Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Search terms highlighted
Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages
2 pages match
  1. Page 8 of 23Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-045 Page 4 of 5 Prior Referenced Response: i OCC-099 Question: (VMP/Cost-Benefit) The University of Connecticut study, Assessing the Effects of a Vegetation Management Standard on Distribution Grid Outage Rates (Exhibit CLP-VMP-3) suggests that Enhanced Tree Trimming ("ETT") improves reliability however, it did not find that increasing ETT consistently resulted in a greater reduction of outages, after accounting for storm severity. a. Has the Company evaluated whether increasing ETT beyond the currently proposed level will continue to produce reliability benefits that justify the cost? b. If yes to (a), provide all analyses, studies, cost-benefit evaluations, or other documentation supporting the Company's conclusion. c. If no such evaluation has been performed, explain how the Company determined that the proposed level of ETT represents a cost-effective investment for ratepayers. OCC-099 Response: Yes, the Company has evaluated whether increasing ETT beyond the currently proposed level to continue to produce reliability benefits. With respect to the evaluation, the Company is relying on the referenced 2019 study, assessing the effects of a vegetation management standard on distribution grid outage rates, (provided in Exhibit CLP-VMP-3), as well as the University of Connecticut 2022 Study, A Statistical Framework for Evaluating the Effectiveness of Vegetation Management in Reducing Power Outages Caused during Storms in Distribution Networks (refer to Exhibit CLP-VMP-4). The results from the 2022 study demonstrated that, “enhanced vegetation management is particularly helpful in reducing trouble spots for lower severity storms, with reductions between 45.8% and 63.8%, and substantially reduces trouble spots during the most severe events when vegetation management is particularly comprehensive, demonstrating a 37.3% reduction when compared with circuits with little to no enhanced tree trimming.” (Exhibit CLP-VMP-4, at 15). The reliability improvements were observed in individual storm events as well as in annual totals. The University of Connecticut 2022 study further elaborates that, “when compared with previous studies in the effectiveness of vegetation management activities, this analysis provides a better understanding of how more rigorous vegetation management standards (applying ETT) help reduce outages at an individual event level, for both the more frequent events and those less frequent, stronger storms, which may also occur more frequently in the future due to climate change.” (id.) However, the Company is observing diminishing system impact from Customer Focus Enhanced Tree Trimming (“ETT”), as only lower priority laterals are available for prescription under the current capitalization structure required in PURA Docket No. 17-10-46. Previous ETT work completed on circuit backbones between 1998 to 2003, and large customer count laterals from 2004 until the ETT project was sunset in 2020 (PURA Docket No. 17-10-46), did not allow for previously completed zones to be readdressed if full clearance was limited by permissions. In addition, the November 25, 2020 ruling in PURA Docket No. 17-10-46 on Motion No. 53 declined the Company’s request to provide additional rate recovery for ETT post-2020 and directed the Company to seek permission to recover such “system resiliency program costs in its next rate case proceeding”. For this proceeding, the Company’s redesigned Reliability Tree Work (“RTW”) program will allow the Company to address the locations on scheduled circuits where overhang and ETT clearances were not previously achieved on the portion of those circuits that serve the most customers and are highly susceptible to tree-related outages, particularly in relation to circuit backbones that were
  2. Page 9 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-045 Page 5 of 5 addressed through the ETT program over 20 years ago. The RTW program will encompass trimming of overhanging branches, as overhanging branches that break and fall on the power lines account for approximately 24% of the treerelated outages on the system (please refer to page 39 of Exhibit CLP-VMP-2). By targeting the zones with overhang that serve the highest number of customers through the RTW program, risk will be mitigated. Please refer to Exhibit CLP-VMP-1 on page 30-31, summarized on page 19 of Exhibit CLP-VMP2, where the Company proposes the RTW program. The RTW program will be key in preventing vegetation outages from outside zone overhanging limb fall-in and inside zone tree fall-in on high priority line segments with the goal of achieving clearance of 10 ft of vegetation from ground to sky where permission allows. Please refer to pages 49-51 of Exhibit CLP-VMP-1 which is also summarized on page 11 of Exhibit CLP-VMP-2. The Company selected 21 circuit zones with high System Average Interruption Duration Index (SAIDI) for targeted vegetation management in 2023. The table and summary table on page 50 of Exhibit CLP-VMP-1 below shows pre- and post-treatment customer reliability (CMI and CI) for circuit zones that received targeted vegetation management. This targeted vegetation management included seeking to remove within 10 feet of the outermost conductor and all overhanging vegetation. On average, the segments where targeted vegetation management was performed experienced a 94% reliability improvement demonstrating a benefit for these circuits associated with removal of overhang, trees that are too close to the distribution system, and removal of high-risk trees.
  3. Page 10 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-046 Page 1 of 2 Date Filed: September 17, 2026 Witness: Douglas P. Horton and Ann Bulkey Request from: ALLCO Question: For each mechanism proposed or continued in this Application that reduces the variability of the Company’s revenues, cash flows, or cost recovery — including revenue decoupling, the proposed Storm Cost Recovery Adjustment Factor rider, the proposed multi-year rate plan, the proposed earnings sharing mechanism with no downside exposure, and each other rate adjustment mechanism or tracker — (a) identify where, if anywhere, the Company’s return-on-equity analysis quantifies the risk-reducing effect of that mechanism on the Company’s cost of equity; (b) state the basis-point adjustment, if any, attributed to each such mechanism in arriving at the requested 10.25% return on equity; and (c) if no adjustment was made for a mechanism, explain why a return derived from a proxy group is an appropriate estimate for a company whose risk profile the Application simultaneously proposes to reduce. Response: (a) Please refer to Exhibit CLP-ROE-1 Testimony, Section VII, and Exhibit CLP-ROE-9 for Ms. Bulkley's direct testimony regarding the business risks reviewed in her analyses. As shown in the exhibit, Ms. Bulkley reviewed various mechanisms that have been implemented by operating utilities of the proxy group companies and compared those mechanisms to the mechanisms that have been implemented by CL&P and proposed in this proceeding. Ms. Bulkley did not make any specific adjustments to the ROE for adjustment mechanisms or trackers, but rather reviewed the cost of equity analyses performed; current market conditions; and, the comparison of CL&P’s risk to the proxy group companies, in aggregate, and concluded that the Company’s requested ROE of 10.25 percent is appropriate. (b) Please refer to Exhibit CLP-ROE-1 Testimony, Section IX, for Ms. Bulkley's direct testimony regarding factors considered in determining that the Company's requested ROE was reasonable and appropriate. Ms. Bulkley did not establish a specific adjustment for each risk factor discussed but rather established her range taking into consideration the range of model results, market conditions, and other business risks. The Company established its requested ROE at the low end of Ms. Bulkley’s range.
  4. Page 11 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-046 Page 2 of 2 (c) The proxy group data is used to establish the range of cost of equity model results presented in Figures 1 and 13 of Exhibit CLP-ROE-1. Please refer to subparts (a) and (b), above, for reference to how Ms. Bulkley established the appropriate range for CL&P’s ROE.
  5. Page 12 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-047 Page 1 of 3 Date Filed: September 17, 2026 Witness: Ann Bulkley Request from: ALLCO Question: With respect to the proxy group used in the Company’s return-on-equity analysis: (a) produce the screening criteria and all workpapers used to select the proxy group, in native (Excel) format with formulas intact; (b) state, for each proxy company, whether it has revenue decoupling, a stormcost tracker or rider, a multi-year rate plan, and an earnings sharing mechanism, identifying the source for each answer; and (c) provide the results of each of the Company’s return-on-equity models recomputed excluding those proxy companies that lack revenue decoupling, and separately excluding those that lack a storm-cost tracker or rider. Response: a. Please refer to Ms. Bulkley's direct testimony at Section VII for a discussion of the business risks reviewed in her analyses. Also refer to Exhibit CLP-ROE-9 for a review of the mechanisms that have been compared between CL&P and the proxy group companies in Ms. Bulkley's evaluation of business risk. Also refer to the Company’s response to information request OCC-365 i, specifically OCC-365 Attachments 10 through 24. b. Please refer to Ms. Bulkley's direct testimony at Section IX for the factors considered by Ms. Bulkley in determining that the Company's requested ROE was reasonable and appropriate. Ms. Bulkley did not establish a specific adjustment for each risk factor discussed but rather established her range taking into consideration the range of model results and other business risks. The Company established its requested ROE at the low end of Ms. Bulkley’s range. c. The proxy group data is used to establish the range of cost of equity model results presented in Figures 1 and 13 of Ms. Bulkley’s testimony. Please refer to the Company’s response to information request ALLCO-046 ii, part (b), for a reference to how Ms. Bulkley established the appropriate range for CL&P’s ROE.
  6. Page 13 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-047 Page 2 of 3 Prior Referenced Responses: i OCC-365 Question: Workpapers. Please provide all workpapers the Company utilized in preparing its schedules, if not previously filed with PURA. Provide the workpapers in electronic format, with all formulas and calculations intact. OCC-365 Response: Please refer to the Attachments listed below for the requested workpapers: ii • OCC-365, Attachment 1, for workpapers used in the preparation of Exhibit CLP-RATES-2. • OCC-365, Attachment 2 through OCC-365, Attachment 9, for workpapers used in the preparation of Exhibit CLP-DEPRECIATION-3 and CLP-DEPRECIATION-4. • OCC-365, Attachment 10, for excel versions of Exhibit CLP-ROE-2 through CLP-ROE-12 with formulas and calculations intact. For all supporting workpapers to Exhibit CLP-ROE-2 through CLP-ROE-12, refer to OCC-365, Attachment 10 through 24. • OCC-365, Attachment 25 and 26, for the workpapers to Exhibit CLP-ACOS-2. • OCC-365, Attachment 27 through OCC-365, Attachment 37, for the workpapers to Exhibit CLP-MCOS-2. ALLCO-046 Question: For each mechanism proposed or continued in this Application that reduces the variability of the Company’s revenues, cash flows, or cost recovery — including revenue decoupling, the proposed Storm Cost Recovery Adjustment Factor rider, the proposed multi-year rate plan, the proposed earnings sharing mechanism with no downside exposure, and each other rate adjustment mechanism or tracker — (a) identify where, if anywhere, the Company’s return-on-equity analysis quantifies the risk-reducing effect of that mechanism on the Company’s cost of equity; (b) state the basispoint adjustment, if any, attributed to each such mechanism in arriving at the requested 10.25% return on equity; and (c) if no adjustment was made for a mechanism, explain why a return derived from a proxy group is an appropriate estimate for a company whose risk profile the Application simultaneously proposes to reduce. ALLCO-046 Response: (a) Please refer to Exhibit CLP-ROE-1 Testimony, Section VII, and Exhibit CLP-ROE-9 for Ms. Bulkley's direct testimony regarding the business risks reviewed in her analyses. As shown in the exhibit, Ms. Bulkley reviewed various mechanisms that have been implemented by operating utilities of the proxy group companies and compared those mechanisms to the mechanisms that have been implemented by CL&P and proposed in this proceeding. Ms. Bulkley did not make any specific adjustments to the ROE for adjustment mechanisms or trackers, but rather reviewed the cost of equity analyses performed; current market conditions; and, the comparison of CL&P’s risk to the proxy group companies, in aggregate, and concluded that the Company’s requested ROE of 10.25 percent is appropriate. (b) Please refer to Exhibit CLP-ROE-1 Testimony, Section IX, for Ms. Bulkley's direct testimony regarding factors considered in determining that the Company's requested ROE was reasonable and appropriate. Ms.
  7. Page 14 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-047 Page 3 of 3 Bulkley did not establish a specific adjustment for each risk factor discussed but rather established her range taking into consideration the range of model results, market conditions, and other business risks. The Company established its requested ROE at the low end of Ms. Bulkley’s range. (c) The proxy group data is used to establish the range of cost of equity model results presented in Figures 1 and 13 of Exhibit CLP-ROE-1. Please refer to subparts (a) and (b), above, for reference to how Ms. Bulkley established the appropriate range for CL&P’s ROE.
  8. Page 15 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-048 Page 1 of 2 Date Filed: September 24, 2026 Witness: Douglas P. Horton, Brendan J. O' Brien and Garrett J. Murray Request from: ALLCO Question: For each electric distribution affiliate of Eversource Energy (including Public Service Company of New Hampshire and the Company’s Massachusetts electric distribution affiliate): (a) state the currently authorized distribution return on equity and common equity ratio, and identify the proceeding and date in which each was authorized; (b) identify each risk-reducing mechanism (decoupling, storm cost recovery or tracker, multi-year rate plan, capital tracker, earnings sharing) available to that affiliate; and (c) state whether the Company contends that CL&P faces greater business or regulatory risk than each such affiliate and, if so, produce every analysis supporting that contention. Response: Please refer to ALLCO-048, Attachment 1, for subparts (a) and (b). The Company has indicated in Attachment 1 whether each company’s respective, approved rate plan includes revenue decoupling, storm cost recovery or dedicated mechanism, multi-year rate plan, capital cost recovery, and/or earnings sharing provision. The Company does not agree with the characterization in the question of these mechanisms as “risk reducing mechanisms,” given the regulators would not implement these mechanisms unless there were a symmetrically, balancing impact for the utility and its customers and after consideration of the trade-offs inherent in the mechanism. Specifically: • Revenue decoupling is primarily implemented for policy reasons to eliminate any disincentive that the utility would have for promoting load-conservation initiatives that would reduce sales revenues between base-rate cases. In the course of achieving that policy goal, revenue decoupling operates as a symmetrical reconciliation in which revenues are adjusted up or down to the target level of revenues authorized by the regulator, so that both the utility and customers are held constant to the authorized level of revenue. As shown in Attachment 1, revenue decoupling has been implemented in Massachusetts for NSTAR Electric but has not been implemented for PSNH. • Storm cost recovery mechanisms operate to provide symmetrical benefits, shielding customers from rate shock associated with the accumulation of incremental storm expenses and limiting carrying costs associated with deferrals, while the utility is allowed timely and adequate recovery of costs it incurs to safely and efficiently restore service to its customers after a significant weather event. By definition, storm cost recovery mechanisms that
  9. Page 16 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-048 Page 2 of 2 operate outside of base rates are intended to cover storms that cannot be reasonably covered through base rates as typical ‘ebb and flow’ of utility expenses, because to do so would leave customers or the utility paying too much or too little for the obligation. As shown in Attachment 1, although the mechanics differ by jurisdiction, both NSTAR Electric and PSNH have storm cost recovery mechanisms that operate outside of base rates. • Multi-year rate plans are aimed at stabilizing revenue levels to provide a symmetrical benefit for customers and the utility in terms of enabling necessary rate changes to cover the cost of service, while providing customers rate stability and predictability, along with strong incentives for cost control. Multi-year rate plans that are performance-based and involved in a relatively longer “stay-out” period drive efficiency for the benefit of the utility and customers, due to the fact that the utility needs to operate within the confines of the plan and control its costs in order to maintain financial integrity over the stay-out term. Conversely, customers are protected from utility over-earning during the rate plan through operation of the ESM which, in the Company’s experience is implemented in a one-sided manner – to the benefit of customers. The NHPUC approved a 4-year PBR plan as part of the Company’s last rate case issued in Docket No. 24-070. The MDPU approved a 5-year PBR plan as part of NSTAR Electric’s last rate case in DPU 22-22 (2022). • Capital cost recovery mechanism outside of a multi-year rate plan have also been implemented by the MDPU for certain targeted investments that are identified as benefitting customers, while providing timely and adequate recovery to the utility in relation to the investments that customers require. The design of the New Hampshire multi-year rate plan encompasses capital cost recovery and PSNH does not currently have a targeted capital cost recovery in place. • As noted in ALLCO-048, Attachment 1, both PSNH and NSTAR Electric have earnings sharing mechanisms that operate on an asymmetric basis so that the utility is allowed to share earnings above (not below) their authorized return on equity. The earnings sharing mechanisms do not provide additional revenues to the utilities in the event they earn below their authorized return on equity. As discussed on page of Exhibit CLP-ROE-1, Ms. Bulkley relied on a proxy group of comparable utilities to develop the costs of equity models. Therefore, when assessing business risk, the appropriate comparison is the business risk of the Company as compared to the proxy group to determine where within the range of results the Company’s ROE should fall. Accordingly, the requested analysis comparing CL&P to NSTAR Electric and PSNH were not conducted.
  10. Page 17 of 23

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-03 Date Issued September 03, 2026 ALLCO-049 Page 1 of 2 Date Filed: September 17, 2026 Witness: Ann Bulkley Request from: ALLCO Question: Produce, in native (Excel) format with all formulas intact, each discounted cash flow, capital asset pricing model, risk premium, expected earnings, or other analysis underlying the Company’s return-on-equity recommendation, and for each: (a) identify each growth rate used, its source, and its period; (b) state whether any growth rate used exceeds projected long-run nominal growth of the United States economy and, if so, explain why such a growth rate is sustainable in perpetuity for a regulated distribution utility; (c) identify the source and vintage of the market risk premium and of each interest rate or bond yield used, stating whether each yield is an actual (spot or trailing) yield or a projected yield; and (d) provide the results of each model rerun using actual rather than projected yields, if projected yields were used. Response: Please refer to the Company’s response to OCC-365 i for Ms. Bulkley's workpapers. (a) Please refer to OCC-365. (b) Ms. Bulkley has not conducted the requested analysis. (c) Please refer to OCC-365. (d) Please refer to OCC-365 for the analyses relied upon by Ms. Bulkley. Ms. Bulkley has not prepared any additional calculations that were not provided in these workpapers. Prior Referenced Response: OCC-365 Question: Workpapers. Please provide all workpapers the Company utilized in preparing its schedules, if not previously filed with PURA. Provide the workpapers in electronic format, with all formulas and calculations intact. i OCC-365 Response: Please refer to the Attachments listed below for the requested workpapers: • OCC-365, Attachment 1, for workpapers used in the preparation of Exhibit CLP-RATES-2. • OCC-365, Attachment 2 through OCC-365, Attachment 9, for workpapers used in the preparation of Exhibit CLP-DEPRECIATION-3 and CLP-DEPRECIATION-4.

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)