Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files20

Search terms highlighted
Eversource rate increase is on 35 pages across 7 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
18 pages match
Words on different pages

Text of Exhibit CLP-REGULATORY-2 (Storm Costs 25-12-13).pdf

Extracted from the file · 2 pages · 8,985 characters

Text of Exhibit CLP-REGULATORY-1 (Regulatory Testimony).pdf

Extracted from the file · 26 pages · 42,568 characters

Text of Exhibit CLP-GOLDMAN-1.pdf

Extracted from the file · 64 pages · 96,187 characters

Text of Exhibit CLP-FINANCING ORDER-1D (9.25.2026).pdf

Extracted from the file · 10 pages · 10,349 characters

Text of Exhibit CLP-FINANCING ORDER-1C (9.25.2026).pdf

Extracted from the file · 129 pages · 372,585 characters

Text of Exhibit CLP-FINANCING ORDER-1B (9.25.2026).pdf

Extracted from the file · 53 pages · 119,308 characters

Text of Exhibit CLP-FINANCING ORDER-1A (9.25.2026).pdf

Extracted from the file · 17 pages · 45,618 characters

Text of Exhibit CLP-FINANCING ORDER-1 (9.25.2026).pdf

Extracted from the file · 39 pages · 131,414 characters

Text of Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).xlsx

Sheet names, column headings and text cells; numbers left out

Text of Exhibit CLP-TREASURY-3-NPV Savings (9.25.2026).pdf

Extracted from the file · 1 page · 817 characters

Text of Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).xlsx

Sheet names, column headings and text cells; numbers left out

Text of Exhibit CLP-TREASURY-2-ADIT Calculation (9.25.2026).pdf

Extracted from the file · 3 pages · 4,783 characters

Words on different pages
  1. Page 18 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-TREASURY-1 September 25, 2026 Page 16 of 37 1 2 Q. How will the Company confirm to PURA the final terms, pricing and costs of the RRB Transaction? 3 A. After pricing of the RRBs, but before issuance, the Company will file an Issuance 4 Advice Letter with PURA (a draft of which is provided in Exhibit CLP-FINANCING 5 ORDER-1D), which will set forth the final structure and repayment terms of the RRB 6 Transaction, the identity of the SPE, the total principal amount and pricing of the RRBs, 7 the initial RRB Charge by customer class to be implemented upon issuance of the 8 RRBs, the capital contribution amount and the actual Upfront Transaction Costs. The 9 final terms and conditions of the RRBs, including the schedule of principal 10 amortization, credit enhancement, the frequency of principal or interest payments, the 11 interest rates on the RRBs, the number of credit ratings and the terms of the final 12 transaction documents, shall be determined by the Company consistent with the 13 provisions of the Financing Order. 14 Q. How will the proceeds of the RRB issuance be applied? 15 A. The RRB proceeds are to be used by CL&P as follows: 16 • To recover the net Storm Costs approved for recovery in the Storm Costs Order 17 (i.e., the $667,930,008 in costs incurred between 2018 and 2023 to prepare for and 18 restore power to customers following storms that have been determined by PURA 19 to have been prudently and efficiently incurred) 20 21 • To pay Upfront Transaction Costs incurred in connection with the issuance of the Rate Reduction Bonds estimated to be equal to approximately $6,950,000.
  2. Page 19 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-TREASURY-1 September 25, 2026 Page 17 of 37 1 • 2 To redeem short term debt and to pay a return of capital to Eversource Energy to maintain an appropriate capital structure at CL&P. 3 4 Q. Other than issuance of a Financing Order from PURA, are any other approvals necessary to consummate the securitization financing? 5 A. No, the proposed Financing Order contains all of the findings, orders and approvals 6 required for the securitization financing. 7 IV. RRB TRANSACTION DESCRIPTION 8 Q. Please describe the proposed RRB Transaction. 9 A. The proposed Financing Order includes a detailed Transaction Description. The 10 following steps illustrate the key elements of the proposed RRB Transaction and the 11 cash flows involved: 12 13 1. CL&P is seeking approval to securitize certain costs and to recover those costs through the RRB Charge, which is a portion of the CTA. 14 2. The right to recover the RRB costs via the RRB Charge will be irrevocable, 15 pursuant to the Securitization Law and the declaration by PURA that the 16 Financing Order shall be irrevocable (such irrevocable right, the “Transition 17 Property”). 18 3. CL&P will create a bankruptcy-remote SPE, which will be wholly owned by 19 CL&P. If recommended by the structuring agent in light of market conditions 20 at the time of the issuance of the RRBs, and after consultation with OTT, CL&P 21 may create more than one bankruptcy-remote SPE, which will be wholly owned
  3. Page 20 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-TREASURY-1 September 25, 2026 Page 18 of 37 1 by CL&P. However, CL&P views it is unlikely that multiple SPEs will be 2 required. CL&P shareholders will capitalize the SPE in an amount anticipated 3 to be at least 0.50% of the initial principal balance of RRBs and deposited into 4 the Capital Subaccount (as defined below). This capitalization is required by 5 the rating agencies in order to provide a source of credit enhancement. 6 4. The SPE will need to enter into an Administration Agreement with CL&P (a 7 draft of which is provided as Exhibit CLP-FINANCING ORDER-1A) pursuant 8 to which CL&P shall perform administrative services and provide facilities for 9 the SPE to ensure that it is able to perform such day-to-day operations as are 10 necessary to maintain its existence and perform its obligations under the RRB 11 transaction documents. Pursuant to the Administration Agreement, CL&P will 12 be paid a fee (the “Administration Fee”) in an amount commensurate with its 13 costs of performing such services and providing such facilities. 14 5. CL&P will sell all of its rights in the Transition Property to the SPE in a 15 transaction that will be intended and treated as a legal true sale and absolute 16 transfer to the SPE. The SPE will issue and sell RRBs to capital markets 17 investors. The RRBs will be payable solely from cashflows associated with 18 Transition Property from the RRB Charge. 19 6. All of the assets of the SPE, including the Transition Property and the other 20 collateral of the SPE (the “Other SPE Collateral”) will be pledged as collateral 21 to secure the RRBs. The Other SPE Collateral will include, without limitation,
  4. Page 21 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-TREASURY-1 September 25, 2026 Page 19 of 37 1 (i) the rights of the SPE under the RRB transaction documents including the 2 purchase agreement by which the SPE acquires the Transition Property and the 3 agreement setting forth the servicing arrangements between the servicer (the 4 “Servicer” and any successor servicer, the “Successor Servicer”) and the SPE 5 (a draft of the Servicing Agreement is provided as Exhibit CLP-FINANCING 6 ORDER-1B), (ii) the Collection Account and any subaccounts contained in the 7 Collection Account, including the General Subaccount, the Excess Funds 8 Subaccount and the Capital Subaccount (each as defined in the Goldman 9 Testimony) and (iii) any return on investment on amounts held by the SPE (with 10 the exception of any return on investment on the Capital Subaccount). The 11 Other SPE Collateral will not include any return on investment on amounts held 12 in the Capital Subaccount (as described below), which return on investment will 13 be remitted on a monthly basis to CL&P, in its capacity as the equity holder of 14 the SPE. 15 16 7. The proceeds of the RRBs will be received by the SPE and remitted to CL&P as consideration for the Transition Property. 17 8. After the RRB issuance, CL&P, acting as Servicer on behalf of the SPE, or any 18 Successor Servicer, will bill and collect the RRB Charge from customers. 19 CL&P will transfer the RRB Charge collections to the Collection Account and 20 the trustee for the holders of the RRBs (the “RRB Trustee”) will use these 21 collections to make payments of principal and interest to holders of the RRBs,
  5. Page 22 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-TREASURY-1 September 25, 2026 Page 20 of 37 1 as well as any Ongoing Transaction Costs (as defined below). The Servicer or 2 any Successor Servicer will be paid a fee by the SPE for performing its 3 servicing duties (the “Servicing Fee”). 4 9. CL&P will bill customers the RRB Charge regardless of who they have chosen 5 as their energy supplier and regardless of whether or not they are self-generating 6 (so long as they are connected to CL&P’s distribution system for back-up 7 power), thus, the RRB Charge shall be non-bypassable as set forth in Public Act 8 No. 25-173. 9 10 Q. Please describe the various Collection Accounts that will be set-up to facilitate the payment of principal, interest, and other costs associated with the Bonds. 11 A. The Collection Account (the “Collection Account”) will be established by the SPE as 12 a trust account to be held by the Trustee. Each subaccount is designed to facilitate the 13 payment of principal, interest, and other costs associated with the Bonds. The 14 Collection Account will have the following subaccounts: 15 • a General Subaccount; 16 • a Capital Subaccount; and 17 • an Excess Funds Subaccount. 18 The SPE’s interest in the Collection Account will be pledged as collateral for the 19 benefit of the bondholders. 20 Q. Please describe the General Subaccount. 21 A. The general subaccount (the “General Subaccount”) is the subaccount in which the 22 Trustee deposits the rate reduction bond charges it receives from the Collection
  6. Page 23 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-TREASURY-1 September 25, 2026 Page 21 of 37 1 Account. Monies in the general subaccount will be applied by the Trustee on a periodic 2 basis to make payments according to the waterfall in the indenture, which generally 3 includes the payment of Ongoing Transaction Costs, then interest on the Bonds, and 4 then principal on the Bonds. 5 Q. Please describe the Excess Funds Subaccount. 6 A. The excess funds subaccount (the “Excess Funds Subaccount”) is where any monies 7 on deposit in the general subaccount that are not required to meet the scheduled interest 8 and principal obligations of the Bonds will be deposited. The initial balance is zero, 9 and the target ongoing balance is also zero. To the extent there are funds on deposit in 10 this subaccount, those amounts will be considered in the next available true-up 11 mechanism adjustment and the subaccount value will again be generally targeted to be 12 zero. 13 Q. Please describe the Capital Subaccount. 14 A. The capital subaccount (the “Capital Subaccount”) represents the equity capital of the 15 SPE and is funded by an amount contributed by the Company at issuance that is at least 16 equal to 0.50 percent of the initial principal amount of the Company’s rate reduction 17 bond transaction. To the extent there is a shortfall in collections, the SPE may draw 18 upon the amount in its Capital Subaccount to pay debt service or Ongoing Transaction 19 Costs. If the Capital Subaccount is drawn upon, it is replenished from the RRB Charge 20 through the true-up mechanism and any available excess RRB Charge collections. The 21 Capital Subaccount will be targeted to maintain the .50 percent of the initial principal 22 of the Company’s rate reduction bond transaction.
  7. Page 24 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-TREASURY-1 September 25, 2026 Page 22 of 37 1 2 Q. Please describe the treatment of any funds remaining in the various subaccounts at the final maturity of the transaction. 3 A. Upon the full repayment of the Bonds and the discharge of the ongoing transaction 4 costs, all amounts in the Collection Account and in each subaccount, in each case 5 including any return on investment, shall be released by the Trustee to the SPE for 6 distribution to the Company for distribution back to its customers. The Company will 7 notify PURA within 30 days after the date that these funds are eligible to be released 8 of the amount of such funds available for crediting to the benefit of customers. The 9 amounts in the Capital Subaccount shall be returned to the Company. 10 Additional details regarding the subaccounts can be found in the Goldman Testimony. 11 V. RRB CHARGE 12 Q. How will the Company calculate the RRB Charges? 13 A. Both initially and during the life of the RRBs, the RRB Charges will be calculated and 14 set at a level intended to cover the Periodic RRB Payment Requirements. Specifically, 15 RRB Charges will be calculated to cover (i) the principal (in accordance with the 16 expected amortization schedule set forth at pricing) and interest on, the RRBs, (ii) 17 Ongoing Transaction Costs (including the Servicing Fee, the Administration Fee, RRB 18 Trustee fees and expenses, rating agency fees, legal, accounting and auditing fees, SPE 19 independent managers’ fees and any indemnity obligations that are anticipated to be 20 payable under the RRB transaction documents on or prior to the next RRB payment 21 date), (iii) the cost of establishing and maintaining any credit enhancement required for 22 the RRBs, including replenishment of any amounts drawn from the Capital Subaccount
  8. Page 25 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-TREASURY-1 September 25, 2026 Page 23 of 37 1 such that the balance is equal to the targeted level, and (iv) to pay any amounts of 2 previous RRB Payment Requirements not satisfied in the previous payment period for 3 any reason. The projected RRB Charges will be calculated using assumptions set forth 4 in the Issuance Advice Letter (as described in the Goldman Testimony) and each 5 subsequent true-up filing which shall include but not be limited to projected kWh 6 usage, expected charge-offs and expected weighted average days sales outstanding. 7 The RRB Charges will be billed until the SPE has collected RRB Charges sufficient to 8 discharge the Total RRB Payment Requirements. 9 When the pricing terms for RRBs are finalized, the required principal amortization 10 payments will also be established. The total scheduled RRB Charge collections for any 11 annual or, if necessary, shorter period will include collections resulting from bills sent 12 in prior periods and from bills sent in the current period, in each case, as a result of the 13 expected timing of collections from the retail users of the Company’s distribution 14 system. 15 The RRB Charges will vary over the life of the RRB Transaction as a result of several 16 factors, including changes in the principal and interest payments resulting from 17 different payment periods, any amounts required to replenish the Capital Subaccount 18 to the targeted balance if necessary, any amounts of previous Periodic RRB Payment 19 Requirements not satisfied in the previous year, any balance in the Excess Funds 20 Subaccount, the impact of the variability of energy sales and forecasts, changes in 21 payment patterns and charge-off experience, as well as changes in any ongoing RRB
  9. Page 26 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-TREASURY-1 September 25, 2026 Page 24 of 37 1 transaction costs. The calculation of the RRB Charges incorporates each of these 2 factors. 3 Q. What are the forecasted initial RRB Charges? 4 A. CL&P proposes to file the initial RRB Charge for each rate class with the Issuance 5 Advice Letter after the RRBs are priced, but prior to their issuance, in compliance with 6 the Financing Order. CL&P requests PURA’s approval of the method for determining 7 the initial RRB Charges so that the RRB Charges set forth in the Issuance Advice Letter 8 will automatically become effective as of such filing. 9 Q. What information will be incorporated into the calculation of the initial charge? 10 A. The initial charge will include: 11 1. The securitized amount; 12 2. Estimated annual Ongoing Transaction Costs; 13 3. Payments of principal and interest on the RRBs; 14 15 4. The number of days after a customer is billed that RRB Charges are deemed collected (based on historical collections experience); 16 17 5. Daily remittances of deemed RRB Charge collections to the General Subaccount; 18 6. Projected kWh sales by rate class for the upcoming year; 19 20 7. An estimated charge-off rate determined based on historical collections experience at the time of issuance of the RRBs; 21 22 23 24 8. Any lags between a payment date and the latest date for which deemed RRB Charge collections available to the RRB Trustee are applied to a payment date (a time period which allows the Servicer to properly account for deemed RRB Charge collections); and 25 9. Weighted average coupon rates.
  10. Page 27 of 41

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-04-04 Exhibit CLP-TREASURY-1 September 25, 2026 Page 25 of 37 1 2 Q. Please describe how the RRB Charges will be adjusted though the true-up mechanism. 3 A. The RRB Charge “true-up” mechanism (the “True-Up Mechanism”) is a periodic 4 adjustment to the RRB Charge, which adjusts the RRB Charge to ensure that there are 5 adequate funds for meeting Periodic RRB Payment Requirements. 6 addresses any cash flow variability and is a positive factor in reducing the need for 7 additional credit enhancements, as the True-Up Mechanism has no upfront cost. The 8 Servicer will file with PURA true-up advice letters (defined below) which will define 9 the new RRB Charges and identify the number of days after a customer is billed that 10 RRB Charges are deemed collected, the RRB charge-off percentage and the forecasted 11 kwh billed by rate class. 12 Not later than April 15 of each year while the RRBs are outstanding, the Servicer will 13 file with PURA a true-up advice letter (“Annual Routine True-Up Letter”). The RRB 14 Charges will be adjusted to ensure that there are adequate funds to meet the next two 15 (November 1 and May 1) Periodic RRB Payment Requirements. 16 In addition, if the Servicer, as of October 15 of each year while the RRBs are 17 outstanding, reasonably projects that expected collections of the RRB Charges will be 18 insufficient to meet the next Periodic RRB Payment Requirements (May 1), the 19 Servicer will file a true-up advice letter (“Mid-year Routine True-Up Letter”) not later 20 than October 15 of such year. 21 In addition, (a) except during the two Remittance Periods preceding the maturity date 22 of the latest maturing tranche of RRBs, the Servicer may (but shall not be required to) This feature

Text of Exhibit CLP-REGULATORY-5 (CTA Tariff Redlined) (9.25.pdf

Extracted from the file · 2 pages · 3,148 characters

Text of Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).xlsx

Sheet names, column headings and text cells; numbers left out

Text of Exhibit CLP-REGULATORY-4 (RRB Class Cost Allocation Factors).pdf

Extracted from the file · 1 page · 1,372 characters

Text of Exhibit CLP-REGULATORY-3 (Traditional Cost Recovery).xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Corres. 09/25/2026 [26-04-04] (Eversource Energy) - Petition

This filing on the current system (opens in a new tab)