    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-044 Page 1 of 4 Date Filed: September 24, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Leanne M. Landry, Warren R. Boutin, and Jeffrey D. Turano Request from: ALLCO Question: With respect to each cost category included in the percentage overhead or "CIAC" rates applied to interconnection upgrade, study, and construction costs charged to distributed generation, qualifying facility, and other interconnection customers (including, without limitation, project management, engineering and supervision, administrative and general expense, employee benefits or compensation loaders, insurance, and Eversource Energy Service Company charges): (a) identify each such cost category and its share of the overhead rate in effect in each year 2018 through 2025; (b) state whether the costs in each such category were included, in whole or in part, in the test-year cost of service and revenue requirement approved in the Company’s most recent prior general distribution rate proceeding, Docket No. 17-10-46, and therefore recovered from all ratepayers through base distribution rates during 2018 through the present; (c) if the answer to any part of subpart (b) is affirmative, explain why applying overhead rates that include the same cost categories to amounts charged to interconnection customers does not result in the Company recovering the same costs twice — once from ratepayers generally and again from interconnection customers; (d) quantify, for each year 2018 through 2025, the total dollar amount of overheads collected from interconnection customers in cost categories that were also reflected in base rates; and (e) state whether amounts collected from interconnection customers through overhead rates are recorded as a credit or offset to the corresponding expense or plant accounts recovered in base rates and, if not, where those amounts are recorded, consistent with the Company’s description of its netting treatment of third-party attacher billings in its response to RRU-002. Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, please note that capital expenditures (direct costs and overheads applied to those amounts) are entirely billed to the interconnection customer and reimbursed through the CIAC process; therefore, these asset additions are not included in rate base. Please refer to ALLCO-064 i for additional discussion on the CIAC rate and ALLCO-003 ii where the Company goes into more detail on the CIAC Tax Adder.
  2. Page 2 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-044 Page 2 of 4 Prior Referenced Response: i ALLCO-064 Question: State how the Company treats, for federal income tax purposes, the amounts it collects from interconnecting customers — contributions in aid of construction ("CIAC"), interconnection study and application fees, payments for system modifications and upgrades, and every percentage overhead or loader applied to any of the foregoing — for each calendar year 2017 through 2025 and for the Test Year, and specifically: (a) whether such amounts are included in gross income as taxable contributions in aid of construction under 26 U.S.C. § 118(b) on the consolidated federal income tax return of the affiliated group of which the Company is a member, or are excluded from gross income as nontaxable contributions to capital pursuant to the intertie safe harbor of IRS Notice 2016-36 (or its predecessors, IRS Notices 88-129, 90-60, and 2001-82), or receive some other treatment — stating the treatment applied, by category of payment and by year, and the total dollar amount in each category and year; (b) whether the Company has charged or collected from any interconnecting customer any income tax gross-up or other tax-related component on any such payment, and if so, for each year: the total gross-up amounts collected, the gross-up rate and computation methodology (including any net-present-value-of-tax method), whether any gross-up was applied to the overhead or loader components, and whether any gross-up was charged on payments that the Company treated as nontaxable under the safe harbor; (c) whether the Company claims federal tax depreciation on, and what tax basis it takes in, property paid for by interconnecting customers, and whether the corresponding plant is included in or excluded from rate base in this Application; (d) how the accumulated deferred income taxes associated with the foregoing treatment are computed, in what FERC account(s) they are recorded, and where they are reflected in the revenue requirement or rate base presented in this Application; (e) the federal income tax treatment of amounts refunded or credited to interconnecting customers — including the final accounting refunds identified in the Company’s responses to Allco’s Set One — stating whether such refunds are deducted from gross income and in what year; and (f) identify, by title, date, and custodian, and produce, the tax accounting policies, workpapers, and return schedules sufficient to show each treatment described in response to subparts (a) through (e). ALLCO-064 Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, Eversource responds: (a) Taxable contributions in aid of construction (CIAC) are included in revenue in the period received and taxed as income on the Company’s federal income tax return. Interconnection study and application fees, payments for system modification and upgrades are not included in revenues and therefore are excluded from taxable income. Specific to generator interconnections, where generator entities are building units of generation which they plan to interconnect with the Company’s transmission system, there is a specific IRS Notice (Notice 2016-
  3. Page 3 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-044 Page 3 of 4 36) which applies whereby if the generator entity meets specific requirements, it will be treated as a nontaxable transaction. Generally, the safe harbor applies to transmission system interconnections. The Company generally deems distribution system interconnection payments to be taxable income and are therefore charged a tax adder/gross up. Please refer to the Company’s ALLCO-064, Attachment 1, pages one through nine, for the annual schedules, which show the monthly taxable income from CIAC and the related tax adder/gross up for each of the years requested. (b) The Company does charge a CIAC Tax Adder (the income tax gross-up) to the interconnecting customer at the time the CIAC payments are charged, as the CIAC estimate includes a calculated CIAC tax adder. The total CIAC Tax Adder amount is included in ALLCO-064, Attachment 1. The CIAC Tax Adder gross-up rate and computation methodology (including any net present value-of-tax method) is provided in the Company’s response to ALLCO-003i. As described in (a), the Company’s distribution system interconnection payments are taxable; therefore, all CIAC Tax Adders charged on CIAC payments were treated as taxable CIAC (there were none under the safe harbor). The CIAC Tax Adder was calculated based on the full cost estimate of the project, including the Company’s construction overhead costs and loaders. (c) The Company claims federal tax depreciation only on interconnection assets that are included in taxable income. For book purposes, there is no basis in the plant accounting records as these capital expenditures are entirely billed to the interconnection customer and reimbursed through the CIAC process; therefore, these asset additions are not included in rate base. (d) ADIT related to CIAC and CIAC income tax gross-up is calculated at the combined statutory rate on the temporary difference. ADIT related to both taxable CIAC, and the CIAC income tax gross-up, is recorded in FERC Account 282, as disclosed in the Company’s SFR Schedule B-6.1. (e) Refunds to interconnection customers are deducted from taxable income in the year paid. These are typically small amounts and are used to adjust tax basis of assets for the current period. (f) Please see below for the Company’s departments that have the oversight responsibilities for the Distributed Generation Interconnection work: Department DER Customer Responsibility Manage the applications that are received by the Company’s customers Engineering Prepares the full CIAC estimate, including the CIAC Tax Adder Tax Dept DER Customer Calculates the annual CIAC rate Prepares and issues the total CIAC bill to interconnection customer Engineering Prepares work orders in the Work Management System, which provides the FERC Accounting treatment Operations Work Performed and charged to work orders
  4. Page 4 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-044 Page 4 of 4 DER Customer ii Final true-ups on costs are calculated for final billed/refunded amounts to interconnection customers after permission to operate (PTO) is completed ALLCO-003 Question: Describe the methodology by which the Company sets the percentage "CIAC" or "overhead" rate applied to interconnection upgrade costs (including rates of 9.97%, 10.19%, 11.00%, 12.00%, and 13.00% applied to projects between 2018 and 2024), produce the workpapers deriving each such percentage, and state the actual project management and administration cost component, as a percentage of construction cost, realized on distributed generation interconnection projects completed in each year 2020 through 2025. ALLCO-003 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company uses a “gross up” method when calculating the CIAC “tax adder” percentage. For an interconnection project, the Company requires each developer to advance adequate funds for the Company to maintain the full amount of funds, after paying the applicable State and Federal Income Tax, necessary to complete the construction. Furthermore, a discount rate is applied for the present value of the tax benefits associated with future tax depreciation. The Company applies the current prime rate as the discount rate pursuant to Order No. 2 of PURA’s January 20, 1987, Decision in Docket No. 86-11-07. Below are the assumptions that the Company uses in the calculation:
  5. Page 5 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-045 Page 1 of 5 Date Filed: September 17, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: ALLCO Question: Separately from EOE-140 and EOE-151, state whether the Company or Eversource Energy Service Company has performed, commissioned, or received, since January 1, 2018, any analysis, study, model, or evaluation — whether by employees, consultants, or vendors — of whether distribution-infrastructure investments (including, without limitation, system hardening, covered or spacer cable, strategic undergrounding, enhanced or resiliency-based vegetation management, animal guards, or accelerated replacement of aged poles, cross-arms, or conductors) would reduce storm damage, storm outage frequency or duration, or storm restoration costs in Connecticut; produce each such analysis, study, model, or evaluation; identify each recommendation contained in any of them that the Company has not implemented, and state the reason it was not implemented and the estimated cost of implementation; and state whether any portion of the storm costs for which recovery is sought in this docket (including the costs compiled in the STORM-ACCT exhibits) arose on circuits, line segments, or assets that any such analysis had previously identified as candidates for hardening, undergrounding, resiliency vegetation management, or replacement, identifying each such circuit or asset and the associated storm cost. Response: The Company has identified the following responsive materials, produced herewith: Please refer to ALLCO-045, Attachment 1: Connecticut Reliability Performance by Tree Exposure Range and Construction Type. An internal analysis prepared by Company personnel examining the historical outage performance of overhead distribution assets installed on the Connecticut system. The analysis compares observed failure rates, normalized per overhead mile per year, across bare conductor, covered conductor, and spacer cable construction, segmented by tree exposure band, under blue sky conditions, storm conditions, and the conditions observed during Tropical Storm Isaias. The analysis observed materially lower failure rates on spacer cable construction relative to bare conductor across every tree exposure band and every weather condition examined, with the difference generally increasing as tree exposure increased. This analysis is the basis for the event-reduction assumption used in the Resiliency Plan. Every zone selected for reconductoring under the Plan is existing bare-wire overhead construction that would be rebuilt using spacer cable, so the spacer-versus-bare comparison is the applicable measure of expected performance improvement.
  6. Page 6 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-045 Page 2 of 5 The Company applied an assumed 62 percent reduction in storm outage events on reconductored segments. That figure is the average reduction observed on segments in the highest tree exposure quartile during the Tropical Storm Isaias event. It was selected deliberately, on the following basis. First, the highest tree exposure quartile is where the Plan's work is targeted, so the improvement factor is drawn from the conditions in which the work will actually be performed rather than from system-wide averages. Second, an Isaias-level catastrophic event is the most severe condition examined in the analysis, and the reduction observed under that condition is lower than the reductions observed under blue sky and ordinary storm conditions. The Company therefore applied the least favorable observed result rather than a more favorable one, and the projected outage, customer-minute, and avoided-cost benefits of the Plan are correspondingly conservative. Zone selection itself was performed separately and did not rely on this analysis. Candidate zones were identified through the Storm DEMI recurrence screen and ranked by predicted customer impact using the All-In SAIDI methodology. This analysis informed the expected benefit of treating those zones, not the choice of which zones to treat. The Company notes one limitation regarding scope. Because construction type is not randomly distributed across the system, the analysis reflects observed performance differences among differently constructed segments rather than a controlled measurement of the effect of construction type in isolation. Please refer to ALLCO-045, Attachment 2: Review of Industry Resilience and Reliability Practices, prepared by Quanta Technology, LLC, dated September 2, 2021. Eversource engaged Quanta Technology to perform an independent review of Eversource's reliability and system resiliency programs and to summarize industry leading practices in reliability and resilience. The review addresses industry reliability and resilience frameworks, including the reliability indices defined in IEEE Standard 1366 and the resilience definitions and metrics developed by the IEEE Power and Energy Society; benchmarks Eversource's historical reliability performance against the IEEE PES Distribution Reliability Working Group annual benchmark under both the PURA and IEEE major event methodologies; catalogs industry standard resilience mitigations, including infrastructure hardening, covered and spacer cable, targeted undergrounding, enhanced vegetation management, and pole inspection and replacement; describes Eversource's enhanced structural and electrical resiliency design standards and its Pole Integrity, Vegetation Management, DSCADA, and Smart Switches programs; and presents case studies of resilience investment outcomes in other jurisdictions. The review further addresses the valuation of resilience benefits, observing that resilience planning is a risk-management discipline and that the value of resilience is generally quantified through the value of avoided customer interruptions. The Company notes that this review assesses Eversource's programs and industry practice generally. It does not quantify the storm damage, outage, or restoration cost reduction attributable to any specific Connecticut circuit, line segment, or asset, and the quantified outcomes it presents are drawn from case studies of other utilities.
  7. Page 7 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-045 Page 3 of 5 Regarding analyses performed on whether “enhanced or resiliency-based vegetation management” would reduce storm damage or storm outage frequency, please refer to the Company’s response to OCC-099 i. The University of Connecticut has published multiple studies on the effectiveness of enhanced vegetation management, two of which are included in this docket: the University of Connecticut 2019 study, Assessing the effects of a vegetation management standard on distribution grid outage rates (refer to CLP-VMP-3), and the University of Connecticut 2022 study, A Statistical Framework for Evaluating the Effectiveness of Vegetation Management in Reducing Power Outages Caused during Storms in Distribution Networks (refer to CLP-VMP-4). The results from the 2022 study demonstrated that, “enhanced vegetation management is particularly helpful in reducing trouble spots for lower severity storms, with reductions between 45.8% and 63.8%, and substantially reduces trouble spots during the most severe events when vegetation management is particularly comprehensive, demonstrating a 37.3% reduction when compared with circuits with little to no enhanced tree trimming.” (Exhibit CLP-VMP-4, at 15). The reliability improvements were observed in individual storm events as well as in annual totals. The University of Connecticut 2022 study further elaborates that, “more rigorous vegetation management standards (applying ETT) help reduce outages at an individual event level, for both the more frequent events and those less frequent, stronger storms, which may also occur more frequently in the future due to climate change.” The Company’s redesigned Reliability Tree Work (“RTW”) program will allow the Company to address the locations on scheduled circuits where overhang and ETT clearances were not previously achieved on the portion of those circuits that serve the most customers and are highly susceptible to tree-related outages, particularly in relation to circuit backbones that were addressed through the ETT program over 20 years ago. The RTW program will encompass trimming of overhanging branches, as overhanging branches that break and fall on the power lines account for approximately 24% of the tree-related outages on the system (please refer to page 39 of Exhibit CLP-VMP-2). By targeting the zones with overhang that serve the highest number of customers through the RTW program, risk will be mitigated. Please refer to Exhibit CLP-VMP-1 on page 30-31, summarized on page 19 of Exhibit CLP-VMP2, where the Company proposes the RTW program. The RTW program will be key in preventing vegetation outages from outside zone overhanging limb fall-in and inside zone tree fall-in on high priority line segments with the goal of achieving clearance of 10 ft of vegetation from ground to sky where permission allows.
  8. Page 8 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-045 Page 4 of 5 Prior Referenced Response: i OCC-099 Question: (VMP/Cost-Benefit) The University of Connecticut study, Assessing the Effects of a Vegetation Management Standard on Distribution Grid Outage Rates (Exhibit CLP-VMP-3) suggests that Enhanced Tree Trimming ("ETT") improves reliability however, it did not find that increasing ETT consistently resulted in a greater reduction of outages, after accounting for storm severity. a. Has the Company evaluated whether increasing ETT beyond the currently proposed level will continue to produce reliability benefits that justify the cost? b. If yes to (a), provide all analyses, studies, cost-benefit evaluations, or other documentation supporting the Company's conclusion. c. If no such evaluation has been performed, explain how the Company determined that the proposed level of ETT represents a cost-effective investment for ratepayers. OCC-099 Response: Yes, the Company has evaluated whether increasing ETT beyond the currently proposed level to continue to produce reliability benefits. With respect to the evaluation, the Company is relying on the referenced 2019 study, assessing the effects of a vegetation management standard on distribution grid outage rates, (provided in Exhibit CLP-VMP-3), as well as the University of Connecticut 2022 Study, A Statistical Framework for Evaluating the Effectiveness of Vegetation Management in Reducing Power Outages Caused during Storms in Distribution Networks (refer to Exhibit CLP-VMP-4). The results from the 2022 study demonstrated that, “enhanced vegetation management is particularly helpful in reducing trouble spots for lower severity storms, with reductions between 45.8% and 63.8%, and substantially reduces trouble spots during the most severe events when vegetation management is particularly comprehensive, demonstrating a 37.3% reduction when compared with circuits with little to no enhanced tree trimming.” (Exhibit CLP-VMP-4, at 15). The reliability improvements were observed in individual storm events as well as in annual totals. The University of Connecticut 2022 study further elaborates that, “when compared with previous studies in the effectiveness of vegetation management activities, this analysis provides a better understanding of how more rigorous vegetation management standards (applying ETT) help reduce outages at an individual event level, for both the more frequent events and those less frequent, stronger storms, which may also occur more frequently in the future due to climate change.” (id.) However, the Company is observing diminishing system impact from Customer Focus Enhanced Tree Trimming (“ETT”), as only lower priority laterals are available for prescription under the current capitalization structure required in PURA Docket No. 17-10-46. Previous ETT work completed on circuit backbones between 1998 to 2003, and large customer count laterals from 2004 until the ETT project was sunset in 2020 (PURA Docket No. 17-10-46), did not allow for previously completed zones to be readdressed if full clearance was limited by permissions. In addition, the November 25, 2020 ruling in PURA Docket No. 17-10-46 on Motion No. 53 declined the Company’s request to provide additional rate recovery for ETT post-2020 and directed the Company to seek permission to recover such “system resiliency program costs in its next rate case proceeding”. For this proceeding, the Company’s redesigned Reliability Tree Work (“RTW”) program will allow the Company to address the locations on scheduled circuits where overhang and ETT clearances were not previously achieved on the portion of those circuits that serve the most customers and are highly susceptible to tree-related outages, particularly in relation to circuit backbones that were
  9. Page 9 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-045 Page 5 of 5 addressed through the ETT program over 20 years ago. The RTW program will encompass trimming of overhanging branches, as overhanging branches that break and fall on the power lines account for approximately 24% of the treerelated outages on the system (please refer to page 39 of Exhibit CLP-VMP-2). By targeting the zones with overhang that serve the highest number of customers through the RTW program, risk will be mitigated. Please refer to Exhibit CLP-VMP-1 on page 30-31, summarized on page 19 of Exhibit CLP-VMP2, where the Company proposes the RTW program. The RTW program will be key in preventing vegetation outages from outside zone overhanging limb fall-in and inside zone tree fall-in on high priority line segments with the goal of achieving clearance of 10 ft of vegetation from ground to sky where permission allows. Please refer to pages 49-51 of Exhibit CLP-VMP-1 which is also summarized on page 11 of Exhibit CLP-VMP-2. The Company selected 21 circuit zones with high System Average Interruption Duration Index (SAIDI) for targeted vegetation management in 2023. The table and summary table on page 50 of Exhibit CLP-VMP-1 below shows pre- and post-treatment customer reliability (CMI and CI) for circuit zones that received targeted vegetation management. This targeted vegetation management included seeking to remove within 10 feet of the outermost conductor and all overhanging vegetation. On average, the segments where targeted vegetation management was performed experienced a 94% reliability improvement demonstrating a benefit for these circuits associated with removal of overhang, trees that are too close to the distribution system, and removal of high-risk trees.
  10. Page 10 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-046 Page 1 of 2 Date Filed: September 17, 2026 Witness: Douglas P. Horton and Ann Bulkey Request from: ALLCO Question: For each mechanism proposed or continued in this Application that reduces the variability of the Company’s revenues, cash flows, or cost recovery — including revenue decoupling, the proposed Storm Cost Recovery Adjustment Factor rider, the proposed multi-year rate plan, the proposed earnings sharing mechanism with no downside exposure, and each other rate adjustment mechanism or tracker — (a) identify where, if anywhere, the Company’s return-on-equity analysis quantifies the risk-reducing effect of that mechanism on the Company’s cost of equity; (b) state the basis-point adjustment, if any, attributed to each such mechanism in arriving at the requested 10.25% return on equity; and (c) if no adjustment was made for a mechanism, explain why a return derived from a proxy group is an appropriate estimate for a company whose risk profile the Application simultaneously proposes to reduce. Response: (a) Please refer to Exhibit CLP-ROE-1 Testimony, Section VII, and Exhibit CLP-ROE-9 for Ms. Bulkley's direct testimony regarding the business risks reviewed in her analyses. As shown in the exhibit, Ms. Bulkley reviewed various mechanisms that have been implemented by operating utilities of the proxy group companies and compared those mechanisms to the mechanisms that have been implemented by CL&P and proposed in this proceeding. Ms. Bulkley did not make any specific adjustments to the ROE for adjustment mechanisms or trackers, but rather reviewed the cost of equity analyses performed; current market conditions; and, the comparison of CL&P’s risk to the proxy group companies, in aggregate, and concluded that the Company’s requested ROE of 10.25 percent is appropriate. (b) Please refer to Exhibit CLP-ROE-1 Testimony, Section IX, for Ms. Bulkley's direct testimony regarding factors considered in determining that the Company's requested ROE was reasonable and appropriate. Ms. Bulkley did not establish a specific adjustment for each risk factor discussed but rather established her range taking into consideration the range of model results, market conditions, and other business risks. The Company established its requested ROE at the low end of Ms. Bulkley’s range.

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)