Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Search terms highlighted
Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-04 Date Issued September 04, 2026 ALLCO-052 Page 1 of 2 Date Filed: September 18, 2026 Witness: Ann Bulkley Request from: ALLCO Question: With respect to the Company’s outstanding preferred stock and the requested 10.25% return on common equity: (a) for each outstanding series of the Company’s preferred stock, state the shares outstanding, par or stated value, carrying value, annual dividend rate, whether the series is callable (and at what price), and whether the series is publicly traded, identifying the ticker symbol or trading venue; (b) for each publicly traded series (including the $3.24 Series G, ticker CNLPL), state the most recent available market price and the resulting current dividend yield as of the most recent practicable date, and provide the source; (c) state the risk premium, in basis points, implied by the requested 10.25% return on common equity over (i) the current market yield of each traded preferred series, (ii) the Company’s embedded cost of preferred stock (4.75%), (iii) the Company’s embedded cost of long-term debt (4.81%), and (iv) the current market yield on seasoned Baa-rated corporate bonds; (d) produce every analysis, calculation, or workpaper in which the Company or any of its cost-of-capital witnesses considered the market prices or yields of the Company’s own outstanding securities — preferred stock or long-term debt — or those of Eversource Energy, in developing the recommended return on common equity in this proceeding; if no such analysis exists, state that fact and explain why company-specific market evidence was not considered while proxy-group estimates for other companies were; (e) state whether the Company contends that the difference in risk between its preferred stock (senior to common, fixed cumulative dividend, no maturity) and its common equity justifies a premium of approximately 400 basis points, and produce every analysis supporting that contention, including any analysis of how revenue decoupling, the proposed Storm Cost Recovery Adjustment Factor, and the proposed multi-year rate plan affect the riskiness of the Company’s common equity relative to its preferred stock; and (f) if the Company contends that the market yields on its preferred stock understate the pre-tax return required by investors (for example, because of the corporate dividends-received deduction), quantify that effect in basis points and produce the supporting calculation. Response: a. Ms. Bulkley did not rely upon the requested information in the preparation of her direct testimony and therefore has not compiled this information. b. Please refer to ALLCO-052 (a). c. Please refer to ALLCO-052 (a).
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-04 Date Issued September 04, 2026 ALLCO-052 Page 2 of 2 d. Please refer to ALLCO-052 (a). Please also refer to Exhibit CLP-ROE-1 Testimony, Section V, for Ms. Bulkley’s discussion of how the proxy group was established. e. Please refer to ALLCO-052 (a). f. Please refer to ALLCO-052 (a).
  3. Page 3

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-04 Date Issued September 04, 2026 ALLCO-053 Page 1 of 2 Date Filed: September 18, 2026 Witness: Donald J. Scacco Jr., Digaunto Chatterjee and Douglas P. Horton Request from: ALLCO Question: With respect to the forecasted plant additions and retirements reported by FERC account on Schedule B-2.2 of Exhibit CLP-REVREQ-2 for the periods January 1, 2026 through June 30, 2027 and July 1, 2027 through June 30, 2028: (a) provide, in native (Excel) format, a project-level itemization of the forecasted additions in each period for each FERC account — at minimum for Account 362 (Station Equipment: $181,989 thousand and $147,907 thousand), Account 365 (Overhead Conductors and Devices: $154,720 thousand and $122,938 thousand), Account 367 (Underground Conductors and Devices), Account 364 (Poles, Towers and Equipment), and every other account whose forecasted additions exceed $10 million in either period — showing for each project the project name or work-order identifier, description, forecasted cost by period, forecasted in-service date, and the driver category (e.g., load growth, asset condition, reliability, storm hardening, interconnection, AMI, fleet); (b) identify each project in subpart (a) that increases substation or circuit capacity or hosting capacity, stating the substation or circuit affected and whether any pending distribution interconnection application would be enabled by it; (c) state where the capital costs of the advanced metering infrastructure program are reflected — identifying the amounts, if any, included in the Schedule B-2.2 additions, the amounts proposed for recovery through the F-Factor or any other mechanism, and the schedule or workpaper where each appears — given that Account 370 (Meters) additions total only $45.8 million across both periods; (d) for the transportation and power-operated equipment accounts (392-series and 396), which reflect forecasted additions of approximately $76 million including $47.9 million of Class 4 heavy trucks against a $112.9 million test-year balance, produce the fleet plan, replacement schedule, or other analysis supporting the forecasted additions, and state the number of units to be acquired by vehicle class and the assumed cost per unit; and (e) state whether each project or category identified in subpart (a) was subjected to a documented business-case or cost-benefit analysis before inclusion in the forecast, and produce each such analysis for projects exceeding $25 million. Response: (a) Plant additions and retirements are not forecasted by project at a FERC account level. Forecasts are developed using historical precedent and anticipated projects. Plant addition forecasts are developed by relying on forecasted capital expenditures and recent historical trends of plant in service in relation to capital expenditures, as well as any project-specific information (if available) to develop reasonable estimates of the forecasted plant additions relied upon in this proceeding.
  4. Page 4

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-04 Date Issued September 04, 2026 ALLCO-053 Page 2 of 2 (b) N/A based on the response to subpart (a), above. (c) N/A based on the response to subpart (a), above. (d) N/A based on the response to subpart (a), above. (e) N/A based on the response to subpart (a), above.
2 pages match

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)