Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Search terms highlighted
Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

5 pages match
  1. Page 11 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-01 Date Issued August 13, 2026 CLF-005 Page 1 of 1 Date Filed: September 03, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Conservation Law Foundation Question: (SPACE HEATING RATE) Did the Company conduct any customer surveys or hold any focus groups as part of its process in designing Rate 6? If yes, please provide all reports, memorandums, or papers resulting from such surveys or focus groups. Response: No, the Company did not conduct any customer surveys or hold any focus groups as part of its process in designing proposed Rate 6.
  2. Page 12 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-01 Date Issued August 13, 2026 CLF-006 Page 1 of 1 Date Filed: September 03, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Conservation Law Foundation Question: (SPACE HEATING RATE) Did the Company meet with and/or discuss the development of Rate 6 with any heat pump related trade groups, manufacturers, or distributors? Response: The Company met with representatives of CLF to provide an overview and discuss the design of Rate 6 while still under development but did not meet and/or discuss the development of Rate 6 with any heat pump related trade groups, manufacturers, or distributors.
  3. Page 13 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-01 Date Issued August 13, 2026 CLF-007 Page 1 of 1 Date Filed: September 03, 2026 Witness: Edward A. Davis, Kimberly R. Parsons and Megan Bernardini Request from: Conservation Law Foundation Question: (SPACE HEATING RATE) Please describe the Company’s plan to notify customers about the availability of Rate 6. Provide copies of all advertising, marketing and educational materials, including bill inserts, transcripts of any media spots, and scripts for customer service representatives. If such materials have not been prepared, when does the Company intend to provide them for review and comment by interested parties? Response: Pending approval of the Space Heating Rate, the Company will communicate availability of the rate and potential cost savings through a variety of channels, which may include: • • • • • • • • Bill inserts On-bill messaging Information on eversource.com Direct email and/or letter Customer e-newsletter Outreach to community leaders, legislators and community-based organizations Traditional and social media Talking points for Customer Service Representatives These materials will be developed prior to the potential launch of the rate, when details of the rate design are finalized and approved. It is the Company’s standard practice, as time allows, to solicit feedback on customer messaging with our online customer panel. That feedback will be incorporated into the final messaging to maximize clarity and engagement. Feedback from other stakeholders or interested parties may be solicited prior to launch of the rate, as determined by PURA.
  4. Page 14 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-01 Date Issued August 13, 2026 CLF-008 Page 1 of 1 Date Filed: September 03, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Conservation Law Foundation Question: (SPACE HEATING RATE) Why did the Company choose to not copy the residential heat pump rate offering of its Massachusetts affiliate and provide for the automatic enrollment of all known existing heat pump customers into Rate 6? Response: The Company designed its proposed Rate 6 using characteristics of Connecticut-specific residential customers and their associated cost of service. Focusing specifically on the incremental usage anticipated through heat pump conversion, and having the benefit of both an allocated cost of service study (“ACOSS”) and a marginal cost of service study (“MCOSS”) prepared for this case, the Company has more specific and relevant insight into the costs and basis for setting rates for its residential customers, particularly for its Residential Rate 1 class. The Company evaluated all components of service and found that the distribution component of service was the relevant component upon which to develop the proposed rate. This structure is designed to be applied on a whole house basis, but targets a share of the load associated with incremental load of newly added heat pumps. The Company is unable to specifically design a rate for only the end use device (i.e., the heat pump). However, block rate structures previously applied for end uses (e.g., water heaters) have been designed into residential rates. A similar concept, but for the incremental load associated with a heat pump, is applied in the design of Rate 6. Redesigning the rate for more efficient pricing of the volumetric rate, in the tail block, while addressing the practical reality of recovering costs on an average basis for usage of the incumbent rate class prior to adding the incremental load, supports more appropriate pricing for incremental load, and addresses the concern of other new, incremental load that may not be distinguishable from heat pump load. A design that discounts the entire volumetric rate, such as the Massachusetts approach, would apply the discount to usage unrelated to the incremental heat pump load. Rate 6 avoids that outcome by confining the discounted pricing to an incremental block during the winter period, so that usage the customer would have taken in any event continues to be priced under the underlying base rate structure, thereby minimizing the costs that would otherwise be allocated to other customers.
  5. Page 15 of 20Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-01 Date Issued August 13, 2026 CLF-009 Page 1 of 1 Date Filed: September 03, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Conservation Law Foundation Question: (SPACE HEATING RATE) Do you agree that, given the proposed increase in the customer charge and the expected increase in annual electric usage for a customer taking service under Rate 6, such customers will significantly increase their contribution to the residential class’s proportional allocation of the Company’ s fixed delivery costs compared to customers who remain on Rate 1? Response: No. Moving more of the fixed component of costs out of the volumetric rate and into the customer charge does not mean that the rate class is contributing more to fixed costs.
  6. Page 16 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-01 Date Issued August 13, 2026 CLF-010 Page 1 of 1 Date Filed: September 03, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Conservation Law Foundation Question: (SPACE HEATING RATE) Why did the Company choose to define the heating season as November through March for Rate 6? Response: The months of November through March were selected from a review of the Rate 5 monthly usage profile during the Test Year, whereby a distinguished heating season load characteristic, relative to that of Rate 1, occurred.
  7. Page 17 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-01 Date Issued August 13, 2026 CLF-011 Page 1 of 4 Date Filed: August 27, 2026 Witness: Matthew Nelson and Michael Goldman Request from: Conservation Law Foundation Question: (SPACE HEATING RATE) See Exhibit CLP-IAP-1. Please provide copies of any papers, presentations, testimonies (whether pre-filed or delivered live) or opinion pieces prepared by Apex Analytics or, separately, by either Mr. Nelson or Mr. Goldman, within the last five years, on the subject of residential space heating rates and/or rate design, and/or residential heat pumps (including but not limited to heat pump cost, rate design, installation incentives, and tie-in with home energy audit and insulation programs.) If presented as live testimony, please include copies of transcripts of the direct, cross-examination, and redirect examination of the witness or witness panel. Response: Please refer to CLF-011, Attachments 1 through 42, for responsive materials prepared by Mr. Nelson, Mr. Goldman, and Apex Analytics, LLC. Apex Analytics is a consulting firm whose practice includes regulatory/rate design work and a substantial energy efficiency engineering practice. Over the past five years, Apex personnel have produced a significant body of work regarding heat pumps, the large majority of which are engineering and program-evaluation materials, studies of heat pump performance, sizing, building integration, and incorporation of heat pumps into energy efficiency plans, rather than heat pump rate design. Mr. Nelson and Mr. Goldman are the primary Apex personnel whose work concerns rates and rate design, while other Apex work is more technical and engineered focused, as described above. The engineering materials were prepared by other Apex staff and are not sponsored by the witnesses. In the interest of completeness, the Company is producing both categories, organized as described in the table below. All responsive materials from Mr. Nelson and Mr. Goldman are included herein. For other staff, Apex has made a good faith effort to recall and produce all documents responsive to this question; however, given the focus on heat pumps during the requested time period and general staff turnover, Apex cannot guarantee that it located every potentially responsive item. Attachment Description CLF-011 Attachment 1 Community-specific Cost-benefit Evaluation Framework for Beneficial Electrification presentation, co-presented by Apex Analytics on September 27, 2022
  8. Page 18 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-01 Date Issued August 13, 2026 CLF-011 Page 2 of 4 CLF-011 Attachment 2 Market Characterization and Assessment Report, co-prepared by Apex Analytics CLF-011 Attachment 3 Community-specific Cost-benefit Evaluation Framework for Beneficial Electrification presentation, presented by Apex Analytics on October 11, 2022 CLF-011 Attachment 4 Platte River Power Authority Beneficial Buildings Electrification Forecast, submitted by Apex Analytics on March 12, 2022 CLF-011 Attachment 5 Evolving Electrification Policy and Program Design in Pursuit of Decarbonization paper, co-authored by Apex Analytics CLF-011 Attachment 6 Legislating Heat Pumps: Assessing the costs and carbon savings from a state heat pump standard presentation, co-presented by Apex Analytics on August 4, 2026 CLF-011 Attachment 7 Legislating Heat Pumps: Assessing the costs and carbon savings from a state heat pump standard, co-authored by Apex Analytics CLF-011 Attachment 8 Keeping the heat on: Assessing the potential for demand side management to alleviate natural gas shortages during extreme cold presentation, co-presented by Apex Analytics on August 4, 2026 CLF-011 Attachment 9 Keeping the heat on: Assessing the potential for demand side management to alleviate natural gas shortages during extreme cold, coauthored by Apex Analytics CLF-011 Attachment 10 Realpolitik vs Wealth of Notions: Realizing the Benefits of Using CostEffectiveness Testing in Building Decarbonization, prepared by Apex Analytics CLF-011 Attachment 11 Reimagining Quality Installation in Residential Heat Pump Programs: An Analysis of Energy Savings and Value Propositions, co-presented by Apex Analytics on August 5, 2026 CLF-011 Attachment 12 Reimagining Quality Installation in Residential Heat Pump Programs: An Analysis of Energy Savings and Value Propositions, co-authored by Apex Analytics CLF-011 Attachment 13 Evolving Electrification Policy and Program Design in the Pursuit of Decarbonization, prepared by Apex Analytics CLF-011 Attachment 14 Don't Freeze! The Heating Electrification Train is Barreling Toward Us?, co-presented by Apex Analytics on November 4, 2022 CLF-011 Attachment 15 Don't Freeze! The Heating Electrification Train is Barreling Toward Us, co-authored by Apex Analytics CLF-011 Attachment 16 Switch talk on dual fuel heat pump carbon calculations, presentation by Apex Analytics CLF-011 Attachment 17 The Mountain Energy Project: Non-Pipeline Alternative Report, which the Apex Analytics team performed an NPA Analysis for, in collaboration with other firms
  9. Page 19 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-01 Date Issued August 13, 2026 CLF-011 Page 3 of 4 CLF-011 Attachment 18 The Mountain Energy Project: Non-Pipeline Alternative Implementation Plan CLF-011 Attachment 19 Rebuttal Testimony of Jordan Mann (Apex Analytics) in Colorado proceeding no. 25A-0044EG CLF-011 Attachment 20 Hearing transcript from Augst 13, 2025 in Colorado proceeding no. 25A0044EG CLF-011 Attachment 21 Hearing transcript from Augst 14, 2025 in Colorado proceeding no. 25A0044EG CLF-011 Attachment 22 VSHP Deep Dive Research Plan, co-presented by Apex Analytics on March 5, 2026 CLF-011 Attachment 23 Accelerated Adoption of Heat Pump Technology, jointly prepared by the Colorado Energy Office and Apex Analytics CLF-011 Attachment 24 LinkedIn Article: Decarbonization Journey Part I: Why did I buy the most boring heat pump? CLF-011 Attachment 25 LinkedIn Article: Decarb Journey Part II, What’s the Big Idea? CLF-011 Attachment 26 LinkedIn Article: Did the Inflation Reduction Act miss an opportunity for a true heat pump revolution? CLF-011 Attachment 27 LinkedIn Article: Hold up! Keeping your gas furnace might be more environmentally beneficial than you think CLF-011 Attachment 28 LinkedIn Article: What happens to EE/DSM when it stops being valuable to save electricity most of the time? And what does this mean for heating electrification? CLF-011 Attachment 29 LinkedIn Article: Where are the methane leaks? And why that’s critical for electrification policy. CLF-011 Attachment 30 Dual Fuel Heat Pump Pilot Phase I Evaluation Report, submitted jointly by Apex Analytics and Ideal Community Strategies CLF-011 Attachment 31 HVAC Market Actor Profile: Small-to-Medium Commercial HVAC Project Decision Making, prepared in-part by Apex Analytics CLF-011 Attachment 32 Turning the Wrenches of Beneficial Electrification: Understanding HVAC Contractor Decision-Making, co-authored by Apex Analytics CLF-011 Attachment 33 Colorado Hybrid Heating Study presentation by Apex Analytics CLF-011 Attachment 34 Energy Efficiency Strategies Roundtable presentation, co-presented by Apex Analytics CLF-011 Attachment 35 Direct Testimony and Attachments of Jane L. Colby (Apex Analytics) in the Matter of Atmos Energy Corporation’s Application for Approval of its 2024-2028 Clean Heat Plan before the Colorado Public Utilities Commission CLF-011 Attachment 36 Atmos Energy Colorado Natural Gas Market Potential Study – Clean Heat Plan, submitted by Apex Analytics with Brightline Group
  10. Page 20 of 20

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-01 Date Issued August 13, 2026 CLF-011 Page 4 of 4 CLF-011 Attachment 37 Direct Testimony and Attachment of Matthew H. Nelson (Apex Analytics) in the Matter of Atmos Energy Corporation’s Application for Approval of its 2024-2028 Clean Heat Plan before the Colorado Public Utilities Commission CLF-011 Attachment 38 Rebuttal Testimony of Matthew H. Nelson (Apex Analytics) in the Matter of Atmos Energy Corporation’s Application for Approval of its 2024-2028 Clean Heat Plan before the Colorado Public Utilities Commission CLF-011 Attachment 39 Renewable Energy World - Transforming utility customer service: Rates, incentives and decarbonization, authored by Michael Goldman (also available at Transforming utility customer service: Rates, incentives and decarbonization) CLF-011 Attachment 40 Renewable Energy World - Transforming utility customer service: Residential heat pumps can help decarbonization efforts, authored by Michael Goldman (also available at Transforming utility customer service: Residential heat pumps can help decarbonization efforts) CLF-011 Attachment 41 Renewable Energy World - Transforming utility customer service: Equity in decarbonization, authored by Michael Goldman (also available at Transforming utility customer service: Equity in decarbonization) CLF-011 Attachment 42 Renewable Energy World - Transforming utility customer service: Helping decarbonize the residential sector, authored by Michael Goldman (also available at Transforming utility customer service: Helping decarbonize the residential sector)

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)