Compilations of discovery responses
Files31
Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
PDF · 161 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Discovery Compilations September 29 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
ALLCO Set 5_COMBINED.pdf
PDF · 669 KB · 36 pagesText searchable
Download ALLCO Set 5_COMBINED.pdfRead the text of ALLCO Set 5_COMBINED.pdf
ALLCO Set 4_COMBINED.pdf
PDF · 133 KB · 4 pagesText searchable
Download ALLCO Set 4_COMBINED.pdfRead the text of ALLCO Set 4_COMBINED.pdf
ALLCO Set 3_COMBINED.pdf
PDF · 346 KB · 23 pagesText searchable
Download ALLCO Set 3_COMBINED.pdfRead the text of ALLCO Set 3_COMBINED.pdf
ALLCO Set 2_COMBINED.pdf
PDF · 576 KB · 38 pagesText searchable
Download ALLCO Set 2_COMBINED.pdfRead the text of ALLCO Set 2_COMBINED.pdf
ALLCO Set 1_COMBINED.pdf
PDF · 458 KB · 27 pagesText searchable
Download ALLCO Set 1_COMBINED.pdfRead the text of ALLCO Set 1_COMBINED.pdf
ALLCO Set 6_COMBINED.pdf
PDF · 332 KB · 9 pagesText searchable
Download ALLCO Set 6_COMBINED.pdfRead the text of ALLCO Set 6_COMBINED.pdf
AMTRAK Set 2_COMBINED.pdf
PDF · 123 KB · 2 pagesText searchable
Download AMTRAK Set 2_COMBINED.pdfRead the text of AMTRAK Set 2_COMBINED.pdf
AMTRAK Set 1_COMBINED.pdf
PDF · 190 KB · 5 pagesText searchable
Download AMTRAK Set 1_COMBINED.pdfRead the text of AMTRAK Set 1_COMBINED.pdf
AMTRAK Set 3_COMBINED.pdf
PDF · 649 KB · 34 pagesText searchable
Download AMTRAK Set 3_COMBINED.pdfRead the text of AMTRAK Set 3_COMBINED.pdf
CIEC Set 2_COMBINED.pdf
PDF · 85 KB · 1 pageText searchable
Download CIEC Set 2_COMBINED.pdfRead the text of CIEC Set 2_COMBINED.pdf
CIEC Set 1_COMBINED.pdf
PDF · 351 KB · 19 pagesText searchable
Download CIEC Set 1_COMBINED.pdfRead the text of CIEC Set 1_COMBINED.pdf
CIEC Set 3_COMBINED.pdf
PDF · 188 KB · 4 pagesText searchable
Download CIEC Set 3_COMBINED.pdfRead the text of CIEC Set 3_COMBINED.pdf
CLF-SC Set 1_COMBINED.pdf
PDF · 611 KB · 56 pagesText searchable
Download CLF-SC Set 1_COMBINED.pdfRead the text of CLF-SC Set 1_COMBINED.pdf
CLF Set 1_ COMBINED.pdf
PDF · 289 KB · 20 pagesText searchable
Download CLF Set 1_ COMBINED.pdfRead the text of CLF Set 1_ COMBINED.pdf
CLF-SC Set 2_COMBINED.pdf
PDF · 182 KB · 7 pagesText searchable
Download CLF-SC Set 2_COMBINED.pdfRead the text of CLF-SC Set 2_COMBINED.pdf
EOE Set 3_COMBINED.pdf
PDF · 237 KB · 11 pagesText searchable
Download EOE Set 3_COMBINED.pdfRead the text of EOE Set 3_COMBINED.pdf
EOE Set 2_COMBINED.pdf
PDF · 417 KB · 22 pagesText searchable
Download EOE Set 2_COMBINED.pdfRead the text of EOE Set 2_COMBINED.pdf
EOE Set 1_COMBINED.pdf
PDF · 1.7 MB · 200 pagesText searchable
Download EOE Set 1_COMBINED.pdfRead the text of EOE Set 1_COMBINED.pdf
EOE Set 4_COMBINED.pdf
PDF · 836 KB · 70 pagesText searchable
Download EOE Set 4_COMBINED.pdfRead the text of EOE Set 4_COMBINED.pdf
ICC Set 1_COMBINED.pdf
PDF · 466 KB · 30 pagesText searchable
Download ICC Set 1_COMBINED.pdfRead the text of ICC Set 1_COMBINED.pdf
OCC Set 13_COMBINED.pdf
PDF · 484 KB · 30 pagesText searchable
Download OCC Set 13_COMBINED.pdfRead the text of OCC Set 13_COMBINED.pdf
OCC Set 12_COMBINED.pdf
PDF · 1.0 MB · 73 pagesText searchable
Download OCC Set 12_COMBINED.pdfRead the text of OCC Set 12_COMBINED.pdf
OCC Set 11_COMBINED.pdf
PDF · 482 KB · 48 pagesText searchable
Download OCC Set 11_COMBINED.pdfRead the text of OCC Set 11_COMBINED.pdf
OCC Set 10_COMBINED.pdf
PDF · 542 KB · 51 pagesText searchable
Download OCC Set 10_COMBINED.pdfRead the text of OCC Set 10_COMBINED.pdf
OCC Set 5_COMBINED.pdf
PDF · 511 KB · 46 pagesText searchable
Download OCC Set 5_COMBINED.pdfRead the text of OCC Set 5_COMBINED.pdf
OCC Set 4_COMBINED.pdf
PDF · 1.3 MB · 159 pagesText searchable
Download OCC Set 4_COMBINED.pdfRead the text of OCC Set 4_COMBINED.pdf
OCC Set 3_COMBINED.pdf
PDF · 1.2 MB · 93 pagesText searchable
Download OCC Set 3_COMBINED.pdfRead the text of OCC Set 3_COMBINED.pdf
OCC Set 2_COMBINED.pdf
PDF · 1.7 MB · 68 pagesText searchable
Download OCC Set 2_COMBINED.pdfRead the text of OCC Set 2_COMBINED.pdf
OCC Set 1_COMBINED.pdf
PDF · 7.0 MB · 139 pagesText searchable
Download OCC Set 1_COMBINED.pdfRead the text of OCC Set 1_COMBINED.pdf
OCC Set 14_COMBINED.pdf
PDF · 880 KB · 66 pagesText searchable
Download OCC Set 14_COMBINED.pdfRead the text of OCC Set 14_COMBINED.pdf
Text of ALLCO Set 3_COMBINED.pdf
Extracted from the file · 23 pages · 55,777 characters
Text of ALLCO Set 2_COMBINED.pdf
Extracted from the file · 38 pages · 81,182 characters
Text of ALLCO Set 1_COMBINED.pdf
Extracted from the file · 27 pages · 46,644 characters
Text of ALLCO Set 6_COMBINED.pdf
Extracted from the file · 9 pages · 18,340 characters
Text of AMTRAK Set 2_COMBINED.pdf
Extracted from the file · 2 pages · 3,025 characters
Text of AMTRAK Set 1_COMBINED.pdf
Extracted from the file · 5 pages · 4,881 characters
Text of AMTRAK Set 3_COMBINED.pdf
Extracted from the file · 34 pages · 101,991 characters
Text of CIEC Set 2_COMBINED.pdf
Extracted from the file · 1 page · 1,005 characters
Text of CIEC Set 1_COMBINED.pdf
Extracted from the file · 19 pages · 26,023 characters
Text of CIEC Set 3_COMBINED.pdf
Extracted from the file · 4 pages · 5,355 characters
Text of CLF-SC Set 1_COMBINED.pdf
Extracted from the file · 56 pages · 132,578 characters
Text of CLF Set 1_ COMBINED.pdf
Extracted from the file · 20 pages · 38,243 characters
Text of CLF-SC Set 2_COMBINED.pdf
Extracted from the file · 7 pages · 17,131 characters
Text of EOE Set 3_COMBINED.pdf
Extracted from the file · 11 pages · 23,418 characters
Text of EOE Set 2_COMBINED.pdf
Extracted from the file · 22 pages · 42,455 characters
Text of EOE Set 1_COMBINED.pdf
Extracted from the file · 200 pages · 332,382 characters
Page 55 of 70
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-161 Page 4 of 5 • Rev.31 (01/21/2026) – Updated the Procurement Manual to clarify restrictions on supplier participation in pre-solicitation activities and establish Director of Procurement approval requirements. Refer to EOE-046, Attachment 20. • Rev.32 (07/09/2026) – Updated the Procurement Manual to strengthen commercial negotiation and communication requirements, clarify procurement responsibilities and sourcing controls, expand Normal Goods and Services categories, and enhance supplier conflict-of-interest provisions. Refer to EOE-046, Attachment 21. Competitive Bid Requirements: Materiality for competitive bidding purposes is not based on a percentage of annual projected spend, but rather on an individual transaction-level threshold. Pursuant to the Procurement Policy and Procurement Manual, all procurement transactions for Normal Goods and Services with an individual value exceeding $50,000 must be supported by one of the following: 1. A Competitive Bid Note: Framework agreements that were competitively bid may have individual transactions over the $50,000 threshold that do not require additional bidding activities. 2. An Approved Sole Source Justification: Supported by an executed Sole Source Justification form or an approved Sole Source Desktop Requisition (DR) in Maximo. 3. A Documented Exception: Completed using the Procurement Exception Template (for Contracts) or designated exception logging (for Purchase Orders) based on authorized criteria in the Procurement Manual. Note: The requirement to document the exception was introduced in August of 2025. Supporting documentation must be retained in the applicable General File in accordance with records retention requirements. Minimum Number of Proposals: The Procurement Manual requires that competitive bids include multiple suppliers and, where feasible, at least three (3) bidders for transactions exceeding $50,000. However, there is no strict mandate that a minimum number of completed proposals must be received. The requirement to invite at least three bidders applies to the extent practicable based on: • Market availability • Technical qualifications • Prequalification status Requirements for Permitting Single / Sole Source Vendors: For transactions exceeding $50,000, sole source procurement is permitted when a review of the marketplace demonstrates that only one viable Supplier is technically and commercially capable of providing the required goods or services.Page 56 of 70
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-161 Page 5 of 5 All Sole Source transactions must be supported by a Sole Source Justification containing: • A detailed commercial and technical narrative describing why no other viable source can meet requirements. • An explanation of why competitive bidding cannot be conducted and efforts made to examine vendor qualifications. • Required management approvals in accordance with the approval hierarchy in effect at the time of the transaction Sole source justifications must be retained in the electronic ordering system (Maximo) as part of the Desktop Requisition or in the Ariba General File as part of the procurement record.Page 57 of 70
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-162 Page 1 of 1 Date Filed: September 17, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (APPROVAL LEVELS) Refer to Response to EOE-050. Explain how the Company monitors adherence to the Company’s Delegation of Authority (DOA) policy to ensure that multiple purchase orders or contracts are not used in lieu of obtaining higher levels of approvals. Response: The Company enforces compliance with its Delegation of Authority (DOA) policy, mitigating the risk of “splitting” purchase orders or contracts through a combination of automated system controls, spending aggregation practices and procurement oversight, which are effective tools in limiting the potential for this practice. • System-Driven Approval Workflows: The majority of procurement spend is supported by Ariba Contracts. Ariba systematically enforces hardcoded DOA approval thresholds based on total contract value. System logic prevents requisitioners from bypassing required management approval levels. • Spend Aggregation & Agent Oversight: Procurement agents continuously monitor requisitions to aggregate spending across business units and vendors. This proactive approach is the best practice that supports the aggregation of fragmented, lower-threshold purchase orders to better leverage our spend and mitigate risk where appropriate and feasible. • Governance & Auditing: Procurement personnel and business partners regularly monitor ordering patterns to identify opportunities where a competitive bid might be warranted and valuable. The Company's DOA policy enforces requirements at both the Purchase Order and Contract levels. Within this framework, there will be operational logistics and strategic considerations that appropriately preclude aggregation of materials or services in advance in all cases. However, system controls ensure that every transaction complies with required approval thresholds. With over 90% of total spend covered under negotiated contracts, the Company balances administrative efficiency with rigorous compliance monitoring to safeguard against policy circumvention.Page 58 of 70
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-163 Page 1 of 1 Date Filed: September 17, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (APPROVAL LEVELS) Refer to Responses to EOE-050, and EOE-054. Identify why the following vendor example was subject to multiple purchase order (PO) numbers where each of the PO values were below the procurement agent’s approval limits. As part of the response, please provide any correspondence or other documentation demonstrating approval by an individual with the correct authority level: PONUM VENDOR NAME 13315849 13312300 13310146 13309415 SUMMIT HANDLING SYSTEMS INC SUMMIT HANDLING SYSTEMS INC SUMMIT HANDLING SYSTEMS INC SUMMIT HANDLING SYSTEMS INC PO VALUE $99,864 $99,864 $99,864 $99,864 APPROVAL DATE 2/5/2025 1/24/2025 1/15/2025 1/15/2025 Response: The four purchase orders listed above were issued as individual release orders against Ariba Contract CW2308163, which received required authorization through the Director of Procurement for an aggregate value up to $7,500,000. Because the total spend commitment of $7,500,000 was properly authorized at the Director level, individual purchase orders beneath this contract represent operational releases for different locations requested by various end-users at different times. While each individual release order fell within the procurement agent's limit, all spend remained governed by the Director-level approval of the supporting contract. Please refer to EOE-163, Attachment 1 CONFIDENTIAL, for documentation showing the approval workflow and authority levels for Master Contract CW2308163.Page 59 of 70
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-164 Page 1 of 2 Date Filed: September 17, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (MILESTONE PAYMENTS) Refer to Response to EOE-056. The Company’s response stated that the “Company does not generally support milestone payments prior to work being performed or costs being incurred by the Company’s vendor…” Provide a listing of all procurements that included milestone payments, along with the rationale for why the payments were permitted. As part of the response, please identify the vendor, the contractual amount, and the payment amount that would be at risk. Response: Milestone payments are not maintained as a separately reportable procurement attribute. Milestone payment terms, where applicable, are permitted on a case-by-case basis as described in the Company’s response to EOE-056 i. Milestone payments may be permitted where appropriate, based on the nature of the goods or services being procured and the applicable commercial terms. Any characterization of an amount that would be “at risk” would depend upon the specific contractual provisions, milestone that was completed, and other facts applicable to the individual procurement and payment. Prior Referenced Response: i EOE-056 Question: (MILESTONE PAYMENTS) Explain the Company’s process for permitting milestone payments prior to work being performed or costs being incurred by the Company’s vendors. EOE-056 Response: The Company does not generally support milestone payments prior to work being performed or costs being incurred by the Company’s vendors unless (1) it was market-driven; (2) it was the result of a negotiation where we received something of equal or greater value in exchange for such milestone payment schedule; (3) the milestone payment schedule was part of an overall proposal that was the most favorable/best evaluated; and (4) it was a relatively small amount, such that the Company would not incur excessive risk as a result of such payment. Milestone payments typically are a consideration for major, long-lead equipment and large, lump sum construction contracts. The process for whether and how to permit milestone payments is managed through the Company’s Procurement department, often with input from other stakeholders including legal, finance and our business units. They are handled on a case-by-case or RFP basis and in most cases, they are a result of negotiation and therefore thePage 60 of 70
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-164 Page 2 of 2 final milestone payment schedule is usually vendor specific and/or equipment specific. Other things equal, the Company works to negotiate milestone payments with as much of the payment tied to delivery and final acceptance/completion as possible. Key considerations the Company makes when evaluating or negotiating milestone payments are (1) ensuring that milestone payments are supported by value of the work performed; (2) trying to tie milestone payments to defined deliverables; and (3) retaining enough leverage to protect the schedule, quality and performance of the work. Milestone schedules are often market-driven and they are considered in context of the full contract.Page 61 of 70
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-165 Page 1 of 2 Date Filed: September 24, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (COMPETITIVE BID ASSESSMENTS) Refer to Response to EOE-051, Att.1. The Company’s response identified that “supporting procurement records are maintained at the Purchase Order or Contract level rather than the Supplier level.” Please supplement EOE-051, Att.1 with a detailed listing of the applicable purchase order or contract numbers and identify whether the POs or contracts were subject to a competitive bid or sole source approval. Response: Please refer to EOE-165, Attachment 1, submitted as a supplement to EOE-051, Attachment 1. The attachment provides the applicable Purchase Order and Contract numbers and identifies whether each was subject to a competitive bid or sole source approval. There are some instances in this population where the Contract was established through a competitive bidding process, but the associated Purchase Order was supported by a Sole Source Justification. This may occur for two primary reasons: 1. In some cases, the Contract was established through a competitive bid process, but the specific work associated with the Purchase Order did not align directly with the scope originally contemplated under that competitive event. As part of the Company's procurement controls and governance processes, the Purchase Order was therefore supported by a Sole Source Justification. In these situations, there may be operational or risk-management benefits to leveraging the existing contractual terms and conditions in place with the supplier, particularly for specialized materials or services. Accordingly, the supplier selection may be supported through a Sole Source Justification while utilizing a Contract that was originally established through a competitive bid process. 2. In other cases, the Contract was established as part of a framework contracting strategy that was negotiated and supported through a competitive bid process. Under these arrangements, a Direct Award Limit is established for work assignments. Any work exceeding that limit is required to either be competitively bid among the qualified suppliers within the framework or supported by a Sole Source Justification. Accordingly, a Purchase Order may be identified as Sole Source while being issued under a Contract that was originally established through a competitive bid process.Page 62 of 70
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-165 Page 2 of 2 The Company categorizes these Purchase Orders as Sole Source Justifications, however, this explanation is provided to clarify the distinction between the sourcing method used to establish the underlying Contract and the procurement process applicable to the individual Purchase Order.Page 63 of 70
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-166 Page 1 of 2 Date Filed: September 17, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (COMPETITIVE BID ASSESSMENTS) Respond to the following: a. Explain how the Company ensures that each purchase order or contract is subject to a competitive bid assessment, sole source justification, or an approved exception. As part of the response, please discuss whether there are any systemic controls, including the use of Ariba, that ensure adherence to these requirements and, if applicable, provide an example of the referenced controls. b. Explain how the Company ensures adherence to the Company’s competitive bid requirements for situations where multiple purchase orders or contracts could be used in lieu of the referenced controls discussed in subsection a. Response: a. The Company enforces adherence to competitive bid assessments, sole source justifications, and approved exceptions through integrated governance policies and automated controls within Ariba and Maximo: • Contract Execution Controls: Prior to executing an Ariba Contract, purchasing agents and designated approvers are required to upload or verify appropriate supporting documentation into the system to validate compliance. • Automated Purchase Order (PO) Systemic Logic: When a PO is released, system logic automatically verifies that it is linked to either an active Ariba Contract or an approved Maximo Sole Source Justification. If neither control is present and the PO is valued at more than $50,000, the system prevents processing until the agent selects an approved exception or flags the record as a policy violation. Both pathways require formal dual sign-off from the agent and their supervisor. For exceptions a standardized comment nomenclature is expected. The image below, details the year-to-date metrics tracked by the procurement group on exceptions and violations across the procurement organization, including records supporting CL&P and other affiliates. To date, out of 50,323 Purchase Orders released byPage 64 of 70
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-04 Date Issued September 03, 2026 EOE-166 Page 2 of 2 the Procurement Team, there were no policy violations and 294 represented exceptions taken at the PO level. b. The Company actively prevents purchase order "stringing" which is the practice of splitting orders to bypass competitive bidding thresholds, where the practice is inappropriate. In some cases, purchase orders may be used to accommodate valid operational requirements (such as distinct delivery sites, scopes of work, or material types): • Agent Oversight & Pattern Detection: Procurement agents evaluate non-contracted POs during the approval workflow. Agents monitor indicators of stringing by cross-referencing requisitions with similar service descriptions, identical supplier selections, and matching accounting strings across multiple orders. • Centralized Spend Coverage: Over 90% of Company spend is governed by master Ariba Contracts. Establishing spend under Ariba Contracts naturally mitigates the risk of PO-level stringing, as individual POs draw down from existing contracts that were approved to DOA systematically.
Text of ICC Set 1_COMBINED.pdf
Extracted from the file · 30 pages · 51,093 characters
Text of OCC Set 13_COMBINED.pdf
Extracted from the file · 30 pages · 61,971 characters
Text of OCC Set 12_COMBINED.pdf
Extracted from the file · 73 pages · 193,636 characters
Text of OCC Set 11_COMBINED.pdf
Extracted from the file · 48 pages · 62,469 characters
Text of OCC Set 10_COMBINED.pdf
Extracted from the file · 51 pages · 90,368 characters
Text of OCC Set 5_COMBINED.pdf
Extracted from the file · 46 pages · 88,105 characters
Text of OCC Set 4_COMBINED.pdf
Extracted from the file · 159 pages · 268,038 characters
Text of OCC Set 3_COMBINED.pdf
Extracted from the file · 93 pages · 113,517 characters
Text of OCC Set 2_COMBINED.pdf
Extracted from the file · 68 pages · 113,929 characters
Text of OCC Set 1_COMBINED.pdf
Extracted from the file · 139 pages · 225,320 characters
Text of OCC Set 14_COMBINED.pdf
Extracted from the file · 66 pages · 143,197 characters
As listed on the current system
Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses