Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

  1. Page 15 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-013 Page 6 of 6 year. Because the rate at which efficiency gains can be sustainably achieved cannot responsibly be set in advance (please refer to OCC-443, parts (d) and (e)), the mechanism determines it from actual results, and an efficiently operating company returns more to customers than a fixed value would, both during the term and through the full rebasing of its relatively lower cost level at the next rate case. The design protects customers on the downside, and any reduction in Core Operating Expense per customer that improved near-term earnings would register against the benchmark and increase the dividend, converting that reduction into an automatic, growing customer credit. iv OCC-543 Question: Performance Based Ratemaking Panel Exhibit CLP-PBR-1 Given that the proposed Consumer Dividend applies to the OM&A portion of the PBMRP, please explain why the Company’s below-benchmark capital and total cost performance is relevant to determining the appropriate Consumer Dividend. In your response: a. a.Explain the relative weight or consideration given to OM&A, capital, and total cost benchmarking results in supporting the proposed 0.30% Consumer Dividend b. b.Explain why favorable capital performance should moderate the Consumer Dividend when capital costs are recovered outside the I-X OM&A revenue adjustment mechanism. OCC-543 Response: a. LEI’s Benchmarking Study presented the results of three different cost models, which were individually estimated using the same econometric techniques, but in some cases different business drivers because of relevance and statistical significance. LEI did not use any weighting methodology to combine the OM&A, capital, and total cost benchmarking results, as implied in the question. Rather, the OM&A cost benchmarking results provide direct evidence regarding potential operating-efficiency improvement and support the inclusion of a Consumer Dividend for the Company’s PBMRP. Capital cost and total cost benchmarking results were considered only as complementary context in assessing CL&P’s overall cost performance, and reasonableness of the overall PBMRP (and not specifically the starting value of the Consumer Dividend). Please also refer to Section 5 of Exhibit CLP-PBR-3. b. Favorable capital performance was not used as a mathematical offset, credit, or adjustment to the OM&A benchmarking result or to calculate the Consumer Dividend. As explained in response to part a), the capital benchmarking results were considered as complementary context regarding CL&P’s overall cost performance. Please also refer to OCC-443i.
  2. Page 16 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-014 Page 1 of 19 Date Filed: September 24, 2026 Witness: Douglas P. Horton Request from: National Railroad Passenger Corp. (Amtrak) Question: Explain whether the implementation of the proposed rates, effective July 1, 2027, will result in a reset or modification of any existing RAM component. In addition, explain whether future RAM proceedings will continue as scheduled. Response: Implementation of the proposed rates, effective July 1, 2027, will result in the following modifications and resets to existing RAM components: 1) Electric System Improvements (ESI) - The Company is proposing to eliminate the existing ESI in accordance with legislation enacted in 2023, pursuant to Section 5 of Public Act 23-102 (also referred to as SB7), effective with the date of new base rates, except that the retired mechanism will need to remain in place for a period of time after the implementation of new base rates on July 1, 2027, to complete recovery of the revenue requirement eligible for recovery through the ESI up until the effective date of new base rates. Base rates will be designed to recover the costs incurred after July 1, 2027 associated with all plant additions that PURA authorizes for recovery in rates at that time, as part of this proceeding (i.e., if the Company’s proposal is accepted as filed, rates effective July 1, 2027, will be designed to recover the revenue requirement on plant additions placed in service up to and including the rate year as of July 1, 2027, and forward). 1 The ESI provides for recovery of capital additions of up to $300 million annually through the effective date of new rates on July 1, 2027, and will need to remain in place after that date, only for the purpose of completing recovery of the annual revenue requirement incurred prior to that date for ESI-eligible capital additions. This means that the 1 As described in the Company’s response to EOE-156, the Company’s F-Factor would take effect the first day of the first Rate Year coming out of the rate case, which eliminates the need for Rate Year capital to be embedded in base rates, subject to later downward-only reconciliation. To the extent capital investment currently factored into the Company’s proposed revenue requirement for Rate Year 1 is “rolled back” to an earlier date (for example, to a capital investment cutoff date of February 28, 2027 for inclusion in base rates), the F-Factor revenue-requirement calculation would inherently adjust to reflect capital investment as of that cutoff date.
  3. Page 17 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-014 Page 2 of 19 elimination of the ESI need to occur in several steps through April 30, 2029 for the recovery of the following amounts: (1) A true-up of the revenue requirement on all ESI in-service capital additions for years 2017 through 2025 for which a 2026 revenue requirement is currently being recovered as a known and measurable adjustment in rates from May 1, 2026 through April 30, 2027; (2) Because these capital additions will not be reflected in base rates until July 1, 2027, the revenue requirement on these 2017 through 2025 in-service capital additions for the period January 1, 2027 through June 30, 2027 will also still need to be recovered; (3) Because PURA does not allow contemporaneous recovery of current year inservice plant additions as a known and measurable adjustment, the 2026 revenue requirement on 2026 in-service plant additions will still need to be recovered as part of the normal RAM process; (4) In addition to the recovery of the 2026 revenue requirement on 2026 in-service plant additions, because these plant additions will not be reflected in base rates until July 1, 2027, the revenue requirement on these 2026 in-service capital additions for the period January 1, 2027 through June 30, 2027 will also still need to be recovered; and (5) Because PURA does not allow contemporaneous recovery of current year inservice plant additions as a known and measurable adjustment, the January 1 - June 30, 2027 revenue requirement on 2027 in service plant additions through June 30, 2027 will still need to be recovered as part of the normal RAM process. How these steps will occur: Item (1) Recovery will occur as part of the normal RAM process as part of the ESI rate that will go into effect May 1, 2027 through April 30, 2028. Item (2) recovery will occur as a known and measurable adjustment as part of the normal RAM process for the ESI rate, which will go into effect from May 1, 2027 through April 30, 2028. Item (3) will be included in rates for the first time as part of the December 31, 2026, under recovery that will be included in the ESI rate, which will go into effect May 1, 2027 through April 30, 2028.
  4. Page 18 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-014 Page 3 of 19 Item (4) recovery will occur through the normal RAM process as a known and measurable adjustment that will be included in the ESI rate that will go into effect May 1, 2027 through April 30, 2028. Item (5) will be included in rates for the first time as part of the December 31, 2027 under recovery that will be included in the ESI rate that will go into effect May 1, 2028 through April 30, 2029. Upon conclusion of the May 1, 2028 through April 30, 2029 rate period, the ESI rate will be retired in accordance with the statutory mandate included in Section 5 of Public Act 23-102. 2) Revenue Decoupling Mechanism (RDM) – Upon the issuance of a Decision in the Company’s rate case, it is expected that a new allowed revenue target for purposes of the RDM will be established. This new allowed revenue target resets the currently allowed revenue target used in the RDM to reconcile the Company’s actual total revenues to the allowed target amount for the rate year. Any under or over collection of the allowed revenue target is either collected or refunded to customers as part of the following year’s RAM process. Additionally, the Company is proposing to roll into base distribution rates two cost categories that are currently recovered through the Company’s RAM. First, the Company proposes to roll the revenue requirement on all capital projects currently recovered through the Company’s RAM into base distribution rates. Second, the Company is proposing to roll into base distribution rates the cost of full-time equivalents (“FTEs”) which are incremental to current base distribution rates and therefore recovered in the Company’s RAM. With respect to capital projects currently recovered through the RAM, the Company is proposing to roll into base distribution rates the following: 1. All capital currently being recovered through the Company’s ESI, which includes (but is not limited to) the following categories: a. System Resiliency (exclusive of enhanced tree trimming O&M), which represents the cost of CL&P’s system resiliency plan as defined in Docket No. 17-10-46; b. 2017 Over-Estimate of Plant Additions (credit), which represents the difference between what was included in base distribution rates for calendar year 2017 and the actual capital placed in service; c. Capital additions over $270 million for the years 2018 – 2020; and d. Core Capital additions up to $300 million for the years 2021 through June 30, 2027.
  5. Page 19 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-014 Page 4 of 19 2. All capital currently being recovered through the Company’s NBFMCC, which includes (but is not limited to) the following categories: a. DER Map – Represents the IT capital costs associated with CL&P's DER Map, which was approved by PURA on October 4, 2017 in Docket No. 17-06-02; b. CT Solar Tariff – Represents the IT capital costs resulting from the implementation CL&P’s residential and non-residential solar tariffs approved in Docket No. 20-0701; c. Shared Clean Energy Facilities (“SCEF”) – Represents the IT capital cost resulting from the implementation of the SCEF program approved in Docket No. 19-07-01; and d. Bill Redesign – Represents the IT capital cost resulting from the customer bill redesign work approved in Docket No. 14-07-19RE06. 3. All capital currently being recovered through the Company’s SBC, which includes (but is not limited to) the following categories: a. Low-Income Discount Rate (“LIDR”) – Represents the IT capital cost resulting from the implementation of LIDR approved in Docket No. 17-12-03RE11; b. Rolling Hardship – Represents the IT capital cost resulting from the rolling hardship verification process approved in Docket No. 23-05-01; c. New Matching Payment Program – Represents the IT capital cost resulting from the implementation of the new matching payment program approved in Docket No. 23-05-01; and d. Matching Payment Program Re-Enrollment – Represents the IT capital cost resulting from the implementation of the matching payment program re-enrollment changes approved in Docket No. 24-05-01. Please note that the same transition and timing as was described earlier in this response related to the phase-out of the ESI will be required for the capital being moved from the NBFMCC and SBC RAM components into base distribution rates. The Company is also proposing to roll the incremental costs associated with FTEs currently recovered through the NBFMCC into base distribution rates. These FTEs were either hired after the Company’s last base distribution rate case into newly established roles or were transferred into
  6. Page 20 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-014 Page 5 of 19 newly established roles, which were created after the last rate case. These FTEs were hired to support various initiatives such as energy storage solutions, innovative energy solutions, electric vehicle programs, shared clean energy facility initiatives, low/zero emission renewable energy certificates and residential/non-residential solar programs. To effectuate this roll-in, there will be a transition period between recovery through the NBFMCC and base distribution rates for the identified FTE costs. In accordance with the current RAM process, the Company includes estimates for the current year costs which are then trued up in the next year’s RAM process. Consistent with this requirement, the Company will include an estimate of the January 1 – June 30, 2027, FTE costs in RAM rates effective May 1, 2027 through April 30, 2028. The Company will then true up the actual FTE costs for the period January 1 – June 30, 2027 in rates effective May 1, 2028 through April 30, 2029, which will be the final true-up for these specific FTEs. Please note that the Company views the interim recovery of incremental FTEs through the RAM as a best practice. There have been numerous instances where, in order for PURA initiatives to move forward, the Company has had to hire incremental resources and has incurred incremental costs. The costs of implementing and administering these programs cannot be included in base distribution rates if such programs do not exist at the time of the base distribution rate case. As described in the Company’s rate case application, the Company is proposing to implement a Performance Based Multi-year Rate Plan (PBMRP) as part of this proceeding, inclusive of an exogenous factor to allow for rate adjustments up or down for exogenous events that impose costs (or reduce them) to a level of significance warranting a rate change. The Company has proposed the exogenous cost threshold will be set at 0.5 percent of distribution revenues. Therefore, if PURA adopts the Company’s proposed PBMRP, additional FTE costs to support RAM programs would be eligible for recovery upon a showing that they have exceeded the exogenous cost threshold. Future RAM proceedings are expected to continue as scheduled. Please also refer to the Company’s response to EOE-156 i for a description of the Company’s proposed F-Factor. Prior Referenced Response: i EOE-156 Question: (PBMRP CAPITAL SUPPORT MECHANISM) Refer to Exhibit CLP-ELP-1, pp. 101-103. Provide a working, unlocked Excel spreadsheet that would serve as a representative tool used to calculate the Company’s incremental revenue requirements resulting from the proposed capital support mechanism (F-Factor) for each year of the MRP. As part of the submission, discuss the calculations and separately identify and explain all critical assumptions, using cited information from the Company’s rate case submission where relevant (e.g., depreciation rate from the Company’s depreciation study). In support of the request, please use the Company’s proposed 5 Year Targeted System Performance (TSP) Plan within the spreadsheet’s initial inputs and apply an initial assumption that the Company incurred actual plant-in-service additions of 5% more than the proposed annual TSP funding. Additionally, please
  7. Page 21 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-014 Page 6 of 19 configure the spreadsheet to allow for the weighted average carrying costs (WACC) to be individually adjusted for both ROE and Cost of Debt. EOE-156 Response: The Company appreciates the opportunity to respond to EOE’s thoughtful question regarding the operation of the PBMRP proposed in this proceeding, which the Company views as key to reaching a long-term reliability and resiliency plan for Connecticut, while meeting affordability needs for customers. The Company’s response to this request is organized as follows: A. Overview and Results B. F-Factor Discussion C. Impact of 5% Additional Capital Investment D. Model overview Attachments referenced in this response: EOE-156, Attachment 1, provides the Company’s working model, with projected capital investment as filed in this proceeding. See, e.g., Exhibit CLP-ELP-1, Figure 7. EOE-156, Attachment 2, provides a second model that is identical in every respect to Attachment 1 except that capital investments are 5% greater than the forecast submitted to this proceeding in Exhibit CLP-ELP-1, Figure 7, as stipulated by EOE’s data request. A. Overview and Results Ultimately, the Company’s goal in this proceeding is to establish a sustainable, cohesive ratemaking framework that supports electric utility service in the State of Connecticut in an affordable manner for customers, over a long term. This is the Company’s goal because the CL&P system needs investment for reliability, resiliency and modernization. For this infrastructure investment to be affordable for customers, a coherent ratemaking plan needs to be instituted that will consider the interests of customers over a longer term than just the next rate case. That framework needs to balance: (1) the reliability and performance requirements of the Company’s customers and the broader State of Connecticut; (2) customer rate stability and affordability; (3) incentives for cost efficiency in utility operations; and (4) implementation of a revenue support mechanism sufficient to cover the cost of delivering these objectives to customers, including the cost of capital. The Company’s PBMRP is designed to address these objectives in a holistic, balanced way. To do this, the Company started with the ratemaking framework under discussion in PURA’s PBR docket (Docket No. 21-0515RE01), while also introducing certain new elements to remediate the flaws that would ultimately hinder PURA’s (draft) PBR model from supporting the necessary stay out terms. As discussed below, the stay-out term is the critical element of the PBMRP that creates the cost-efficiency incentive inherent in a performance based ratemaking plan. This context is vital to understand both the design and mechanics of the Company’s proposed PBMRP, including both the F-Factor and “I-X” components. To augment understanding of how the plan would work over the stay-out period, the Company has incorporated the projected costs of service set forth in EOE-156, Attachment 1, Worksheet, entitled “COS-1 Total,” which is the Company’s cost of service, as filed. The Company does not intend to imply that these dollar amounts are certain for the future and there will undoubtedly be changes in a litigated result. However, these figures serve as a reasonable basis for presenting this analysis to reflect the Company’s PBMRP proposal. Moreover, assuming that there will be changes to the underlying cost of service that serves as the “going in revenue requirement,” all of the projections made herein become highly optimistic, as discussed below.
  8. Page 22 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-014 Page 7 of 19 Increasing capital investment on the Connecticut distribution system is a given for the reasons described in the testimony of the Company’s Leadership Panel and Targeted System Plan (“TSP”) Panel – the Connecticut distribution system needs additional investment to maintain service reliability to customers and even more investment to achieve a level of modernization. The Company will need to make this investment to meet the interests of customers, with or without a multi-year plan. However, without a multi-year rate plan, whether in the form of the Company’s proposed PBMRP or another reasonable model, the Company’s only viable course of action to support this level of needed investment will be to file traditional cost-of-service rate cases, as closely to annually as possible. Effectively, these sequential cases will “roll in” unrecovered capital investment into base rates to maintain a nexus between what the Company needs to invest in the system and what rates are reflecting for recovery of costs. In a world in which system investment needs are relatively flat, economy-wide inflation is modest and predictable at 2% annually, and rates are fully coupled with growing sales revenues (and no revenue decoupling mechanism), it is conceivable that a utility could offset the cost increases it incurs with organic sales growth, as electric utilities could do in past decades. However, that is not the reality of today’s operating environment. The distribution system investment needs are extensive and growing and the financial consequences of these circumstances are factors that need to be considered in determining a reasonable and workable regulatory plan. Establishment of a reasonable multiyear, performance-based ratemaking plan is the mechanism that can support the system needs in a manner that is wholly transparent and stable for customers, allowing for a smoother trajectory of rate changes than would otherwise occur. Results of F-Factor Implementation Assuming Capped Forecast Investment EOE-156, Chart 1, below, provides illustrative rate increases comparing circumstances where the Company is pursuing a traditional rate-case cycle with filings as close to annually as possible under Connecticut law, as compared to the proposed PBMRP. These amounts assume the Company’s revenue requirement proposed in this docket is authorized without modification, except that the Company has used its existing weighted average cost of capital to perform the analysis, in order to isolate the functioning of the F-Factor operation - apart from changes in the cost of capital (i.e., the analysis uses a 9.25% return on equity and 47%/53% debt to equity capital structure). As noted above, the cost-of-service projections are shown in EOE-156, Attachment 1, Worksheet “COS-1 Total,” Line 35. In the absence of a multi-year rate plan, the Company anticipates filing rate cases on a rolling basis, with base rate changes effective January 1, 2029, July 1, 2030, and January 1, 2032. Chart 1, below, also spans the time period covering one year beyond the Company’s proposed four-year plan. 2032 is shown for illustrative purposes. EOE-156, Chart 1 Annual Incremental Revenue Increase, $ Millions
  9. Page 23 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-014 Page 8 of 19 Note: Chart 1 assumes base-rate amendments effective 1/1/2029, 7/1/2030 and 1/1/2032. In Chart 1, a rolling rate-case cycle is depicted as the orange series, with the Company estimating new rates effective January 1, 2029 (18 months after the present docket concludes), with additional revenues of $129 million; followed by another $183 million rate change effective July 1, 2030, and a further $147 million effective January 1, 2032. These rate adjustments arise primarily as a result of capital investment rather than O&M changes, which means that the associated rate changes are reasonably foreseeable and ultimately predictable. In contrast, the Company’s proposed PBMRP would yield revenue increases of $77.6 million for rates effect July 1, 2028, $81.1 million July 1, 2029, and $83 million July 1, 2030 (EOE-156, Attachment 1, worksheet “PBR-1 Total PBRA”, Line 41). For purposes of discussion, the Company estimates that the subsequent rate case taking effect after the proposed PBMRP would be $119 million in 2031, followed by $89 million in 2032 assuming continuation of the proposed framework. Uncertainty grows as the timeframe of projections extends, as the Company will inevitably experience cost increases in relation to both operating expenses and capital investment, as time passes. Therefore, the later years (particularly 2031 and 2032) should be interpreted as illustrative for purposes of discussing the principles and conceptual impacts of the PBMRP and traditional rate case frameworks. As Chart 1 illustrates, whether through a multi-year rate plan or sequential rate cases, ongoing revenue support is essential to the electric system. Revenue increases for the Company are rate increases for customers, so that a smoother and more predictable customer impact occurs through the Company’s PBMRP, which is the fundamental purpose of the PBMRP. The Company’s proposal results in rate increases amounting to approximately 1.5-2.1% on a total bill basis, annually (Line 3). In contrast, a rolling rate-case cycle yields rate increases nearly double at 3.4% (Line 4). Essential to this discussion is that both frameworks are designed to roughly track with the cost of service, although the stay-out feature of the PBMRP forces the Company to absorb the risk of deviation from the cost of service given the likelihood that operating and investment costs will increase over the period. The difference is the gradualism of the Company’s PBMRP, which results in smoother, more predictable bill changes for customers. EOE-156, Table 1 Line Description Incremental Revenues ($ Millions) 2028 2029 2030 2031 2032
  10. Page 24 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set AMTRAK-03 Date Issued September 09, 2026 AMTRAK-014 Page 9 of 19 1 2 Company Proposal Rate Case Cycle 77.6 0.0 81.1 129.0 83.0 183.0 118.6 0.0 89.0 147.0 3 4 Annual Increase, % Total Bill Company Proposal Rate Case Cycle 1.5% 0.0% 1.5% 2.4% 1.5% 3.4% 2.1% 0.0% 1.6% 2.6% The rolling rate-case cycle is characterized by larger changes that are more disruptive to customers, in addition to being administratively burdensome for all Connecticut stakeholders. Importantly, the Company’s PBMRP does not undermine the applicability or efficacy of prudence reviews in terms of establishing a strong incentive for cost control. Under the Company’s proposal, prudence reviews can occur annually, preserving accountability and cost-control incentives with increased transparency, as well. B. F-Factor Operation At its core, the Company’s proposed F-Factor mechanism is designed to provide a revenue allowance sufficient to support the level of capital investment needed by the system, including the cost of capital. Several essential characteristics of the F-Factor mechanism mutually contribute to its viability and potential longevity: 1. Like the CT-Bar1 the Company’s F-Factor would take effect the first day of the first Rate Year coming out of the rate case, which eliminates the need for Rate Year capital to be embedded in base rates, subject to later downward only reconciliation. To the extent capital investment currently factored into the Company’s proposed revenue requirement for Rate Year 1 is “rolled back” to an earlier date (for example, to a capital investment cutoff date of February 28, 2027 for inclusion in base rates), the F-Factor revenuerequirement calculation would inherently adjust to reflect capital investment as of that cutoff date. 2. Like the CT-Bar, the Company’s F-Factor does not pre-emptively or categorically exclude any type of capital investment. The Company regularly makes capital investments that do not directly affect the performance of the electric grid the way utility poles, transformers, lines, substations, etc. clearly do, but are nonetheless essential capital investments in the provision of service to customers. Capital investments for facilities safeguarding equipment, information technology enabling self-service customer portals, and vehicles needed for transporting materials to work sites are but a few examples of core capital investments that are necessary and, therefore, inform the F-Factor allowance. 3. Like the CT-Bar, the Company’s F-Factor aligns the capital investment necessary for the target performance of the electric grid outlined in the Company’s Targeted System Plan, with the revenues required to support those investments. In developing the F-Factor the Company sought to establish a means of tying the F-Factor revenue allowances to the capital investment forecast that would be discussed extensively in this docket. This allows the focus of the TSP to remain on the system needs and plan objectives while simultaneously acknowledging that those needs and objectives, whatever they may be, require some measure of revenue support. The F-Factor serves as a necessary link between the system needs evaluated in this docket and necessary revenues. 4. The Company’s F-Factor properly includes the cost of capital. If CT-bar is evaluated separately from going-in revenue requirements, no single design factor would guarantee its failure more so than the absence of the cost of capital from its revenue requirement calculations. Though the cost of capital is not visible the way other costs of service are, such as the maintenance cost that keeps an older piece of equipment online or the cost of gasoline in a line truck, it is just as real a cost of service.

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)