Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Search terms highlighted
Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Words on different pages
  1. Page 18 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-013 Page 1 of 2 Date Filed: September 14, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez, and Steven C. Osuch Request from: ALLCO Question: With respect to the contemplated "Bul Substation near Hampton" (Exhibit CLP-TSP-3 at 146): state its proposed scope, cost estimate, and in-service timing; identify the in-queue projects it is intended to enable, including their application dates and queue positions; and state how projects with pending applications at the Card Street 11F substation or on Circuit 11F14 — including applications pending since 2017 and 2018 — would be treated under the SHARE proposal, including whether and how amounts previously paid by such earlier-queued customers (deposits, study fees, CIAC, and upgrade payments) would be credited against any SHARE fee. Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, as outlined in Exhibit CLP-TSP-3 at 146, the proposed new bulk substation would be needed to support Tracy 14M, Brooklyn 30Y, and Mansfield 12J. This project is intended to safely and reliably accommodate large-scale DER growth in the area served by the three existing substations, improve system reliability, and resolve capacity constraints due to recent commercial load growth in the region. The preliminary scope of the project includes construction of a new bulk substation with two standard size transformers supplied by transmission sources, and new distribution feeders to pick up loads from the other aforementioned substations in the group, accommodate new loads, connect in-queue DER and enable future DER connections. The project is still in the very early planning stage and no system studies, engineering design or detailed cost estimates have been performed to determine detailed scope, equipment needs, site requirements, resource availability, procurement and construction schedules and myriad other issues that can affect cost and schedule. Therefore, it is not possible, at this preliminary stage, to provide more granularity on scope, cost estimate, and in-service timing than included in Exhibit CLP-TSP-3. If the project were to be constructed today, the in-queue projects it would be intended to enable, including application dates and queue position are available for each of the three substations in the
  2. Page 19 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-013 Page 2 of 2 published CT DER Queue located on the Company’s Connecticut Application to Connect website. 1 As there are no projects in-queue at the Card Street 11F substation impacted by the preliminary design of this project, it is not possible to say specifically how they would be treated under this SHARE proposal. However, in general, the $/kW SHARE fee would not apply to Level 1 projects. All other projects interconnecting to the group of stations (existing and new) will be required to pay the $/kW SHARE fee which is intended to recover the portion of the cost of common distribution upgrades allocated to DER customers from current (in-queue) and future DER benefiting from those upgrades. This fee does not replace any additional fees associated with interconnection including, but not limited to, application fees, study fees, point-of-interconnection costs or individual or project upgrade requirements identified by a system impact study, such as the installation of a DER Gateway and other project-specific upgrades. If the SHARE Program is approved, the Company will work with stakeholders to develop a Group Study Agreement that outlines how projects with pending applications would be treated including whether and how amounts previously paid by such earlier-queued customers (deposits, study fees, CIAC, and upgrade payments) would be handled. https://www.eversource.com/residential/about/doing-business-with-us/interconnections/connecticut/connecticutapplication-to-connect 1
  3. Page 20 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-014 Page 1 of 1 Date Filed: September 04, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez, and Steven C. Osuch Request from: ALLCO Question: State whether participation in the SHARE program would be a condition of interconnection for new or pending applications in SHARE target areas, and describe the interconnection path and cost responsibility for a queued project in a SHARE target area that declines to pay the SHARE fee. Response: If the SHARE Program is approved, the Company will work with stakeholders to develop a Group Study Agreement. Based on experience in another jurisdiction, new or pending applications in SHARE target areas would have the option to participate in the SHARE Group Study that determines the Group Solution and associated SHARE fee. If a project elects not to participate in the Group Study, the opt-out project will be queued for study after the Group Study is complete. If there is excess enabled capacity (due to use of standard size equipment) remaining after the Group Study projects have received interconnection agreements (IA), any remaining projects in queue would be eligible to connect and pay the SHARE fee (after their subsequent study). A queued project in a SHARE target area that declines to pay the SHARE fee would be removed from the queue, consistent how a project that declines to pay for the system upgrades identified in a study and outlined in an IA is treated under the current interconnection process.
  4. Page 21 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-015 Page 1 of 1 Date Filed: September 14, 2026 Witness: Andrew C. Belden Request from: ALLCO Question: In addition to the milestone-component information requested in OCC-137, produce the "recent historical performance" data on which the Company based the proposed 35-business-day target for the Level 1 DER Interconnection Processing component of the Customer PIM Suite (Exhibit CLP-CUSTOMER-1 at 35), including, for each year 2020 through 2025, the annual average number of business days from (a) receipt of a complete DER interconnection application to conditional approval, and (b) municipal inspection to issuance of Permission to Operate, reported separately for residential and non-residential projects. Response: Please refer to ALLCO-015, Attachment 1, for the recent historical performance data on which the Company based the proposed 35-business-day target for the Level 1 DER Interconnection Processing component of the Customer PIM Suite. Only residential projects qualify to apply as Level 1 thus, ALLCO-015, Attachment 1, does not include separately reported non-residential data. Although ALLCO-015, Attachment 1, includes the requested range of 2020-2025, note the metric development only considered the years 2022 through 2025, as the implementation of the Residential Renewable Energy Solutions (RRES) program in 2022 necessitated changes to the interconnection application process to include RRES qualification review. Data prior to 2022 is not representative of the current process. The historical data also may contain time in the applicant queue due to tracking capabilities available in those years.
  5. Page 22 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-016 Page 1 of 1 Date Filed: September 04, 2026 Witness: Andrew C. Belden Request from: ALLCO Question: State, for each year 2020 through 2025, the number and aggregate MW of DER interconnection applications that would be excluded from the proposed Level 1 DER Interconnection Processing metric because they "require electric power system modifications" (Exhibit CLP-CUSTOMER-1 at 34 n.22), as a count and as a percentage of all applications and of all applied-for MW, and explain the basis for excluding such projects from a metric intended to measure interconnection performance. Response: Please refer to ALLCO-016, Attachment 1, which specifies the number, percentage, and MW of Level 1 DER interconnection applications that required electric power system modifications. These projects are proposed to be excluded from the Level 1 DER Interconnection Processing PIM since they represent time periods outside the scope of a standard project. In addition, the system modification process is not tracked in PowerClerk to the level of detail the PIM requires, which is designed to only track the time requiring Company action.
  6. Page 23 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-017 Page 1 of 1 Date Filed: September 14, 2026 Witness: Warren R. Boutin Request from: ALLCO Question: State the average and maximum elapsed time, in each year 2019 through 2025, between the Company’s receipt of an interconnection agreement executed by a Connecticut generator and the Company’s countersignature and return of that agreement, and identify each instance exceeding 180 days, including project LEG-22708. Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, the Company does not track information on the average and maximum elapsed time between the receipt of a partially-executed interconnection agreement (“IA”) from a Generator and the Company’s countersignature and return of the fully-executed IA to the Generator. Starting in early 2026, the IA execution process was enhanced to leverage automation available in PowerClerk; therefore, the execution dates are now recorded electronically in a software platform.
  7. Page 24 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-018 Page 1 of 1 Date Filed: September 14, 2026 Witness: Danielle Munson Request from: ALLCO Question: The Office of Consumer Counsel has requested extensive discovery regarding variable, incentive, and executive compensation generally (see, e.g., OCC-199, OCC-202, OCC-286 through OCC300, OCC-369, and OCC-370), which Allco does not repeat. Allco asks only: state whether any portion of executive compensation, variable (incentive) compensation, or Eversource Energy Service Company charges is included in the overhead rates, loaders, or general and administrative components applied to interconnection project costs charged to interconnection customers as CIAC or "overheads"; if so, identify each loader component and its rate, and quantify the amounts so charged to interconnection customers in each year 2020 through 2025. Response: CL&P objects to this request on the ground that it is an improper effort by Allco to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, with respect to Eversource’s executive management, there is no portion of their compensation included in the overheads and/or loaders charged to interconnection projects.
  8. Page 25 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-019 Page 1 of 3 Date Filed: September 04, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: ALLCO Question: With respect to the injuries and damages expense, judgments and settlements, and outside legal expense that are the subject of OCC-303, OCC-308, and OCC-309, identify the portion of each that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers (including disputes with Allco or its affiliates), stating the amount, FERC account, and matter; and state whether the Company proposes to recover through rates any judgment, settlement, refund, or interest obligation arising from such disputes. Response: With respect to the Company’s response to OCC-303 i, CL&P does not track injuries and damages expense in a format that would allow the Company to identify the portion of expense that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers. With respect to the Company’s response to OCC-308 ii, there are no judgments and/or settlements resulting from lawsuits brought by distributed generation developers, qualifying facilities, or interconnection customers. With respect to the Company’s responses to OCC-309 iii, CL&P does not track legal expense in a format that would allow the Company to identify the portion of expense that relates to disputes with distributed generation developers, qualifying facilities, or interconnection customers. Prior Referenced Responses: i OCC-303 Question: Injuries and Damages. a. Provide the injuries and damages expense (direct and allocated) for each of the years 2021, 2022, 2023, 2024, 2025, and included in the rate year. Provide calculations showing how the rate year expense was derived.
  9. Page 26 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-019 Page 2 of 3 b. Provide the injuries and damages reserve balances (direct and allocated), including debits and credits to the reserve, for each of the years 2021 through 2025. OCC-303 Response: a. Please refer to the table below for the injuries and damage expense for years 2021 through 2025. Year 2021 2022 2023 2024 2025 Workers’ $775,433 $811,947 $864,244 $908,661 $929,097 Compensation Public Liability $2,407,758 $2,933,449 $4,007,554 $3,753,055 $2,925,703 Please refer to OCC-303, Attachment 1, for the calculation of the Rate Year expense for Workers' Compensation. The Company calculated the Rate Year level of expense for Public Liability using the most recent actuarial report and monthly accrual expense. This accrual was $318,932 direct and $187 allocated per month. b. ii Please refer to OCC-303, Attachment 2, for the injuries and reserves balance, including debits and credits to the reserve, for each of the years 2021 through 2025. OCC-308 Question: Judgments/Settlements (Direct and Allocated). a. Please provide, in list form, the details of all judgments and/or settlements resulting from suits brought which involved the Company or affiliates as a defendant, which resulted in the Company or affiliates, during the test year, paying or agreeing to pay or being ordered to pay an amount in excess of $10,000, including but not limited to the case name, a brief description of the case, the date filed, the date of settlement or the date of judgment and the amount the Company or affiliates was ordered or agreed to pay. Provide this information even if appeals are pending and note every instance of an appeal. b. Provide the total amount of judgments/settlements expense (direct and allocated) for each of the years 2021, 2022, 2023, 2024, 2025, and the amount included in the rate year. OCC-308 Response: iii a. Please refer to OCC-308, Attachment 1 CONFIDENTIAL, for a list of all judgements and/or settlements resulting from suits brought in federal or state court, which resulted in the Company either paying or agreeing to pay an amount in excess of $10,000 during the years 2021, 2022, 2023, 2024, and 2025. b. Settlements and judgments that are property damage or bodily injury claims are funded out of the Company’s public liability reserve up to $1 million. Property damage and bodily injury settlements and judgements over $1 million are covered by the Company’s excess liability insurance. The Company has included $3.829 million in its Rate Year to accrue into the public liability reserve which is recovered from customers through base distribution rates. The table below summarizes the public liability expense for each year 2021 through 2025 and the legal settlement payments that are not covered by the Public Liability Reserve and excess liability insurance. OCC-309 Question:
  10. Page 27 of 27

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-019 Page 3 of 3 Legal Expense. Please itemize the amount of outside legal expense (direct and allocated) (excluding rate case expense, by vendor, for each of the years 2021, 2022, 2023, 2024, 2025, and the amount included in the rate year. OCC-309 Response: Please refer to OCC-309, Attachment 1, which lists the Company’s outside legal expenses by vendor for each of the years 2021, 2022, 2023, 2024, 2025 (Test Year). The Company’s outside legal expenses for the Rate Year totaled $5.388 million, which were calculated using the GDP-PI escalation factor against the Test Year Pro-Forma, as provided in Exhibit CLP-REVREQ-2 Schedule C-3.20.

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)