Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
  1. Page 26 of 36Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 26 of 27 h. • Lines 47-81 provide rates for uncollectible expense, gross earnings tax, and the costs of capital as well as necessary calculation of gross-ups to those rates for use in the model’s calculations. • Additional details are shown in column (F) of this worksheet. Worksheet “PBR-8 GDP” This worksheet presents raw Gross Domestic Product-Price Index (GDP-PI) data obtained from the Bureau of Economic Analysis. For illustrative purposes only, this model also includes a projection of GDP-PI obtained from Moody’s September 14, 2026. As noted above, actual calculations of PBR increases, if approved as filed, rely only on historical data available at the time of a given year’s annual PBR filing. i. Worksheet “PBR-9 ECI” This worksheet contains raw Employment Cost Index (ECI) data obtained from the Bureau of Labor Statistics. Note that projections of inflation are used for analytical purposes and to assist with discussion pertaining to future rate increase implications. Calculations of PBR increases, if approved as filed, rely only on historical data available at the time of a given year’s annual PBR filing. 3) Cost of Service The cost of service included for analytical purposes in the Company’s working model consists of three worksheets: “COS-1 Total,” “COS-2 Capital,” and “COS-3 Property Tax.” a. Worksheet “COS-1 Total” This worksheet provides projections of the Company’s actual costs through the end of the PBMRP term as a means of assessing the impact the capital investment forecast and O&M cost pressures have on the overall cost of service as well as the degree to which revenues align with the Company’s cost of service (as reflected on the “Financial Summary” worksheet). Lines 15-37 summarize the results of the cost drivers, including especially O&M (Lines 16-19), depreciation (Line 21), property taxes (Line 22), and costs of capital, including corresponding income taxes (Lines 2427). Gross earnings taxes and uncollectible expense are calculated on Lines 33 and 34 as if the full cost of service (Line 28) is in rates. Non-storm O&M is shown on Lines 38-44, while storm O&M is shown on Lines 45-50, where noncatastrophic costs are identified separately from catastrophic storm / pre-staging funding. Non-storm rate base is shown on Lines 52-59, which reflect the capital investment forecast (exclusive of AMI) filed in this docket. Lastly, capital-driven costs of service are shown on Lines 61-67. Depreciation, property tax, uncollectible, gross earnings taxes, and costs of capital are based on the Company’s filed cost of service in this docket,
  2. Page 27 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-054 Page 27 of 27 specifically Exhibit CLP REVREQ-2-A, B, C, D Schedules, except that the return on equity (9.25%) and equity capitalization (53%) are shown at currently authorized amounts. b. Worksheet “COS-2 Capital” This worksheet functions nearly identically to “PBR-4 F-Factor” except that it relies on actual capital investment projected over the term of the PBMRP. This is essential to understanding actual costs of service, whether or not those costs are supported by revenues. It forms the basis for evaluating the degree to which the F-Factor is sufficient. For additional details pertaining to the mechanics, please see the line references found at the end of this worksheet (or model PDF page 19). c. Worksheet “COS-3 Property Tax” Similarly, this worksheet is included to assist with the calculation of actual costs of service. It operates mechanically identically to “PBR-5 F-Factor Property Tax” except that it relies on actual capital investment projections (Line 12).
  3. Page 28 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-055 Page 1 of 2 Date Filed: September 22, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Leanne M. Landry, Warren R. Boutin, and Marisa B. Paruta Request from: ALLCO Question: Follow-up to the Company’s response to Q-ALLCO-010 (third-party and affiliate interconnection administration costs). The Company’s response quantified the labor ($616,047 test year; $660,100 rate year) and outside-services ($640,960 test year; $682,263 rate year) components of its Connecticut DG interconnection program administration costs, but did not respond to the portion of Q-ALLCO-010 concerning amounts paid to, or allocated from, Burns & McDonnell and Eversource Energy Service Company. For the test year and each rate year: (a) state the total amount paid to Burns & McDonnell (or any successor or affiliated engineering contractor) for services relating to the interconnection of distributed generation in Connecticut, and state whether that amount is included within the $640,960/$682,263 outside-services figures identified in the Company’s response; (b) state the total amount of Eversource Energy Service Company costs allocated to CL&P for services relating to the interconnection of distributed generation in Connecticut, identify the allocation method, and state whether that amount is included within the figures identified in the Company’s response; and (c) if any amount identified in (a) or (b) is not included in those figures, identify the schedule, account, and cost-of-service line item in which it is recovered. Response: (a) The total amount paid to Burns & McDonnell for services related to the interconnection of distributed generation in Connecticut is $752,873. The amount is not included within the $640,960/$682,263 outside services figures identified in the Company’s response to ALLCO-010 i. (b) Please refer to the table below, for the total amount of Eversource Energy Service Company costs included within the figures identified in the Companies response in ALLCO-010. These costs are directly charged from employees or contractors when supporting CT Electric Distributed Generation.
  4. Page 29 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-055 Page 2 of 2 Description Labor Outside Services/Other Admin Costs Total Schedule C-3.5 Payroll C-3.16 Field Ops – OH Lines Test Year $131,390 $194,935 Rate Year $139,391 $207,496 $326,324 $346,887 (c) The Burns and McDonnell amounts identified in subpart (a), above, are not in the cost of service or rate base; therefore, these amounts are not included in any SFR schedule in the Company’s rate case application. These amounts are recorded to FERC Account 186010, and are then billed to customers / counterparties for reimbursable work. Prior Referenced Response: i ALLCO-010 Question: State the Test Year and projected Rate Year costs of administering the Company’s Connecticut distributed generation interconnection program (including employee and contractor headcount and costs, and any allocations from Eversource Energy Service Company or from Burns & McDonnell or other third-party project management vendors), and identify where those costs appear in the proposed revenue requirement. ALLCO-010 Response: Please refer to the table below which shows the Test Year and projected Rate Year O&M expenses associated with administering the Company’s Connecticut distributed generation interconnection program including employee and contractor costs and where they appear in the Company’s cost of service. Description Labor Outside Services/Other Admin Costs Total Schedule C-3.5 Payroll C-3.16 Field Ops – OH Lines Test Year $616,047 $640,960 Rate Year $660,100 $682,263 $1,257,007 $1,342,362
  5. Page 30 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-056 Page 1 of 1 Date Filed: September 22, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez, and Steven C. Osuch Request from: ALLCO Question: Follow-up to the Company’s response to Q-ALLCO-011 (basis for SHARE program fees). The Company’s response states that the allocation of substation project costs to distributed energy resources for purposes of the SHARE fee is based on a "preliminary technical review," and the Company’s prefiled testimony references a preliminary analysis (Exhibit CLP-TSP-3 at 144). Produce the preliminary technical review and any preliminary analysis — including all workpapers, models, and calculations in native (Excel) format with formulas intact — supporting the allocation of $85.5 million of the Tracy substation project, $16.3 million of the Frybrook substation project, and $36.1 million of the Campville substation project to distributed energy resources. If no such review or analysis exists in documentary form, so state, and identify each person who performed the review, when it was performed, and the methodology and inputs used. Response: Please refer to ALLCO-056, Attachment 1, which contains the analysis of the cost allocation of these projects. This document constitutes an original engineering work product developed by Company engineers through meetings, conference calls, technical evaluations, and the application of professional engineering judgment. The values, assumptions, and conclusions set forth herein are the result of that engineering analysis and reflect the team's final determinations. To the extent information from various sources was considered during the analytical process, the values and conclusions contained in this document represent the engineering team's independent professional judgments and comprise the work product underlying this analysis.
  6. Page 31 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-057 Page 1 of 2 Date Filed: September 22, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: ALLCO Question: Follow-up to the Company’s response to Q-ALLCO-016 (applications excluded from interconnection performance metrics). The Company’s response and Attachment 1 provided annual counts of interconnection applications excluded from the Company’s interconnectiontimeline performance metrics because they require transformer upgrades (187 in 2020; 142 in 2021; 122 in 2022; 406 in 2023; 534 in 2024; 671 in 2025), but did not provide the percentage figures and total-application denominators requested. For each calendar year 2020 through 2025: (a) state the total number of Connecticut DG interconnection applications received; (b) state the total number of applications completed or otherwise closed; and (c) state the excluded applications identified in the Company’s response as a percentage of each of (a) and (b). (d) If the Company contends it cannot derive these figures from PowerClerk or any other system, describe each system of record for interconnection applications and state which data fields it maintains. Response: Please refer to ALLCO-057, Attachment 1, which includes the previously provided count and percentage of Level 1 projects requiring an upgrade as requested in the Company’s response to ALLCO-016 i, with the addition of three newly requested columns as detailed above in bullets a-c. The figures are for Level 1 Connecticut DG interconnection applications as referenced in ALLCO016. For the purposes of this filing the Company is considering “completed or otherwise closed” applications as those that received Permission to Operate. The Company has derived these figures from PowerClerk, so no alternative description of additional data sources is applicable. Prior Referenced Response: i ALLCO-016 Question: State, for each year 2020 through 2025, the number and aggregate MW of DER interconnection applications that would be excluded from the proposed Level 1 DER Interconnection Processing metric because they "require electric power system modifications" (Exhibit CLP-CUSTOMER-1 at 34 n.22), as a count and as a percentage of all
  7. Page 32 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-057 Page 2 of 2 applications and of all applied-for MW, and explain the basis for excluding such projects from a metric intended to measure interconnection performance. ALLCO-016 Response: Please refer to ALLCO-016, Attachment 1, which specifies the number, percentage, and MW of Level 1 DER interconnection applications that required electric power system modifications. These projects are proposed to be excluded from the Level 1 DER Interconnection Processing PIM since they represent time periods outside the scope of a standard project. In addition, the system modification process is not tracked in PowerClerk to the level of detail the PIM requires, which is designed to only track the time requiring Company action.
  8. Page 33 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-058 Page 1 of 2 Date Filed: September 21, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: ALLCO Question: Follow-up to the Company’s response to Q-ALLCO-019 (recovery of DG dispute obligations through rates). The Company’s response did not answer the final portion of Q-ALLCO-019. State whether the Company proposes, in this proceeding, to recover through rates — whether in base rates, through any rate adjustment mechanism, or through any deferral or regulatory asset — any judgment, settlement payment, refund, or interest obligation arising from any dispute with a distributed generation or qualifying facility customer, including without limitation any refund or interest obligation to Allco or its affiliates arising from overcharges for interconnection-related costs. If so, identify each such amount, the schedule and line item in which it appears, and the witness sponsoring it. If not, state the accounting treatment the Company proposes for any such judgment, settlement, refund, or interest obligation that becomes payable during the rate plan term, including the account to be charged and whether shareholders or ratepayers would bear the cost. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, as the Company stated in response to ALLCO-019 i, there are no judgments and/or settlements resulting from lawsuits brought by distributed generation developers, qualifying facilities, or interconnection customers; therefore, the Company is not proposing to recover any such amounts through rates. Please refer to the Company’s response to ALLCO-006 ii for the accounting treatment of interconnection refunds. Prior Referenced Responses: i ALLCO-019 Question: With respect to the injuries and damages expense, judgments and settlements, and outside legal expense that are the subject of OCC-303, OCC-308, and OCC-309, identify the portion of each that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers (including disputes with Allco or its
  9. Page 34 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-058 Page 2 of 2 affiliates), stating the amount, FERC account, and matter; and state whether the Company proposes to recover through rates any judgment, settlement, refund, or interest obligation arising from such disputes. ALLCO-019 Response: With respect to the Company’s response to OCC-303i, CL&P does not track injuries and damages expense in a format that would allow the Company to identify the portion of expense that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers. With respect to the Company’s response to OCC-308ii, there are no judgments and/or settlements resulting from lawsuits brought by distributed generation developers, qualifying facilities, or interconnection customers. With respect to the Company’s responses to OCC-309iii, CL&P does not track legal expense in a format that would allow the Company to identify the portion of expense that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers. ALLCO-006 Question: Separately from the customer deposits and customer advances addressed in OCC-74, OCC-75, and OCC-270, state the total amount of deposits, performance assurance, development period security, operating period security, and bid deposits held by the Company from renewable energy developers, qualifying facilities, and interconnection customers as of the end of the Test Year; identify where such amounts are recorded on the Company’s books; state whether such amounts are treated as cost-free capital, an offset to rate base, or otherwise in the proposed revenue requirement; and state the amount of interest accrued and paid on such amounts in the Test Year. ii ALLCO-006 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the total amount of performance assurance, development period security and operating period security held by the Company was $14,115,950 as of the end of 2025. These deposits are refundable to project owners upon completion of project milestones or, if forfeited, credited as an offset to program costs recovered through fully reconciling rates approved in the Company’s annual Rate Adjustment Mechanism. As such, the funds are not available to the Company for other purposes and are not reflected in the proposed revenue requirement. Lastly, interest only accrues on a deposit when required under the terms of the agreement and is returned or forfeited with original deposit as described above.
  10. Page 35 of 36

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-05 Date Issued September 08, 2026 ALLCO-059 Page 1 of 2 Date Filed: September 22, 2026 Witness: Leanne M. Landry, Warren R. Boutin and Jeffrey D. Turano Request from: ALLCO Question: For each project or interconnection for which the Company collected, billed, or recorded contributions in aid of construction ("CIAC") — including any percentage overhead or "CIAC" charge applied to interconnection study, upgrade, or construction costs, and any SHARE or other prepaid capital contribution treated as CIAC — in each year 2018 through 2025 and in the test year, provide a schedule, in native (Excel) format, identifying: (a) the project or interconnection name and work-order number; (b) the customer or counterparty type (distributed generation, qualifying facility, thirdparty attacher, municipal, or other); (c) the construction or upgrade cost of the project; (d) the CIAC amount collected or billed, stating separately the base construction component, each overhead or loader component and the percentage applied, and any tax gross-up; (e) the FERC account(s) in which each amount was recorded and the amount, if any, netted against or offsetting plant in service; and (f) whether the amount has been the subject of any final accounting, true-up, reconciliation, or refund, and if so the amount and date of any refund and any interest paid. Reconcile the annual totals in this schedule to (i) the annual CIAC totals provided in response to Q-ALLCO-002, and (ii) the "Deferred Taxes on CIAC, Net of Grossup" amounts included in rate base on Schedule B-1.0 ($35,961,000 for the test year), identifying the CIAC balances from which those deferred tax amounts are derived. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, CL&P does not track or maintain information on interconnections in a format that is commercially reasonable for the Company to collect and provide a response to the entirety of the interrogatory. As of the date of this response, CL&P is querying its system to
Words on different pages
2 pages match

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses