Utility Dockets and Filings

Compilations of discovery responses

Files31

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

  1. Page 37 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-014 Page 4 of 5 normalized historical peaks, please state so explicitly and explain in detail why actual metered data is unavailable at the feeder level. b. the feeder's forecasted summer peak demand and winter peak demand, in the same unit used in item a above, for each year of the Company's most recent long-term feeder-level load forecast, together with the assumed month, day, and hour (or hour range) at which the Company's forecasting model assumes the coincident summer and winter peaks occur. Please also state the assumed weather condition or percentile (e.g., 50/50 or 90/10 weather-normalized design conditions) underlying the forecast provided. Please provide this information with one row per feeder and one column per year (or, equivalently, one row per feeder per year), broken out separately for summer and winter. If the Company does not possess the information needed to produce the historical peaks and forecasted peaks itemized in this Request at the individual feeder level, please state specifically which item(s) it is unable to provide, and explain in detail why not. The Company may provide the information requested in CLF-SC-12 and CLF-SC-13 as two separate tables, or as a single combined table containing both the feeder identifying/rating information described in CLF-SC-12 and the peak demand information described in CLF-SC-13, joined on the unique feeder identifier described in CLF-SC-12, item a, above; either format is acceptable, provided that the items requested can be unambiguously matched to the correct feeder. CLLF-SC-013 Response: The Company interprets the request for coincident peak to mean coincident with the New England ISO peak for the respective calendar year and season (summer and winter) barring further clarification by CLF and SF. The Company notes that the winter peak does not guarantee correlation with the coldest day. Given that the test year for this proceeding is 2025, the request for the last 3 completed calendar years overlaps with the test year resulting in data being provided for 2025, 2024, and 2023. a) The information requested is detailed, comprehensive data, constituting highly confidential Critical Energy Infrastructure Information (“CEII”) that qualifies for protection under PURA’s requirements for CEII, which protection the Company will seek when it is submitted to the record. The Company does not currently have an executed non-disclosure agreement (“NDA”) in place with the Conservation Law Foundation and Sierra Club (“CLF-SC”), although the Company is in contact with CLF-SC and is appreciative for their coordination and collaboration. In addition, the Company is in the final stages of implementation of new internal information systems and document controls for enhanced cybersecurity goals that would apply to this data production. Therefore, the Company plans to supplement this response with production for all parties having executed an non-disclosure agreement with the Company, once an executed NDA is obtained from CLFSC. In the interim the Company is submitting all non-confidential parts of the CLF-SC interrogatories. b) The Company does not currently produce long-term load forecasts at the individual feeder level. Accordingly, it cannot provide the feeder-by-feeder, year-by-year summer and winter peak demand data, coincident peak timing, or weather-normalization assumptions requested in subpart (b). The Company’s long-term load forecasting is performed at the substation level, consistent with standard industry and regulatory practice for capacity and system planning purposes. Feeder-level analysis in the Company’s planning process is generally reserved for shorter-term, operational and reliability-driven purposes rather than for multi-year
  2. Page 38 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-014 Page 5 of 5 forward-looking forecasts. This distinction reflects the fact that substation transformer capacity, not individual feeder capacity, is typically the binding constraint that drives long-term capital planning; feeder loads can be reconfigured or transferred between circuits off a common substation bus more readily than substation capacity itself can be expanded.
  3. Page 39 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-015 Page 1 of 2 Date Filed: September 18, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: CLF and Sierra Club Question: For each feeder identified in response to CLF-SC-12, please provide the feeder's actual hourly metered loading or demand, in the same unit used for the feeder's rating in response to CLF-SC12 (amps, kW, or MVA), for each of the three most recently completed calendar years (i.e., up to 8,760 hourly values per feeder per year — 8,784 in a leap year — for each of the three years). These historical values should reflect actual metered data specific to that feeder, not weathernormalized, estimated, or "representative" values (e.g., a representative load profile assigned to a class of similar feeders, rather than telemetry recorded for that specific feeder). If the Company's systems already possess this feeder-level load data pre-aggregated to hourly resolution, please provide that data as maintained, and state whether each hourly value represents an interval average, an instantaneous/snapshot reading, an interval maximum, or some other convention used by the Company. If the Company does not already maintain this data at hourly resolution and must newly aggregate it from a finer-resolution source (e.g., SCADA data polled at a sub-hourly interval) in order to respond to this request, please use the interval average — i.e., the average metered demand over each clock-hour — as the aggregation convention. If the Company does not possess the information necessary to produce hourly metered loading at the individual feeder level for the full three-year period (including because, for some or all feeders, the Company has only a representative or archetype load profile rather than actual metered telemetry), please provide whatever actual metered feeder-level data it does maintain and for the longest available sub-period of those three calendar years, identify the resolution and period provided, and explain in detail why the data isn't available for all feeders or for the entire requested time period. Please provide this information in a machine-readable live Microsoft Excel or CSV format, with one row per feeder per timestamp/interval and a labeled timestamp column (not a static image, PDF, or pivoted/merged-cell table), together with the unique feeder identifier described in CLFSC-12, item 1, above, so that this data can be joined to the feeder-level information provided in response to CLF-SC-12 and CLF-SC-13. Please use the same timestamp convention — including time zone, whether intervals are labeled by interval-beginning or interval-ending, and treatment of daylight saving time transitions — as used in response to CLF-SC-8 above, and identify that convention. If the Company does not possess the information necessary to produce this feederlevel hourly load data, please explain in detail why not.
  4. Page 40 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-015 Page 2 of 2 Response: The information requested is detailed, comprehensive data, constituting highly confidential Critical Energy Infrastructure Information (“CEII”) that qualifies for protection under PURA’s requirements for CEII, which protection the Company will seek when it is submitted to the record. The Company does not currently have an executed non-disclosure agreement (“NDA”) in place with the Conservation Law Foundation and Sierra Club (“CLF-SC”), although the Company is in contact with CLF-SC and is appreciative for their coordination and collaboration. In addition, the Company is in the final stages of implementation of new internal information systems and document controls for enhanced cybersecurity goals that would apply to this data production. Therefore, the Company plans to supplement this response with production for all parties having executed an non-disclosure agreement with the Company, once an executed NDA is obtained from CLF-SC. In the interim the Company is submitting all non-confidential parts of the CLF-SC interrogatories. The information will provide hourly interval data which represents a time-weighted average through the interval period. The time stamps correspond with Eastern Prevailing Time. Other than the time-weighted average referenced above, the data will be actual metered data, as requested, without normalization for weather, operational conditions, or other interpolations for missing data for any other reason, such as no metering infrastructure or remote communications. This will result in some data points reporting null or zero values in the spreadsheet.
  5. Page 41 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-016 Page 1 of 2 Date Filed: September 18, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez and John P. DiPaola-Tromba Request from: CLF and Sierra Club Question: For every substation transformer on the Company's electric distribution system, please provide a table, in CSV format or in the same live Microsoft Excel format, containing the following information for each substation transformer as of the test year in this proceeding: a. b. c. d. e. f. g. h. a unique transformer identifier the substation at which the transformer is located the transformer's nominal voltage class the transformer's summer normal rating, in amps, kW, or MVA (whichever unit the Company provides for the equivalent feeder data) the transformer's winter normal rating, in the same unit used in item 4 above the total number of customers served by the transformer the number of customers served by the transformer broken out by major customer class (e.g., residential, small commercial, and large commercial/industrial) the number of customers served by the transformer with heat pumps as their primary heating type If the Company does not maintain any of the items requested above at the individual substation transformer level, please state specifically which item(s) it is unable to provide, and explain in detail why not. If the Company is not able to produce all of the items requested above for the test year, but is able to do so for a different time period, please provide these figures for the most recent time period available Response: The information requested is detailed, comprehensive data, constituting highly confidential Critical Energy Infrastructure Information (“CEII”) that qualifies for protection under PURA’s requirements for CEII, which protection the Company will seek when it is submitted to the record. The Company does not currently have an executed non-disclosure agreement (“NDA”) in place with the Conservation Law Foundation and Sierra Club (“CLF-SC”), although the Company is in contact with CLF-SC and is appreciative for their coordination and collaboration. In addition, the Company is in the final stages of implementation of new internal information systems and document controls for enhanced cybersecurity goals that would apply to this data production. Therefore, the Company plans to supplement this response with production for all parties having executed an non-disclosure agreement with the Company, once an executed NDA
  6. Page 42 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-016 Page 2 of 2 is obtained from CLF-SC. In the interim the Company is submitting all non-confidential parts of the CLF-SC interrogatories. Customer counts and major customer class are not currently tracked or stored at the bulk transformer level. As-identified in the Company’s response to CLF-SC-001, i the Company does not possess a comprehensive list of customers with heat pumps as their primary heat source. Prior Referenced Response: i CLF-SC-001 Question: Please provide any quantitative heat pump adoption forecast(s) for the Company's service territory prepared by the Company, or by a third party on behalf of the Company, in CSV format or in live Microsoft Excel format with all formulae intact. For each forecast, please provide results by year including, as available: a. b. c. the number of customers with heat pumps that year; the percentage of customers with heat pumps in that year; the additions to and/or reductions from summer and winter peak demand (in MW) caused by heat pump adoption in that year. If a forecast distinguishes among heat pump types (e.g., standard air-source, cold-climate air-source, geothermal/ground-source, etc.), please provide results broken out by heat pump type. If a forecast includes multiple scenarios, please provide results for each scenario separately. If the Company does not possess any such forecast, please explain in detail why not. CLF-SC-001 Response: Please refer to CLF-SC-001, Attachment 1, for the heat pump forecast used in the Company’s sales forecast (MWH). Adjustments to the sales forecast are made for heat pumps during the heating period for the months of October through April. Note that electrification and the number of customers installing heat pumps in the attachment are based on the CT C&LM programs forecast, i.e. these are customers that will be using C&LM incentives. Other heat pumps not installed though the C&LM program are not captured in the attachment. This forecast is solely based on the installation of cold climate heat pumps through C&LM programs. a. b. c. Please refer to CLF-SC-001, Attachment 1, for the number of customers with heat pumps installed through the C&LM program. Please refer to CLF-SC-001, Attachment 1, for the number of customers with heat pumps installed through the C&LM program as a percentage of residential customers. The heat pump forecast used to develop the Company’s sales forecast (MWH) in CLF-SC-001, Attachment 1 is solely for the winter heating months (October to April). Heat pump adjustments are not currently applied to our forecasted summer peak or winter peak demand (MW).
  7. Page 43 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-017 Page 1 of 2 Date Filed: September 18, 2026 Witness: Lavelle A. Freeman, Gerhard Walker, and Juan F. Martinez Request from: CLF and Sierra Club Question: For each substation transformer identified in response to the CLF-SC-16, please provide, in CSV format or in the same live Microsoft Excel format: a. the transformer's coincident summer and winter peak loading, in the same unit used for the transformer's rating in CLF-SC-16, for each of the three most recently completed calendar years (i.e., three summer peaks and three winter peaks per feeder) and for the test year itself (if test year is not contained within three most recently completed calendar years), together with the specific date and hour (or finest available timestamp) at which each summer and winter peak occurred. These historical peaks should reflect actual metered values, not weather-normalized estimates; if the Company does not maintain actual metered peak demand at the individual substation transformer level and is only able to provide weathernormalized historical peaks, please state so explicitly and explain in detail why actual metered data is unavailable at the substation transformer level. b. the transformer's forecasted summer peak demand and winter peak demand, in the same unit used in item a above, for each year of the Company's most recent long-term substationtransformer-level load forecast, together with the assumed month, day, and hour (or hour range) at which the Company's forecasting model assumes the coincident summer and winter peaks occur. Please also state the assumed weather condition or percentile (e.g., 50/50 or 90/10 weather-normalized design conditions) underlying the forecast provided. Please provide this information with one row per transformer and one column per year (or, equivalently, one row per transformer per year), broken out separately for summer and winter. If the Company does not possess the information needed to produce the historical peaks and forecasted peaks itemized in this Request at the substation transformer level, please state specifically which item(s) it is unable to provide, and explain in detail why not. As with CLF-SC-12 and CLF-SC-13, the Company may provide the information requested in CLF-SC-16 and CLF-SC-17 as two separate tables, or as a single combined table joined on the unique transformer identifier described in CLF-SC-16; either format is acceptable, provided that the items requested can be unambiguously matched to the correct transformer.
  8. Page 44 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-017 Page 2 of 2 Response: The Company interprets the request for coincident peak to mean coincident with the New England ISO peak for the respective calendar year and season (summer and winter) barring further clarification by CLF and SF. The Company notes that the winter peak does not guarantee correlation with the coldest day. Given that the test year for this proceeding is 2025, the request for the last 3 completed calendar years overlaps with the test year resulting in data being provided for 2025, 2024, and 2023. a. The information requested is detailed, comprehensive data, constituting highly confidential Critical Energy Infrastructure Information (“CEII”) that qualifies for protection under PURA’s requirements for CEII, which protection the Company will seek when it is submitted to the record. The Company does not currently have an executed non-disclosure agreement (“NDA”) in place with the Conservation Law Foundation and Sierra Club (“CLF-SC”), although the Company is in contact with CLF-SC and is appreciative for their coordination and collaboration. In addition, the Company is in the final stages of implementation of new internal information systems and document controls for enhanced cybersecurity goals that would apply to this data production. Therefore, the Company plans to supplement this response with production for all parties having executed an nondisclosure agreement with the Company, once an executed NDA is obtained from CLFSC. In the interim the Company is submitting all non-confidential parts of the CLF-SC interrogatories. b. The Company does not produce a transformer level forecast. Please refer to the planning guide in CLF-SC-023, Attachment 1.
  9. Page 45 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-018 Page 1 of 2 Date Filed: September 18, 2026 Witness: Lavelle A. Freeman, Gerhard Walker, Juan F. Martinez and John P. DiPaola-Tromba Request from: CLF and Sierra Club Question: For each substation transformer identified in CLF-SC-17, please provide: a. whether the Company identifies the substation transformer as currently having an N-0 thermal constraint (i.e., forecasted peak at or above 100% of its summer or winter normal rating under N-0 conditions) or an N-1 contingency overload (i.e., a circumstance in which restoring the feeder's load following a contingency event would require a neighboring feeder to exceed its own emergency rating for an excessive period of time, or equivalent definition used by the Company), and, if possible, the load at which that constraint occurred. b. whether the Company has flagged the substation transformer as having a forecasted N-0 thermal constraint or N-1 contingency overload during the time horizon of the load forecast provided in CLF-SC-13, and, if possible, the load level at which that constraint is expected to occur. If the Company only tracks the year in which a particular constraint is first forecast to occur, rather than every year it is expected to occur, please provide this information instead. c. for any such constraint identified in item a above, the remediation status the Company has assigned to it (e.g., identified/monitoring only, under evaluation, planned, approved, in construction, or in-service); and d. if a remediation has been identified or is underway, the type of remediation involved, such as a temporary operational measure (e.g., switching or load transfer to a neighboring substation transformer or substation), a non-wires alternative (e.g., battery storage, demand response, or other non-infrastructure solution), or a capacity project (e.g., a new or upgraded substation transformer, a new or expanded substation, or other infrastructure addition), together with the associated project identifier (if any) and expected in-service date or estimated completion year. If the Company tracks remediation status or project type using its own categories or flags that do not map cleanly onto the categories above, please instead provide the Company's own categories or flags, along with a brief description of what each one means, rather than attempting to force the Company's data into the categories listed above. If the Company does not possess the information needed to produce the forecasted thermal constraints and remediation status itemized in this Request at the substation transformer level, please state specifically which item(s) it is unable to provide, and explain in detail why not. As with CLF-SC-12 and CLF-SC-13, the Company may provide the information requested in this Request as a separate table, or as a single combined table with the peak demand information
  10. Page 46 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-SC-01 Date Issued August 28, 2026 CLF-SC-018 Page 2 of 2 described in CLF-SC-17, joined on the unique transformer identifier described in CLF-SC-16, item a, above; either format is acceptable, provided that the items requested can be unambiguously matched to the correct transformer. Response: a. Please refer to CLF-SC-023, Attachment 1, for the Distribution System Planning Guide. This document outlines all planning criteria as it pertains to transformer and substation loading and what would classify as an overload or violation. Transformers are monitored in real time by the Operations department to stay loaded under 100% nameplate. The Company does not have any transformers on the system that are loaded above 100% nameplate under N-0 conditions. Any transformer loading above 100% nameplate was due to an N-1 condition or sustained transient peak. b. For planning purposes, transformers are monitored during peak periods to stay loaded below 75% of their nameplate rating when that transformer is relied upon to automatically restore an alternate distribution substation bus during an N-1 event. The Company tracks and forecasts substation N-1 emergency ratings and total loads. These ratings and loads are based on all transformers available for an independent voltage class at a specific substation location. In almost all scenarios, the normal 75% nameplate requirement for aggregate transformers will be less limiting than the substation Load Carrying Capacity (“LCC”) requirement. c. As mentioned above, the Company does not have any individual transformers that are loaded above 100% of nameplate during normal operation. d. N/A; see response in part (c).

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)