  1. Page 11 of 26

    Docket No. 26-05-01 Page 9 However, the Authority invites all stakeholders to offer evidence and analysis to support their positions on this issue in next year’s annual review (i.e., Docket No. 27-05-01) with consideration of both participant and program impacts. 3. Service Reconnection Fee a. Proposal After a customer has been disconnected for non-payment, the Companies’ policy currently requires the lower of 50% of the arrearage due or $1,000 for non-financial hardship customers, and the lower of 20% of the arrearage due or $400 for financial hardship customers. Joint AFP, Joint 09, p. 6. The Companies propose eliminating the “lower of” option and retain simply the 50/20% requirement for all customers.” Id. The Companies explain that the “lower of” flat minimum payment option allows customers with large balances to reconnect while significant past due balances remain without a path to resolution. Id. b. Stakeholder Comments EOE argued that the $1,000 and $400 caps were included by the Authority as an affordability measure. EOE July Comments, p. 5. EOE contended that more information, including an evaluation of other state practices, is required before such a change is made. Id. Generation Power argued the proposal does not account for the customer’s ability to pay the proposed higher amounts. Generation Power July Comments, p. 7. Generation Power approved 439 emergency energy assistance applications for households with incomes between 60–75% State Median Income in Fiscal Year 2026. Id. Generation Power stated that these customers do not qualify for financial hardship protections and therefore would be at risk of shutoff and required to pay an unmanageable debt for most limited-income residents under the Companies’ proposal. Id. OCC expressed concern over the proposed increased costs to reconnect service, noting that customers who are unable to afford monthly payments cannot afford to pay a percentage of their past due balance and therefore may take steps, such as putting service in another individual’s name, in order to reconnect their utility service. OCC July Comments, pp. 7–8. OCC recommended that the goal of the reconnection fee should be that customers must pay a higher amount, on average, to reconnect utility service than it would be to restart that customer’s respective payment arrangement. Id. p. 8. CCA and CVLC argued that the proposed reconnection fee is unaffordable and would represent an insurmountable payment challenge for many customers. CCA & CVLC July Comments, p. 4. CCA and CVLC expressed great concern that the proposed changes could return Connecticut to a time when customers live for many months of a year without service because they simply cannot afford to have their service reinstated. Id. CCA and CVLC stated that even the $400 reconnection fee is unaffordable for many of their clients, though some are able to make that payment through a combination of personal savings and donations from charitable organizations. Id. As such, requiring a
  2. Page 12 of 26

    Docket No. 26-05-01 Page 10 customer to pay 20% of an arrearage as the only option for reconnection would likely be unattainable and cause many to simply live without service. Id. c. Authority Analysis The Authority accepts the EDCs’ proposal to apply the 50% of arrearage standard only to customers who do not qualify for financial hardship or medical protection status. The Authority understands and respects the stakeholder view that non-hardship customers struggle to afford utility bills and already face substantial barriers to reconnection, but the Authority must balance these real concerns against the increasing pressure on utility bills imposed by the cost of uncollectible debt; the availability of flexible payment arrangements to assist customers with managing outstanding balances; and the data presented by the EDCs demonstrating that 2025 reconnection fee activity allowed customers to continue to receive service after termination despite maintaining substantial unpaid account balances. Specifically, the current “lesser of” standard allowed Eversource and Avangrid customers to reconnect despite an average of 89% and 91% of their outstanding balances remaining unpaid, respectively. Joint 09, p. 6. The Authority notes that prior to the COVID-19 pandemic, non-hardship customers were required to pay 100% of their outstanding balance in order to reconnect. Id., p. 4. The Companies’ proposal to apply a 50% of balance standard to non-hardship customers appropriately balances the Authority’s concerns while maintaining a policy that remains twice as flexible as the standard in place prior to the pandemic. However, the Authority does not accept the Companies’ proposal to remove the “lesser of” option for financial hardship and medical protection customers. The Authority concurs with the concerns of stakeholders and specifically notes a particular comment provided by CCA and CVLC: Given the low-income customer total household income, the proposed adjustments to payment plan parameters are unaffordable. When customers are struggling to pay their bills and are at the point of shut off, requesting 20% of the total arrears presents an insurmountable challenge. It is of great concern that the proposed changes could return . . . the State to a time when customers live for many months of a year without service because they simply cannot afford to have their service reinstated. CCA & CVLC July Comments, p. 4. The arrearages of financial hardship and medical protection customers also ultimately impose costs upon all ratepayers. However, the Authority is concerned that accepting the Companies’ proposal for financial hardship and medical protection customers may leave many customers with no feasible option to continue to receive service, which would impose health and safety risks.
  3. Page 13 of 26

    Docket No. 26-05-01 Page 11 4. BBP Reporting a. Proposal The Companies proposed that Yankee Gas, CNG, and SCG cease reporting on their BBP offerings, as required by Order No. 22 of the Authority’s October 12, 2022 Decision in Docket No. 22-05-01, 2022 Energy Affordability Annual Review (22-05-01 Decision), effective November 1, 2026, because Yankee Gas, CNG, and SCG will no longer offer BBPs to gas customers upon implementation of the gas LIDR. 5 Joint AFP, p. 10; 25-05-01 Decision, p. 15; Motion No. 6, May 26, 2026, pp. 1–2. 6 The Companies additionally proposed that Yankee Gas, CNG, and SCG cease reporting on Orders Nos. 1 and 3 of the Authority’s September 30, 2020 Decision in Docket No. 20-07-04, Application of The Connecticut Light and Power Company and Yankee Gas Services Company, each individually d/b/a Eversource Energy, The United Illuminating Company, Connecticut Natural Gas Corporation, and The Southern Connecticut Gas Company for Approval of Arrearage Forgiveness Program 2020-2021 (20-07-04 Decision), as modified by the April 23, 2025 Interim Decision in Docket No. 25-05-01 (25-05-01 Interim Decision), related to the processing of Below Budget Worksheets. Joint AFP, p. 10. b. Stakeholder Comments EOE supported the Companies’ proposal to cease reporting BBP metrics as all the Companies have already, or will soon have, cease offering this program. EOE July Comments, p. 2. Generation Power agrees that once there are no longer any customers enrolled in BBP, reporting on its metrics will no longer be useful. Generation Power July Comments, p. 4. However, given that customers are still enrolled in BBP, that reporting on it should continue until it ceases to be utilized. Id. OCC finds no value in a compliance filing with no data and therefore agrees that when the Companies cease offering BBP, the Companies should be allowed to cease reporting on BBP. OCC July Comments, p. 4. CCA and CVLC do not believe that the Companies should be allowed to cease reporting on BBP metrics, as it will be important to compare monthly payments obligations under BBP and LIDR, including payment amounts and success rates of the two programs. CCA & CVLC July Comments, p. 3. CNG and SCG implemented LIDR in August 2026. Tech Mt’g Tr., Aug. 6, 2026, 32:10–11. Yankee Gas will not implement LIDR until mid-January 2027 at the earliest. Eversource Brief, Aug. 28, 2026 (Eversource Brief), p. 3. 6 The Authority approved CNG and SCG’s proposal to cease offering the BBP to eligible customers when they each implemented LIDR and ordered CNG and SCG to cease offering BBP no later than November 1, 2026. 25-05-01 Decision, pp. 15, 39. The Authority directed Yankee Gas to submit a proposal to cease offering the BBP once LIDR is implemented. 24-12-01 Decision, pp. 205–206, 223 (Order 11). 5
  4. Page 14 of 26

    Docket No. 26-05-01 Page 12 c. Authority Analysis The Authority concurs that BBP reporting will be unnecessary once no customers remain on BBP. However, customers do remain on BBP to this day and so it is premature to cease reporting on BBP metrics. Accordingly, the Authority denies the Companies’ proposal to cease BBP reporting; therefore, the Companies are required to continue reporting in the annual affordability review dockets, as required by Order No. 22 of the 25-05-01 Decision and Order Nos. 1 and 3 of the 20-07-04 Decision, as modified by the 25-05-01 Interim Decision. 5. Improvements to DSS Data Matching a. Proposal The Companies signed an opt-out customer data sharing agreement with DSS in January 2024. Motion No. 85 Ruling, Apr. 8, 2024, Docket No. 17-12-03RE11, pp. 2, 4. In accordance with this agreement, the Companies send DSS a data file every month that consists of all active residential accounts. 24-05-01 Decision, p. 12. DSS then analyzes whether the customers currently receive public assistance and indicates to the Companies whether each account is eligible for financial hardship, and for EDC customers, whether the customers are eligible for the various LIDR tiers. Id., pp. 12–13; 17-12-03RE11 2024 Decision, p. 23. The Authority directed the Companies to submit a proposal in the 2026–2027 AFP to address mismatches with the DSS data-sharing. 25-05-01 Decision, p. 39 (Order No. 12). In response, the Companies provided two potential solutions. First, Eversource, with DSS, identified customer scenarios in which DSS had a street address prefix which was not included in the utility customer’s address (i.e., “10 Main St” vs “10. E. Main St”) that resulted in mismatches between the two systems. Joint AFP, Joint 01, pp. 11–12. Eversource proposed a test for June 2026 to include prefixes for all street addresses provided to DSS. Id. Eversource states that in the test sample, the street address matching rate decreased when including the prefixes. Id., p. 12. Based on a sample review of accounts on the DSS file with address mismatches for Avangrid, Avangrid determined that the most common discrepancies were attributable to the differences in address formatting. Id. Specifically, cases where records listed an address as Street instead of St. or Place instead of Pl., or where some records included an apartment number following the street name. Joint AFP, Joint 01, p. 12. Second, the Companies worked on scenarios where addresses for a benefit recipient between DSS and the utility do not match, possibly because the benefit recipient has moved. Id. The Companies continue to work with DSS to understand how public benefit recipient addresses are updated when they move and the impact this would have on the overall data-matching. Id. Recommendations from DSS include a data-matching process modification to indicate when a utility customer is identified as a public benefit recipient, absent an address match, by instead matching the last five digits of a social security number, matching the last name, and matching the first name. Id.
  5. Page 15 of 26

    Docket No. 26-05-01 Page 13 The Companies indicated that while these potential solutions may be viable, the number of additional customers that may be identified through the proposed matching improvements is unknown and additional time is needed for DSS to analyze the data. Eversource Interrog. Resp. OCC-17; Avangrid Interrog. Resp. OCC-17. b. Stakeholder Comments EOE stated that more information, including how many customers will be added or excluded as a result of these changes, would likely be beneficial before making a determination whether these changes should be implemented. EOE July Comments, p. 3. EOE suggested that the Companies be directed to file this proposal as a motion so that it might be resolved prior to next year’s annual review. Id. OCC echoed EOE’s comments, expressing concern over the potential number of customers that might be added after implementing these changes and similarly considered filing this proposal as a motion to avoid any unnecessary delays. OCC July Comments, pp. 4–5. c. Authority Analysis The Companies and stakeholders recognize that while these solutions may improve the DSS data matching process, the size of the impact is still unknown. The Authority appreciates the efforts the Companies have taken in working with DSS to improve the data-matching process but finds it premature to implement until the effects of the proposed changes can be understood. Therefore, the Authority denies the proposed data matching changes, but directs the Companies to each submit by June 1, 2027, an updated proposal, with an impact study, as part of the 2027–2028 Joint Arrearage Forgiveness Plan (2027–2028 Joint AFP). 6. Household Size Verification a. Proposal The Companies proposed to have the CAAs perform all eligibility verification that requires proof of household size and income. Joint AFP, Joint 01, pp. 13–15. The Companies would, however, continue accepting proof of other qualifying benefits as eligibility for financial hardship designation and LIDR. Id. p. 15. Pursuant to Order No. 12(c) of the 25-05-01 Decision, and again in Interrogatory CAE-9, the Authority requested a comparison of the Companies’ process for identifying customers eligibility for financial hardship designation, specifically household size verification, with the processes of other jurisdictions and other entities in Connecticut. Eversource stated that in all three of its jurisdictions (i.e., Connecticut, New Hampshire, and Massachusetts), CAAs perform household size and income verification. Eversource Interrog. Resp. CAE-9. Eversource also noted that Connecticut’s state datamatching was designed after its Massachusetts affiliate. Id. However, its New Hampshire affiliate “does not support (and has intentionally decided not to pursue) automated state data-matching with utilities to identify and verify low-income customers who are benefits program recipients.” Id. Similarly, Eversource’s Massachusetts affiliate offers selfattestation to provide temporary service protection during the winter protection period and
  6. Page 16 of 26

    Docket No. 26-05-01 Page 14 temporary and reversible 60-day LIDR, pending proof of income eligibility. Id. Eversource’s New Hampshire affiliate does not provide the same self-attestation opportunities. Id. Avangrid stated that its gas affiliates (i.e., Central Maine Power and Berkshire Gas Company) do not verify household income or size and instead rely on CAAs and other third parties for verification. Avangrid Interrog. Resp. CAE-9. Conversely, its electric affiliates (i.e., Rochester Gas and Electric and New York State Electric and Gas) accept verbal income verification from a customer to determine the customer’s inability to pay and qualify for a minimum payment agreement and medical emergency renewals. Id. Additionally, the Companies contacted more than 10 utility companies across New Hampshire, Maryland, New York, and Pennsylvania and none of the companies have a way to verify household size. Joint AFP, Joint 01, p. 14. In calendar years 2024 and 2025, Eversource’s annual costs to conduct financial hardship income verification in Connecticut were $546,348 and $565,615, respectively. Eversource Interrog. Resp. CAE-8. Avangrid provided similar costs, which totaled $524,486 and $633,830 for calendar years 2024 and 2025, respectively. Avangrid Interrog. Resp. CAE-8. b. Stakeholder Comments EOE stated that it is not an opportune time to make any changes to the household verification process. EOE July Comments, p. 3. While EOE understands the Companies’ desire to transfer responsibility of household verification to CAAs, as the Companies are not social service organizations, EOE remains concerned that CAAs will be overwhelmed by the number of customers in need of income verification, which will result in a greater risk of under inclusion. Id. Generation Power opposed this proposal for similar reasons to EOE, noting that while this proposal may save time and money for the Companies, shifting that responsibility entirely on to non-profit organizations will result in delays that will increase customer costs and customer risk of losing service. Generation Power July Comments, p. 4. OCC is hesitant to take steps, such as this proposed change, that may hinder customers’ ability to receive assistance. OCC July Comments, p. 6. While OCC recognized that having the Companies continue providing household verification presents a risk of over-inclusion, something taken very seriously as that benefit is paid for by all ratepayers, the Companies have not quantified that risk. Id. At this moment when federal assistance is becoming more difficult to obtain, OCC believed the risk of under-inclusion outweighs the risk of over inclusion. Id. CCA and CVLC do not think that CAAs should be the sole way customers verify their income and household size. CCA & CLVC July Comments, p. 4. CAAs are limited in location, staff, and appointment availability, while customers have limited time to find an appointment and may require time off of work to do so. Id., pp. 3–4. Moreover,
  7. Page 17 of 26

    Docket No. 26-05-01 Page 15 customers may have difficulty physically getting to a CAA location even when they do have an appointment. Id., p. 4. When a customer can simply provide the required documentation to the Companies themselves, the program should not put undue burden on customers and CAAs. Id. c. Authority Analysis The Authority recognizes stakeholders’ considerable concerns with transferring household income and verification responsibility to CAAs only. However, the Authority also recognizes that the Companies are not qualified or ideally suited to evaluate eligibility criteria for individual customers. The Authority also finds that the money and time saved by removing the Companies from this process should ultimately benefit the customers who are currently funding the operational expenses necessary to perform this function through utility rates. Accordingly, the Authority accepts the Companies’ proposal to cease their eligibility verification responsibilities. The Authority also notes that other state and local agencies and resources may be available to provide services directly or share data that could facilitate program administration and encourages the utilities and stakeholders to explore collaborative opportunities and legislative or other public policies that could improve program implementation to the benefit of all utility customers. 7. LIDR Reporting a. Proposal The Companies proposed that the reporting on LIDR be removed from the annual energy affordability proceedings and instead be reported in the respective LIDR dockets. Joint AFP, Joint 01, p. 16. Specifically, the Companies propose the following modifications: - Docket 17-12-03RE11, October 2022 Decision at pages 38-40. Stating at page 40, “Notwithstanding the biennial LIDR review, the EDCs shall report at least annually on or before June 15 on the items enumerated above in the current year’s energy affordability proceeding” o The Companies propose the following modified language “Notwithstanding the biennial LIDR review, the EDCs shall report at least annually on or before June 15 on the items enumerated above in Docket 17-12-03RE11 the current year’s energy affordability proceeding” - Id. Docket 17-12-03RE11, November 2024 Decision at Order No. 12. o The Companies propose the following modified language “No later than June 15, 2025, and annually thereafter, the EDCs shall submit in Docket No. 17-12- 03RE11 and in the current year’s applicable energy affordability review proceeding, i.e., Docket No. XX-05-01, as part of each EDC’s annual LIDR reporting…“
  8. Page 18 of 26

    Docket No. 26-05-01 Page 16 b. Stakeholder Comments EOE agreed that all decisions relating to LIDR should be made in the relevant LIDR dockets. EOE July Comments, p. 5. While continuing to cross file LIDR reporting in the annual energy affordability dockets may not be reasonable in perpetuity, EOE does appreciate the current system as it eases the review of LIDR compliance filings due to the substantial size of the LIDR dockets. Id. Generation Power is also concerned with the size of the LIDR dockets, noting an extensive documentary history going back years, believing that only publishing content there would be challenging and time-consuming for stakeholders and other interested parties. Generation Power July Comments, p. 5. Generation Power highlighted that one possible solution would be to present the data in both the LIDR and annual nergy affordability dockets. Id. Generation Power believes that LIDR should continue to be discussed in the annual affordability review as LIDR rates, payments, costs, and impacts directly affect energy affordability issues. Id. CCA and CVLC believe that LIDR should remain as part of the annual energy affordability dockets, noting that it adds simplification and therefore transparency to the Authority’s dockets. CCA & CLVC July Comments, p. 4. c. Authority Analysis The Authority finds that stakeholders’ concerns about removing LIDR reporting from the annual energy affordability docket are valid. The extensive LIDR dockets can be difficult to navigate due to the many filings over years of proceedings. The LIDR programs are also directly tied to any discussion around affordability and should remain a part of that discussion in future proceedings so that all interested stakeholders can receive a wholistic view of the affordability landscape in Connecticut. Therefore, the Authority denies the Companies’ proposal to cease reporting on LIDR in the annual energy affordability proceedings. III. OTHER AFFORDABILITY ISSUES A. MOTION NO. 3, CNG AND SCG HOT WEATHER CUSTOMER PROTOCOLS 1. CNG and SCG Proposal On October 2, 2025, CNG and SCG jointly filed Motion No. 3 requesting to modify their customer service policy by removing service protection for gas customers during severe heat days in the summer. Motion No. 3, pp. 1–2. CNG and SCG stated that they currently suspend gas service disconnections on days with high heat indexes and/or when the governor of Connecticut activates the State’s hot weather protocols. Id., p. 1. Originally, CNG and SCG explained, they implemented this practice in alignment with UI’s procedures. Id. CNG and SCG argued the loss of gas service does not interfere with the cooling needs of homes or businesses because gas service is rarely used for air conditioning and customers also typically have electric service for cooling. Id. CNG and
  9. Page 19 of 26

    Docket No. 26-05-01 Page 17 SCG made clear that this proposal would not modify in any way CNG and SCG’s Cold Weather Policy. Motion No. 3, p. 1. Additionally, CNG and SGC reported suspending gas terminations for 5 days in 2023, 7 days in 2024, and 15 days in 2025 due to severe heat days. CNG-SGC Interrog. Resp. OCC-1. The longest continuous period of time that terminations were suspended due to severe heat was four days, and the number of CNG and SCG customers affected annually ranged from approximately 800 to nearly 5,000. CNG and SCG Interrog. Resp. OCC-1. Table 2, below, provides the number of CNG and SCG customers affected by gas service terminations due to severe heat days and Table 3, below, provides the number of severe heat and severe cold days per month reported by Avangrid. Table 2: Number of Customers Affected by Suspension of Gas Service Terminations Due to Heat Days Company CNG SCG 2023 1,083 803 2024 3,806 4,797 2025 4,842 4,729 CNG and SCG Interrog. Resp. OCC-1, p. 1. Table 3: Number of Severe Weather Days per Month, Nov. 2024 – May 2026 Month Nov. 2024 Dec. 2024 Jan. 2025 Feb. 2025 Mar. 2025 Apr. 2025 May 2025 Jun. 2025 Jul. 2025 Aug. 2025 Sep. 2025 Oct. 2025 Nov. 2025 Dec. 2025 Jan. 2026 Feb. 2026 Mar. 2026 Apr. 2026 May 2026 Avangrid Interrog. Resp. CAE-2. No. of Days 7 7 3 8 4 5 8 10 1 -
  10. Page 20 of 26

    Docket No. 26-05-01 Page 18 CNG and SCG reported that in July 2024, it was required to restart the dunning process for approximately 2,500 accounts because the billing cycle for those accounts had closed. CNG and SCG Interrog. Resp. OCC-1, p. 1. CNG and SCG noted that such disruptions in the dunning process have a negative impact on their ability to perform disconnections because those disconnections are then rolled into the following days and further compound their ability to complete the number of disconnections required due to staffing levels. Id. However, CNG and SCG do not currently have a reporting mechanism to track the impact of this effect. Id., p. 2. Finally, CNG and SCG reported that no IT or billing system reprogramming is required to implement the proposed change and therefore they would incur no cost. Id. Yankee Gas’ customer service policy regarding shut off protections for severe weather days does not provide shut off protection for severe heat days. Yankee Gas Interrog. Resp. CAE-1, Att.1. 2. Stakeholder Comments NAG requested that the Authority “not permit gas service disconnections during hot-weather protocols without additional safeguards, notice requirements, medical screening, hardship review, and consistency across all gas utilities.” NAG Written Comments, May 29, 2026, p. 2. NAG stated that while gas service may not be a direct source of cooling, it is an essential household utility used for hot water, cooking, medical hygiene, sanitation, laundry, and safe household functioning. Id. Notwithstanding, NAG recommended that if the Authority allows gas shutoffs during severe heat days, the Authority should exclude shutoffs for customers coded as financial hardship, medical protection, elderly, disabled, infant household, or payment-assistance eligible. Id. EOE expressed concern over the proposal and its effect on customers’ ability to cook and heat water. EOE Written Comments, June 4, 2026, p. 2. Also, EOE is unclear how the overall effect of this proposed change will impact the CNG and SCG’s collection practices and believed it beneficial for the Authority to incorporate this issue into the broader discussion of the Joint AFP. Id. EOE asserted that further discussion on this topic may assist the Authority when ultimately making a decision. Id. OCC recognized that most customers do not use natural gas for cooling; therefore, disconnection of gas service on a hot day should impact only gas fueled cooking equipment and water heating for customers with gas water heaters. OCC Written Comments, June 4, 2026, p. 1. However, OCC asserted that clear public health and safety reasons should be considered when making a determination on this subject, as it is concerned that the delays in disconnections caused by this policy may incur costs in the form of mailed disconnect letters as well as the accumulation of additional arrearages. Id., pp. 1–2. OCC expressed interest in better understanding whether any specific health and safety protections are needed for gas customers on severe heat days. Id., p. 2. Generation Power is concerned that CNG and SCG’s request, if approved, would create “harmful and potential life-threatening impacts on vulnerable households.” Generation Power Written Comments, June 4, 2026, p. 1. Generation Power stated that changing this policy would affect an unknown number of gas customers across

As listed on the current system

Final Decision, 10/21/2026 [26-05-01]