Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Search terms highlighted
Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

1 page match
  1. Page 1 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-001 Page 1 of 1 Date Filed: September 22, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Interconnection Customer Coalition Question: Reference Exhibit CLP-ELP-1 at Page 109 and Exhibit CLP-CUSTOMER-1 at 34. Provide the currently operative versions of any Connecticut Light and Power Company governing documents related to the interconnection process, including, but not limited to, the Generator Interconnection Technical Requirements, the Information & Requirements for Electric Supply (a/k/a the “Yellow Book”) and any other documents that specify interconnection timelines (together referred to herein as the “Eversource Interconnection Policies”). Response: Please refer to ICC-001, Attachment 1 through ICC-001, Attachment 5, for the prevailing version of the documents at the time of this filing. The attachments are relevant to requirements specifically as it pertain to interconnecting a generator in parallel to the grid and do not represent any specific requirements of tariffs or incentive structure the interconnecting generator may be a participant of, for example, but not limited to, the RRES, NRES, or SCEF programs; each specific programs requirements and customer contract should be evaluated separately from the attachments in this response. These documents are made publicly available and are amended or revised from time to time. Listing of attachments: • ICC-001, Attachment 1: Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 50 kW (AC) or Less • ICC-001, Attachment 2: Guidelines for Generator Interconnection Excluding Residential Inverter Based Projects Level 1 50 kW or Less • ICC-001, Attachment 3: Exhibit B Generator Interconnection Technical Requirements • ICC-001, Attachment 4: Technical Interconnection and Interoperability Requirements for Distributed Energy Resources (DERs) • ICC-001, Attachment 5: Information & Requirements for Electric Supply: CT 2024 Edition
  2. Page 2 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-002 Page 1 of 2 Date Filed: September 22, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Interconnection Customer Coalition Question: Reference ICC-1. Since January 1, 2020, provide all versions of the Eversource Interconnection Policies, including: • • • • Date of Revision Summary of Inclusions/Deletions Rationale for Inclusions/Deletions The review and approval process for finalization of each version Response: The Company and United Illuminating Company (together, the “EDCs”) maintain three joint, PURA-approved interconnection documents as shown in Table 1. The EDCs revise these documents pursuant to PURA order. Revisions are prepared jointly by the EDCs, and PURA generally requires clean and redlined versions showing every insertion and deletion to be filed for review and approval. PURA may also require stakeholder review and input, which typically occurs in the Interconnection Working Group established in Docket No. 17-12-03RE06, prior to such filing for review and approval. Following PURA approval, the EDCs implement the approved Guidelines in PowerClerk and post the clean version on their respective interconnection webpages. Table 1. Three Joint Documents, current Approved Versions Document Current version Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 50 kW (AC) or Less (Refer to ICC-001, Attachment 1) April 11, 2025 Guidelines for Generator Interconnection Excluding Residential Inverter Based Projects Level 1 50 kW or Less (Refer to ICC-001, Attachment 2) September 1, 2026 Exhibit B Generator Interconnection Technical Requirements (Refer to ICC-001, Attachment 3) April 11, 2025 Major Rev / October 1, 2025 Minor Rev
  3. Page 3 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-002 Page 2 of 2 The 2019 document versions shown in Table 2 below were in effect on January 1, 2020. Since then, revisions to these documents have been filed in Docket Nos. 17-12-03RE06, 22-06-29, 2206-29RE01, 24-08-05, 25-01-27, and 25-08-05. Table 2. Versions in Effect on January 1, 2020 Document Version then in effect Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 20 kW (ac) or Less (Refer to ICC-002, Attachment 1) April 8, 2019 Guidelines for Generator Interconnection Fast Track and Study Processes Excluding Inverter Based Projects 20 kW and Less (Refer to ICC-002, Attachment 2) April 8, 2019 Exhibit B - Generator Interconnection Technical Requirements (Refer to ICC-002 Attachment 3) April 8, 2019
  4. Page 4 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-003 Page 1 of 1 Date Filed: September 21, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Interconnection Customer Coalition Question: Reference ICC-1. Are any of the Eversource Interconnection Policies joint documents with United Illuminating? If so, state which ones and explain the timeline and purpose for which the document(s) were integrated. Response: The Company and the United Illuminating Company (“UI”) maintain three joint, PURA-approved interconnection documents: 1. Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 50 kW (AC) or less. (Docket No. 03-01-15RE04; current version dated April 11, 2025). 2. Guidelines for Generator Interconnection Agile Fast Track and Study Processes (Docket No. 17-12-03RE06; current version dated September 1, 2026). 3. Exhibit B Generator Interconnection Technical Requirements; current version April 11, 2025. The Company and UI have jointly developed and maintained PURA-approved interconnection guidelines, developed through stakeholder working groups, since PURA’s April 21, 2004, Decision in Docket No. 03-01-15, which implemented Public Act No. 03-135’s directive that PURA review and adopt statewide generation interconnection protocols, including applicable IEEE standards, so that both EDCs apply uniform, nondiscriminatory interconnection procedures to distributed generation.
  5. Page 5 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-004 Page 1 of 1 Date Filed: September 22, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Interconnection Customer Coalition Question: Reference ICC-1. Provide the equivalent current versions of Eversource Massachusetts and Eversource New Hampshire Interconnection Policies. Explain in a narrative summary the differences between the Eversource Connecticut, Massachusetts and New Hampshire policies. Response: The links to the Massachusetts and New Hampshire Interconnection Policies are below. • • NH: New Hampshire Guide to Interconnection MA: Massachusetts Guide to Interconnection The Distribution Engineering Planning criteria and Distributed Energy Resource Planning criteria is fundamentally the same across all three states. However, the regulatory timelines, deliverables and expectations result in differences in execution.
  6. Page 6 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-005 Page 1 of 5 Date Filed: September 22, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Interconnection Customer Coalition Question: In a narrative response, describe the Eversource process for interconnecting a generation project in Connecticut, in the following categories: a. Residential Inverter-Based Generators 50 kW or less; b. Fast Track: Residential Inverters greater than 50 kW; c. Commercial & Industrial less than or equal to 2 MW; and d. Study Process: Complex projects greater than 2 MW. Include relevant Eversource business units that must review/sign off/be consulted, describe approvals to move on to the next stage, and required timelines or deadlines that must be met. Response: Connecticut interconnection is administered under PURA-approved Guidelines. The EDCs may consider case-specific exemptions; these may include, but are not limited to, applicant redesign, supplemental review, or movement between Fast Track and Study. In addition, ISO-NE transmission and Proposed Plan Application (“PPA”) steps sit outside the state Guidelines and can control the critical path even for state-jurisdictional distribution interconnections. More information on the ISO review process is outlined below. The Eversource process for interconnecting a generation project in Connecticut can be found using the following link: Connecticut Application to Connect The interconnection process, in a narrative response, is administered using the following documents: • Guidelines for the Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities of 50 kW (AC) or Less (April 11, 2025) • Guidelines for Generator Interconnection — Agile Fast Track and Study Processes (September 1, 2026), which exclude residential inverter-based projects 50 kW or less
  7. Page 7 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-005 Page 2 of 5 The timeframes below are Guideline timeframes. The EDCs make reasonable efforts to meet them unless the parties agree otherwise. ISO-NE review for projects greater than 1 MW: Independent of the state Guidelines and of whether the interconnection is state-jurisdictional, any Generating Facility greater than 1 MW must comply with ISO-NE rules, including Tariff Section I.3.9 and Planning Procedure 5 (PPA). Projects 5 MW or greater generally require a PPA supported by Level III Transmission study. Projects greater than 1 MW and less than 5 MW are screened by ISO-NE; a Generator Notification Form may suffice, or ISO-NE may require further analysis, including a transmission system impact study. Transmission Planning Engineering coordinates this review with ISO-NE. These ISO-NE steps sit outside the Eversource/UI Guidelines. The duration and outcomes are not controlled by the Guideline timelines below and may extend the overall interconnection timeline, including the date an executable Interconnection Agreement can be issued. The EDC cannot issue an executable Interconnection Agreement until applicable ISO-NE requirements are met. Residential inverter-based generators 50 kW or less: These projects follow the 50 kW-or-less Guidelines and are processed in PowerClerk. After submission of an application and all applicable fees, the Company acknowledges receipt within 3 business days. Completeness review occurs within 10 business days of acknowledgment. Incomplete applications are placed on hold. If missing material is not provided within 15 business days, the application may be deemed withdrawn. If applicable, tariff-compliance review is completed as an initial step and the project then proceeds to technical screening. If technical screens are passed, Contingent Approval is issued within 15 business days. Screens include transformer nameplate versus aggregate generation, sharedsecondary ampacity, the 120 V / 4 kW limit, and voltage-change limits consistent with PURA Docket 03-01-15RE04 and Conn. Agencies Regs. §16-11-115(a). A screen failure does not automatically start a study. The Applicant is given options to redesign the system to pass the screens or is directed to the Agile Fast Track and Study Process Guidelines, unless the EDC waives that path. Area-network interconnections may also be directed to Fast Track/Study unless waived.
  8. Page 8 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-005 Page 3 of 5 After municipal electrical inspection, the EDC may request a commissioning/witness test and metering work within 10 business days. Parallel operation is not allowed until the EDC issues approval to operate. Primary coordination is between Customer Care and Distribution Planning Engineering for screens. Meter Engineering is typically involved in commissioning and service upgrades. Design Engineering, Protection and Control, and Substation Engineering are consulted only if a screen failure or a network/service issue requires it. Guidelines for Generator Interconnection Agile Fast Track and Study Processes September 1, 2026: Both categories use Section 3 — Agile Fast Track Process of the September 1, 2026 Guidelines. Fast Track also applies to certified residential inverter projects 50 kW or less that failed the Level 1 screens. Agile Fast Track Process: The Applicant submits the application along with applicable fees. Receipt is acknowledged within 3 business days. Completeness notice is issued within 10 business days. The Applicant has 15 business days to cure incompleteness. The Facilitator may hold an initial project meeting to set process expectations, the requested inservice date, and milestones. Initial technical review occurs within 10 to 15 business days after the application is deemed complete (Section 3.2 screens; hosting-capacity map data may be used in lieu of screens at EDC discretion). If the screens pass and no supplemental review is requested or required, the EDC provides an executable Interconnection Agreement, subject to any applicable ISO-NE approvals. If screens fail or more details are needed, a Customer Options Meeting may be held, followed by optional or required Supplemental Review. The Supplemental Review Agreement is issued within 10 business days; the Applicant has 10 business days to execute and pay. Additional technical review (metering, service, protection, SCADA, or a site visit) may follow. If Fast Track or Supplemental Review cannot confirm a safe, reliable interconnection, the project proceeds to the Study Process (Section 4).
  9. Page 9 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-005 Page 4 of 5 Projects greater than 1 MW require compliance with ISO-NE rules as described in the ISO-NE note above. That review is coordinated by Transmission Planning Engineering and may affect the Guideline timelines. The Company issues an executable Interconnection Agreement only after required distribution review is complete, any needed internal approvals are obtained, and applicable ISO-NE requirements are satisfied. The Generator generally has 30 business days to execute the agreement. Business units involved vary with complexity: Customer Care (Facilitator), Distribution Planning Engineering (screens and supplemental review), Meter Engineering, Design Engineering, Protection and Control, and Substation Engineering as needed; Transmission Planning Engineering and ISO-NE when transmission or PPA issues arise; Legal if the agreement or dispute path requires it. Study Process: Section 4 applies to Generating Facilities greater than 2 MW, facilities 2 MW or less that are not certified, or certified facilities 2 MW or less that did not pass Fast Track. Application intake follows the same completeness timelines as Fast Track. The application fee is paid; study fees are at actual cost. Initial application review is targeted within 15 business days. A scoping meeting may be held, to decide whether to perform a Feasibility Study or proceed directly to a System Impact Study, a Facility Study, or an Interconnection Agreement, and whether an ISO-NE System Impact Study is needed. If a Feasibility Study is selected, the Feasibility Study Agreement is issued. The Generator has 30 business days to execute each study agreement and pay the estimated cost and provide any additional information requested in the milestones. Distribution studies (Feasibility, Distribution System Impact) typically take about 30 to 60 business days each after the agreement is executed and milestones are met. A Facility Study is usually conducted when significant EPS upgrades are identified, unless the Generator waives it. After each study, results and upgrade costs are provided. An optional results meeting may be held. Internal EDC approval of identified work is obtained as needed. Transmission and ISO-NE studies, if required, including all projects greater than 1 MW under ISO-NE rules as described above under ISO-NE procedures (PP5, Schedules 22/23, and Section I.3.9), not under the state Guideline clocks. Those steps can extend the study schedule. The EDC files the PPA for non-Governance Participant generators and supports the process; the Generator remains responsible for data accuracy and study and upgrading costs. It is worth noting that a Level III Transmission study can take up to 18 months to complete.
  10. Page 10 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ICC-01 Date Issued September 08, 2026 ICC-005 Page 5 of 5 After all required distribution and ISO-NE steps and any needed internal approvals, the EDC issues an executable Interconnection Agreement. The Generator has 30 business days to sign and must meet the payment and all milestones in the agreement. Municipal approval and a commissioning/witness test follow. The EDC aims to schedule the witness test within 10 business days of municipal approval, then issue written authorization to interconnect. Costs are trued up, generally within six months. Coordination is led jointly by Customer Care (Facilitator) and Distribution Planning Engineering, with Design Engineering, Protection and Control, Meter Engineering, Substation Engineering, Distribution System Planning, Transmission Planning Engineering (ISO-NE), and Legal engagement as the project requires.

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)