Eversource rate increase is on 35 pages across 7 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
18 pages match
Words on different pages

Text of Exhibit CLP-REGULATORY-2 (Storm Costs 25-12-13).pdf

Extracted from the file · 2 pages · 8,985 characters

3 pages match
  1. Page 5 of 26Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 5 of 26 1 Q. Mr. Murray, please state your full name and business address. 2 A. My name is Garrett J. Murray. My business address is 107 Selden Street, Berlin, 3 Connecticut 06037. 4 Q. By whom are you employed and in what capacity? 5 A. I am employed by ESC as Director of Revenue Requirements for Eversource Energy’s 6 Connecticut electric and gas utility companies. In this role I am responsible for 7 preparing and presenting regulatory filings and revenue requirements calculations for 8 Eversource’s Connecticut subsidiaries, including CL&P. 9 Q. Please describe your educational and employment experience. 10 A. I received a Bachelor of Science degree in Accounting from Southern Connecticut State 11 University and earned a Master of Business Administration with a concentration in 12 Finance from the University of Connecticut. I have worked at Eversource for over 17 13 years, joining Northeast Utilities, Eversource’s predecessor, in 2009. I have worked in 14 the transmission and distribution regulatory and revenue requirements organizations, 15 holding roles of increasing responsibility. I assumed my current position as Director 16 of Revenue Requirements, in January 2026. 17 Q. Have you previously testified in any formal hearings before regulatory bodies? 18 A. Yes, I have previously testified before PURA in multiple proceedings. Most recently, 19 I testified on behalf of the Company in storm proceedings in Docket Nos. 24-03-30 and 20 25-12-13. I have also previously testified before PURA in other dockets, including the 21 Yankee Gas rate case in Docket No. 24-12-01, the CL&P RAM proceeding in Docket
  2. Page 6 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 6 of 26 1 No. 26-01-03, and submitted prefiled testimony case in Docket 2 in CL&P’s current Distribution rate No. 26-05-10. 3 Q. Mr. Davis, please state your full name and business address. 4 A. My name is Edward D. Davis. My business address is 107 Selden Street, Berlin, 5 Connecticut 06037. 6 Q. By whom are you employed and in what capacity? 7 A. I am the Director of Rates for ESC. As Director of Rates, I am responsible for activities 8 related to the design, regulation and administration of rates for the Eversource Energy 9 operating subsidiaries, including CL&P. 10 Q. Please describe your educational and employment experience. 11 A. I hold a Bachelor of Science degree in Electrical Engineering from the University of 12 Hartford and a Master of Business Administration degree from the University of 13 Connecticut. I joined Northeast Utilities in 1979 and have held various positions in the 14 areas of consumer economics, engineering and operations, wholesale and retail 15 marketing and rate design, regulation and administration. 16 Q. Have you previously testified in any formal hearings before regulatory bodies? 17 A. Yes, I have testified before PURA on multiple occasions. Most recently, I testified on 18 behalf of the Company in the annual RAM proceeding in Docket No. 26-01-03. I have 19 also previously testified before PURA in numerous other dockets, including the Yankee 20 Gas rate case in Docket No. 24-12-01 and submitted prefiled testimony in the recently 21 filed CL&P distribution rate case in Docket No. 26-05-10.
  3. Page 7 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 7 of 26 1 Q. What is the purpose of your testimony in this proceeding? 2 A. The purpose of our testimony is to support CL&P’s petition for the issuance of 3 a financing order (the “Financing Order”) authorizing the issuance of Rate Reduction 4 Bonds (“RRBs”), pursuant to Conn. Gen. Stat. §§ 16-245e to 16-245k, as amended (the 5 “Securitization Law”). 1 In its petition, CL&P requests that PURA issue a Financing 6 Order for the purpose of recovering approximately $668 million of costs previously 7 determined by PURA in a final decision dated July 29, 2026 in Docket No 25-12- 8 13, Application of The Connecticut Light and Power Company d/b/a Eversource 9 Energy for Order to Securitize 2018-2023 Catastrophic Storm Costs (the “Storm Costs 10 Order”), to have been prudently and efficiently incurred by CL&P to prepare for and 11 restore power to customers following storms between the period January 2018 to 12 December 2023 (the “Storm Costs”) and any fees, expenses and transaction costs 13 incurred in connection with the issuance, servicing and retirement of such 14 RRBs (together with Storm Costs, the “Financed Utility Services”). In the Storm Costs 15 Order, PURA approved the use of a securitized financing through the issuance of Rate 16 Reduction Bonds as authorized by the Securitization Law. 17 In our testimony, we explain how the Storm Costs to be securitized have been 18 calculated; how the Company proposes to establish a portion of the competitive 19 transition assessment (“CTA”) from which the Financed Utility Services will be Effective July 1, 2025, the Securitization Law was amended by sections 10 – 16 of Public Act No. 25173, An Act Concerning Energy Affordability, Access and Accountability (the “Act”). 1
  4. Page 8 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 8 of 26 1 recovered and from which the Rate Reduction Bonds will be issued, serviced and 2 retired (such portion of the CTA, the “RRB Charge”); how the RRB Charge will be 3 allocated amongst CL&P’s rate classes; and explain the tariff changes necessary to 4 CL&P’s CTA Tariff to reflect and implement the securitization financing process. 5 Q. Are you presenting any exhibits in addition to your testimony? 6 A. Yes. We are providing the following exhibits in support of the Company’s financing 7 petition: Exhibit Reference Exhibit Description Exhibit CLP-REGULATORY-1 Joint Direct Testimony of Brendan J. O’Brien, Garrett J. Murray and Edward A. Davis Exhibit CLP-REGULATORY-2 Storm Costs to be Securitized Exhibit CLP-REGULATORY-3 Traditional Cost Recovery Exhibit CLP-REGULATORY-4 RRB Cost Allocation Exhibit CLP-REGULATORY-5 Updated CTA Tariff 8 Q. How is your testimony organized? 9 A. Our testimony is organized into the following sections: 10 • Section I provides the introduction; 11 12 • Section II discusses the calculation of the balance of Storm Costs to be securitized; 13 14 • Section III discusses the proposed ratemaking treatment for the RRB Charge and inclusion in the CTA; 15 16 • Section IV discusses the alternative ratemaking treatment for the 2018 - 2023 catastrophic storm and pre-staging event costs through base distribution rates;
  5. Page 9 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 9 of 26 1 2 3 • Section V discusses the detailed cost allocations for the RRB Charge for each customer class and the changes necessary to CL&P’s CTA Tariff to reflect and implement the securitization financing process; and 4 • Section VI provides the conclusion to our pre-filed testimony. 5 II. CATASTROPHIC STORM COSTS TO BE SECURITIZED 6 Q. Provide an overview of the types of costs that qualify for the securitized financing. 7 A. Effective as of July 1, 2025, the Act amended the Securitization Law to provide that an 8 electric distribution company may submit a petition to PURA for a financing order to 9 authorize the issuance of Rate Reduction Bonds to recover Financed Utility Services, 10 including any costs determined by PURA to have been prudently and efficiently 11 incurred to prepare for and restore power to customers between January 1, 2018 and 12 January 1, 2025. Conn. Gen. Stat. §§ 16-245i(a) and 16-245j(a) provide that a 13 financing entity may issue Rate Reduction Bonds upon approval by PURA in the 14 pertinent financing order, and that a financing order adopted following the application 15 of an electric distribution company shall become effective in accordance with its terms 16 after the electric distribution company files with PURA the electric distribution 17 company’s written consent to all terms and conditions of the financing order. 18 19 Q. What are the catastrophic storm and pre-staging event costs included in the Company’s financing order application? 20 A. In the Storm Costs Order, PURA determined that $767,930,008 in Storm Costs incurred 21 by CL&P between January 2018 and December 2023 to prepare for and restore power 22 to customers following storms had been prudently and efficiently incurred, authorizing 23 CL&P to file a petition in Docket No. 26-04-04 to request a determination from PURA
  6. Page 10 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 10 of 26 1 as to whether the issuance of Rate Reduction Bonds to recover the net amount 2 of $667,930,008 is in the best interests of ratepayers. 2 In its petition, CL&P seeks 3 certain findings of fact and the issuance of a financing order to authorize the issuance 4 of Rate Reduction Bonds to recover the Financed Utility Services, including the Storm 5 Costs. 3 In the Storm Costs Order, PURA authorized the Company to “file a petition in 6 Docket No. 26-04-04 to request a determination of whether the issuance of rate 7 reduction bonds is in the best interest of ratepayers.” 4 8 The Storm Costs approved by PURA and presented by the Company in its petition were 9 incurred during the applicable statutory period identified. As a result, the prudently 10 incurred storm costs presented herein qualify for securitized financing through RRBs 11 under the applicable statutes. 12 13 Q. Did the Company offset the prudently incurred storm costs to be securitized with any customer contributions? 14 A. Yes. In accordance with the Storm Costs Order, the Company partially offset the 15 principal storm balance to be securitized with: (1) customer contributions recovered 16 through base distribution rates over the period January 1, 2018 through December 31, 17 2023 in the amount of approximately $101.4 million; 5 and (2) customer contributions Storm Costs Order, at 144 (“Accordingly, the Authority will consider the securitization of up to $767,930,008 in prudently incurred storm costs, and application of the $100,000,000 RAM CTA credit in Docket No. 26-04-04, pursuant to General Statutes § 16-245e”). 2 3 See Conn. Gen. Stat. § 16-245e(a)(21), defining “Financed Utility Services.” 4 Storm Costs Order at 143. See total storm reserve accrual of $90.9 million and total prestaging reserve of $10.6 million approved in the Storm Costs Order at 2 – 3 and 20. 5
  7. Page 11 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 11 of 26 1 authorized for recovery through the CTA during the period May 1, 2026 through April 2 30, 2027 in the amount of $100 million within Docket No. 26-01-03. 6 3 Q. How did the Company calculate the total Storm Costs balance to be securitized? 4 A. The Company relied upon the Storm Costs Order to determine the final storm balance 5 to be securitized. In the Storm Costs Order, PURA authorized the recovery of $667.9 6 million (Storm Costs Order at 20). This amount represents the prudently incurred 7 catastrophic storm and pre-staging costs of approximately $869.4 million 7 net of 8 approximately $201.5 million 8 of customer funding. 9 breakout of those costs as Exhibit CLP-REGULATORY-2. See Table 1 below for a 10 summary of the costs to be securitized. Our testimony provides a 6 Docket No. 26-01-03, Annual Review of the Rate Adjustment Mechanisms of the Connecticut Light and Power Company, Interim Decision (Apr. 22, 2026) at 9; see also Storm Costs Order at 2. 7 This amount represents the sum of the total catastrophic storm costs approved of $861,478,785 (Final Decision at 2), less the $2,642,850 in mutual aid credits applied (Final Decision at 2) and plus $10,563,865 of approved pre-staging costs (Final Decision at 3). 8 This amount represents the sum of the $90,905,927 storm reserve accrual (Final Decision at 2), the $10,563,865 of prestaging cost reserves (Final Decision at 3) and the $100,000,000 of RAM CTA Credits (Final Decision at 2).
  8. Page 12 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 12 of 26 Table 1: Storm Costs to be Securitized 9 1 Description 2018 – 2023 Storm Costs Catastrophic Storm Reserve Accrual Pre-Staging Reserve RAM CTA Credit Net Storm Costs to be Securitized Amount $869,399,800 ($90,905,927) ($10,563,865) ($100,000,000) $667,930,008 2 3 Q. Is the total principal storm balance included in the financing application presented in accordance with the Storm Costs Order? 4 A. Yes, the amounts presented within Table 1 above were approved by PURA in the Storm 5 Costs Order in Table 10 (see page 20). 6 III. PROPOSED RATEMAKING TREATMENT FOR THE RRB CHARGE 7 8 Q. How is the Company proposing to recover the deferred Storm Costs approved in Docket No. 25-12-13? 9 A. The Company is proposing to establish a portion of the CTA as the RRB Charge, from 10 which the Financed Utility Services will be recovered and from which the Rate 11 Reduction Bonds will be issued. 12 accordance with the Storm Costs Order, which stated CL&P could “file a petition in 13 Docket No. 26-04-04 to request a determination of whether the issuance of rate 9 See Storm Costs Order, Table 10 (page 20). The Company is presenting this proposal in
  9. Page 13 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 13 of 26 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 September 25, 2026 Page 11 of 26 1 reduction bonds is in the best interest of ratepayers with respect to the 2018 - 2023 2 approved storms.” 10 3 Q. Does securitization provide a benefit for customers? 4 A. Yes. As discussed at length in both Docket Nos. 24-03-30 and 25-12-13, and in other 5 PURA proceedings, securitization provides significant value and savings for 6 customers. These significant savings will be realized through the ability to rely 7 exclusively on securitized debt, rather than on a combination of long-term debt and 8 equity, and through achieving a triple-A rating through the securitization financing 9 process, which together will significantly lower the bill impacts to customers for 10 recovery of the Storm Costs as compared to traditional recovery under PURA 11 precedent, and to lower the interest costs customers will experience over the extended 12 recovery period as compared to other forms of financing. Please refer to the direct 13 testimony of Company witness Matthew P. Fallon for more information on how 14 securitization is in the best interest of customers. 15 16 Q. What is the rate mechanism the Company proposes to use to recover the costs of the Rate Reduction Bonds? 17 A. Conn. Gen. Stat. § 16-245e(l) governs the recovery of the RRB Charge. Specifically, § 16-254e(l) states: 18 19 20 21 Subject to the reconciliation process set forth in this subsection, the costs of any rate reduction bonds, including all principal, interest, premium, costs and arrearages on such bonds, shall be recovered through the 10 Storm Costs Order at 143.
  10. Page 14 of 26

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-REGULATORY-1 Page 14 of 26 competitive transition assessment pursuant to section 16-245g, as amended by this act. (emphasis added) 1 2 3 As noted, the Company is proposing to recover the Financed Utility Services, including 4 the Storm Costs, through the RRB Charge, which is a reconciling component of the 5 CTA, in accordance with § 16-245e(l). 6 Q. Will the RRB Charge be reconciled to actual revenues received? 7 A. Yes. The RRB Charge will be calculated to recover all debt service on the Rate 8 Reduction Bonds, as well as ongoing transaction costs. 11 CL&P proposes to file 9 adjustments, up or down, to the RRB Charge pursuant to a true-up mechanism (the 10 “True-Up Mechanism”), as explained in detail in Mr. Fallon’s testimony. As proposed, 11 the True-Up Mechanism will be a periodic adjustment to the RRB Charge to ensure 12 that the aggregate RRB Charge billed for the applicable period will result in RRB 13 Charge collections that are sufficient to meet periodic RRB payment requirements. 14 Similar to the recovery governance noted above, Conn. Gen. Stat. § 16-245e(l) also 15 provides for reconciliation of the RRB Charge to the actual revenues received. 16 Specifically, § 16-254e(l) states: 17 18 19 20 21 Upon the issuance of any rate reduction bonds as ordered by the authority to recover any financed utility services, the authority shall periodically adjust the competitive transition assessment in accordance with section 16-245j, as amended by this act, to allow the recovery of the cost of such bonds, including through a reconciliation of the actual revenues from As described in Mr. Fallon’s testimony, the initial RRB Charge will be set forth as per the proposed Financing Order in the Issuance Advice Letter to be filed by CL&P after the pricing date, but before the issuance of, the RRBs. 11

Text of Exhibit CLP-GOLDMAN-1.pdf

Extracted from the file · 64 pages · 96,187 characters

Text of Exhibit CLP-FINANCING ORDER-1D (9.25.2026).pdf

Extracted from the file · 10 pages · 10,349 characters

Text of Exhibit CLP-FINANCING ORDER-1C (9.25.2026).pdf

Extracted from the file · 129 pages · 372,585 characters

Text of Exhibit CLP-FINANCING ORDER-1B (9.25.2026).pdf

Extracted from the file · 53 pages · 119,308 characters

Text of Exhibit CLP-FINANCING ORDER-1A (9.25.2026).pdf

Extracted from the file · 17 pages · 45,618 characters

Text of Exhibit CLP-FINANCING ORDER-1 (9.25.2026).pdf

Extracted from the file · 39 pages · 131,414 characters

Text of Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).xlsx

Sheet names, column headings and text cells; numbers left out

Text of Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).pdf

Extracted from the file · 1 page · 817 characters

Text of Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).xlsx

Sheet names, column headings and text cells; numbers left out

Text of Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).pdf

Extracted from the file · 3 pages · 4,783 characters

Text of Exhibit CLP-TREASURY-1 (Treasury Testimony).pdf

Extracted from the file · 41 pages · 69,775 characters

Text of Exhibit CLP-REGULATORY-5 (CTA Tariff Redlined) (9.25.pdf

Extracted from the file · 2 pages · 3,148 characters

Text of Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).xlsx

Sheet names, column headings and text cells; numbers left out

Text of Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).pdf

Extracted from the file · 1 page · 1,372 characters

Text of Exhibit CLP-REGULATORY-3 (Traditional Cost Recovery).xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Corres. 09/25/2026 [26-04-04] (Eversource Energy) - Petition