Compilations of discovery responses
Files31
Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
PDF · 161 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Discovery Compilations September 29 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
ALLCO Set 5_COMBINED.pdf
PDF · 669 KB · 36 pagesText searchable
Download ALLCO Set 5_COMBINED.pdfRead the text of ALLCO Set 5_COMBINED.pdf
ALLCO Set 4_COMBINED.pdf
PDF · 133 KB · 4 pagesText searchable
Download ALLCO Set 4_COMBINED.pdfRead the text of ALLCO Set 4_COMBINED.pdf
ALLCO Set 3_COMBINED.pdf
PDF · 346 KB · 23 pagesText searchable
Download ALLCO Set 3_COMBINED.pdfRead the text of ALLCO Set 3_COMBINED.pdf
ALLCO Set 2_COMBINED.pdf
PDF · 576 KB · 38 pagesText searchable
Download ALLCO Set 2_COMBINED.pdfRead the text of ALLCO Set 2_COMBINED.pdf
ALLCO Set 1_COMBINED.pdf
PDF · 458 KB · 27 pagesText searchable
Download ALLCO Set 1_COMBINED.pdfRead the text of ALLCO Set 1_COMBINED.pdf
ALLCO Set 6_COMBINED.pdf
PDF · 332 KB · 9 pagesText searchable
Download ALLCO Set 6_COMBINED.pdfRead the text of ALLCO Set 6_COMBINED.pdf
AMTRAK Set 2_COMBINED.pdf
PDF · 123 KB · 2 pagesText searchable
Download AMTRAK Set 2_COMBINED.pdfRead the text of AMTRAK Set 2_COMBINED.pdf
AMTRAK Set 1_COMBINED.pdf
PDF · 190 KB · 5 pagesText searchable
Download AMTRAK Set 1_COMBINED.pdfRead the text of AMTRAK Set 1_COMBINED.pdf
AMTRAK Set 3_COMBINED.pdf
PDF · 649 KB · 34 pagesText searchable
Download AMTRAK Set 3_COMBINED.pdfRead the text of AMTRAK Set 3_COMBINED.pdf
CIEC Set 2_COMBINED.pdf
PDF · 85 KB · 1 pageText searchable
Download CIEC Set 2_COMBINED.pdfRead the text of CIEC Set 2_COMBINED.pdf
CIEC Set 1_COMBINED.pdf
PDF · 351 KB · 19 pagesText searchable
Download CIEC Set 1_COMBINED.pdfRead the text of CIEC Set 1_COMBINED.pdf
CIEC Set 3_COMBINED.pdf
PDF · 188 KB · 4 pagesText searchable
Download CIEC Set 3_COMBINED.pdfRead the text of CIEC Set 3_COMBINED.pdf
CLF-SC Set 1_COMBINED.pdf
PDF · 611 KB · 56 pagesText searchable
Download CLF-SC Set 1_COMBINED.pdfRead the text of CLF-SC Set 1_COMBINED.pdf
CLF Set 1_ COMBINED.pdf
PDF · 289 KB · 20 pagesText searchable
Download CLF Set 1_ COMBINED.pdfRead the text of CLF Set 1_ COMBINED.pdf
CLF-SC Set 2_COMBINED.pdf
PDF · 182 KB · 7 pagesText searchable
Download CLF-SC Set 2_COMBINED.pdfRead the text of CLF-SC Set 2_COMBINED.pdf
EOE Set 3_COMBINED.pdf
PDF · 237 KB · 11 pagesText searchable
Download EOE Set 3_COMBINED.pdfRead the text of EOE Set 3_COMBINED.pdf
EOE Set 2_COMBINED.pdf
PDF · 417 KB · 22 pagesText searchable
Download EOE Set 2_COMBINED.pdfRead the text of EOE Set 2_COMBINED.pdf
EOE Set 1_COMBINED.pdf
PDF · 1.7 MB · 200 pagesText searchable
Download EOE Set 1_COMBINED.pdfRead the text of EOE Set 1_COMBINED.pdf
EOE Set 4_COMBINED.pdf
PDF · 836 KB · 70 pagesText searchable
Download EOE Set 4_COMBINED.pdfRead the text of EOE Set 4_COMBINED.pdf
ICC Set 1_COMBINED.pdf
PDF · 466 KB · 30 pagesText searchable
Download ICC Set 1_COMBINED.pdfRead the text of ICC Set 1_COMBINED.pdf
OCC Set 13_COMBINED.pdf
PDF · 484 KB · 30 pagesText searchable
Download OCC Set 13_COMBINED.pdfRead the text of OCC Set 13_COMBINED.pdf
OCC Set 12_COMBINED.pdf
PDF · 1.0 MB · 73 pagesText searchable
Download OCC Set 12_COMBINED.pdfRead the text of OCC Set 12_COMBINED.pdf
OCC Set 11_COMBINED.pdf
PDF · 482 KB · 48 pagesText searchable
Download OCC Set 11_COMBINED.pdfRead the text of OCC Set 11_COMBINED.pdf
OCC Set 10_COMBINED.pdf
PDF · 542 KB · 51 pagesText searchable
Download OCC Set 10_COMBINED.pdfRead the text of OCC Set 10_COMBINED.pdf
OCC Set 5_COMBINED.pdf
PDF · 511 KB · 46 pagesText searchable
Download OCC Set 5_COMBINED.pdfRead the text of OCC Set 5_COMBINED.pdf
OCC Set 4_COMBINED.pdf
PDF · 1.3 MB · 159 pagesText searchable
Download OCC Set 4_COMBINED.pdfRead the text of OCC Set 4_COMBINED.pdf
OCC Set 3_COMBINED.pdf
PDF · 1.2 MB · 93 pagesText searchable
Download OCC Set 3_COMBINED.pdfRead the text of OCC Set 3_COMBINED.pdf
OCC Set 2_COMBINED.pdf
PDF · 1.7 MB · 68 pagesText searchable
Download OCC Set 2_COMBINED.pdfRead the text of OCC Set 2_COMBINED.pdf
OCC Set 1_COMBINED.pdf
PDF · 7.0 MB · 139 pagesText searchable
Download OCC Set 1_COMBINED.pdfRead the text of OCC Set 1_COMBINED.pdf
OCC Set 14_COMBINED.pdf
PDF · 880 KB · 66 pagesText searchable
Download OCC Set 14_COMBINED.pdfRead the text of OCC Set 14_COMBINED.pdf
Text of ALLCO Set 3_COMBINED.pdf
Extracted from the file · 23 pages · 55,777 characters
Text of ALLCO Set 2_COMBINED.pdf
Extracted from the file · 38 pages · 81,182 characters
Page 16 of 27
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-012 Page 1 of 2 Date Filed: September 04, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: ALLCO Question: Explain how SHARE program investments and SHARE fee revenues would be treated in rate base, depreciation expense, and the revenue requirement, in this docket and prospectively; state whether any SHARE-related capital expenditures are included in the capital additions or five-year investment plan for which recovery is sought in this docket; and identify them. Response: In Docket No. 22-06-29RE01, the Company introduced the Shared Hosting for Advancement of Renewable Energy (“SHARE”) program as a means to cost effectively enable Distributed Energy Resource (“DER”) interconnection and to ensure that interconnection upgrade costs are equitably allocated among DER customers and non-DER customers. In that proceeding, the EDCs (CL&P and The United Illuminating Company) collectively submitted comments in response to PURA’s Notice of Request for Written Comments issued on December 22, 2023. In those comments, the EDCs comments indicated that the following framework would need to be established in order to effectuate the SHARE program: The EDC will recover the costs of the Interconnection Solution through two channels. First, interconnecting customers in the Group will offset the upfront construction or implementation costs through a $/kW Interconnection Solution fee based on the interconnecting facility’s prorata share of the cost of the Interconnection Solution. Interconnecting customers in the Group shall pay a portion of the total Interconnection Solution cost based on technical analysis. This fee will be treated as a contribution in aid of construction (“CIAC”) and will be grossed up for taxes to ensure the full CIAC, plus gross-up, will hold distribution customers harmless on the deferred income tax implication to rate base in each Company’s next rate case. Second, the EDC will recover the remaining Interconnection Solution incurred costs with subsequent recovery from distribution customers through a rate reconciliation mechanism the Authority reviews and approves in the RAM proceeding. Distributed energy resource (DER) facilities that connect to the distribution system at a future time using the newly enabled hosting capacity will pay all of the associated Interconnection Solution fee, which will be flowed through the same rate reconciliation mechanism and credited back toPage 17 of 27
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-012 Page 2 of 2 distribution customers. Docket 22-06-29RE01, February 14, 2024 EDC comments in response to PURA request for written comments on December 22, 2023. In this proceeding, the Company presented Exhibit CLP-TSP-3 in which it provided three investment scenarios; 1) Sustained Performance, 2) Targeted System Performance, and 3) Advancing the Grid. In this proceeding, the Company has proposed to implement in base rates the capital expenditures associated with the Targeted System Performance scenario presented in Exhibit CLP-TSP-3, which does not include SHARE investments. However, the five-year investment Advancing the Grid plan includes specific investments to upgrade 3 bulk substations, build 2 new bulk substations and add new distribution feeder capacity in three (3) areas of the system to improve hosting capacity for DER integration. The high-level planning estimate for these major upgrades is approximately $275M, which would be allocated equally between DER customers and distribution customers based on a preliminary technical review of benefits (Exhibit CLP-TSP-3 at 146 to 149). Based on anticipated study, engineering, and construction schedules, $47.6M of capital expenditure is included in the five-year investment plan under the Advancing the Grid Investment Scenario (Exhibit CLP-TSP-3 at 9). Should PURA opt to support the Advancing the Grid plan as part of this proceeding, or, in a future proceeding, implement the SHARE program and associated cost recovery as proposed by the EDCs in Docket No. 22-06-29RE01, the gross investments would be reflected in plant in service installed by the Company. As described above, Interconnection Solution fees would be collected as a CIAC which would offset plant in service in rate bae. Depreciation expense would be calculated on the gross plant additions, less the CIAC. The revenue requirement that customers would pay through a rate reconciliation mechanism would be calculated on the gross plant investment, less the CIAC.Page 18 of 27
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-013 Page 1 of 2 Date Filed: September 14, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez, and Steven C. Osuch Request from: ALLCO Question: With respect to the contemplated "Bul Substation near Hampton" (Exhibit CLP-TSP-3 at 146): state its proposed scope, cost estimate, and in-service timing; identify the in-queue projects it is intended to enable, including their application dates and queue positions; and state how projects with pending applications at the Card Street 11F substation or on Circuit 11F14 — including applications pending since 2017 and 2018 — would be treated under the SHARE proposal, including whether and how amounts previously paid by such earlier-queued customers (deposits, study fees, CIAC, and upgrade payments) would be credited against any SHARE fee. Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, as outlined in Exhibit CLP-TSP-3 at 146, the proposed new bulk substation would be needed to support Tracy 14M, Brooklyn 30Y, and Mansfield 12J. This project is intended to safely and reliably accommodate large-scale DER growth in the area served by the three existing substations, improve system reliability, and resolve capacity constraints due to recent commercial load growth in the region. The preliminary scope of the project includes construction of a new bulk substation with two standard size transformers supplied by transmission sources, and new distribution feeders to pick up loads from the other aforementioned substations in the group, accommodate new loads, connect in-queue DER and enable future DER connections. The project is still in the very early planning stage and no system studies, engineering design or detailed cost estimates have been performed to determine detailed scope, equipment needs, site requirements, resource availability, procurement and construction schedules and myriad other issues that can affect cost and schedule. Therefore, it is not possible, at this preliminary stage, to provide more granularity on scope, cost estimate, and in-service timing than included in Exhibit CLP-TSP-3. If the project were to be constructed today, the in-queue projects it would be intended to enable, including application dates and queue position are available for each of the three substations in thePage 19 of 27
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-013 Page 2 of 2 published CT DER Queue located on the Company’s Connecticut Application to Connect website. 1 As there are no projects in-queue at the Card Street 11F substation impacted by the preliminary design of this project, it is not possible to say specifically how they would be treated under this SHARE proposal. However, in general, the $/kW SHARE fee would not apply to Level 1 projects. All other projects interconnecting to the group of stations (existing and new) will be required to pay the $/kW SHARE fee which is intended to recover the portion of the cost of common distribution upgrades allocated to DER customers from current (in-queue) and future DER benefiting from those upgrades. This fee does not replace any additional fees associated with interconnection including, but not limited to, application fees, study fees, point-of-interconnection costs or individual or project upgrade requirements identified by a system impact study, such as the installation of a DER Gateway and other project-specific upgrades. If the SHARE Program is approved, the Company will work with stakeholders to develop a Group Study Agreement that outlines how projects with pending applications would be treated including whether and how amounts previously paid by such earlier-queued customers (deposits, study fees, CIAC, and upgrade payments) would be handled. https://www.eversource.com/residential/about/doing-business-with-us/interconnections/connecticut/connecticutapplication-to-connect 1Page 20 of 27
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-014 Page 1 of 1 Date Filed: September 04, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez, and Steven C. Osuch Request from: ALLCO Question: State whether participation in the SHARE program would be a condition of interconnection for new or pending applications in SHARE target areas, and describe the interconnection path and cost responsibility for a queued project in a SHARE target area that declines to pay the SHARE fee. Response: If the SHARE Program is approved, the Company will work with stakeholders to develop a Group Study Agreement. Based on experience in another jurisdiction, new or pending applications in SHARE target areas would have the option to participate in the SHARE Group Study that determines the Group Solution and associated SHARE fee. If a project elects not to participate in the Group Study, the opt-out project will be queued for study after the Group Study is complete. If there is excess enabled capacity (due to use of standard size equipment) remaining after the Group Study projects have received interconnection agreements (IA), any remaining projects in queue would be eligible to connect and pay the SHARE fee (after their subsequent study). A queued project in a SHARE target area that declines to pay the SHARE fee would be removed from the queue, consistent how a project that declines to pay for the system upgrades identified in a study and outlined in an IA is treated under the current interconnection process.Page 21 of 27
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-015 Page 1 of 1 Date Filed: September 14, 2026 Witness: Andrew C. Belden Request from: ALLCO Question: In addition to the milestone-component information requested in OCC-137, produce the "recent historical performance" data on which the Company based the proposed 35-business-day target for the Level 1 DER Interconnection Processing component of the Customer PIM Suite (Exhibit CLP-CUSTOMER-1 at 35), including, for each year 2020 through 2025, the annual average number of business days from (a) receipt of a complete DER interconnection application to conditional approval, and (b) municipal inspection to issuance of Permission to Operate, reported separately for residential and non-residential projects. Response: Please refer to ALLCO-015, Attachment 1, for the recent historical performance data on which the Company based the proposed 35-business-day target for the Level 1 DER Interconnection Processing component of the Customer PIM Suite. Only residential projects qualify to apply as Level 1 thus, ALLCO-015, Attachment 1, does not include separately reported non-residential data. Although ALLCO-015, Attachment 1, includes the requested range of 2020-2025, note the metric development only considered the years 2022 through 2025, as the implementation of the Residential Renewable Energy Solutions (RRES) program in 2022 necessitated changes to the interconnection application process to include RRES qualification review. Data prior to 2022 is not representative of the current process. The historical data also may contain time in the applicant queue due to tracking capabilities available in those years.Page 22 of 27
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-016 Page 1 of 1 Date Filed: September 04, 2026 Witness: Andrew C. Belden Request from: ALLCO Question: State, for each year 2020 through 2025, the number and aggregate MW of DER interconnection applications that would be excluded from the proposed Level 1 DER Interconnection Processing metric because they "require electric power system modifications" (Exhibit CLP-CUSTOMER-1 at 34 n.22), as a count and as a percentage of all applications and of all applied-for MW, and explain the basis for excluding such projects from a metric intended to measure interconnection performance. Response: Please refer to ALLCO-016, Attachment 1, which specifies the number, percentage, and MW of Level 1 DER interconnection applications that required electric power system modifications. These projects are proposed to be excluded from the Level 1 DER Interconnection Processing PIM since they represent time periods outside the scope of a standard project. In addition, the system modification process is not tracked in PowerClerk to the level of detail the PIM requires, which is designed to only track the time requiring Company action.Page 23 of 27
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-017 Page 1 of 1 Date Filed: September 14, 2026 Witness: Warren R. Boutin Request from: ALLCO Question: State the average and maximum elapsed time, in each year 2019 through 2025, between the Company’s receipt of an interconnection agreement executed by a Connecticut generator and the Company’s countersignature and return of that agreement, and identify each instance exceeding 180 days, including project LEG-22708. Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company does not track information on the average and maximum elapsed time between the receipt of a partially-executed interconnection agreement (“IA”) from a Generator and the Company’s countersignature and return of the fully-executed IA to the Generator. Starting in early 2026, the IA execution process was enhanced to leverage automation available in PowerClerk; therefore, the execution dates are now recorded electronically in a software platform.Page 24 of 27
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-018 Page 1 of 1 Date Filed: September 14, 2026 Witness: Danielle Munson Request from: ALLCO Question: The Office of Consumer Counsel has requested extensive discovery regarding variable, incentive, and executive compensation generally (see, e.g., OCC-199, OCC-202, OCC-286 through OCC300, OCC-369, and OCC-370), which Allco does not repeat. Allco asks only: state whether any portion of executive compensation, variable (incentive) compensation, or Eversource Energy Service Company charges is included in the overhead rates, loaders, or general and administrative components applied to interconnection project costs charged to interconnection customers as CIAC or "overheads"; if so, identify each loader component and its rate, and quantify the amounts so charged to interconnection customers in each year 2020 through 2025. Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, with respect to Eversource’s executive management, there is no portion of their compensation included in the overheads and/or loaders charged to interconnection projects.Page 25 of 27
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-019 Page 1 of 3 Date Filed: September 04, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: ALLCO Question: With respect to the injuries and damages expense, judgments and settlements, and outside legal expense that are the subject of OCC-303, OCC-308, and OCC-309, identify the portion of each that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers (including disputes with Allco or its affiliates), stating the amount, FERC account, and matter; and state whether the Company proposes to recover through rates any judgment, settlement, refund, or interest obligation arising from such disputes. Response: With respect to the Company’s response to OCC-303 i, CL&P does not track injuries and damages expense in a format that would allow the Company to identify the portion of expense that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers. With respect to the Company’s response to OCC-308 ii, there are no judgments and/or settlements resulting from lawsuits brought by distributed generation developers, qualifying facilities, or interconnection customers. With respect to the Company’s responses to OCC-309 iii, CL&P does not track legal expense in a format that would allow the Company to identify the portion of expense that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers. Prior Referenced Responses: i OCC-303 Question: Injuries and Damages. a. Provide the injuries and damages expense (direct and allocated) for each of the years 2021, 2022, 2023, 2024, 2025, and included in the rate year. Provide calculations showing how the rate year expense was derived.
Text of ALLCO Set 6_COMBINED.pdf
Extracted from the file · 9 pages · 18,340 characters
Text of AMTRAK Set 2_COMBINED.pdf
Extracted from the file · 2 pages · 3,025 characters
Text of AMTRAK Set 1_COMBINED.pdf
Extracted from the file · 5 pages · 4,881 characters
Text of AMTRAK Set 3_COMBINED.pdf
Extracted from the file · 34 pages · 101,991 characters
Text of CIEC Set 2_COMBINED.pdf
Extracted from the file · 1 page · 1,005 characters
Text of CIEC Set 1_COMBINED.pdf
Extracted from the file · 19 pages · 26,023 characters
Text of CIEC Set 3_COMBINED.pdf
Extracted from the file · 4 pages · 5,355 characters
Text of CLF-SC Set 1_COMBINED.pdf
Extracted from the file · 56 pages · 132,578 characters
Text of CLF Set 1_ COMBINED.pdf
Extracted from the file · 20 pages · 38,243 characters
Text of CLF-SC Set 2_COMBINED.pdf
Extracted from the file · 7 pages · 17,131 characters
Text of EOE Set 3_COMBINED.pdf
Extracted from the file · 11 pages · 23,418 characters
Text of EOE Set 2_COMBINED.pdf
Extracted from the file · 22 pages · 42,455 characters
Text of EOE Set 1_COMBINED.pdf
Extracted from the file · 200 pages · 332,382 characters
Text of EOE Set 4_COMBINED.pdf
Extracted from the file · 70 pages · 139,575 characters
Text of ICC Set 1_COMBINED.pdf
Extracted from the file · 30 pages · 51,093 characters
Text of OCC Set 13_COMBINED.pdf
Extracted from the file · 30 pages · 61,971 characters
Text of OCC Set 12_COMBINED.pdf
Extracted from the file · 73 pages · 193,636 characters
Text of OCC Set 11_COMBINED.pdf
Extracted from the file · 48 pages · 62,469 characters
Text of OCC Set 10_COMBINED.pdf
Extracted from the file · 51 pages · 90,368 characters
Text of OCC Set 5_COMBINED.pdf
Extracted from the file · 46 pages · 88,105 characters
Text of OCC Set 4_COMBINED.pdf
Extracted from the file · 159 pages · 268,038 characters
Text of OCC Set 3_COMBINED.pdf
Extracted from the file · 93 pages · 113,517 characters
Text of OCC Set 2_COMBINED.pdf
Extracted from the file · 68 pages · 113,929 characters
Text of OCC Set 1_COMBINED.pdf
Extracted from the file · 139 pages · 225,320 characters
Text of OCC Set 14_COMBINED.pdf
Extracted from the file · 66 pages · 143,197 characters
As listed on the current system
Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses