Petition
Files20
26-04-04 CL&P Securitization Petition.pdf
PDF · 263 KB · 15 pagesText searchable
Download 26-04-04 CL&P Securitization Petition.pdfRead the text of 26-04-04 CL&P Securitization Petition.pdf
Exhibit CLP-REGULATORY-3 (Traditional Cost Recovery).pdf
PDF · 179 KB · 39 pagesText searchable
Download Exhibit CLP-REGULATORY-3 (Traditional Cost Recovery).pdfRead the text of Exhibit CLP-REGULATORY-3 (Traditional Cost Recovery).pdf
Exhibit CLP-REGULATORY-2 (Storm Costs 25-12-13).xlsx
Excel · 35 KBText searchable
Download Exhibit CLP-REGULATORY-2 (Storm Costs 25-12-13).xlsxRead the text of Exhibit CLP-REGULATORY-2 (Storm Costs 25-12-13).xlsx
Exhibit CLP-REGULATORY-2 (Storm Costs 25-12-13).pdf
PDF · 125 KB · 2 pagesText searchable
Download Exhibit CLP-REGULATORY-2 (Storm Costs 25-12-13).pdfRead the text of Exhibit CLP-REGULATORY-2 (Storm Costs 25-12-13).pdf
Exhibit CLP-REGULATORY-1 (Regulatory Testimony).pdf
PDF · 1.6 MB · 26 pagesText searchable
Download Exhibit CLP-REGULATORY-1 (Regulatory Testimony).pdfRead the text of Exhibit CLP-REGULATORY-1 (Regulatory Testimony).pdf
Exhibit CLP-GOLDMAN-1.pdf
PDF · 550 KB · 64 pagesText searchable
Download Exhibit CLP-GOLDMAN-1.pdfRead the text of Exhibit CLP-GOLDMAN-1.pdf
Exhibit CLP-FINANCING ORDER-1D (9.25.2026).pdf
PDF · 212 KB · 10 pagesText searchable
Download Exhibit CLP-FINANCING ORDER-1D (9.25.2026).pdfRead the text of Exhibit CLP-FINANCING ORDER-1D (9.25.2026).pdf
Exhibit CLP-FINANCING ORDER-1C (9.25.2026).pdf
PDF · 868 KB · 129 pagesText searchable
Download Exhibit CLP-FINANCING ORDER-1C (9.25.2026).pdfRead the text of Exhibit CLP-FINANCING ORDER-1C (9.25.2026).pdf
Exhibit CLP-FINANCING ORDER-1B (9.25.2026).pdf
PDF · 491 KB · 53 pagesText searchable
Download Exhibit CLP-FINANCING ORDER-1B (9.25.2026).pdfRead the text of Exhibit CLP-FINANCING ORDER-1B (9.25.2026).pdf
Exhibit CLP-FINANCING ORDER-1A (9.25.2026).pdf
PDF · 225 KB · 17 pagesText searchable
Download Exhibit CLP-FINANCING ORDER-1A (9.25.2026).pdfRead the text of Exhibit CLP-FINANCING ORDER-1A (9.25.2026).pdf
Exhibit CLP-FINANCING ORDER-1 (9.25.2026).pdf
PDF · 412 KB · 39 pagesText searchable
Download Exhibit CLP-FINANCING ORDER-1 (9.25.2026).pdfRead the text of Exhibit CLP-FINANCING ORDER-1 (9.25.2026).pdf
Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).xlsx
Excel · 23 KBText searchable
Download Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).xlsxRead the text of Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).xlsx
Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).pdf
PDF · 103 KB · 1 pageText searchable
Download Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).pdfRead the text of Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).pdf
Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).xlsx
Excel · 33 KBText searchable
Download Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).xlsxRead the text of Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).xlsx
Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).pdf
PDF · 112 KB · 3 pagesText searchable
Download Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).pdfRead the text of Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).pdf
Exhibit CLP-TREASURY-1 (Treasury Testimony).pdf
PDF · 346 KB · 41 pagesText searchable
Download Exhibit CLP-TREASURY-1 (Treasury Testimony).pdfRead the text of Exhibit CLP-TREASURY-1 (Treasury Testimony).pdf
Exhibit CLP-REGULATORY-5 (CTA Tariff Redlined) (9.25.pdf
PDF · 49 KB · 2 pagesText searchable
Download Exhibit CLP-REGULATORY-5 (CTA Tariff Redlined) (9.25.pdfRead the text of Exhibit CLP-REGULATORY-5 (CTA Tariff Redlined) (9.25.pdf
Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).xlsx
Excel · 37 KBText searchable
Download Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).xlsxRead the text of Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).xlsx
Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).pdf
PDF · 111 KB · 1 pageText searchable
Download Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).pdfRead the text of Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).pdf
Exhibit CLP-REGULATORY-3 (Traditional Cost Recovery).xlsx
Excel · 196 KBText searchable
Download Exhibit CLP-REGULATORY-3 (Traditional Cost Recovery).xlsxRead the text of Exhibit CLP-REGULATORY-3 (Traditional Cost Recovery).xlsx
Text of Exhibit CLP-REGULATORY-2 (Storm Costs 25-12-13).pdf
Extracted from the file · 2 pages · 8,985 characters
Page 7 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 7 of 26 1 Q. What is the purpose of your testimony in this proceeding? 2 A. The purpose of our testimony is to support CL&P’s petition for the issuance of 3 a financing order (the “Financing Order”) authorizing the issuance of Rate Reduction 4 Bonds (“RRBs”), pursuant to Conn. Gen. Stat. §§ 16-245e to 16-245k, as amended (the 5 “Securitization Law”). 1 In its petition, CL&P requests that PURA issue a Financing 6 Order for the purpose of recovering approximately $668 million of costs previously 7 determined by PURA in a final decision dated July 29, 2026 in Docket No 25-12- 8 13, Application of The Connecticut Light and Power Company d/b/a Eversource 9 Energy for Order to Securitize 2018-2023 Catastrophic Storm Costs (the “Storm Costs 10 Order”), to have been prudently and efficiently incurred by CL&P to prepare for and 11 restore power to customers following storms between the period January 2018 to 12 December 2023 (the “Storm Costs”) and any fees, expenses and transaction costs 13 incurred in connection with the issuance, servicing and retirement of such 14 RRBs (together with Storm Costs, the “Financed Utility Services”). In the Storm Costs 15 Order, PURA approved the use of a securitized financing through the issuance of Rate 16 Reduction Bonds as authorized by the Securitization Law. 17 In our testimony, we explain how the Storm Costs to be securitized have been 18 calculated; how the Company proposes to establish a portion of the competitive 19 transition assessment (“CTA”) from which the Financed Utility Services will be Effective July 1, 2025, the Securitization Law was amended by sections 10 – 16 of Public Act No. 25173, An Act Concerning Energy Affordability, Access and Accountability (the “Act”). 1Page 8 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 8 of 26 1 recovered and from which the Rate Reduction Bonds will be issued, serviced and 2 retired (such portion of the CTA, the “RRB Charge”); how the RRB Charge will be 3 allocated amongst CL&P’s rate classes; and explain the tariff changes necessary to 4 CL&P’s CTA Tariff to reflect and implement the securitization financing process. 5 Q. Are you presenting any exhibits in addition to your testimony? 6 A. Yes. We are providing the following exhibits in support of the Company’s financing 7 petition: Exhibit Reference Exhibit Description Exhibit CLP-REGULATORY-1 Joint Direct Testimony of Brendan J. O’Brien, Garrett J. Murray and Edward A. Davis Exhibit CLP-REGULATORY-2 Storm Costs to be Securitized Exhibit CLP-REGULATORY-3 Traditional Cost Recovery Exhibit CLP-REGULATORY-4 RRB Cost Allocation Exhibit CLP-REGULATORY-5 Updated CTA Tariff 8 Q. How is your testimony organized? 9 A. Our testimony is organized into the following sections: 10 • Section I provides the introduction; 11 12 • Section II discusses the calculation of the balance of Storm Costs to be securitized; 13 14 • Section III discusses the proposed ratemaking treatment for the RRB Charge and inclusion in the CTA; 15 16 • Section IV discusses the alternative ratemaking treatment for the 2018 - 2023 catastrophic storm and pre-staging event costs through base distribution rates;Page 9 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 9 of 26 1 2 3 • Section V discusses the detailed cost allocations for the RRB Charge for each customer class and the changes necessary to CL&P’s CTA Tariff to reflect and implement the securitization financing process; and 4 • Section VI provides the conclusion to our pre-filed testimony. 5 II. CATASTROPHIC STORM COSTS TO BE SECURITIZED 6 Q. Provide an overview of the types of costs that qualify for the securitized financing. 7 A. Effective as of July 1, 2025, the Act amended the Securitization Law to provide that an 8 electric distribution company may submit a petition to PURA for a financing order to 9 authorize the issuance of Rate Reduction Bonds to recover Financed Utility Services, 10 including any costs determined by PURA to have been prudently and efficiently 11 incurred to prepare for and restore power to customers between January 1, 2018 and 12 January 1, 2025. Conn. Gen. Stat. §§ 16-245i(a) and 16-245j(a) provide that a 13 financing entity may issue Rate Reduction Bonds upon approval by PURA in the 14 pertinent financing order, and that a financing order adopted following the application 15 of an electric distribution company shall become effective in accordance with its terms 16 after the electric distribution company files with PURA the electric distribution 17 company’s written consent to all terms and conditions of the financing order. 18 19 Q. What are the catastrophic storm and pre-staging event costs included in the Company’s financing order application? 20 A. In the Storm Costs Order, PURA determined that $767,930,008 in Storm Costs incurred 21 by CL&P between January 2018 and December 2023 to prepare for and restore power 22 to customers following storms had been prudently and efficiently incurred, authorizing 23 CL&P to file a petition in Docket No. 26-04-04 to request a determination from PURAPage 10 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 10 of 26 1 as to whether the issuance of Rate Reduction Bonds to recover the net amount 2 of $667,930,008 is in the best interests of ratepayers. 2 In its petition, CL&P seeks 3 certain findings of fact and the issuance of a financing order to authorize the issuance 4 of Rate Reduction Bonds to recover the Financed Utility Services, including the Storm 5 Costs. 3 In the Storm Costs Order, PURA authorized the Company to “file a petition in 6 Docket No. 26-04-04 to request a determination of whether the issuance of rate 7 reduction bonds is in the best interest of ratepayers.” 4 8 The Storm Costs approved by PURA and presented by the Company in its petition were 9 incurred during the applicable statutory period identified. As a result, the prudently 10 incurred storm costs presented herein qualify for securitized financing through RRBs 11 under the applicable statutes. 12 13 Q. Did the Company offset the prudently incurred storm costs to be securitized with any customer contributions? 14 A. Yes. In accordance with the Storm Costs Order, the Company partially offset the 15 principal storm balance to be securitized with: (1) customer contributions recovered 16 through base distribution rates over the period January 1, 2018 through December 31, 17 2023 in the amount of approximately $101.4 million; 5 and (2) customer contributions Storm Costs Order, at 144 (“Accordingly, the Authority will consider the securitization of up to $767,930,008 in prudently incurred storm costs, and application of the $100,000,000 RAM CTA credit in Docket No. 26-04-04, pursuant to General Statutes § 16-245e”). 2 3 See Conn. Gen. Stat. § 16-245e(a)(21), defining “Financed Utility Services.” 4 Storm Costs Order at 143. See total storm reserve accrual of $90.9 million and total prestaging reserve of $10.6 million approved in the Storm Costs Order at 2 – 3 and 20. 5Page 11 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 11 of 26 1 authorized for recovery through the CTA during the period May 1, 2026 through April 2 30, 2027 in the amount of $100 million within Docket No. 26-01-03. 6 3 Q. How did the Company calculate the total Storm Costs balance to be securitized? 4 A. The Company relied upon the Storm Costs Order to determine the final storm balance 5 to be securitized. In the Storm Costs Order, PURA authorized the recovery of $667.9 6 million (Storm Costs Order at 20). This amount represents the prudently incurred 7 catastrophic storm and pre-staging costs of approximately $869.4 million 7 net of 8 approximately $201.5 million 8 of customer funding. 9 breakout of those costs as Exhibit CLP-REGULATORY-2. See Table 1 below for a 10 summary of the costs to be securitized. Our testimony provides a 6 Docket No. 26-01-03, Annual Review of the Rate Adjustment Mechanisms of the Connecticut Light and Power Company, Interim Decision (Apr. 22, 2026) at 9; see also Storm Costs Order at 2. 7 This amount represents the sum of the total catastrophic storm costs approved of $861,478,785 (Final Decision at 2), less the $2,642,850 in mutual aid credits applied (Final Decision at 2) and plus $10,563,865 of approved pre-staging costs (Final Decision at 3). 8 This amount represents the sum of the $90,905,927 storm reserve accrual (Final Decision at 2), the $10,563,865 of prestaging cost reserves (Final Decision at 3) and the $100,000,000 of RAM CTA Credits (Final Decision at 2).Page 12 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 12 of 26 Table 1: Storm Costs to be Securitized 9 1 Description 2018 – 2023 Storm Costs Catastrophic Storm Reserve Accrual Pre-Staging Reserve RAM CTA Credit Net Storm Costs to be Securitized Amount $869,399,800 ($90,905,927) ($10,563,865) ($100,000,000) $667,930,008 2 3 Q. Is the total principal storm balance included in the financing application presented in accordance with the Storm Costs Order? 4 A. Yes, the amounts presented within Table 1 above were approved by PURA in the Storm 5 Costs Order in Table 10 (see page 20). 6 III. PROPOSED RATEMAKING TREATMENT FOR THE RRB CHARGE 7 8 Q. How is the Company proposing to recover the deferred Storm Costs approved in Docket No. 25-12-13? 9 A. The Company is proposing to establish a portion of the CTA as the RRB Charge, from 10 which the Financed Utility Services will be recovered and from which the Rate 11 Reduction Bonds will be issued. 12 accordance with the Storm Costs Order, which stated CL&P could “file a petition in 13 Docket No. 26-04-04 to request a determination of whether the issuance of rate 9 See Storm Costs Order, Table 10 (page 20). The Company is presenting this proposal inPage 13 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 13 of 26 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 September 25, 2026 Page 11 of 26 1 reduction bonds is in the best interest of ratepayers with respect to the 2018 - 2023 2 approved storms.” 10 3 Q. Does securitization provide a benefit for customers? 4 A. Yes. As discussed at length in both Docket Nos. 24-03-30 and 25-12-13, and in other 5 PURA proceedings, securitization provides significant value and savings for 6 customers. These significant savings will be realized through the ability to rely 7 exclusively on securitized debt, rather than on a combination of long-term debt and 8 equity, and through achieving a triple-A rating through the securitization financing 9 process, which together will significantly lower the bill impacts to customers for 10 recovery of the Storm Costs as compared to traditional recovery under PURA 11 precedent, and to lower the interest costs customers will experience over the extended 12 recovery period as compared to other forms of financing. Please refer to the direct 13 testimony of Company witness Matthew P. Fallon for more information on how 14 securitization is in the best interest of customers. 15 16 Q. What is the rate mechanism the Company proposes to use to recover the costs of the Rate Reduction Bonds? 17 A. Conn. Gen. Stat. § 16-245e(l) governs the recovery of the RRB Charge. Specifically, § 16-254e(l) states: 18 19 20 21 Subject to the reconciliation process set forth in this subsection, the costs of any rate reduction bonds, including all principal, interest, premium, costs and arrearages on such bonds, shall be recovered through the 10 Storm Costs Order at 143.Page 14 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 14 of 26 competitive transition assessment pursuant to section 16-245g, as amended by this act. (emphasis added) 1 2 3 As noted, the Company is proposing to recover the Financed Utility Services, including 4 the Storm Costs, through the RRB Charge, which is a reconciling component of the 5 CTA, in accordance with § 16-245e(l). 6 Q. Will the RRB Charge be reconciled to actual revenues received? 7 A. Yes. The RRB Charge will be calculated to recover all debt service on the Rate 8 Reduction Bonds, as well as ongoing transaction costs. 11 CL&P proposes to file 9 adjustments, up or down, to the RRB Charge pursuant to a true-up mechanism (the 10 “True-Up Mechanism”), as explained in detail in Mr. Fallon’s testimony. As proposed, 11 the True-Up Mechanism will be a periodic adjustment to the RRB Charge to ensure 12 that the aggregate RRB Charge billed for the applicable period will result in RRB 13 Charge collections that are sufficient to meet periodic RRB payment requirements. 14 Similar to the recovery governance noted above, Conn. Gen. Stat. § 16-245e(l) also 15 provides for reconciliation of the RRB Charge to the actual revenues received. 16 Specifically, § 16-254e(l) states: 17 18 19 20 21 Upon the issuance of any rate reduction bonds as ordered by the authority to recover any financed utility services, the authority shall periodically adjust the competitive transition assessment in accordance with section 16-245j, as amended by this act, to allow the recovery of the cost of such bonds, including through a reconciliation of the actual revenues from As described in Mr. Fallon’s testimony, the initial RRB Charge will be set forth as per the proposed Financing Order in the Issuance Advice Letter to be filed by CL&P after the pricing date, but before the issuance of, the RRBs. 11Page 15 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 15 of 26 the competitive transition assessment to the actual cost of such bonds. (emphasis added) 12 1 2 3 4 Q. What does the Company propose with respect to the timing of the RRB Charge reconciliation filings? 5 A. In accordance with § 16-245e(l), the Company is proposing to reconcile the RRB 6 Charge to the actual revenues received through an annual true-up in the Company’s 7 annual RAM filing. The current RAM process consists of a January 15 known and 8 measurable filing, a February 15 rates filing, and a March 1 comprehensive RAM 9 reconciliation and supporting documentation filing. These filings are followed by a 10 Phase I discovery process, hearings, and an interim decision issued in late April for 11 rates effective May 1 each year. 12 The Company proposes that the RRB Charge, including the annual reconciliation and 13 the upcoming year’s RRB Charge, will be filed no later than April 15 each year for 14 inclusion in CTA rates effective May 1. As required to achieve a triple-A rating, the 15 RRB Charge must be automatically included in rates, barring any mathematical errors. 16 Although this proposal is unique to the typical RAM ratemaking schedule and process, 17 it is a necessary requirement to enable automatic rate changes specific to the RRB 18 Charge to ensure the Company can receive a triple-A bond rating that maximizes 19 customer benefits. 12 See also Conn. Gen. Stat. § 16-245i(b)(2).Page 16 of 26
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 16 of 26 1 It is essential that the true-up filing be finalized and submitted as close in time as 2 possible to the rate effective date to take into account the latest information in setting 3 the RRB Charge for the upcoming period. As such, the Company intends to submit the 4 actual RRB charge by April 15 annually to be effective May 1. This cadence is 5 consistent with the timing of filings for the Company’s New Hampshire affiliate, Public 6 Service Company of New Hampshire (“PSNH”), in establishing the RRB charge for 7 securitized costs in that jurisdiction, where RRB charges are filed January 15 for effect 8 February 1. 9 In order to provide a preliminary indication of the upcoming year’s RRB Charge ahead 10 of the formal April 15 true-up filing for PURA and all docket participants, the Company 11 will provide for informational purposes an estimate of the RRB Charge as part of the 12 annual March 1 comprehensive RAM filing, based on calculation inputs available at 13 that time. The actual RRB Charge filed on April 15 each year will be included in CTA 14 rates and become effective May 1. The RRB Charge may vary substantially from the 15 March 1 estimate based on a number of factors, but should assist in providing indicative 16 information to PURA. 17 18 Q. Is it necessary for the Financing Order to include a mechanism for the RRB Charge to be adjusted more frequently than annually? 19 A. Yes. As part of the True-Up Mechanism, the RRB Charge would be set annually as 20 part of the reconciliation process described above, but in order to receive a triple-A 21 bond rating, the process must also provide for semi-annual routine true-up filings and 22 other true-up filings as needed in order to ensure that expected collections of the RRB
Text of Exhibit CLP-GOLDMAN-1.pdf
Extracted from the file · 64 pages · 96,187 characters
Text of Exhibit CLP-FINANCING ORDER-1D (9.25.2026).pdf
Extracted from the file · 10 pages · 10,349 characters
Text of Exhibit CLP-FINANCING ORDER-1C (9.25.2026).pdf
Extracted from the file · 129 pages · 372,585 characters
Text of Exhibit CLP-FINANCING ORDER-1B (9.25.2026).pdf
Extracted from the file · 53 pages · 119,308 characters
Text of Exhibit CLP-FINANCING ORDER-1A (9.25.2026).pdf
Extracted from the file · 17 pages · 45,618 characters
Text of Exhibit CLP-FINANCING ORDER-1 (9.25.2026).pdf
Extracted from the file · 39 pages · 131,414 characters
Text of Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).xlsx
Sheet names, column headings and text cells; numbers left out
Text of Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).pdf
Extracted from the file · 1 page · 817 characters
Text of Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).xlsx
Sheet names, column headings and text cells; numbers left out
Text of Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).pdf
Extracted from the file · 3 pages · 4,783 characters
Text of Exhibit CLP-TREASURY-1 (Treasury Testimony).pdf
Extracted from the file · 41 pages · 69,775 characters
Text of Exhibit CLP-REGULATORY-5 (CTA Tariff Redlined) (9.25.pdf
Extracted from the file · 2 pages · 3,148 characters
Text of Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).xlsx
Sheet names, column headings and text cells; numbers left out
Text of Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).pdf
Extracted from the file · 1 page · 1,372 characters
Text of Exhibit CLP-REGULATORY-3 (Traditional Cost Recovery).xlsx
Sheet names, column headings and text cells; numbers left out
As listed on the current system
Corres. 09/25/2026 [26-04-04] (Eversource Energy) - Petition