Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files2

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
  1. Page 115 of 151

    Order Standard and who certifies What happens at pricing Connecticut, 2026 draft (CL&P) Terms set to achieve “the targeted triple-A rating and therefore the lowest cost” (FO p. 7). No lowest-cost certificate. The letter is filed “for informational purposes” and “is not a condition to the authority to issue” (FO pp. 15, 38). The Treasurer confirms it matches the final terms, “an affirmative gate on final bond economics” (OTT Test. 15:10–23). Texas, 2002 (Oncor) The Commission’s financial adviser must “ensure that the structuring and pricing … results in the lowest transition bond charges consistent with market conditions” (Findings of Fact 63, 102, 104(g)). The utility certifies in its issuance advice letter. The adviser takes part “fully and in advance” in the decisions and may veto an issue that does not comply (Finding of Fact 103; Ordering ¶ 21). Florida, 2006 (FPL) The utility, the bookrunning underwriters and Commission reviews the certificates on the the Commission’s adviser each certify that the third business day after pricing and may stop structuring, marketing and pricing “in fact the transaction (Finding of Fact 135, p. 43). achieved the lowest cost objective” (Finding of Fact 105, p. 36). North Carolina, 2025 (Duke Energy Carolinas) Each lead underwriter must deliver “an independent certificate confirming that the structuring, marketing, and pricing … in fact resulted in the lowest Storm Recovery Charges,” and the certificates must be “without material qualification” (p. 51; Ordering ¶ 30(a), p. 62). The Commission’s consultant, if retained, must certify on the same terms or “fully explain the reasons in a written filing” (Ordering ¶ 30(b), p. 62). Sources: Connecticut 2000: DPUC Decision, Docket No. 00-05-01 (Nov. 8, 2000); Connecticut 2026: Ex. CLP-FINANCING ORDER-1 and OTT pre-filed testimony (Oct. 12, 2026); Texas: Saber Partners, Certificate to the PUCT, Docket No. 25230 (Aug. 21, 2003), pp. 1–2 (summarizing the Financing Order of Aug. 5, 2002); Florida: Order No. PSC-060464-FOF-EI (May 30, 2006); North Carolina: Financing Order, Docket No. E-7, Sub 1325 (June 18, 2025).8 3. The certificate as filed A certificate is measured against the order’s own words: “certify” or “confirm,” “in fact,” and “lowest.” It is then measured against the legal standard for a financial opinion. Three points of law apply. • Materiality. A matter is material if there is “a substantial likelihood that a reasonable” person “would consider it important.”9 An assumption that the utility’s figures are accurate, made without checking them, is material. Independent confirmation is what the certificate exists to supply. • Independent verification. An opinion qualified by the words “without independent verification,” and resting on information from a party whose interests conflict with those of the party receiving it, does not supply independent confirmation. A basic principle of auditing states the reason: “Evidence obtained from a knowledgeable source that is independent of the company is more reliable than evidence obtained 8 https://www.sec.gov/Archives/edgar/data/1131671/000101905601000038/0001019056-01-000038.txt; https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d?OpenView&StartKey=26-0404; https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/ 6db54a3cbe007ed085258e8f004a97de?OpenDocument; https://saberpartners.com/wp-content/uploads/2023/08/Ex-18-Saber-Texas-certification.pdf; https://www.floridapsc.com/library/Orders/2006/06-0464.ord.doc; https://www.sec.gov/Archives/edgar/data/30371/000110465925070038/tm2521130d2_ex99-1.htm. 9 TSC Industries, Inc. v. Northway, Inc., 426 U.S. 438, 449 (1976), https://law.resource.org/pub/us/case/reporter/US/426/426.US.438.74-1471.html. © 2026 Saber Partners, LLC | Public Comment, Exhibit D — Docket 26-04-04 | October 20, 2026 Page 2 of 4
  2. Page 116 of 151

    only from internal company sources.”10 The Florida staff found that parties had qualified early certifications “to avoid accountability.”11 • The underwriter’s role. Underwriters act “solely in the capacity of an arm’s length contractual counterparty … and not as a financial advisor or a fiduciary.” 12 Their certificate is useful because they hold the order book. It is not independent of the result. Certificate What it says (verbatim) Measured against the order and the law Under “We hereby certify”: the structure “resulted in the Issuer achieving the lowest transition bond charge for the Transition Bonds consistent with the terms of the Financing Order and market conditions at the Pricing Time.” Certifies “lowest.” “At the Pricing Time” is a point in time, not a reservation. The Commission’s adviser was offered full participation “in advance.” Texas · Commission’s “… the structuring and pricing of the Transition adviser · Aug. 21, Bonds resulted in the lowest transition bond 2003 charges at the Pricing Time.” Rests on the adviser’s own due diligence, which the certificate describes. The adviser had a part in the decisions and a veto. Florida · joint-lead underwriter · June 16, 2016 “The marketing and pricing … resulted in (a) the lowest overall net cost of funds … and (b) the lowest net cost of funds … in respect of each weighted average life designation.” Certifies “lowest” on a measure the underwriter controls. Defines its terms. The Commission’s adviser was offered full participation. North Carolina · lead underwriters · Sept. 24, 2025 “It is the view of [underwriter], as underwriter, that the structuring, marketing and pricing … resulted in the lowest Storm Recovery Charges ….” Subject to: “we have assumed, without independent investigation, the accuracy and completeness of information from the Company …”; and “The pricing … does not reflect a level at which actual other transactions have occurred or may occur.” The order required an independent certificate “confirming” the result “in fact,” “without material qualification.” The filing states a “view,” omits “in fact,” assumes the utility’s information without checking it, and disclaims the benchmark. North Carolina · Commission’s consultant · Sept. 24, 2025 “It is [consultant]’s opinion, in its best professional judgement … that the structuring, marketing and pricing … in fact resulted in the lowest Storm Recovery Charges ….” Subject to: “we have assumed, without independent investigation, the accuracy and completeness of information from the Company, the docket, the Financing Order, the Underwriters ….” Tracks the order’s words but rests on information assumed without independent investigation, including the underwriters’ information. That is a material qualification. Acceptable Texas · lead underwriter · Jan. 31, 2002 Not acceptable Sources: Texas underwriter: letter to the PUCT, Docket No. 21528 (Jan. 31, 2002), p. 3; Texas adviser: certificate, Docket No. 25230 (Aug. 21, 2003), p. 3; Florida underwriter: certificate, Fla. PSC Docket No. 150171-EI (June 16, 2016), p. 2; North Carolina: underwriter certifications and consultant certification, NCUC Docket No. E-7, Sub 1325 (Sept. 24, 2025; public redacted underwriter versions filed Feb. 6, 2026); underwriter certifications, pp. 3–4; consultant certification, pp. 1–2.13 10 Public Company Accounting Oversight Board, AS 1105, Audit Evidence, ¶ .08, https://pcaobus.org/oversight/standards/auditing-standards/details/AS1105. 11 Fla. Public Service Commission, Memorandum (staff recommendation), Docket No. 060038-EI (May 8, 2006), Document No. 04068-2006, Issue 61, p. 186 (parties “were allowed to qualify certain aspects of their certifications with terms such as ‘reasonable’ and other means to avoid accountability for their certifications”), https://floridapsc.com/library/filings/2006/04068-2006/04068-2006.PDF (Exhibit C). 12 Appalachian Power Recovery Funding LLC, Underwriting Agreement (May 19, 2026), § 14, https://www.sec.gov/Archives/edgar/data/6879/000119312526231725/d27122dex11.htm. 13 https://saberpartners.com/wp-content/uploads/2023/08/Ex-2-Goldman-certification.pdf; https://saberpartners.com/wp-content/uploads/2023/08/Ex-18-Saber-Texas-certification.pdf; https://saberpartners.com/wp-content/uploads/2023/08/Ex-25-Fl-underwriter-cert-with-annotations.pdf; North Carolina filings at https://starw1.ncuc.gov/NCUC/page/Dockets/portal.aspx (search Docket No. E-7, Sub 1325). © 2026 Saber Partners, LLC | Public Comment, Exhibit D — Docket 26-04-04 | October 20, 2026 Page 3 of 4
  3. Page 117 of 151

    The utility’s own certificate needs the same reading. The utility receives the proceeds; its customers pay the charge. CenterPoint’s treasurer told the Texas commission in 2005 that “the company has a real incentive to try to get the bonds sold as quickly as possible,” and that he could “understand why … the Commission either directly or indirectly needs to be involved in this process.”14 4. What PURA may consider in this contested case Because the Connecticut statute leaves these terms to the financing order, PURA can take evidence on them now. Among the questions: • Should the order adopt a lowest-cost standard in the order’s own words, as in 2000? • Should the utility, each lead underwriter and an independent adviser to PURA each certify that the structuring, marketing and pricing “in fact” produced the lowest charges, “without material qualification,” and state that it independently verified the material facts? • Should the order attach a form of certificate, so the operative words cannot change at pricing? • What role should PURA’s side have before pricing: observer, reviewer or participant in the decisions? • Should each certifier state what it verified itself and what it assumed? • What should happen if a certificate falls short of the order’s words? 14 Testimony of Marc Kilbride, Treasurer, CenterPoint Energy, PUCT Docket No. 30485, Tr. vol. 4, 658:2–15 (Feb. 2, 2005), https://saberpartners.com/wp-content/uploads/2023/06/PUCT-Transcript-Feb-2-2005Docket_30485_Vol_4.pdf. © 2026 Saber Partners, LLC | Public Comment, Exhibit D — Docket 26-04-04 | October 20, 2026 Page 4 of 4
  4. Page 118 of 151

    Exhibit E. What the Utility Earns on Its Deposit: 94 Financing Orders, 1997–2026 Public Comment of Saber Partners, LLC, PURA Docket No. 26-04-04 October 20, 20261 The deposit When the bonds are sold, CL&P puts in a deposit of at least 0.50 percent of principal. On $620,364,568 of bonds, that is about $3.1 million. The money sits in the capital subaccount until the bonds are paid. Then it goes back to CL&P.2 CL&P asks only for what the deposit earns, paid monthly. Connecticut gave the same answer in 2000. 3 What other commissions have done The utility benefits from the transaction: it recovers 100 percent of its approved costs up front. Its deposit is required for tax purposes.4 The charge is set to replenish any draw on the deposit. So the deposit is expected to come back in full if customers keep paying the charge for the life of the bonds.5 If the utility’s funds are not at risk, what return is fair to the utility, and what is fair to customers? We reviewed 94 financing orders for investor-owned utility bonds from 1997 through 2026.6 This is what they let the utility earn on its deposit. What the utility may earn Commission chose State law required What the deposit earns, or less 52 0 A bond or utility debt rate 32 0 Its full rate of return 4 6 Total 88 6 Where the law set no rate, commissions held the utility to what the deposit earned in 52 of 88 orders. Four gave the full rate of return: Maryland in 2007, New York in 2024 (two 1 © 2026 Saber Partners, LLC. 2 CL&P, Ex. CLP-TREASURY-1 (Sept. 25, 2026), PDF p. 11 (principal) and p. 23 (deposit of at least 0.50 percent); 0.50% × $620,364,568 = $3,101,823. CL&P, Ex. CLP-FINANCING ORDER-1, Proposed Financing Order, p. 38 (balance “returned to CL&P”), PURA Docket No. 26-04-04, https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d?OpenView&StartKey=26-0404. 3 Proposed Financing Order, ordering ¶ 13, p. 38; Ex. CLP-TREASURY-1, PDF p. 37, https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d?OpenView&StartKey=26-0404; Connecticut DPUC, Docket No. 00-05-01, Decision (Nov. 8, 2000), Ex. A, § C.2, p. A-8, https://www.sec.gov/Archives/edgar/data/1131671/000101905601000038/0001019056-01-000038.txt. 4 Proposed Financing Order, Ex. CLP-FINANCING ORDER-1, PURA Docket No. 26-04-04 (Sept. 25, 2026), pp. 20–21 (under IRS Rev. Proc. 2005-62, as modified by Rev. Proc. 2024-15, the issuer must be capitalized with equity of “at least 0.5 percent” of the bonds), https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d?OpenView&StartKey=26-0404. 5 Proposed Financing Order, Ex. CLP-FINANCING ORDER-1, PURA Docket No. 26-04-04 (Sept. 25, 2026), p. 14 (the charge covers “replenishment of any amounts drawn from the Capital Subaccount such that the balance is equal to the targeted level”), https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d?OpenView&StartKey=26-0404. 6 Orders for investor-owned utility bonds in the URB Master Database, 1997–2026; state-agency and cooperative bonds are excluded. In Louisiana’s state-agency transactions the utility makes no deposit. The order-by-order list, with the language and page of each order, is available on request. © 2026 Saber Partners, LLC | Public Comment, Exhibit E — Docket 26-04-04 | October 20, 2026
  5. Page 119 of 151

    orders) and Virginia in 2025.7 The other six full-return orders came from three states whose laws require it.8 Connecticut’s law sets no rate. The practice has shifted. Before 2020, 45 of 57 orders allowed only what the deposit earns. Since 2020, 7 of 37 have. What it costs customers Customers pay the gap between what the utility may earn and what the deposit earns. Under CL&P’s proposal the gap is zero. If a higher rate were allowed, over the 12-year life of the bonds the proposed deposit would cost customers:9 Deposit At the bond rate, 5.48% At the full rate of return, 7.09% 0.50 percent, as proposed ($3.1 million) $0.5 million $1.1 million Saber estimate, nominal: (allowed rate − bank rate) × deposit × 12 years. Bank rate 4.10 percent, the 3-month Treasury bill on October 15, 2026, held constant for illustration. A lower bank rate would raise each figure.10 7 Md. Public Service Comm’n, Order No. 81181 (BGE), filed as Ex. 99.1 to Form S-3 (Mar. 16, 2007), https://www.sec.gov/Archives/edgar/data/9466/000095012007000193/exhibit99_1.htm; N.Y. Public Service Comm’n, Case 24-E-0493 (Dec. 19, 2024) (NYSEG and RG&E), filed as Ex. 99.1 to Form SF-1/A (Jan. 8, 2025), https://www.sec.gov/Archives/edgar/data/71675/000119312525003177/d923110dex991.htm; Va. State Corp. Comm’n, Case No. PUR-2025-00116 (Nov. 24, 2025), filed as Ex. 99.1 to Form SF-1 (Feb. 27, 2026), https://www.sec.gov/Archives/edgar/data/6879/000119312526083197/d44535dex991.htm. 8 Mo. Rev. Stat. § 393.1700.2(3)(c) (three orders), https://revisor.mo.gov/main/OneSection.aspx? section=393.1700; Kan. Stat. Ann. § 66-1,241(e)(14) (two orders), https://ksrevisor.gov/statutes/chapters/ch66/066_001_0241.html; 2023 Ky. Acts ch. 72, § 4(1)(m) (one order). 9 PURA Interrogatory RRU-7 (Oct. 14, 2026), https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/ bed803b7492d402e85258e900063df67?OpenDocument. 10 Federal Reserve Bank of St. Louis, FRED, series DTB3, https://fred.stlouisfed.org/series/DTB3. Bond rate 5.482%: Ex. CLP-GOLDMAN-1, p. 27, Table 2; rate of return 7.09%: Ex. CLP-TREASURY-1, PDF p. 38, https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d?OpenView&StartKey=26-0404. At a 0.50% deposit, a 3% bank rate gives $0.9 million and $1.5 million; a 5% bank rate gives $0.2 million and $0.8 million. A pre-tax rate of return would cost more. © 2026 Saber Partners, LLC | Public Comment, Exhibit E — Docket 26-04-04 | October 20, 2026 Page 2 of 2
  6. Page 120 of 151

    Exhibit F. After Pricing: Advice Letters and Customer Protections in Financing Orders, 2016–2026 Public Comment of Saber Partners, LLC, PURA Docket No. 26-04-04 October 20, 20261 We read the financing orders for every utility securitization sold by a commissionregulated issuer from October 18, 2016 to October 18, 2026: 50 issues under 49 orders. 2 We asked two questions. What happens between pricing and closing? Who bears a cost caused by a party’s mistake? 1. What happens after pricing Treatment after pricing Orders Commissions (number of orders) Commission may stop the issue within one to four business days after pricing 32 California (9; each also requires the Finance Team’s approval letter before issuance), Texas (6), North Carolina (4), Missouri (3), Kansas (2), New York (2), South Carolina (2), Virginia (2), Indiana (1), Kentucky (1) Commission or its designee must approve before issuance 6 Louisiana Public Service Commission (5), New Orleans City Council (1) Advice letter filed for information only 5 New Hampshire, 2018 (Public Service Company of New Hampshire, an Eversource company); Oklahoma, 2021–22 (4; a state finance authority issued the bonds) No filing before issuance; report after closing 6 Michigan (3), Wisconsin (1), New Mexico (1), Texas Railroad Commission (1) Total 49 Connecticut, 2000 (CL&P) — Advice letter filed “for informational purposes,” with “a calculation confirming net savings to ratepayers” (Order No. 3, p. 27). Final terms subject to Finance Authority approval (p. 9). Connecticut, 2026 draft (CL&P) — Advice letter filed “for informational purposes”; “not a condition to the authority to issue” (FO pp. 15, 38). No savings calculation. Sources: Connecticut 2000: DPUC Decision, Docket No. 00-05-01 (Nov. 8, 2000); Connecticut 2026: Ex. CLP-FINANCING ORDER-1; New Hampshire: Order No. 26,099, Docket DE 17-096 (Jan. 30, 2018), Finance Order § N.3 2. Who bears the cost of a mistake No one expects mistakes. The documents must still anticipate them. The standard of care, and who bears the loss, should be settled before the bonds are sold. CL&P’s 2001 servicing agreement held the servicer liable for “willful misconduct or negligence.” It protected “the State of Connecticut, the Finance Authority, the State Treasurer, agencies of the State of Connecticut.”4 The 2026 draft limits liability to “willful misconduct, bad faith or gross negligence” and protects only the issuer, the bondholders 1 © 2026 Saber Partners, LLC. 2 Issues in the URB Master Database with sale dates from October 18, 2016 to October 18, 2026, excluding four cooperative issues with no commission order. Two PG&E issues (2022-A and 2022-B) share one order. The New Orleans City Council order (2022) is classified from the issue’s offering statement. The order-by-order list, with quotations and page cites, is available on request. 3 https://www.sec.gov/Archives/edgar/data/1131671/000101905601000038/0001019056-01-000038.txt; https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d?OpenView&StartKey=26-0404; https://www.sec.gov/Archives/edgar/data/1730300/000104746918000902/a2234535zex-99_1.htm. 4 Transition Property Servicing Agreement between CL&P Funding LLC and CL&P (Mar. 30, 2001), § 6.02(b)– (c), filed with CL&P Funding LLC, Form 8-K (Apr. 9, 2001), https://www.sec.gov/Archives/edgar/data/1131671/000113167101000006/0001131671-01-000006.txt. © 2026 Saber Partners, LLC | Public Comment, Exhibit F — Docket 26-04-04 | October 20, 2026
  7. Page 121 of 151

    and the trustee. The draft order sets the charge to cover “any indemnity obligations” and any shortfall “for any reason” (FO p. 14). A cost caused by a party’s error can pass to customers through the true-up. Other commissions put customer protection in the order or the agreement: Transaction Provision West Virginia, 2007 and 2009 The utility “shall indemnify customers to the extent customers incur losses by reason of the negligence, recklessness or willful misconduct of that Applicant as Servicer” (Financing Order, Finding of Fact 46). Duke Energy Florida, 2016 The servicer “shall indemnify the Commission, on behalf of the Customers, for any Losses incurred by Customers by reason of the Servicer’s negligence, recklessness or willful misconduct,” including “higher Series Charges.” Payments go to the collection account (Servicing Agreement § 6.02(e)). Oncor, 2003 The servicer indemnifies “the PUCT (for the benefit of the Customers)” (Servicing Agreement § 6.02(b)). AEP Texas Central, 2006 The servicer “shall indemnify the PUCT (for the benefit of Customers)” for losses from its “negligence” (Servicing Agreement § 6.02(g)). Sources: West Virginia: Case Nos. 05-0402-E-CN and 05-0750-E-PC; Duke Energy Florida: Servicing Agreement (June 22, 2016); Oncor: Transition Property Servicing Agreement (Aug. 21, 2003); AEP Texas Central Transition Funding II: Transition Property Servicing Agreement (Oct. 11, 2006).5 We reviewed 46 of the 49 orders on this point. Of those 46, 18 require the servicer to protect customers on a negligence standard. None uses gross negligence for customers. Most cover only a higher fee for a replacement servicer. No order caps or excludes indemnity payments to the underwriters or the trustee from the customer charge. 3. How service providers are chosen Some orders require competitive selection. California’s 2026 order requires “a request for proposals for the selection of the lead underwriters.”6 Indiana’s 2023 order found a proposal “to competitively bid the underwriters and indenture trustee services is appropriate.”7 Others leave selection to the utility. CL&P sought trustee quotes from three banks (EOE-6). The record does not show competitive selection of the structuring agent, the underwriters or counsel. The standard for service providers also matters. Must they act in the customer’s best interest, and not in their own economic interest? Or are they free of any such duty? 5 https://www.sec.gov/Archives/edgar/data/1384731/000095012007000199/exhibit99_2.htm; https://www.sec.gov/Archives/edgar/data/1669374/000110465916128781/a16-2779_16ex99d1.htm; https://www.sec.gov/Archives/edgar/data/1100179/000095012003000534/ex10b.txt; https://www.sec.gov/Archives/edgar/data/18734/000119312506206342/dex991.htm. 6 Cal. Pub. Util. Comm’n, Decision D.26-05-006, A.26-01-007 (May 2026), pp. 50–51, filed as Exhibit 99.1 to Form SF-1 of Southern California Edison Company (May 29, 2026), https://www.sec.gov/Archives/edgar/data/92103/000119312526245837/d143317dex991.htm. 7 Ind. Util. Regulatory Comm’n, Order, Cause No. 45722 (Jan. 4, 2023), p. 71, filed as Exhibit 99.1 to Form SF1 of Southern Indiana Gas and Electric Company (Mar. 24, 2023), https://www.sec.gov/Archives/edgar/data/92195/000119312523079261/d472510dex991.htm. © 2026 Saber Partners, LLC | Public Comment, Exhibit F — Docket 26-04-04 | October 20, 2026 Page 2 of 2
  8. Page 122 of 151

    Exhibit G. The Classification of Utility Recovery Bonds: Background, Cost to Customers and Filings with the SEC Public Comment of Saber Partners, LLC, PURA Docket No. 26-04-04 October 20, 20261 This exhibit gives the SEC’s publications, with links, on its staff guidance for public utility securitizations and on its request for public comment. It also lists, in date order, the filings with the SEC by governors, regulators and consumer advocates. Exhibit H contains the Energy and Policy Institute article, reprinted with permission, and the governors’ letter and the NARUC and NASUCA resolutions. The request comes from many offices and states. Governors of eight states wrote to the SEC in 2024. NARUC, the national association of state utility commissions, and NASUCA, the national association of consumer advocates, adopted resolutions. Officials of the Colorado, Illinois, New York and North Carolina commissions joined comments in 2025. The consumer advocates of Hawaii, Missouri and New Hampshire filed comments in 2026. Former chairs of the Colorado and Texas commissions filed as well. The list at the end of this exhibit gives each filing, with a link. Date Event Sept. 19, 2007 The SEC staff’s Office of Chief Counsel concludes that two West Virginia utility bond issuers “are not asset-backed issuers and the Bonds are not asset-backed securities.” It answers 12 days after the request. The issuers’ registration had gone through two rounds of SEC staff comments, posted on the SEC’s website. June 2016 2 Duke Energy Florida’s bonds are registered on Form SF-1. The prospectus states that they “are corporate securities” and “not asset-backed securities.” Feb. 2021 3 Southern California Edison’s first recovery bonds state that they “are not asset-backed securities.” They price about 0.6 percentage point over Treasuries. Until 2022 4 Bloomberg and its predecessor, Barclays, classify utility recovery bonds as corporate bonds, as reported by the Energy and Policy Institute. 5 2022 Bloomberg’s index service begins classifying utility recovery bonds as asset-backed securities. Bloomberg said it did so at the request of investors, after a market survey, as reported by NARUC and the Energy and Policy Institute. July 31, 2024 SEC staff publishes Question 112.01 on public utility securitizations. Sept. 10, 2024 Eight governors write to the SEC (Exhibit H). Nov. 10 and 13, 2024 NASUCA and NARUC adopt resolutions (Exhibit H). May 16, 2025 SEC staff revises Question 112.01 and adds Question 112.02. Sept. 26, 2025 The Commission publishes Concept Release No. 33-11391 and invites comment. Dec. 1, 2025 Comment due date. The SEC continues to post comments filed after it. 1 © 2026 Saber Partners, LLC. 2 SEC, Division of Corporation Finance, Office of Chief Counsel, Response to MP Environmental Funding LLC and PE Environmental Funding LLC (Sept. 19, 2007) (incoming letter dated Sept. 7, 2007), https://www.sec.gov/divisions/corpfin/cf-noaction/2007/mpef091907-1101.htm. 3 Duke Energy Florida Project Finance, LLC, Prospectus, Series A Bonds (Form 424(b)(1), June 17, 2016), https://www.sec.gov/Archives/edgar/data/1669374/000104746916013865/a2228973z424b1.htm. 4 SCE Recovery Funding LLC, Prospectus, Senior Secured Recovery Bonds, Series 2021-A (Form 424(b)(1), Feb. 19, 2021) (“the bonds are not asset-backed securities as such terms are defined by the SEC in governing regulations Item 1101 of Regulation AB”), https://www.sec.gov/Archives/edgar/data/92103/000119312521048838/d86177d424b1.htm; Sue Sturgis, “Utility group EEI backs recovery bond reclassification that drives up electric bills,” Energy and Policy Institute (Sept. 23, 2026), https://energyandpolicy.org/eei-utility-recovery-bonds-sec/ (reporting The Wall Street Journal’s finding on the 2021 bonds). 5 Sue Sturgis, “Utility group EEI backs recovery bond reclassification that drives up electric bills,” Energy and Policy Institute (Sept. 23, 2026), https://energyandpolicy.org/eei-utility-recovery-bonds-sec/ (“For years before their recent reclassifications, Bloomberg and its predecessor, Barclays, classified URBs as corporate bonds.”). © 2026 Saber Partners, LLC | Public Comment, Exhibit G — Docket 26-04-04 | October 20, 2026
  9. Page 123 of 151

    Date Event July 29, 2026 SEC staff responds to a request on data center securitizations. Today The question for utility recovery bonds remains open. 6 7 8 9 10 Sources: , , , , The SEC staff’s guidance, not a rule or regulation of the SEC Question 112.01 asks: “What is the appropriate Securities Act form to register an offering of securities that are backed by securitization property which includes the right to assess and collect certain special charges on customers’ public utility bills (‘public utility securitizations’)?” The answer states: “Public utility securitizations that are structured as stand-alone trusts meet the definition of ‘asset-backed security’ (‘ABS’) in Item 1101(c) of Regulation AB . . . . Therefore, these securitizations must be registered on Form SF-1.” It also states that “the staff has advised issuers in public utility securitizations that are structured as series trusts to register offers and sales of securities on Form SF-1,” and that “such series trust issuers should refrain from making statements in their filings that they are not asset-backed issuers or that their securities are not asset-backed securities, as such statements would not be accurate.”11 Most importantly, the SEC says these staff interpretations “are not rules, regulations, or statements of the Commission,” and that they “are not binding due to their highly informal nature.”12 On July 29, 2026, the staff told counsel for data center issuers that “the fixed-income or other securities issued in data center securitizations of the type described in your letter are not asset-backed securities.”13 6 Utility recovery bond classification by Bloomberg: NARUC, Resolution on Urging Clarification of Utility Recovery Bond Classification by the SEC to Lower the Cost to Energy Customers (Nov. 13, 2024), https://pubs.naruc.org/pub/812873F4-E348-B77F-4D75-E513FF13A86D; Sue Sturgis, “Utility group EEI backs recovery bond reclassification that drives up electric bills,” Energy and Policy Institute (Sept. 23, 2026), https://energyandpolicy.org/eei-utility-recovery-bonds-sec/ (reprinted with permission in Exhibit H). 7 SEC, Division of Corporation Finance, Asset-Backed Securities interpretations, Questions 112.01 and 112.02 (first published July 31, 2024; revised May 16, 2025), https://www.sec.gov/rules-regulations/staff-guidance/corporation-finance-interpretations-cfis/asset-backedsecurities. 8 Letter from eight governors to SEC Chair Gary Gensler (Sept. 10, 2024); NASUCA, Resolution 2024-01 (Nov. 10, 2024); NARUC resolution (Nov. 13, 2024). Copies in Exhibit H; links in the list that follows. 9 SEC, Concept Release on Residential Mortgage-Backed Securities Disclosures and Enhancements to AssetBacked Securities Registration, Release No. 33-11391, File No. S7-2025-04 (Sept. 26, 2025), https://www.sec.gov/files/rules/concept/2025/33-11391.pdf; SEC, “Concept Release” (public comments due Dec. 1, 2025), https://www.sec.gov/rules-regulations/2025/09/s7-2025-04; comment file, https://www.sec.gov/comments/s7-2025-04/s7202504.htm. 10 SEC, Office of Structured Finance, Response to Latham & Watkins LLP, Data Center Securitizations (July 29, 2026), https://www.sec.gov/rules-regulations/no-action-interpretive-exemptive-letters/division-corporationfinance-no-action/certain-data-center-securitizations-072926. 11 SEC, Division of Corporation Finance, Asset-Backed Securities interpretations, Questions 112.01 and 112.02 (first published July 31, 2024; revised May 16, 2025), https://www.sec.gov/rules-regulations/staff-guidance/corporation-finance-interpretations-cfis/asset-backedsecurities, Question 112.01. 12 SEC, Division of Corporation Finance, Corporation Finance Interpretations (CFIs) (“These interpretations reflect the views of the staff of the Division of Corporation Finance. They are not rules, regulations, or statements of the Commission. The Commission has neither approved nor disapproved these interpretations.”), https://www.sec.gov/rules-regulations/staff-guidance/corporation-finance-interpretations-cfis. 13 SEC, Office of Structured Finance, Response to Latham & Watkins LLP, Data Center Securitizations (July 29, 2026), https://www.sec.gov/rules-regulations/no-action-interpretive-exemptive-letters/division-corporationfinance-no-action/certain-data-center-securitizations-072926. © 2026 Saber Partners, LLC | Public Comment, Exhibit G — Docket 26-04-04 | October 20, 2026 Page 2 of 4
  10. Page 124 of 151

    The Commission’s request for comment The Commission’s request for comment in its 2025 concept release on residential mortgage-backed securities gives consumers an opening to comment directly to the SEC on rate reduction bonds. In its 2025 concept release, the SEC states that the Commission “is publishing this concept release to solicit comments on whether to amend the asset-level disclosure requirements for residential mortgage-backed securities in Item 1125 of Regulation AB and whether to revise generally the definition of ‘asset-backed security’ and/or other definitions in Item 1101 of Regulation AB.” The release states: “we also welcome comments on any other aspects of the ABS registration and reporting regime.” It closes: “We encourage all interested parties to submit comments on the topics being considered in this concept release.”14 Comments were due December 1, 2025. The SEC has continued to post comments filed after that date.15 Why the classification matters to customers The Energy and Policy Institute published a detailed article on the issue in September 2026 (Exhibit H). The Wall Street Journal had reported on it in March 2024, in connection with a private index provider.16 The Energy and Policy Institute reported that the classification “can determine which investors can buy” these bonds. It also reported that EEI, the utilities’ trade group, told the SEC it “would not support” requiring these bonds to register on corporate forms.17 Accounting standards hold that the charge securing these bonds is not a financial asset: “while a right to collect cash flows exists, it is not the result of a contract and, thus, not a financial asset.”18 Regulation AB defines an asset-backed security by reference to “a discrete pool of receivables or other financial assets.” The bonds are reported as debt on the utility’s consolidated balance sheet. CL&P’s proposed order says its issuer’s debt “will appear on the consolidated balance sheets of both CL&P and Eversource Energy.” 19 The Energy and Policy Institute cited The Wall Street Journal’s finding that Southern California Edison’s 2021 recovery bonds priced about 0.6 percentage point over comparable Treasuries, and its April 2023 bonds about 1.2 percentage points over. Spreads on other top-rated corporate bonds stayed essentially flat over the same period. 20 14 SEC, “Concept Release,” overview, https://www.sec.gov/rules-regulations/2025/09/s7-2025-04; SEC, Concept Release on Residential Mortgage-Backed Securities Disclosures and Enhancements to Asset-Backed Securities Registration, Release No. 33-11391, File No. S7-2025-04 (Sept. 26, 2025), pp. 7, 46, https://www.sec.gov/files/rules/concept/2025/33-11391.pdf. 15 Comment file, https://www.sec.gov/comments/s7-2025-04/s7202504.htm; Sturgis, “Utility group EEI backs recovery bond reclassification,” Energy and Policy Institute (Sept. 23, 2026) (the SEC “has continued to post comments received since then”), https://energyandpolicy.org/eei-utility-recovery-bonds-sec/. 16 Andrew Ackerman, “Bonds Got Relabeled. Now Millions of Americans Get Higher Electric Bills,” Wall Street Journal (Mar. 28, 2024), https://www.wsj.com/finance/bonds-got-relabeled-now-millions-of-americans-gethigher-electric-bills-d765c609. 17 Sturgis, “Utility group EEI backs recovery bond reclassification,” Energy and Policy Institute (Sept. 23, 2026), https://energyandpolicy.org/eei-utility-recovery-bonds-sec/; Letter from Kristen Siegele, Edison Electric Institute, File No. S7-2025-04 (Dec. 1, 2025), in the comment file, https://www.sec.gov/comments/s7-2025-04/s7202504.htm. 18 FASB Accounting Standards Codification 860-10-55-8, reproduced in Deloitte, Roadmap: Transfers and Servicing of Financial Assets § 2.2, https://dart.deloitte.com/USDART/home/codification/broad-transactions/ asc860-10/roadmap-transfers-financial-assets/chapter-2-scope/2-2-asset; SEC, Policy Statement: Reaffirming the Status of the FASB as a Designated Private-Sector Standard Setter, Release No. 33-8221 (Apr. 25, 2003), https://www.sec.gov/rules-regulations/policy-statements/33-8221. 19 17 C.F.R. § 229.1101(c)(1), https://www.ecfr.gov/current/title-17/chapter-II/part-229/subpart-229.1100/ section-229.1101; Proposed Financing Order, Ex. CLP-FINANCING ORDER-1, PURA Docket No. 26-04-04 (Sept. 25, 2026), pp. 21–23. © 2026 Saber Partners, LLC | Public Comment, Exhibit G — Docket 26-04-04 | October 20, 2026 Page 3 of 4
Words on different pages

As listed on the current system

Corres. 10/21/2026 [26-04-04] (Saber Partners, LLC) - Comments

This filing on the current system (opens in a new tab)