Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Response to EOE 11/4/26 Correspondence

Compliance Filing, Order No. EOE

Filed by Pullman & Comley, LLC

Part of

Application for Approval to Install and use an Electricity Submetering System at 1001 Bridgeport Ave, Shelton, CT

Type of filing
Compliance filing (Compliance Filing, Order No. EOE)
Date filed
November 12, 2026
Filed by
Pullman & Comley, LLC
Files
Not listed yet

As listed on the current system

Compliance Filings, 11/12/2026 [26-04-25] Order No.EOE 11/4/26 Correspondence / Pullman & Comley, LLC / Response to EOE 11/4/26 Correspondence

This filing on the current system (opens in a new tab)

Files

The attached files for this filing have not been copied to this site yet. Open the filing on the current system (opens in a new tab)