Compilations of discovery responses
Files31
Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
PDF · 161 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Discovery Compilations September 29 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
ALLCO Set 5_COMBINED.pdf
PDF · 669 KB · 36 pagesText searchable
Download ALLCO Set 5_COMBINED.pdfRead the text of ALLCO Set 5_COMBINED.pdf
ALLCO Set 4_COMBINED.pdf
PDF · 133 KB · 4 pagesText searchable
Download ALLCO Set 4_COMBINED.pdfRead the text of ALLCO Set 4_COMBINED.pdf
ALLCO Set 3_COMBINED.pdf
PDF · 346 KB · 23 pagesText searchable
Download ALLCO Set 3_COMBINED.pdfRead the text of ALLCO Set 3_COMBINED.pdf
ALLCO Set 2_COMBINED.pdf
PDF · 576 KB · 38 pagesText searchable
Download ALLCO Set 2_COMBINED.pdfRead the text of ALLCO Set 2_COMBINED.pdf
ALLCO Set 1_COMBINED.pdf
PDF · 458 KB · 27 pagesText searchable
Download ALLCO Set 1_COMBINED.pdfRead the text of ALLCO Set 1_COMBINED.pdf
ALLCO Set 6_COMBINED.pdf
PDF · 332 KB · 9 pagesText searchable
Download ALLCO Set 6_COMBINED.pdfRead the text of ALLCO Set 6_COMBINED.pdf
AMTRAK Set 2_COMBINED.pdf
PDF · 123 KB · 2 pagesText searchable
Download AMTRAK Set 2_COMBINED.pdfRead the text of AMTRAK Set 2_COMBINED.pdf
AMTRAK Set 1_COMBINED.pdf
PDF · 190 KB · 5 pagesText searchable
Download AMTRAK Set 1_COMBINED.pdfRead the text of AMTRAK Set 1_COMBINED.pdf
AMTRAK Set 3_COMBINED.pdf
PDF · 649 KB · 34 pagesText searchable
Download AMTRAK Set 3_COMBINED.pdfRead the text of AMTRAK Set 3_COMBINED.pdf
CIEC Set 2_COMBINED.pdf
PDF · 85 KB · 1 pageText searchable
Download CIEC Set 2_COMBINED.pdfRead the text of CIEC Set 2_COMBINED.pdf
CIEC Set 1_COMBINED.pdf
PDF · 351 KB · 19 pagesText searchable
Download CIEC Set 1_COMBINED.pdfRead the text of CIEC Set 1_COMBINED.pdf
CIEC Set 3_COMBINED.pdf
PDF · 188 KB · 4 pagesText searchable
Download CIEC Set 3_COMBINED.pdfRead the text of CIEC Set 3_COMBINED.pdf
CLF-SC Set 1_COMBINED.pdf
PDF · 611 KB · 56 pagesText searchable
Download CLF-SC Set 1_COMBINED.pdfRead the text of CLF-SC Set 1_COMBINED.pdf
CLF Set 1_ COMBINED.pdf
PDF · 289 KB · 20 pagesText searchable
Download CLF Set 1_ COMBINED.pdfRead the text of CLF Set 1_ COMBINED.pdf
CLF-SC Set 2_COMBINED.pdf
PDF · 182 KB · 7 pagesText searchable
Download CLF-SC Set 2_COMBINED.pdfRead the text of CLF-SC Set 2_COMBINED.pdf
EOE Set 3_COMBINED.pdf
PDF · 237 KB · 11 pagesText searchable
Download EOE Set 3_COMBINED.pdfRead the text of EOE Set 3_COMBINED.pdf
EOE Set 2_COMBINED.pdf
PDF · 417 KB · 22 pagesText searchable
Download EOE Set 2_COMBINED.pdfRead the text of EOE Set 2_COMBINED.pdf
EOE Set 1_COMBINED.pdf
PDF · 1.7 MB · 200 pagesText searchable
Download EOE Set 1_COMBINED.pdfRead the text of EOE Set 1_COMBINED.pdf
EOE Set 4_COMBINED.pdf
PDF · 836 KB · 70 pagesText searchable
Download EOE Set 4_COMBINED.pdfRead the text of EOE Set 4_COMBINED.pdf
ICC Set 1_COMBINED.pdf
PDF · 466 KB · 30 pagesText searchable
Download ICC Set 1_COMBINED.pdfRead the text of ICC Set 1_COMBINED.pdf
OCC Set 13_COMBINED.pdf
PDF · 484 KB · 30 pagesText searchable
Download OCC Set 13_COMBINED.pdfRead the text of OCC Set 13_COMBINED.pdf
OCC Set 12_COMBINED.pdf
PDF · 1.0 MB · 73 pagesText searchable
Download OCC Set 12_COMBINED.pdfRead the text of OCC Set 12_COMBINED.pdf
OCC Set 11_COMBINED.pdf
PDF · 482 KB · 48 pagesText searchable
Download OCC Set 11_COMBINED.pdfRead the text of OCC Set 11_COMBINED.pdf
OCC Set 10_COMBINED.pdf
PDF · 542 KB · 51 pagesText searchable
Download OCC Set 10_COMBINED.pdfRead the text of OCC Set 10_COMBINED.pdf
OCC Set 5_COMBINED.pdf
PDF · 511 KB · 46 pagesText searchable
Download OCC Set 5_COMBINED.pdfRead the text of OCC Set 5_COMBINED.pdf
OCC Set 4_COMBINED.pdf
PDF · 1.3 MB · 159 pagesText searchable
Download OCC Set 4_COMBINED.pdfRead the text of OCC Set 4_COMBINED.pdf
OCC Set 3_COMBINED.pdf
PDF · 1.2 MB · 93 pagesText searchable
Download OCC Set 3_COMBINED.pdfRead the text of OCC Set 3_COMBINED.pdf
OCC Set 2_COMBINED.pdf
PDF · 1.7 MB · 68 pagesText searchable
Download OCC Set 2_COMBINED.pdfRead the text of OCC Set 2_COMBINED.pdf
OCC Set 1_COMBINED.pdf
PDF · 7.0 MB · 139 pagesText searchable
Download OCC Set 1_COMBINED.pdfRead the text of OCC Set 1_COMBINED.pdf
OCC Set 14_COMBINED.pdf
PDF · 880 KB · 66 pagesText searchable
Download OCC Set 14_COMBINED.pdfRead the text of OCC Set 14_COMBINED.pdf
Text of ALLCO Set 3_COMBINED.pdf
Extracted from the file · 23 pages · 55,777 characters
Text of ALLCO Set 2_COMBINED.pdf
Extracted from the file · 38 pages · 81,182 characters
Text of ALLCO Set 1_COMBINED.pdf
Extracted from the file · 27 pages · 46,644 characters
Text of ALLCO Set 6_COMBINED.pdf
Extracted from the file · 9 pages · 18,340 characters
Text of AMTRAK Set 2_COMBINED.pdf
Extracted from the file · 2 pages · 3,025 characters
Text of AMTRAK Set 1_COMBINED.pdf
Extracted from the file · 5 pages · 4,881 characters
Text of AMTRAK Set 3_COMBINED.pdf
Extracted from the file · 34 pages · 101,991 characters
Text of CIEC Set 2_COMBINED.pdf
Extracted from the file · 1 page · 1,005 characters
Text of CIEC Set 1_COMBINED.pdf
Extracted from the file · 19 pages · 26,023 characters
Text of CIEC Set 3_COMBINED.pdf
Extracted from the file · 4 pages · 5,355 characters
Page 33 of 56
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-013 Page 2 of 2 Response: The Company interprets the request for coincident peak to mean coincident with the New England ISO peak for the respective calendar year and season (summer and winter) barring further clarification by CLF and SF. The Company notes that the winter peak does not guarantee correlation with the coldest day. Given that the test year for this proceeding is 2025, the request for the last 3 completed calendar years overlaps with the test year resulting in data being provided for 2025, 2024, and 2023. a. The information requested is detailed, comprehensive data, constituting highly confidential Critical Energy Infrastructure Information (“CEII”) that qualifies for protection under PURA’s requirements for CEII, which protection the Company will seek when it is submitted to the record. The Company does not currently have an executed non-disclosure agreement (“NDA”) in place with the Conservation Law Foundation and Sierra Club (“CLF-SC”), although the Company is in contact with CLF-SC and is appreciative for their coordination and collaboration. In addition, the Company is in the final stages of implementation of new internal information systems and document controls for enhanced cybersecurity goals that would apply to this data production. Therefore, the Company plans to supplement this response with production for all parties having executed an nondisclosure agreement with the Company, once an executed NDA is obtained from CLFSC. In the interim the Company is submitting all non-confidential parts of the CLF-SC interrogatories. b. The Company does not currently produce long-term load forecasts at the individual feeder level. Accordingly, it cannot provide the feeder-by-feeder, year-by-year summer and winter peak demand data, coincident peak timing, or weather-normalization assumptions requested in subpart (b). The Company’s long-term load forecasting is performed at the substation level, consistent with standard industry and regulatory practice for capacity and system planning purposes. Feeder-level analysis in the Company’s planning process is generally reserved for shorter-term, operational and reliability-driven purposes rather than for multi-year forward-looking forecasts. This distinction reflects the fact that substation transformer capacity, not individual feeder capacity, is typically the binding constraint that drives long-term capital planning; feeder loads can be reconfigured or transferred between circuits off a common substation bus more readily than substation capacity itself can be expanded.Page 34 of 56
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-014 Page 1 of 5 Date Filed: September 18, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: CLF and Sierra Club Question: For each feeder identified in CLF-SC-13, please provide: a. whether the Company identifies the feeder as currently having an N-0 thermal constraint (i.e., forecasted peak at or above 100% of its summer or winter normal rating under N-0 conditions) or an N-1 contingency overload (i.e., a circumstance in which restoring the feeder's load following a contingency event would require a neighboring feeder to exceed its own emergency rating for an excessive period of time, or equivalent definition used by the Company), and, if possible, the load at which that constraint occurred. b. whether the Company has flagged the feeder as having a forecasted N-0 thermal constraint or N-1 contingency overload during the time horizon of the load forecast provided in CLFSC-13, and, if possible, the load level at which that constraint is expected to occur. If the Company only tracks the year in which a particular constraint is first forecast to occur, rather than every year it is expected to occur, please provide this information instead. c. for any such constraint identified in items a. and b. above, the remediation status the Company has assigned to it (e.g., identified/monitoring only, under evaluation, planned, approved, in construction, or in-service); and d. if a remediation has been identified or is underway, the type of remediation involved, such as a temporary operational measure (e.g., switching, feeder reconfiguration, or load transfer to a neighboring feeder or substation), a non-wires alternative (e.g., battery storage, demand response, or other non-infrastructure solution), or a capacity project (e.g., a new or upgraded feeder, conductor or cable upgrade, or new or expanded substation or substation transformer), together with the associated project identifier (if any) and expected in-service date or estimated completion year. If the Company tracks remediation status or project type using its own categories or flags that do not map cleanly onto the categories above, please instead provide the Company's own categories or flags, along with a brief description of what each one means, rather than attempting to force the Company's data into the categories listed above. If the Company does not possess the information needed to produce the forecasted thermal constraints and remediation status itemized in this Request at the individual feeder level, please state specifically which item(s) it is unable to provide, and explain in detail why not. As with CLF-SC-12 and CLF-SC-13, the Company may provide the information requested in this Request as a separate table, or as a single combined table with the peak demand informationPage 35 of 56
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-014 Page 2 of 5 described in CLF-SC-13, joined on the unique feeder identifier described in CLF-SC-12, item a, above; either format is acceptable, provided that the items requested can be unambiguously matched to the correct feeder. Response: a. Please refer to the Company’s response to CLF-SC-012 i, for the requested information. b. Please refer to the Company’s response to CLF-SC-013 ii, in reference to forecasting provided. c. To track the disposition of identified circuit overload conditions, the following remediation statuses were assigned: • Identified: Overload condition has been identified and is being monitored pending evaluation, prioritization, and development of a corrective solution. • Project Developed: A mitigation project has been established to address the overload condition but has not yet been placed in service. • Under Construction: Construction activities associated with the mitigation project are underway. • In-Service: The mitigation project has been completed and placed in service, and the overload condition has been addressed. d. The following remediation types have been assigned to corrective actions developed to address identified circuit overload conditions: • New Circuit: Construction of a new distribution circuit. • Infrastructure Upgrade: Replacement or upgrade of distribution assets to increase capacity. • Load Transfer: Transfer of load to an adjacent circuit with available capacity. • Conversion: Upgrade of the distribution system to a higher operating voltagePage 36 of 56
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-014 Page 3 of 5 Prior Referenced Response: CLF-SC-012 Question: For every feeder on the Company's electric distribution system, please provide a table, in CSV format or in live Microsoft Excel format with all formulae intact, containing the following information for each feeder as of the test year in this proceeding: a. a unique feeder identifier b. the substation, and, if applicable, the specific substation transformer(s), that supply the feeder c. the feeder's nominal operating voltage class (e.g., 34.5 kV, 13.2 kV, or 4.16 kV) d. the feeder's summer normal rating, in amps, kW, or MVA (whichever unit the Company uses natively for feeder ratings) e. the feeder's winter normal rating, in the same unit used in item 4 above f. the total number of customers served by the feeder g. the number of customers served by the feeder broken out by major customer class (e.g., residential, small commercial, and large commercial/industrial) h. the number of customers served by the feeder with heat pumps as their primary heating type i If the Company does not possess the information to produce the data fields requested above at the individual feeder level, please state specifically which item(s) it is unable to provide, and explain in detail why not. If the Company is not able to produce all of the items requested above for the test year, but is able to do so for a different time period, please provide these figures for the most recent time period available. CLF-SC-012 Response: The information requested is detailed, comprehensive data, constituting highly confidential Critical Energy Infrastructure Information (“CEII”) that qualifies for protection under PURA’s requirements for CEII, which protection the Company will seek when it is submitted to the record. The Company does not currently have an executed non-disclosure agreement (“NDA”) in place with the Conservation Law Foundation and Sierra Club (“CLFSC”), although the Company is in contact with CLF-SC and is appreciative for their coordination and collaboration. In addition, the Company is in the final stages of implementation of new internal information systems and document controls for enhanced cybersecurity goals that would apply to this data production. Therefore, the Company plans to supplement this response with production for all parties having executed an non-disclosure agreement with the Company, once an executed NDA is obtained from CLF-SC. In the interim the Company is submitting all nonconfidential parts of the CLF-SC interrogatories. As-identified in the Company’s response to CLF-SC-001i, the Company does not possess a comprehensive list of customers with heat pumps as their primary heat source. CLF-SC-013 Question: For each feeder identified in response to CLF-SC-12, please provide, in CSV format or in the same live Microsoft Excel format: ii a. the feeder's coincident summer peak demand and winter peak demand, in the same unit used for the feeder's rating in response to CLF-SC-12 (amps, kW, or MVA), for each of the three most recently completed calendar years (i.e., three summer peaks and three winter peaks per feeder) and for the test year itself (if test year is not contained within the three most recently completed calendar years), together with the specific date and hour (or finest available timestamp) at which each summer and winter peak occurred. These historical peaks should reflect actual metered values, not weather-normalized estimates; if the Company does not maintain actual metered peak demand at the individual feeder level and is only able to provide weather-Page 37 of 56
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-014 Page 4 of 5 normalized historical peaks, please state so explicitly and explain in detail why actual metered data is unavailable at the feeder level. b. the feeder's forecasted summer peak demand and winter peak demand, in the same unit used in item a above, for each year of the Company's most recent long-term feeder-level load forecast, together with the assumed month, day, and hour (or hour range) at which the Company's forecasting model assumes the coincident summer and winter peaks occur. Please also state the assumed weather condition or percentile (e.g., 50/50 or 90/10 weather-normalized design conditions) underlying the forecast provided. Please provide this information with one row per feeder and one column per year (or, equivalently, one row per feeder per year), broken out separately for summer and winter. If the Company does not possess the information needed to produce the historical peaks and forecasted peaks itemized in this Request at the individual feeder level, please state specifically which item(s) it is unable to provide, and explain in detail why not. The Company may provide the information requested in CLF-SC-12 and CLF-SC-13 as two separate tables, or as a single combined table containing both the feeder identifying/rating information described in CLF-SC-12 and the peak demand information described in CLF-SC-13, joined on the unique feeder identifier described in CLF-SC-12, item a, above; either format is acceptable, provided that the items requested can be unambiguously matched to the correct feeder. CLLF-SC-013 Response: The Company interprets the request for coincident peak to mean coincident with the New England ISO peak for the respective calendar year and season (summer and winter) barring further clarification by CLF and SF. The Company notes that the winter peak does not guarantee correlation with the coldest day. Given that the test year for this proceeding is 2025, the request for the last 3 completed calendar years overlaps with the test year resulting in data being provided for 2025, 2024, and 2023. a) The information requested is detailed, comprehensive data, constituting highly confidential Critical Energy Infrastructure Information (“CEII”) that qualifies for protection under PURA’s requirements for CEII, which protection the Company will seek when it is submitted to the record. The Company does not currently have an executed non-disclosure agreement (“NDA”) in place with the Conservation Law Foundation and Sierra Club (“CLF-SC”), although the Company is in contact with CLF-SC and is appreciative for their coordination and collaboration. In addition, the Company is in the final stages of implementation of new internal information systems and document controls for enhanced cybersecurity goals that would apply to this data production. Therefore, the Company plans to supplement this response with production for all parties having executed an non-disclosure agreement with the Company, once an executed NDA is obtained from CLFSC. In the interim the Company is submitting all non-confidential parts of the CLF-SC interrogatories. b) The Company does not currently produce long-term load forecasts at the individual feeder level. Accordingly, it cannot provide the feeder-by-feeder, year-by-year summer and winter peak demand data, coincident peak timing, or weather-normalization assumptions requested in subpart (b). The Company’s long-term load forecasting is performed at the substation level, consistent with standard industry and regulatory practice for capacity and system planning purposes. Feeder-level analysis in the Company’s planning process is generally reserved for shorter-term, operational and reliability-driven purposes rather than for multi-yearPage 38 of 56
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-014 Page 5 of 5 forward-looking forecasts. This distinction reflects the fact that substation transformer capacity, not individual feeder capacity, is typically the binding constraint that drives long-term capital planning; feeder loads can be reconfigured or transferred between circuits off a common substation bus more readily than substation capacity itself can be expanded.Page 39 of 56
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-015 Page 1 of 2 Date Filed: September 18, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: CLF and Sierra Club Question: For each feeder identified in response to CLF-SC-12, please provide the feeder's actual hourly metered loading or demand, in the same unit used for the feeder's rating in response to CLF-SC12 (amps, kW, or MVA), for each of the three most recently completed calendar years (i.e., up to 8,760 hourly values per feeder per year — 8,784 in a leap year — for each of the three years). These historical values should reflect actual metered data specific to that feeder, not weathernormalized, estimated, or "representative" values (e.g., a representative load profile assigned to a class of similar feeders, rather than telemetry recorded for that specific feeder). If the Company's systems already possess this feeder-level load data pre-aggregated to hourly resolution, please provide that data as maintained, and state whether each hourly value represents an interval average, an instantaneous/snapshot reading, an interval maximum, or some other convention used by the Company. If the Company does not already maintain this data at hourly resolution and must newly aggregate it from a finer-resolution source (e.g., SCADA data polled at a sub-hourly interval) in order to respond to this request, please use the interval average — i.e., the average metered demand over each clock-hour — as the aggregation convention. If the Company does not possess the information necessary to produce hourly metered loading at the individual feeder level for the full three-year period (including because, for some or all feeders, the Company has only a representative or archetype load profile rather than actual metered telemetry), please provide whatever actual metered feeder-level data it does maintain and for the longest available sub-period of those three calendar years, identify the resolution and period provided, and explain in detail why the data isn't available for all feeders or for the entire requested time period. Please provide this information in a machine-readable live Microsoft Excel or CSV format, with one row per feeder per timestamp/interval and a labeled timestamp column (not a static image, PDF, or pivoted/merged-cell table), together with the unique feeder identifier described in CLFSC-12, item 1, above, so that this data can be joined to the feeder-level information provided in response to CLF-SC-12 and CLF-SC-13. Please use the same timestamp convention — including time zone, whether intervals are labeled by interval-beginning or interval-ending, and treatment of daylight saving time transitions — as used in response to CLF-SC-8 above, and identify that convention. If the Company does not possess the information necessary to produce this feederlevel hourly load data, please explain in detail why not.Page 40 of 56
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-015 Page 2 of 2 Response: The information requested is detailed, comprehensive data, constituting highly confidential Critical Energy Infrastructure Information (“CEII”) that qualifies for protection under PURA’s requirements for CEII, which protection the Company will seek when it is submitted to the record. The Company does not currently have an executed non-disclosure agreement (“NDA”) in place with the Conservation Law Foundation and Sierra Club (“CLF-SC”), although the Company is in contact with CLF-SC and is appreciative for their coordination and collaboration. In addition, the Company is in the final stages of implementation of new internal information systems and document controls for enhanced cybersecurity goals that would apply to this data production. Therefore, the Company plans to supplement this response with production for all parties having executed an non-disclosure agreement with the Company, once an executed NDA is obtained from CLF-SC. In the interim the Company is submitting all non-confidential parts of the CLF-SC interrogatories. The information will provide hourly interval data which represents a time-weighted average through the interval period. The time stamps correspond with Eastern Prevailing Time. Other than the time-weighted average referenced above, the data will be actual metered data, as requested, without normalization for weather, operational conditions, or other interpolations for missing data for any other reason, such as no metering infrastructure or remote communications. This will result in some data points reporting null or zero values in the spreadsheet.Page 41 of 56
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-016 Page 1 of 2 Date Filed: September 18, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez and John P. DiPaola-Tromba Request from: CLF and Sierra Club Question: For every substation transformer on the Company's electric distribution system, please provide a table, in CSV format or in the same live Microsoft Excel format, containing the following information for each substation transformer as of the test year in this proceeding: a. b. c. d. e. f. g. h. a unique transformer identifier the substation at which the transformer is located the transformer's nominal voltage class the transformer's summer normal rating, in amps, kW, or MVA (whichever unit the Company provides for the equivalent feeder data) the transformer's winter normal rating, in the same unit used in item 4 above the total number of customers served by the transformer the number of customers served by the transformer broken out by major customer class (e.g., residential, small commercial, and large commercial/industrial) the number of customers served by the transformer with heat pumps as their primary heating type If the Company does not maintain any of the items requested above at the individual substation transformer level, please state specifically which item(s) it is unable to provide, and explain in detail why not. If the Company is not able to produce all of the items requested above for the test year, but is able to do so for a different time period, please provide these figures for the most recent time period available Response: The information requested is detailed, comprehensive data, constituting highly confidential Critical Energy Infrastructure Information (“CEII”) that qualifies for protection under PURA’s requirements for CEII, which protection the Company will seek when it is submitted to the record. The Company does not currently have an executed non-disclosure agreement (“NDA”) in place with the Conservation Law Foundation and Sierra Club (“CLF-SC”), although the Company is in contact with CLF-SC and is appreciative for their coordination and collaboration. In addition, the Company is in the final stages of implementation of new internal information systems and document controls for enhanced cybersecurity goals that would apply to this data production. Therefore, the Company plans to supplement this response with production for all parties having executed an non-disclosure agreement with the Company, once an executed NDAPage 42 of 56
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-016 Page 2 of 2 is obtained from CLF-SC. In the interim the Company is submitting all non-confidential parts of the CLF-SC interrogatories. Customer counts and major customer class are not currently tracked or stored at the bulk transformer level. As-identified in the Company’s response to CLF-SC-001, i the Company does not possess a comprehensive list of customers with heat pumps as their primary heat source. Prior Referenced Response: i CLF-SC-001 Question: Please provide any quantitative heat pump adoption forecast(s) for the Company's service territory prepared by the Company, or by a third party on behalf of the Company, in CSV format or in live Microsoft Excel format with all formulae intact. For each forecast, please provide results by year including, as available: a. b. c. the number of customers with heat pumps that year; the percentage of customers with heat pumps in that year; the additions to and/or reductions from summer and winter peak demand (in MW) caused by heat pump adoption in that year. If a forecast distinguishes among heat pump types (e.g., standard air-source, cold-climate air-source, geothermal/ground-source, etc.), please provide results broken out by heat pump type. If a forecast includes multiple scenarios, please provide results for each scenario separately. If the Company does not possess any such forecast, please explain in detail why not. CLF-SC-001 Response: Please refer to CLF-SC-001, Attachment 1, for the heat pump forecast used in the Company’s sales forecast (MWH). Adjustments to the sales forecast are made for heat pumps during the heating period for the months of October through April. Note that electrification and the number of customers installing heat pumps in the attachment are based on the CT C&LM programs forecast, i.e. these are customers that will be using C&LM incentives. Other heat pumps not installed though the C&LM program are not captured in the attachment. This forecast is solely based on the installation of cold climate heat pumps through C&LM programs. a. b. c. Please refer to CLF-SC-001, Attachment 1, for the number of customers with heat pumps installed through the C&LM program. Please refer to CLF-SC-001, Attachment 1, for the number of customers with heat pumps installed through the C&LM program as a percentage of residential customers. The heat pump forecast used to develop the Company’s sales forecast (MWH) in CLF-SC-001, Attachment 1 is solely for the winter heating months (October to April). Heat pump adjustments are not currently applied to our forecasted summer peak or winter peak demand (MW).
Text of CLF Set 1_ COMBINED.pdf
Extracted from the file · 20 pages · 38,243 characters
Text of CLF-SC Set 2_COMBINED.pdf
Extracted from the file · 7 pages · 17,131 characters
Text of EOE Set 3_COMBINED.pdf
Extracted from the file · 11 pages · 23,418 characters
Text of EOE Set 2_COMBINED.pdf
Extracted from the file · 22 pages · 42,455 characters
Text of EOE Set 1_COMBINED.pdf
Extracted from the file · 200 pages · 332,382 characters
Text of EOE Set 4_COMBINED.pdf
Extracted from the file · 70 pages · 139,575 characters
Text of ICC Set 1_COMBINED.pdf
Extracted from the file · 30 pages · 51,093 characters
Text of OCC Set 13_COMBINED.pdf
Extracted from the file · 30 pages · 61,971 characters
Text of OCC Set 12_COMBINED.pdf
Extracted from the file · 73 pages · 193,636 characters
Text of OCC Set 11_COMBINED.pdf
Extracted from the file · 48 pages · 62,469 characters
Text of OCC Set 10_COMBINED.pdf
Extracted from the file · 51 pages · 90,368 characters
Text of OCC Set 5_COMBINED.pdf
Extracted from the file · 46 pages · 88,105 characters
Text of OCC Set 4_COMBINED.pdf
Extracted from the file · 159 pages · 268,038 characters
Text of OCC Set 3_COMBINED.pdf
Extracted from the file · 93 pages · 113,517 characters
Text of OCC Set 2_COMBINED.pdf
Extracted from the file · 68 pages · 113,929 characters
Text of OCC Set 1_COMBINED.pdf
Extracted from the file · 139 pages · 225,320 characters
Text of OCC Set 14_COMBINED.pdf
Extracted from the file · 66 pages · 143,197 characters
As listed on the current system
Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses