  1. Page 7 of 26

    Docket No. 26-05-01 Joint AFP Section VII VIII IX Page 5 Joint AFP Topic Customer Communications and Outreach Other Reporting Accounting Treatment and Expense Recovery Proposals Household Size Verification N/A Description Rely only on Community Action Agencies (CAAS) to perform household income and size verification LIDR Reporting N/A Shift reporting on LIDR from the Joint AFP to the annual LIDR dockets N/A N/A Joint AFP, Joint 01, pp. 5–17; Joint AFP, Att. Joint 09 Proposals to Reduce Arrears (Joint 9), pp. 5–6. The Authority hereby approves the Joint AFP generally; however, of the seven proposals included therein, PURA approves only the proposed MPP metrics, the household size verification proposal, and the reconnection fee proposal with respect to only non-hardship customers. The Companies’ affordability programs continue in a period of transition as LIDR has been implemented and modified for the EDCs, as the gas LIDR is being refined and implemented through recent local distribution company (LDC) rate amendment application decisions and the proceeding in Docket No. 26-02-06, PURA Investigation into the Implementation of a Multi-Tiered Low-Income Discount Rate for Natural Gas Companies, and as other affordability program changes take hold. As discussed further below, the Authority declines to make significant new changes in the affordability programs for the 2026–2027 program year as the recent and impending modifications are effectuated and results can be observed. A current area of interest to PURA and stakeholders is in reducing arrearages for each of the Companies, as noted in Section II.B.1, MPP Metrics. This indicator should continue to be monitored to determine whether the policies governed under the annual affordability review are achieving desirable outcomes for all customers. Several stakeholders provided feedback that more time and data are needed to determine if past affordability program modifications are having their intended impact. The Authority agrees and therefore avoids further program modifications for now. Moreover, several changes proposed by the Companies are nearly identical to those brought forth in previous annual affordability reviews and on which the Authority has already ruled. In response to these renewed proposals, many stakeholders note that their positions on the proposals have not wavered.
  2. Page 8 of 26

    Docket No. 26-05-01 B. Page 6 JOINT AFP PROPOSED CHANGES 1. MPP Metrics a. Proposal In 2024, the Authority directed the Companies to provide initial MPP impact metrics with a proposal for new metrics to measure “success” under the new MPP program structure. Decision, Nov. 6, 2024, Docket No. 24-05-01, Annual Review of Affordability Programs and Offerings (ENERGY AFFORDABILITY ANNUAL REVIEW) (24-05-01 Decision, pp. 37–38 (Order No. 14). Subsequently, the Companies proposed new MPP impact metrics but recommended that the Authority allow for an entire MPP program year to complete prior to establishing MPP success metrics. See Decision, Oct. 22, 2025, Docket No. 25-05-01, Annual Review of Affordability Programs and Offerings (Energy Affordability Annual Review) (25-05-01 Decision), p. 5. Consequently, the Companies requested that “the Authority review success metrics in the next energy affordability annual review proceeding, i.e., Docket No. 26-05-01.” Id. However, the Companies did not propose any additional metrics to measure “success” in MPP in the Joint AFP. See Joint AFP, Att. Joint 05, p. 3. In response to Authority discovery requests, the Companies proposed adopting two metrics as MPP success goals. Eversource Interrog. Resp. CAE-12, pp. 1–2; Avangrid Interrog. Resp. CAE-12, p. 1. Specifically, both Companies proposed adopting one existing MPP metric and creating a new metric to help measure MPP success: (1) MPP customer successful completion rates; and (2) overall reduction of arrears in MPP. Id. The Companies’ first proposed MPP metric provides data on the total number and percentage of customers who completely eliminate their individual arrears by successfully completing the program. Eversource Interrog. Resp. CAE-12, p. 1; Avangrid Interrog. Resp. CAE-12, p. 1. The second metric, which the Companies propose adopting for future evaluation, would “measure the overall reduction of arrearages for all customers enrolled in MPP, expressed as a percentage of the total arrearage enrolled in MPP.” Id. For the 2024–2025 MPP program year, Eversource reported that arrears were reduced through the program by 17% and 13% for CL&P and Yankee Gas, respectively. Eversource Interrog. Resp. CAE-57. Avangrid reported that arrears were reduced through the program by 24%, 29% and 11% for CNG, SCG, and UI, respectively. Avangrid Interrog. Resp. CAE-57. For all five companies, this equates to about $62.7 million in arrears reduction during the 2024–2025 MPP program year. Id. b. Stakeholder Comments EOE did not support or oppose any proposed MPP metrics but stated that it is still too early in MPP to make any reliable, evidence-based conclusions about the program’s success. EOE Written Comments, July 22, 2026 (EOE July Comments), p. 2. Generation Power states that additional metrics for MPP are unnecessary at this time. Generation Power Written Comments, July 22, 2026 (Generation Power July
  3. Page 9 of 26

    Docket No. 26-05-01 Page 7 Comments), p. 2. However, Generation Power expressed concern in the data provided by the Companies, stating MPP completion rates were far below the 65% success rate goal. Id. Generation Power opined that the proposals provided by the Companies in the Joint AFP were not designed to improve those success rates. Id. c. Authority Analysis The proposed MPP metrics provide important reference points for the overall direction of the program by focusing on both the individual participating customer impact of successful completion, and the overall ratepayer impact of arrearages. Both perspectives are valuable when tracking MPP performance and can provide a starting point for further investigation to understand the trends and program design behind these high-level metrics. Stakeholders did not oppose any of the proposed metrics and believe that additional metrics would be unnecessary at this juncture. The Authority finds the data showing a consistent reduction in arrearages across all companies is encouraging and should be the goal of all involved for that trend to continue. Accordingly, the Authority directs the Companies to add to their list of reporting metrics: (1) a metric that collects the total number and percentage of customers who completely eliminate their individual arrears by successfully completing the MPP; and (2) a metric that collects the overall reduction of arrearages for all customers enrolled in MPP, expressed as a percentage of the total arrearage enrolled in MPP. The Companies shall begin tracking the two new MPP success metrics no later than November 1, 2026. 2. Payment Plan Removal a. Proposal The Companies propose that the requirement for removing customers, in all customer segments (i.e., residential and non-residential), enrolled in a payment plan be reduced from two missed payments down to a single missed payment. Joint AFP, Att. Joint 09, p. 5. The Companies explain: While a customer is enrolled in a payment plan their service is protected. Customers are currently required to remain protected by a payment plan unless they miss two consecutive monthly required payments. Instead, the Companies propose that when a customer misses one payment, they should be removed from the payment plan. Id. Eversource reports that approximately 62,000 customers missed one or both of their first two required monthly payments after enrolling in a payment plan. Id. Of those customers who missed payments, 79% (i.e., 49,000 customers) made one payment while 21% (i.e., 13,000 customers) made zero payments. Id. Avangrid reports that approximately 12,000 customers missed one or both of their first two required monthly payments after enrolling in a payment plan. Joint AFP, Joint 9,
  4. Page 10 of 26

    Docket No. 26-05-01 Page 8 p. 5. Of those customers who missed payments, 91.7% (i.e., 11,000 customers) made one payment while 6.7% (i.e., 800 customers) made zero payments. 4 Id. b. Stakeholder Comments EOE noted that the Authority denied a similar proposal in the 25-05-01 Decision and stated that EOE’s concerns about the proposal have not changed. EOE July Comments, p. 5. Specifically, EOE has concerns about the lack of a grace period for late payments, as well as the idea that if an eligible customer is auto enrolled in MPP during the winter moratorium and never makes a payment, that customer would only be required to make up one missed payment to re-enroll in May. Id. Generation Power stated that removing customers from their payment plan harms all utility ratepayers by increasing a customer’s monthly charges, thereby increasing their arrearages, adding to the total that a customer would be required to pay back to avoid service termination. Generation Power July Comments, p. 7. To even consider this change, Generation Power believes that the Companies should show how this proposal would improve affordability for a customer or for the entire rate class, which has not been demonstrated in this proposal. Id. OCC argued that no changes should be made to MPP at this time, stating that recent changes to MPP and LIDR would benefit from some level of sustained consistency to allow participants to properly evaluate the effects of those changes. OCC Written Comments, July 22, 2026 (OCC July Comments), p. 7. OCC opined that a flexible payment arrangement (FPA) is essentially an 18-month interest free loan since an FPA requires a customer pays 1/18th of the customer’s arrearage each month. Id. As such, OCC states that it may be reasonable to remove a non-hardship or non-residential customer from the FPA when the customer misses a payment. Id. CCA and CVLC oppose the Companies’ missed payment proposal, contending that customers who experience an extreme hardship (e.g., illness, loss of employment, or personal or household emergencies) in one month should not automatically lose their payment plan. CCA & CVLC Written Comments, July 22, 2026 (CCA & CVLC July Comments), p. 4. c. Authority Analysis The Companies’ rationale for the proposal is unsupported by evidence showing that changing from two missed payments to one missed payment would improve program outcomes. Similarly, however, the proposition that the single missed payment threshold would necessarily produce net negative program outcomes, a concern raised by some stakeholders, is also unsupported. Without further evidence and analysis, and in light of the OCC’s assertion that further adjustments to the MPP will further delay any data-driven analysis of the effectiveness of the program, the Authority is not inclined to change the current missed payment standard. Therefore, the Authority denies the proposal to reduce the requirement for removal from a payment plan down to a single missed payment. 4 The Authority identified a minor discrepancy of 200 customers in Avangrid’s reporting (i.e., 12,000 – 11,000 – 800 = 200).
  5. Page 11 of 26

    Docket No. 26-05-01 Page 9 However, the Authority invites all stakeholders to offer evidence and analysis to support their positions on this issue in next year’s annual review (i.e., Docket No. 27-05-01) with consideration of both participant and program impacts. 3. Service Reconnection Fee a. Proposal After a customer has been disconnected for non-payment, the Companies’ policy currently requires the lower of 50% of the arrearage due or $1,000 for non-financial hardship customers, and the lower of 20% of the arrearage due or $400 for financial hardship customers. Joint AFP, Joint 09, p. 6. The Companies propose eliminating the “lower of” option and retain simply the 50/20% requirement for all customers.” Id. The Companies explain that the “lower of” flat minimum payment option allows customers with large balances to reconnect while significant past due balances remain without a path to resolution. Id. b. Stakeholder Comments EOE argued that the $1,000 and $400 caps were included by the Authority as an affordability measure. EOE July Comments, p. 5. EOE contended that more information, including an evaluation of other state practices, is required before such a change is made. Id. Generation Power argued the proposal does not account for the customer’s ability to pay the proposed higher amounts. Generation Power July Comments, p. 7. Generation Power approved 439 emergency energy assistance applications for households with incomes between 60–75% State Median Income in Fiscal Year 2026. Id. Generation Power stated that these customers do not qualify for financial hardship protections and therefore would be at risk of shutoff and required to pay an unmanageable debt for most limited-income residents under the Companies’ proposal. Id. OCC expressed concern over the proposed increased costs to reconnect service, noting that customers who are unable to afford monthly payments cannot afford to pay a percentage of their past due balance and therefore may take steps, such as putting service in another individual’s name, in order to reconnect their utility service. OCC July Comments, pp. 7–8. OCC recommended that the goal of the reconnection fee should be that customers must pay a higher amount, on average, to reconnect utility service than it would be to restart that customer’s respective payment arrangement. Id. p. 8. CCA and CVLC argued that the proposed reconnection fee is unaffordable and would represent an insurmountable payment challenge for many customers. CCA & CVLC July Comments, p. 4. CCA and CVLC expressed great concern that the proposed changes could return Connecticut to a time when customers live for many months of a year without service because they simply cannot afford to have their service reinstated. Id. CCA and CVLC stated that even the $400 reconnection fee is unaffordable for many of their clients, though some are able to make that payment through a combination of personal savings and donations from charitable organizations. Id. As such, requiring a
  6. Page 12 of 26

    Docket No. 26-05-01 Page 10 customer to pay 20% of an arrearage as the only option for reconnection would likely be unattainable and cause many to simply live without service. Id. c. Authority Analysis The Authority accepts the EDCs’ proposal to apply the 50% of arrearage standard only to customers who do not qualify for financial hardship or medical protection status. The Authority understands and respects the stakeholder view that non-hardship customers struggle to afford utility bills and already face substantial barriers to reconnection, but the Authority must balance these real concerns against the increasing pressure on utility bills imposed by the cost of uncollectible debt; the availability of flexible payment arrangements to assist customers with managing outstanding balances; and the data presented by the EDCs demonstrating that 2025 reconnection fee activity allowed customers to continue to receive service after termination despite maintaining substantial unpaid account balances. Specifically, the current “lesser of” standard allowed Eversource and Avangrid customers to reconnect despite an average of 89% and 91% of their outstanding balances remaining unpaid, respectively. Joint 09, p. 6. The Authority notes that prior to the COVID-19 pandemic, non-hardship customers were required to pay 100% of their outstanding balance in order to reconnect. Id., p. 4. The Companies’ proposal to apply a 50% of balance standard to non-hardship customers appropriately balances the Authority’s concerns while maintaining a policy that remains twice as flexible as the standard in place prior to the pandemic. However, the Authority does not accept the Companies’ proposal to remove the “lesser of” option for financial hardship and medical protection customers. The Authority concurs with the concerns of stakeholders and specifically notes a particular comment provided by CCA and CVLC: Given the low-income customer total household income, the proposed adjustments to payment plan parameters are unaffordable. When customers are struggling to pay their bills and are at the point of shut off, requesting 20% of the total arrears presents an insurmountable challenge. It is of great concern that the proposed changes could return . . . the State to a time when customers live for many months of a year without service because they simply cannot afford to have their service reinstated. CCA & CVLC July Comments, p. 4. The arrearages of financial hardship and medical protection customers also ultimately impose costs upon all ratepayers. However, the Authority is concerned that accepting the Companies’ proposal for financial hardship and medical protection customers may leave many customers with no feasible option to continue to receive service, which would impose health and safety risks.
  7. Page 13 of 26

    Docket No. 26-05-01 Page 11 4. BBP Reporting a. Proposal The Companies proposed that Yankee Gas, CNG, and SCG cease reporting on their BBP offerings, as required by Order No. 22 of the Authority’s October 12, 2022 Decision in Docket No. 22-05-01, 2022 Energy Affordability Annual Review (22-05-01 Decision), effective November 1, 2026, because Yankee Gas, CNG, and SCG will no longer offer BBPs to gas customers upon implementation of the gas LIDR. 5 Joint AFP, p. 10; 25-05-01 Decision, p. 15; Motion No. 6, May 26, 2026, pp. 1–2. 6 The Companies additionally proposed that Yankee Gas, CNG, and SCG cease reporting on Orders Nos. 1 and 3 of the Authority’s September 30, 2020 Decision in Docket No. 20-07-04, Application of The Connecticut Light and Power Company and Yankee Gas Services Company, each individually d/b/a Eversource Energy, The United Illuminating Company, Connecticut Natural Gas Corporation, and The Southern Connecticut Gas Company for Approval of Arrearage Forgiveness Program 2020-2021 (20-07-04 Decision), as modified by the April 23, 2025 Interim Decision in Docket No. 25-05-01 (25-05-01 Interim Decision), related to the processing of Below Budget Worksheets. Joint AFP, p. 10. b. Stakeholder Comments EOE supported the Companies’ proposal to cease reporting BBP metrics as all the Companies have already, or will soon have, cease offering this program. EOE July Comments, p. 2. Generation Power agrees that once there are no longer any customers enrolled in BBP, reporting on its metrics will no longer be useful. Generation Power July Comments, p. 4. However, given that customers are still enrolled in BBP, that reporting on it should continue until it ceases to be utilized. Id. OCC finds no value in a compliance filing with no data and therefore agrees that when the Companies cease offering BBP, the Companies should be allowed to cease reporting on BBP. OCC July Comments, p. 4. CCA and CVLC do not believe that the Companies should be allowed to cease reporting on BBP metrics, as it will be important to compare monthly payments obligations under BBP and LIDR, including payment amounts and success rates of the two programs. CCA & CVLC July Comments, p. 3. CNG and SCG implemented LIDR in August 2026. Tech Mt’g Tr., Aug. 6, 2026, 32:10–11. Yankee Gas will not implement LIDR until mid-January 2027 at the earliest. Eversource Brief, Aug. 28, 2026 (Eversource Brief), p. 3. 6 The Authority approved CNG and SCG’s proposal to cease offering the BBP to eligible customers when they each implemented LIDR and ordered CNG and SCG to cease offering BBP no later than November 1, 2026. 25-05-01 Decision, pp. 15, 39. The Authority directed Yankee Gas to submit a proposal to cease offering the BBP once LIDR is implemented. 24-12-01 Decision, pp. 205–206, 223 (Order 11). 5
  8. Page 14 of 26

    Docket No. 26-05-01 Page 12 c. Authority Analysis The Authority concurs that BBP reporting will be unnecessary once no customers remain on BBP. However, customers do remain on BBP to this day and so it is premature to cease reporting on BBP metrics. Accordingly, the Authority denies the Companies’ proposal to cease BBP reporting; therefore, the Companies are required to continue reporting in the annual affordability review dockets, as required by Order No. 22 of the 25-05-01 Decision and Order Nos. 1 and 3 of the 20-07-04 Decision, as modified by the 25-05-01 Interim Decision. 5. Improvements to DSS Data Matching a. Proposal The Companies signed an opt-out customer data sharing agreement with DSS in January 2024. Motion No. 85 Ruling, Apr. 8, 2024, Docket No. 17-12-03RE11, pp. 2, 4. In accordance with this agreement, the Companies send DSS a data file every month that consists of all active residential accounts. 24-05-01 Decision, p. 12. DSS then analyzes whether the customers currently receive public assistance and indicates to the Companies whether each account is eligible for financial hardship, and for EDC customers, whether the customers are eligible for the various LIDR tiers. Id., pp. 12–13; 17-12-03RE11 2024 Decision, p. 23. The Authority directed the Companies to submit a proposal in the 2026–2027 AFP to address mismatches with the DSS data-sharing. 25-05-01 Decision, p. 39 (Order No. 12). In response, the Companies provided two potential solutions. First, Eversource, with DSS, identified customer scenarios in which DSS had a street address prefix which was not included in the utility customer’s address (i.e., “10 Main St” vs “10. E. Main St”) that resulted in mismatches between the two systems. Joint AFP, Joint 01, pp. 11–12. Eversource proposed a test for June 2026 to include prefixes for all street addresses provided to DSS. Id. Eversource states that in the test sample, the street address matching rate decreased when including the prefixes. Id., p. 12. Based on a sample review of accounts on the DSS file with address mismatches for Avangrid, Avangrid determined that the most common discrepancies were attributable to the differences in address formatting. Id. Specifically, cases where records listed an address as Street instead of St. or Place instead of Pl., or where some records included an apartment number following the street name. Joint AFP, Joint 01, p. 12. Second, the Companies worked on scenarios where addresses for a benefit recipient between DSS and the utility do not match, possibly because the benefit recipient has moved. Id. The Companies continue to work with DSS to understand how public benefit recipient addresses are updated when they move and the impact this would have on the overall data-matching. Id. Recommendations from DSS include a data-matching process modification to indicate when a utility customer is identified as a public benefit recipient, absent an address match, by instead matching the last five digits of a social security number, matching the last name, and matching the first name. Id.
  9. Page 15 of 26

    Docket No. 26-05-01 Page 13 The Companies indicated that while these potential solutions may be viable, the number of additional customers that may be identified through the proposed matching improvements is unknown and additional time is needed for DSS to analyze the data. Eversource Interrog. Resp. OCC-17; Avangrid Interrog. Resp. OCC-17. b. Stakeholder Comments EOE stated that more information, including how many customers will be added or excluded as a result of these changes, would likely be beneficial before making a determination whether these changes should be implemented. EOE July Comments, p. 3. EOE suggested that the Companies be directed to file this proposal as a motion so that it might be resolved prior to next year’s annual review. Id. OCC echoed EOE’s comments, expressing concern over the potential number of customers that might be added after implementing these changes and similarly considered filing this proposal as a motion to avoid any unnecessary delays. OCC July Comments, pp. 4–5. c. Authority Analysis The Companies and stakeholders recognize that while these solutions may improve the DSS data matching process, the size of the impact is still unknown. The Authority appreciates the efforts the Companies have taken in working with DSS to improve the data-matching process but finds it premature to implement until the effects of the proposed changes can be understood. Therefore, the Authority denies the proposed data matching changes, but directs the Companies to each submit by June 1, 2027, an updated proposal, with an impact study, as part of the 2027–2028 Joint Arrearage Forgiveness Plan (2027–2028 Joint AFP). 6. Household Size Verification a. Proposal The Companies proposed to have the CAAs perform all eligibility verification that requires proof of household size and income. Joint AFP, Joint 01, pp. 13–15. The Companies would, however, continue accepting proof of other qualifying benefits as eligibility for financial hardship designation and LIDR. Id. p. 15. Pursuant to Order No. 12(c) of the 25-05-01 Decision, and again in Interrogatory CAE-9, the Authority requested a comparison of the Companies’ process for identifying customers eligibility for financial hardship designation, specifically household size verification, with the processes of other jurisdictions and other entities in Connecticut. Eversource stated that in all three of its jurisdictions (i.e., Connecticut, New Hampshire, and Massachusetts), CAAs perform household size and income verification. Eversource Interrog. Resp. CAE-9. Eversource also noted that Connecticut’s state datamatching was designed after its Massachusetts affiliate. Id. However, its New Hampshire affiliate “does not support (and has intentionally decided not to pursue) automated state data-matching with utilities to identify and verify low-income customers who are benefits program recipients.” Id. Similarly, Eversource’s Massachusetts affiliate offers selfattestation to provide temporary service protection during the winter protection period and
  10. Page 16 of 26

    Docket No. 26-05-01 Page 14 temporary and reversible 60-day LIDR, pending proof of income eligibility. Id. Eversource’s New Hampshire affiliate does not provide the same self-attestation opportunities. Id. Avangrid stated that its gas affiliates (i.e., Central Maine Power and Berkshire Gas Company) do not verify household income or size and instead rely on CAAs and other third parties for verification. Avangrid Interrog. Resp. CAE-9. Conversely, its electric affiliates (i.e., Rochester Gas and Electric and New York State Electric and Gas) accept verbal income verification from a customer to determine the customer’s inability to pay and qualify for a minimum payment agreement and medical emergency renewals. Id. Additionally, the Companies contacted more than 10 utility companies across New Hampshire, Maryland, New York, and Pennsylvania and none of the companies have a way to verify household size. Joint AFP, Joint 01, p. 14. In calendar years 2024 and 2025, Eversource’s annual costs to conduct financial hardship income verification in Connecticut were $546,348 and $565,615, respectively. Eversource Interrog. Resp. CAE-8. Avangrid provided similar costs, which totaled $524,486 and $633,830 for calendar years 2024 and 2025, respectively. Avangrid Interrog. Resp. CAE-8. b. Stakeholder Comments EOE stated that it is not an opportune time to make any changes to the household verification process. EOE July Comments, p. 3. While EOE understands the Companies’ desire to transfer responsibility of household verification to CAAs, as the Companies are not social service organizations, EOE remains concerned that CAAs will be overwhelmed by the number of customers in need of income verification, which will result in a greater risk of under inclusion. Id. Generation Power opposed this proposal for similar reasons to EOE, noting that while this proposal may save time and money for the Companies, shifting that responsibility entirely on to non-profit organizations will result in delays that will increase customer costs and customer risk of losing service. Generation Power July Comments, p. 4. OCC is hesitant to take steps, such as this proposed change, that may hinder customers’ ability to receive assistance. OCC July Comments, p. 6. While OCC recognized that having the Companies continue providing household verification presents a risk of over-inclusion, something taken very seriously as that benefit is paid for by all ratepayers, the Companies have not quantified that risk. Id. At this moment when federal assistance is becoming more difficult to obtain, OCC believed the risk of under-inclusion outweighs the risk of over inclusion. Id. CCA and CVLC do not think that CAAs should be the sole way customers verify their income and household size. CCA & CLVC July Comments, p. 4. CAAs are limited in location, staff, and appointment availability, while customers have limited time to find an appointment and may require time off of work to do so. Id., pp. 3–4. Moreover,

As listed on the current system

Final Decision, 10/21/2026 [26-05-01]