Search terms highlighted
Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

12 pages match
  1. Page 42 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-156 Page 19 of 19 Non-storm rate base is shown on Lines 52-59, which reflect the capital investment forecast (exclusive of AMI) filed in this docket. Lastly, capital-driven costs of service are shown on Lines 61-67. Depreciation, property tax, uncollectible, gross earnings taxes, and costs of capital are based on the Company’s filed cost of service in this docket, specifically Exhibit CLPREVREQ-2-A, B, C, D Schedules, except that the return on equity (9.25%) and equity capitalization (53%) are shown at currently authorized amounts. b. Worksheet “COS-2 Capital” This worksheet functions nearly identically to “PBR-4 F-Factor” except that it relies on actual capital investment projected over the term of the PBMRP. This is essential to understanding actual costs of service, whether or not those costs are supported by revenues. It forms the basis for evaluating the degree to which the F-Factor is sufficient. For additional details pertaining to the mechanics, please see the line references found at the end of this worksheet (or model PDF page 19). c. Worksheet “COS-3 Property Tax” Similarly, this worksheet is included to assist with the calculation of actual costs of service. It operates mechanically identically to “PBR-5 F-Factor Property Tax” except that it relies on actual capital investment projections (Line 12).
  2. Page 43 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-157 Page 1 of 1 Date Filed: September 17, 2026 Witness: Timothy J. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (RECEIVABLES/UNCOLLECTIBLES) Refer to Response to EOE-061, Att.1 Redacted. The Memo referenced a Reserve Calculation Report (p. 2). Provide a working copy of the report as of December 31, 2025. Response: Please refer to EOE-157, Attachment 1, for a working copy of the Reserve calculation report as of December 31, 2025. The Reserve Calculation Report estimates the general reserve required each month using the methods described in the Internal Memo submitted in response to EOE-061 i to arrive at the total bad debt reserve requirements. These requirements are compared to the general ledger balance and necessary and /or recommended adjustments based on subject expertise are made within the monthly close. Prior Referenced Response: i EOE-061 Question: (RECEIVABLES/UNCOLLECTIBLES) Provide a complete copy of any and all internal Company policies and procedures regarding the administration of receivable balances, the treatment of uncollectible accounts, and reserving. This should include details regarding the establishment of bad debt reserves, the account write-off process (including the size of arrears in dollars and months eligible for write-off), and should specifically identify details regarding both Hardship and Non-Hardship treatments. EOE-061 Response: Please refer to EOE-061, Attachment 1 CONFIDENTIAL AND REDACTED FOR RELEVANCE, for a copy of the internal Company policies and procedures regarding reserves, which has been edited to redact information regarding Eversource’s other utility subsidiaries. Please refer to Exhibit CLP-REVREQ-2-H-2.0 (F) for copies of Customer Service policies.
  3. Page 44 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-158 Page 1 of 2 Date Filed: September 17, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Education, Outreach, and Enforcement Question: (ANNUAL REVENUE REQUIREMENTS) Refer to Response to EOE-064. The Company provided the authorized annual revenue requirements, excluding the authorized revenues associated with the Electric System Improvements (ESI) charges. Please supplement the response to include the authorized revenues associated with ESI. Response: The Company is updating its response to EOE-064 i to include ESI charges. Refer to the table below for the annual base distribution revenue requirement authorized for each Rate Year and the ESI charges authorized by PURA for the specific rate period noted. Rate Year May 1, 2018 to April 30, 2019 May 1, 2019 to April 30, 2020 May 1, 2020 to April 30, 2021 May 1, 2021 to April 30, 2022 May 1, 2022 to April 30, 2023 May 1, 2023 to April 30, 2024 May 1, 2024 to April 30, 2025 May 1, 2025 to April 30, 2026 May 1, 2026 to Present Authorized Revenues ($000) $1,098,572 $1,151,040 $1,184,812 $1,162,078 $1,162,078 $1,162,078 $1,162,078 $1,162,078 $1,162,078 Authorized Revenues ($000) $9,641 (a) $29,642 (b) $57,245 (c) $80,568 (d) $128,725 $153,958 (e) $211,655 $246,414 $265,427 ESI (a) Authorized annual ESI revenues are for the period July 1, 2018, through December 31, 2018. (b) Authorized annual ESI revenues are for the period January 1, 2019, to December 31, 2019. (c) Authorized annual ESI revenues are for the period January 1, 2020, to December 31, 2020. (d) Authorized annual ESI revenues reflect one month of revenues approved in Docket No. 20-0101 and eleven months of revenues approved in Docket No. 21-01-03. (e) In Docket No. 23-01-03 the Company proposed adjusting its initial 12-month ESI revenue requirement of $182.9 million by the $53.1 million rate mitigation that is recovered over a 22month period. The authorized annual ESI revenues reflect a rate mitigation adjustment pro rate for twelve months in the Rate Year.
  4. Page 45 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-158 Page 2 of 2 Prior Referenced Response: i EOE-064 Question: (ANNUAL REVENUE REQUIREMENTS) Identify the Company’s authorized annual revenue requirements for each calendar year 2018 through present. EOE-064 Response: Under ratemaking practice, the “authorized annual revenue requirement” applies only to the Rate Year in the context of a PURA decision with no multi-year rate plan. If a multi-year rate plan is in effect, then the terms of that plan determine the applicability of the “authorized annual revenue requirement” beyond the Rate Year. As a result of the 2018 Rate Settlement, an annual base distribution revenue requirement was authorized for each Rate Year listed in the table below. The revenue requirements exclude authorized revenues associated with Electric System Improvements (“ESI”) charges. Rate Year May 1, 2018 to April 30, 2019 May 1, 2019 to April 30, 2020 May 1, 2020 to April 30, 2021 May 1, 2021 to Present Authorized Revenues ($000) $1,098,572 $1,151,040 $1,184,812 $1,162,078
  5. Page 46 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-159 Page 1 of 1 Date Filed: September 17, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (PROCUREMENT PROCEDURES) Refer to Response to EOE-046. The Company’s response identified the requirements for purchases greater than $50,000 (i.e., competitive bids, sole source justifications, or documented exceptions) and included a note that states “[t]he requirement to document the exception was introduced in August of 2025.” Explain why the documented exception process was only introduced in August of 2025 and discuss what standard(s) existed prior to the new requirement. Response: The Company updated its Procurement Policy in August 2025 to strengthen recordkeeping, enhance transparency, and ensure consistent compliance across procurement activities. Prior to this update, capturing decentralized exception details across separate records proved administratively challenging. To improve efficiency and tracking, the team implemented structured tracking fields and a standardized note template to centralize exception documentation. Prior to August 2025, documenting exceptions in a centralized system was not a mandatory requirement. Instead, purchasing agents would log exceptions and context, as appropriate, which had the potential for inconsistencies. The August 2025 policy update formalized and standardized this practice into the mandatory requirement in place today.
  6. Page 47 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-160 Page 1 of 5 Date Filed: September 17, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (PROCUREMENT-DOCUMENTED EXCEPTION) Refer to Response to EOE-046. Provide a detailed listing of all “Documented Exceptions” to the Procurement Policy and Procurement Manual as referenced on p. 4. Response: The definitions and categories of "Documented Exceptions" are set forth in the Procurement Manual provided in the Company’s response to EOE-046 i. The transaction-level listing of Documented Exceptions for purchases exceeding $50,000 will be provided in the Supplemental Response to EOE-047 ii. Prior Referenced Response: i EOE-046 Question: (PROCUREMENT PROCEDURES) Provide copies of the Company’s procurement-related policies, procedures, and guidance including details regarding the Company’s competitive bid requirements. Provide all versions from 2018 to present and identify any changes that have occurred. Furthermore, specify the materiality of annual (or total) projected spend that requires a competitive bid analysis, the minimum number of proposals, and the frequency of updates. Additionally, identify the requirements for permitting any single source vendors. EOE-046 Response: The Procurement Policy and Procurement Manual collectively set the general requirements for competitive bidding, sole source procurement, documentation and governance and are provided as attachments to this response, as designated below. Copies of these documents, including all versions in effect from 2018 through the present reflect documented revision histories identifying material changes. The Procurement Manual is reviewed at least annually. The Procurement Policy is reviewed periodically and updated as needed to reflect governance, compliance and operational changes. Revisions are formally documented with revision numbers and effective dates. Summary of Procurement Policy Updates (2018 – Present): • Rev. 1 (12/21/2015): Eversource rebranding and revisions to both the Guideline and Selection Process sections. Refer to EOE-046, Attachment 1. o Note: EOE-046, Attachment 1, includes both revisions 1 and 2.
  7. Page 48 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-160 Page 2 of 5 • Rev. 2 (03/18/2019): Introduced explicit policy requirements governing the selling and disposition of surplus material, including procurement oversight and documentation controls. Refer to EOE-046, Attachment 1. • Rev. 3 (02/07/2020): Expanded and clarified the Guidelines section to reinforce procurement controls and promote consistency in sourcing and contracting practices. Refer to EOE-046, Attachment 2. • Rev. 4 (08/22/2024): Updated language in the Supplier Selection and Bidding Sections. Refer to EOE-046, Attachment 3. • Rev. 5 (05/07/2025): Updated the Guidelines section. Refer to EOE-046, Attachment 4. • Rev. 6 (08/14/2025): Comprehensive Policy revision to align with IOUs best practices, enhance key controls, and clarify roles/responsibilities. Refer to EOE-046, Attachment 5. • Rev. 7 (11/12/2025): Updated link to the Procurement Manual. • Rev. 8 (06/01/2026): Clarified Policy Scope regarding the procurement operating model and updated document references/hyperlinks. Refer to EOE-046, Attachment 6. The current and requested versions of the Procurement Manual (Attachments 7-21), with the summary of updates below: • Rev.17 (02/04/2019) – Updated the Procurement Manual to reflect organizational title changes and clarify procurement roles and responsibilities. Additional revisions were made to modernize procurement processes, including implementation of electronic sole source workflows, third-party COI administration, updates to contractor safety requirements to alignment with corporate compliance standards. Refer to EOE-046, Attachment 7. • Rev.18 (01/01/2020) – Updated the Procurement Manual to incorporate NERC CIP compliance requirements for Bulk Electric Systems (BES) and Cyber Systems procurements. Enhanced IT security documentation requirements. Refer to EOE-046, Attachment 8. • Rev.19 (03/04/2020) – Updated the Procurement Manual to reflect organizational title changes, including revision of the Procurement Director designation. Added active reference link to the Contractor CIP Compliance Agreement and expanded Diverse Supplier definitions. Refer to EOE-046, Attachment 9. • Rev.20 (07/08/2021) – Updated to align with executive titles with current organizational structure, enhance and refine Diverse Supplier classifications, modernize sourcing terminology, reorganize non-competitive procurement exceptions, and strengthen Sole Source approval requirements. Refer to EOE-046, Attachment 10. • Rev.21 (11/16/2021) – Updated the Procurement Manual to correct internal section references and align cross-references within the Supplier Diversity and Disqualification sections. Refer to EOE-046, Attachment 11. • Rev.23 (05/10/2022) – Updated the Procurement Manual to enhance Sole Source governance controls, including expanded executive approval requirements and additional documentation obligations requiring disclosure of sourcing deviations and supplier personnel with prior Eversource employment. Clarified
  8. Page 49 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-160 Page 3 of 5 competitive bid exception language and updated Compliance section terminology. Refer to EOE-046, Attachment 12. • Rev.24 (09/27/2023) – Updated the Procurement Manual to align Supplier Diversity and Subcontracting Plan requirements with federal government contracting thresholds, clarifying applicability for agreements unique to Eversource’s federal contracts and adjusting documentation requirements accordingly. Refer to EOE-046, Attachment 13. • Rev.25 (02/9/2024) – Updated the Procurement Manual to strengthen Sole Source requirements and clarify non-competitive procurement exceptions. Refer to EOE-046, Attachment 14. • Rev.26 (06/13/2024) – Updated the Procurement Manual to enhance Competitive Bid requirements, including pricing review requirements for multi-supplier awards. Refer to EOE-046, Attachment 15. • Rev.27 (08/14/2024) – Updated the Procurement Manual to strengthen Competitive Bid requirements, clarify non-competitive bid exceptions, refine contract definitions, and remove the Capital Approvals process. Refer to EOE-046, Attachment 16. • Rev.28 (10/15/2024) – Updated the Procurement Manual to add an Original Equipment Manufacturer (OEM) non-competitive bid exception. Refer to EOE-046 Attachment 17. • Rev.29 (12/11/2024) – Updated the Procurement Manual to align procurement requirements with applicable state and federal contracting laws and regulations. Refer to EOE-046, Attachment 18. • Rev.30 (08/15/2025) – Updated the Procurement Manual to comprehensively revise procurement governance, strengthen competitive bidding, negotiation, and approval requirements, clarify procurement roles and buying channels, and incorporate requirements for contracts, cybersecurity, data privacy, and policy compliance. Refer to EOE-046, Attachment 19. • Rev.31 (01/21/2026) – Updated the Procurement Manual to clarify restrictions on supplier participation in pre-solicitation activities and establish Director of Procurement approval requirements. Refer to EOE-046, Attachment 20. • Rev.32 (07/09/2026) – Updated the Procurement Manual to strengthen commercial negotiation and communication requirements, clarify procurement responsibilities and sourcing controls, expand Normal Goods and Services categories, and enhance supplier conflict-of-interest provisions. Refer to EOE-046, Attachment 21. Competitive Bid Requirements: Materiality for competitive bidding purposes is not based on a percentage of annual projected spend, but rather on an individual transaction-level threshold. Pursuant to the Procurement Policy and Procurement Manual, all procurement transactions for Normal Goods and Services with an individual value exceeding $50,000 must be supported by one of the following: 1. A Competitive Bid
  9. Page 50 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-160 Page 4 of 5 Note: Framework agreements that were competitively bid may have individual transactions over the $50,000 threshold that do not require additional bidding activities. 2. An Approved Sole Source Justification: Supported by an executed Sole Source Justification form or an approved Sole Source Desktop Requisition (DR) in Maximo. 3. A Documented Exception: Completed using the Procurement Exception Template (for Contracts) or designated exception logging (for Purchase Orders) based on authorized criteria in the Procurement Manual. Note: The requirement to document the exception was introduced in August of 2025. Supporting documentation must be retained in the applicable General File in accordance with records retention requirements. Minimum Number of Proposals: The Procurement Manual requires that competitive bids include multiple suppliers and, where feasible, at least three (3) bidders for transactions exceeding $50,000. However, there is no strict mandate that a minimum number of completed proposals must be received. The requirement to invite at least three bidders applies to the extent practicable based on: • Market availability • Technical qualifications • Prequalification status Requirements for Permitting Single / Sole Source Vendors: For transactions exceeding $50,000, sole source procurement is permitted when a review of the marketplace demonstrates that only one viable Supplier is technically and commercially capable of providing the required goods or services. All Sole Source transactions must be supported by a Sole Source Justification containing: • A detailed commercial and technical narrative describing why no other viable source can meet requirements. • An explanation of why competitive bidding cannot be conducted and efforts made to examine vendor qualifications. • Required management approvals in accordance with the approval hierarchy in effect at the time of the transaction Sole source justifications must be retained in the electronic ordering system (Maximo) as part of the Desktop Requisition or in the Ariba General File as part of the procurement record. ii EOE-047 Question: (PROCUREMENT PROCEDURES) In addition, to providing the requested policies, procedures, and guidance in EOE-46, above, please provide the following: a. Each instance from 2018 through the present in which the Company approved an exception to its competitive bidding requirements; b. The approving individual(s); c. The justification for the exception; d. The associated vendor and contract value; and e. Whether the exception was documented in writing and where that documentation is maintained.
  10. Page 51 of 70

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-160 Page 5 of 5 EOE-047 Response: Please refer to EOE-047, Attachment 1 CONFIDENTIAL, providing the details requested for Contracts and Purchase Orders released in 2025. Consistent with the Company’s response to EOE-051, the Company is preparing its response to this request relative to the scope of this proceeding. 1. For capitalized costs, the Company has compiled and is providing the requested information for the time period 2018-2025, which is in alignment with the plant additions that are requested for inclusion in rate base. 2. For operating and maintenance expense, the Company has compiled and is providing the requested information for the time period 2023-2025, which is in alignment with the Company’s test year (calendar year 2025), plus two additional historical years. 3. For storm-restoration expense associated with the deferred storm costs requested for recovery in this docket, the Company has compiled and is providing the requested information for the time period 20242025. With this response, the Company is providing the requested information, within scope, for calendar year 2025, which is the test year for this proceeding. Details for the set of exceptions approved in 2025 are shown in the spreadsheet attached, EOE-047, Attachment 1 CONFIDENTIAL. The Company plans to supplement this response with information pertaining to transactions prior to 2025, as soon as possible.

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)