (5) daily remittances of deemed RRB Charge collections to the General Subaccount; (6) projected kWh sales by rate class for the upcoming year; (7) an estimated charge-off rate determined based on historical collections experience at the time of issuance of the RRBs; (8) any lags between a payment date and the latest date for which deemed RRB Charge collections available to the RRB Trustee are applied to a payment date (a time period which allows the Servicer to properly account for deemed RRB Charge collections); and (9) weighted average coupon rates (Exh. CLP-TREASURY-1, at 24). 17 - 15 -
  3. Page 18 of 38

    D. True-Up Mechanism The RRB Charge will be calculated to recover all debt service on the Rate Reduction Bonds, as well as ongoing transaction costs (Exh. CLP-REGULATORY-1, at 12). The RRB Charge will vary over the life of the RRB Transaction as a result of several factors, including changes in the principal and interest payments resulting from different payment periods; any amounts required to replenish the Capital Subaccount to the targeted balance if necessary; any amounts of previous periodic RRB payment requirements not satisfied in the previous year; any balance in the Excess Funds Subaccount; the impact of the variability of energy sales and forecasts; changes in payment patterns and charge-off experience; as well as changes in any ongoing RRB transaction costs (Exh. CLP-TREASURY-1, at 23). The calculation of the RRB Charge incorporates each of these factors (Exh. CLP-TREASURY-1, at 24). Based on these factors, CL&P will file adjustments, up or down, to the RRB Charge pursuant to a periodic true-up mechanism established (the “True-Up Mechanism”) (Exh. CLPREGULATORY-1, at 12; RRU-005). As proposed, the True-Up Mechanism is a periodic adjustment to the RRB Charge to ensure that the aggregate RRB Charge billed for the applicable period will result in RRB Charge collections that are sufficient to meet periodic RRB payment requirements (Exh. CLP-REGULATORY-1, at 12; Exh. CLP-TREASURY-1, at 25; RRU-007). 18 In accordance with Conn. Gen. Stat. § 16-245e(l), the Company is proposing to reconcile the RRB Charge to the actual revenues received through an annual true-up in the Company’s annual rate adjustment mechanism (“RAM”) filing (Exh. CLP-REGULATORY-1, at 13; RRU014). The current RAM process consists of a January 15 known and measurable filing, a February Conn. Gen. Stat. § 16-245e(l) states: “Upon the issuance of any rate reduction bonds as ordered by the authority to recover any financed utility services, the authority shall periodically adjust the competitive transition assessment in accordance with section 16-245j, as amended by this act, to allow the recovery of the cost of such bonds, including through a reconciliation of the actual revenues from the competitive transition assessment to the actual cost of such bonds” (emphasis added); see also Conn. Gen. Stat. § 16-245i(b)(2). 18 - 16 -
  4. Page 19 of 38

    15 rates filing, and a March 1 comprehensive RAM reconciliation and supporting documentation filing (Exh. CLP-REGULATORY-1, at 13; Tr. 10/20/26, at 75-76). These filings are followed by a Phase I discovery process, hearings, and an interim decision issued in late April for rates effective May 1 each year (Exh. CLP-REGULATORY-1, at 13; Tr. 10/20/26, at 75-76). The Company proposes that the RRB Charge, including the annual reconciliation and the upcoming year’s RRB Charge, will be filed no later than April 15 each year for inclusion in CTA rates effective May 1 (Exh. CLP-REGULATORY-1, at 13; Tr. 10/20/26, at 77-78). As required to achieve a triple-A rating, the RRB Charge must be automatically included in rates, absent manifest error (Exh. CLP-REGULATORY-1, at 13; Exh. CLP-TREASURY-1 at 26; RRU-014; Tr. 10/20/26, at 72-76). 19 Although this proposal is unique to the typical RAM ratemaking schedule and process, it is a necessary requirement to enable automatic rate changes specific to the RRB Charge to enable the Company to receive a triple-A bond rating that maximizes customer benefits (Exh. CLP-REGULATORY-1, at 13; Tr. 10/21/26, at 72-76). It is essential that the true-up filing be finalized and submitted as close in time as possible to the rate effective date to take into account the latest information in setting the RRB Charge for the upcoming period (Exh. CLP-REGULATORY-1, at 14). As such, the Company intends to submit the actual RRB charge by April 15 annually to be effective May 1. This cadence is consistent with the timing of filings for the Company’s New Hampshire affiliate, Public Service Company of New Hampshire (“PSNH”), in establishing the RRB charge for securitized costs in that jurisdiction, where RRB charges are filed January 15 for effect February 1 (Exh. CLPREGULATORY-1, at 14; Tr. 10/20/26, at 75-76). Absent manifest error in a routine true-up letter, the resulting upward or downward adjustments to the RRB Charge will be deemed approved by PURA and effective: (i) in the case of any Annual Routine True-Up Letter, on the ensuing May 1; (ii) in the case of any Mid-year Routine True-Up Letter, on the ensuing November 1; or (iii) in the case of an Other Routine True-Up Letter, on the first day of the ensuing month (Exh. CLP-TREASURY-1 at 26). 19 - 17 -
  5. Page 20 of 38

    In order to provide a preliminary indication of the upcoming year’s RRB Charge ahead of the formal April 15 true-up filing for PURA and all docket participants, the Company will provide for informational purposes an estimate of the RRB Charge as part of the annual March 1 comprehensive RAM filing, based on calculation inputs available at that time (Exh. CLPREGULATORY-1, at 14; Tr. 10/20/26, at 76-78). The actual RRB Charge filed on April 15 each year will be included in CTA rates and become effective May 1 (Exh. CLP-REGULATORY-1, at 14; see RRU-014). The RRB Charge may vary substantially from the March 1 estimate based on a number of factors but should assist in providing indicative information to PURA (Exh. CLPREGULATORY-1, at 14). As part of the True-Up Mechanism, the RRB Charge would be set annually as part of the reconciliation process described above, but in order to receive a triple-A bond rating, the process must also provide for semi-annual routine true-up filings and other true-up filings as needed in order to ensure that expected collections of the RRB Charge will be sufficient at all times to cover upcoming periodic RRB payment requirements (Exh. CLP-REGULATORY-1, at 14 – 15). As part of this process, the Financing Order must provide for additional automatic optional true-ups in circumstances where the actual revenues received through the RRB Charge are expected to be insufficient to cover the upcoming periodic RRB payment requirements (Exh. CLPREGULATORY-1, at 15; Tr. 10/20/26, at 73-74 (true-up mechanism is a zero-cost credit enhancement specific to utility securitization that allows for no over-collateralization, lowest cost - 18 -
  6. Page 21 of 38

    and highest credit rating)). 20 In addition, if the methodology used to calculate the RRB Charge adjustments must be modified to more accurately project and generate adequate RRB Charge collections, CL&P, as Servicer, may file a Non-Routine True-Up Letter with the resulting RRB Charge adjustments (reflecting such modification to the methodology or model) to be effective upon review and approval by PURA as provided in the proposed Financing Order. 21 E. Use of Proceeds The proposed Financing Order provides that the use of proceeds from the issuance of the Rate Reduction Bonds shall be applied for the purposes approved by PURA in the Financing Order. Conn. Gen. Stat. § 16-245j(c)(4)(A). The Financing Entity will transfer the proceeds from the issuance of the Rate Reduction Bonds, net of its transaction costs, if any, to CL&P as consideration for the transfer of the Transition Property to the Financing Entity (LFE-003, Att. 1, at 21). The RRB proceeds received by CL&P will be used by CL&P as follows: • To recover the Storm Costs approved for recovery in the Storm Costs Order (i.e., the $667,930,008 in net costs incurred between January 2018 and December 2023 to prepare for and restore power to customers following storms that have been determined by PURA to have been prudently and efficiently incurred). • To pay upfront transaction costs incurred in connection with the issuance of the Rate Reduction Bonds. If a rate adjustment is necessary, the Company would file a true-up to update the RRB Charge no later than: (a) in the case of a semi-annual true-up, October 15 of the relevant year; or (b) in the case of an optional true-up, the date that is 15 days before the end of the then-current calendar month. The rate change would become automatically effective: (a) in the case of a semi-annual true-up, on the ensuing November 1; and (b) in the case of an optional trueup, on the first day of the following month (in each case, absent manifest error) (Exh. CLP-REGULATORY-1, at 15; Exh. CLP-TREASURY-1 at 26). More detail on the True-Up Mechanism required to maximize the likelihood of achieving the desired triple-A rating is included in Exhibit CLP-TREASURY-1, at 25 – 29 and Exhibit CLPGOLDMAN-1, at 46 – 48. 20 The proposed Financing Order provides that an adjustment based on a Non-Routine True-Up Letter would become effective upon review and approval by PURA, “with such review and determination to occur within thirty (30) days of such filing, in accordance with Conn. Gen. Stat. § 16-245i(c)” (LFE-003 Att. 1, at 16) (in summarizing the true-up mechanism, Exh. CLP-TREASURY-1 at 27 stated that such review and approval would occur within 90 days of filing; however, the Company’s proposal is for the 30-day period as reflected in the proposed Financing Order). 21 - 19 -
  7. Page 22 of 38

    • To redeem short term debt and to pay a return of capital to Eversource Energy to maintain an appropriate capital structure at CL&P. (Exh. CLP-TREASURY-1, at 16 – 17). F. Summary Please refer to the proposed Financing Order (LFE-003, Att. 1) at Section II for a comprehensive description of all elements of the proposed RRB Transaction. V. DISCUSSION A. PURA’s Issuance of the Proposed Financing Order is in the Best Interest of Customers The proposed RRB Transaction is in the best interest of customers, consistent with the Securitization Law. Conn. Gen. Stat. § 16-245e(l). As discussed at length in Docket Nos. 24-0330 and 25-12-13, and in other PURA proceedings, securitization provides significant value and savings for customers (Exh. CLP-REGULATORY-1, at 11). These benefits will be realized through the ability to rely exclusively on securitized debt, rather than on a combination of longterm debt and equity, and through achieving a triple-A rating through the securitization financing process, which together will significantly lower the bill impacts to customers for recovery of the Storm Costs as compared to traditional recovery under PURA precedent, and to lower the interest costs customers will experience over the extended recovery period as compared to other forms of financing (Exh. CLP-REGULATORY-1, at 11; see EOE-005; EOE-005 Att. 1). The Company’s long-term capital sources supporting regulatory assets are comprised of long-term debt and equity, which come at the currently authorized weighted average cost of capital of 7.09 percent (Exh. CLP-TREASURY-1, at 36). The effect of the RRB Transaction is to change the rate of return from CL&P’s weighted average cost of capital, as authorized from time to time by PURA, to the weighted average interest rate on the RRBs, estimated at time of the Petition to be 5.482 percent. This rate changes day to day with fluctuations in market rates (Exh. CLP- 20 -
  8. Page 23 of 38

    TREASURY-1, at 36; Exh. CLP-GOLDMAN-1 at 27; see Tr. 10/20/26, at 128 – 129; RRU-001; RRU-001 Att. 1; RRU-002). This financing benefit for extraordinary costs outside of what is collected in rates is achieved through securitization. The securitization financing is anticipated to receive a triple-A rating, and can be achieved without a return to equity investors and paid back over time by customers through the non-bypassable and irrevocable RRB Charge (Exh. CLPTREASURY-1, at 36). The difference between CL&P’s cost of capital and the lower interest rate on the RRBs reduces the revenue requirement that must be paid by customers to pay back the deferred balance and mitigates customer bill impacts for recovery of these costs (Exh. CLPTREASURY-1, at 36). In the Petition, CL&P estimated an overall level NPV savings to customers of $120 million based on: (a) the effective all-in costs of RRBs; (b) the amount to be securitized; and (c) a 5.482 percent interest rate on the RRBs, as compared to recovery of the same costs over six years at CL&P’s authorized weighted average cost of capital (Exh. CLP-TREASURY-1, at 36; Exh. CLPTREASURY-3). The actual savings will depend on the principal repayment schedule, interest rate, actual ongoing transaction costs, amount of credit enhancement, if any, and other factors which will be established at the time RRBs are priced (Exh. CLP-TREASURY-1, at 36 – 37; Tr. 10/20/26, at 128 – 129). 22 Thus, the proposed RRB Transaction is in the best interest of customers, consistent with the Securitization Law. Conn. Gen. Stat. § 16-245e(l). The Petition utilized interest rates as of September 11, 2026. Based on current rates, the Company estimated a coupon rate of 5.65% (compared to 5.482%), which would result in a monthly bill increase of approximately three cents per month on average and an insignificant decline in the $120 million NPV (Tr. 10/20/26 at 128 – 129). In fact, a hypothetical one percent increase in the coupon rate would result in a 20-cent bill increase and only a $25 million decrease to the NPV savings, still yielding substantial overall NPV savings to customers in the mid-$90 million range (Tr. 10/20/26, at 129). 22 - 21 -
  9. Page 24 of 38

    B. Customers Will Benefit from the Transaction Structure and OTT’s Role as Finance Authority The working group engaged in an approximately seven-month long process to arrive at the proposed transaction structure presented in the Petition. As described in the status reports provided to PURA in April and June 2026, the working group comprised of OTT, OCC and CL&P began meeting in March 2026 to discuss the securitization process, potential structures for the securitization, and coordination on the development and filing of the Petition (Exh. CLPTREASURY-1, at 13). This work continued through the spring and summer. The working group parties ultimately agreed with OTT’s recommendation in June 2026 that CL&P would be the issuer and serve as the Financing Entity for the securitization, with close coordination of efforts with OTT and OCC (Exh. CLP-TREASURY-1, at 13). The working group parties also agreed that this structure would best preserve maximum benefits for customers, while assuring OTT’s overall oversight of the project (Exh. CLP-TREASURY-1, at 13). Following the PURA technical session on July 13, 2026, CL&P moved expeditiously to put in place the necessary underwriting and legal resources to develop the Petition documents (Exh. CLP-TREASURY-1, at 13). The working group parties continued to meet on a weekly basis during this period (Exh. CLP-TREASURY-1, at 13 – 14). The Company provided OTT and OCC initial drafts of Petition documents on August 18, 2026, and received comments from OTT on August 31, 2026 (Exh. CLP-TREASURY-1, at 14). The Company provided updated drafts on September 8, 2026, and received additional feedback from OTT on September 16, 2026 (Exh. CLP-TREASURY-1, at 14). Over the following week, the parties engaged in further discussions to review and finalize the Petition ahead of filing on September 25, 2026 (Exh. CLP-TREASURY1, at 14). In the proposed transaction structure, OTT will serve a critical role to ensure that the Storm Cost securitization produces maximum benefits for customers. In its testimony, OTT explained - 22 -
  10. Page 25 of 38

    that the Securitization Law designates OTT as the Finance Authority for the transaction (OTT Test. at 13 (citing Conn. Gen. Stat. 16-245e)). “In this capacity, OTT has authority to specify the final terms and conditions of the RRBs, including principal amount (as defined in the Financing Order), tranche structure, repayment schedule, pricing, and total issuance costs before the bonds may be issued” (OTT Test. at 13). OTT testified that it is not “passively reviewing a final transaction,” but is taking an active role “from the earliest stages of the transaction through to its completion, with a thorough, proactive review process by OTT and its advisors” (OTT Test. at 13). OTT testified that “[t]his ensures the transaction proceeds on terms that are in the best interests of ratepayers” (OTT Test. at 13). OTT identified several aspects of its role that will benefit the transaction and customers: • Non-Impairment: OTT’s participation in providing the non-impairment pledge, 23 which is a “cornerstone of the AAA credit rating that will deliver the lowest possible interest rates and provide material ratepayer savings,” will directly reinforce the creditworthiness of the RRBs (OTT Test. at 14). • Market Oversight and Benchmarking: OTT, working with its financial advisor, “will evaluate the proposed transaction economics against the national market for utility securitizations throughout the transaction process” (OTT Test. at 14). • Issuance Advice Letter: The Issuance Advice Letter (“IAL”) to be filed by CL&P will contain final pricing, tranche terms, the securitization charge calculation and allocation method (Exh. CLP-TREASURY-1, at 16; OTT Test. at 15). “Consistent By statute, the State covenants with bondholders that as long as the RRBs are outstanding it will take no action that would impair the rights of bondholders, meaning that the State will not impair the securitized property or take any action that would reduce charges below the level necessary to pay principal, interest, and transaction costs (OTT Test. at 14). Conn. Gen. Stat. § 16-245j(b). 23 - 23 -

As listed on the current system

Brief, 11/12/2026 03:18:51 PM (Eversource Energy) [26-04-04]