Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Search terms highlighted
Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

2 pages match
  1. Page 15 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-13 Date Issued September 02, 2026 OCC-550 Page 3 of 3 Understanding the track record of “accuracy” associated with these sources would provide no value to the Company as “inaccuracy” in the past says nothing about the future, as every event is different and forecasts may be “inaccurate” simply because actual forces of nature behaved differently than forecast, even by sophisticated models not because the model is inherently flawed. No weather forecast is 100% accurate, and weather forecasts do not approach 100% predictive before the actual weather event is occurring whereas the Company needs to be prepared in advance of the onset of the storm event. Event specific assessments of model accuracy were provided in OCC-547, Attachment 1 CONFIDENTIAL through OCC-547, Attachment 6 CONFIDENTIAL, in relation to the UCONN damage prediction model. ii OCC-548 Question: Referring to Exhibit CLP-STORM-1 at 29-30. The Company states that event levels may be modified as conditions and actual impacts become better understood. For events with impacts below forecast, please explain how the event level and resource plan were reassessed as conditions developed. OCC-548 Response: The Company prepares for an ERP event based on weather forecasts, the potential severity and timing of the event, and other relevant information reasonably available to the Company at the time the relevant decisions are made. As the weather system develops, actual storm impacts may differ from earlier forecasts. There are many variables that can change, including but not limited to: pressure gradient, storm track and intensity, forward speed, timing and movement of frontal boundaries, wind speeds (sustained and gusts), precipitation type and totals, radial ice accretion totals, ambient temperatures, atmospheric instability, soil moisture and ground saturation conditions, river and stream levels, storm duration, geographic extent of impacts, and the interaction of local and mesoscale weather features. Any variation in these factors can significantly affect the timing, location, severity and overall impacts of the event. No weather forecast is 100% accurate. Therefore, the Company will err on the side of caution when impacts appear to be below forecast and maintain preparedness as weather conditions are observed. Once weather forecasts are published with new information, impacts are directly observable and the threat has passed, the Company takes steps to adjust the resource plan, including consideration of the deployment and/or demobilization of on-site resources.
  2. Page 16 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-13 Date Issued September 02, 2026 OCC-551 Page 1 of 2 Date Filed: September 16, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, and Mark P. Baldwin Request from: Office of Consumer Counsel Question: For each storm event, please provide the lessons-learned action tracker and show how completed actions changed later event plans or procedures and how their effectiveness was verified. Response: The Company conducts lessons learned exercises for larger events focused on managerial and operational processes and actively pursues opportunities for improvement following every ERP event. Items developed from a formal After Action Review are tracked in an Improvement Plan. Initiatives that the Company has identified through these efforts include but are not limited to initiatives for development of a Pole Setting Branch, cost tracking, contractor hiring processes, and invoice review processes. The effectiveness of these improvements is verified through routine training and exercises. Please refer to the Company’s response to interrogatory OCC-552 i confirming that none of the storms included in the application met the requirements for an After Action Report under the standards set forth in PURA Doc. No. 12-06-09, PURA Establishment of Performance Standards for Electric and Gas Companies, Final Decision, Appendix A, Section 3.7 After Action Report. Prior Referenced Response i OCC-552 Question: For each storm event, please provide the after-action reports and each post-event comparison of forecasts, resources, restoration performance and cost, including the management review and resulting corrective actions. OCC-552 Response: None of the storms included in the application met the requirements for an After-Action Report under the standards set forth in PURA Docket No. 12-06-09, PURA Establishment of Performance Standards for Electric and Gas Companies, Final Decision, Appendix A, Section 3.7 After-Action Report. PURA Doc. No. 12-06-09, Appendix A, Section 1 Purpose and Applicability states: The purpose of these standards is to ensure that the electric distribution companies (EDCs) are prepared for emergencies and disasters in order to minimize damage and inconvenience to the public which may occur as a result of electric system failures, major outages, or hazards posed by damage
  3. Page 17 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-13 Date Issued September 02, 2026 OCC-551 Page 2 of 2 to electric distribution facilities. These standards apply to any Emergency Event, which is defined as electric service interruptions involving 10% or more of the EDC’s total number of customers who are out for a period of 48 consecutive hours or more…” Please refer to Exhibit CLP-STORM-IMT-2 for storm-by-storm breakdown of costs and outage data.
  4. Page 18 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-13 Date Issued September 02, 2026 OCC-552 Page 1 of 1 Date Filed: September 16, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, and Mark P. Baldwin Request from: Office of Consumer Counsel Question: For each storm event, please provide the after-action reports and each post-event comparison of forecasts, resources, restoration performance and cost, including the management review and resulting corrective actions. Response: None of the storms included in the application met the requirements for an After-Action Report under the standards set forth in PURA Docket No. 12-06-09, PURA Establishment of Performance Standards for Electric and Gas Companies, Final Decision, Appendix A, Section 3.7 After-Action Report. PURA Doc. No. 12-06-09, Appendix A, Section 1 Purpose and Applicability states: The purpose of these standards is to ensure that the electric distribution companies (EDCs) are prepared for emergencies and disasters in order to minimize damage and inconvenience to the public which may occur as a result of electric system failures, major outages, or hazards posed by damage to electric distribution facilities. These standards apply to any Emergency Event, which is defined as electric service interruptions involving 10% or more of the EDC’s total number of customers who are out for a period of 48 consecutive hours or more…” Please refer to Exhibit CLP-STORM-IMT-2 for storm-by-storm breakdown of costs and outage data.
  5. Page 19 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-13 Date Issued September 02, 2026 OCC-553 Page 1 of 2 Date Filed: September 16, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: For each storm event, please provide productive, travel, staging, standby, idle and demobilization hours, including the cost of hours not associated with a work assignment. Response: The Company interprets the request as an effort to differentiate contractor time among the categories of “productive,” “travel,” “standby,” “idle,” and “demobilization.” However, the Company respectfully disagrees with the assumption that travel, standby, or related restoration activities are “non-productive,” as this does not reflect the realities of storm restoration work. Storm restoration demands mobilization, strategic positioning, coordination, and the constant availability of contractor resources. Activities such as traveling to the Company’s service territory or restoration sites, staging, waiting on standby for work assignments, and demobilizing after restoration are essential elements of the restoration process. Contractors may need to remain staged and ready to respond to shifting restoration priorities, await dispatch instructions, or information required for safe completion of assigned duties. All these activities are integral to the restoration process, essential to restoring the electric system to a safe and reliable operating condition after an emergency and are productive time. Therefore, the Company is providing information for the contractor time categories of travel, standby, and work time (i.e., performing physical restoration work)—all of which are “productive” time in the context of storm deployment. Information responsive to this request for storm MS24A was provided in the Company’s response to interrogatory EOE-030 i , which is currently being updated for the remaining storms and will be filed as a supplement to EOE-030 upon completion. Prior Referenced Response: i EOE-030 Question: For each storm event, please provide the after-action reports and each post-event comparison of forecasts, resources, restoration performance and cost, including the management review and resulting corrective actions.
  6. Page 20 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-13 Date Issued September 02, 2026 OCC-553 Page 2 of 2 EOE-030 Response: The Company does not track or account for the billable hours in the manner requested in this interrogatory. In order to respond to this request, the Company must perform a manual exercise to identify each billable hour by work or standby time for each individual invoice by storm. The Company is currently working through this exercise for each storm. Please reference EOE-030, Attachment 1, for a summary of hours and costs associated with external line crew support for MS24A011. The Company will supplement the remaining spreadsheets for the remaining 13 storm events included in the request.
  7. Page 21 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-13 Date Issued September 02, 2026 OCC-554 Page 1 of 2 Date Filed: September 16, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: For each storm event, please provide the release and demobilization criteria and quantify cancellation charges, minimum guarantees, travel, standby, unused lodging and other nonproductive costs. Response: The Company does not agree with the characterization of travel, standby and unused lodging, or other related restoration costs as “non-productive.” Such costs are necessary and reasonable components of mobilizing, maintaining and demobilizing personnel and resources during storm restoration activities. Subject to this clarification, the Company responds as follows: Please refer to OCC-554, Attachment 1 CONFIDENTIAL, and OCC-554, Attachment 2 CONFIDENTIAL, which illustrate processes used for each storm event for not only the mobilization process but also the release and demobilization criteria. During the 2024-2025 OH Storm Contract revision there was agreement and understanding of a minimum requirement that the Company agrees to be reasonable for a cancellation policy. If a forecast storm does not materialize and the Company cancels resources at or before they complete four hours on the system, the Company will pay each affected resource a four-hour minimum for reporting in support of anticipated restoration activities. This provision is consistent with Eversource labor agreements and local IBEW agreements. The Company has provided information regarding the contractor’s time categories of travel and standby time for storm MS24A in its response to interrogatory EOE-030 i, which is currently being updated for the remaining storms and will be filed as a supplement to EOE-030 upon completion. Prior Referenced Response: i EOE-030 Question: For each storm event, please provide the after-action reports and each post-event comparison of forecasts, resources, restoration performance and cost, including the management review and resulting corrective actions.
  8. Page 22 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-13 Date Issued September 02, 2026 OCC-554 Page 2 of 2 EOE-030 Response: The Company does not track or account for the billable hours in the manner requested in this interrogatory. In order to respond to this request, the Company must perform a manual exercise to identify each billable hour by work or standby time for each individual invoice by storm. The Company is currently working through this exercise for each storm. Please reference EOE-030, Attachment 1, for a summary of hours and costs associated with external line crew support for MS24A011. The Company will supplement the remaining spreadsheets for the remaining 13 storm events included in the request.
  9. Page 23 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-13 Date Issued September 02, 2026 OCC-555 Page 1 of 2 Date Filed: September 16, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, and Mark P. Baldwin Request from: Office of Consumer Counsel Question: Please provide any analysis of the restoration-time benefit associated with additional external crews and any lower-crew alternative considered. Response: The Event Level Matrix correlates anticipated damage locations and customer outages with an ERP event level, which identifies the number of crews needed to restore power within the corresponding restoration-duration range. The Company relies on weather analysis and estimated damage locations to initially establish external crew needs. Since weather is very variable, there are times when the weather is not as severe as predicted and therefore the number of crews to trouble spots could be skewed. In other events, the weather is more severe, and the Company must obtain additional external resources, and this may be accompanied by an increased number of trouble spots completed by external crews. Thus, the Company utilizes the Event Level Matrix to calibrate the number of crews for each event. The Company does not calculate a “restoration-time benefit” that would presumably calculate how long customer interruptions could endure – and with the expectation that the Company could reduce costs with longer outage durations by using fewer crews. This type of perspective is contrary to the expectations of customers, as well as the ethic of storm response and is not consistent with the circumstances of restoration work for two primary reasons: First, the Company prepares for a storm event in advance of the event, bringing crews to the system based on the forecast weather conditions and anticipated potential damage to the system. Once the crews are mobilized to the system, the cost of mobilizing them is incurred. Any additional cost incurred is a function of the actual number, type and location of damage events, as well as needs for public-safety response. When this information is known, then crews are scaled up or down in correlation with those known quantities. When the Company makes decisions to scale up or down on deployed crews, that decision is made with the objective of restoring customers within the timeline for the event, as established in the Event Level Matrix, which defines the expected restoration timeline at each event level. Thus, the cost is a function of the actual damage incurred. Second, in a storm event, the restoration timeline is a function of the number of outage and nonoutage events that have to be addressed and the number of field resources available. If fewer resources are deployed for a particular number of outage and non-outage events, the duration will
  10. Page 24 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-13 Date Issued September 02, 2026 OCC-555 Page 2 of 2 be longer than with more crews – and vice versa – if the same jobs are done with a greater number of crews the timeline will be quicker. However, in either scenario, it is the number, type and location of damage events that drives the cost and the cost will not vary materially as all jobs have to get done, and to get the same job done, there needs to be the appropriate crew complement deployed to that trouble event whether the overall timeline is a longer or shorter timeline, i.e., the crew hours necessary to address the damage is the same whether half the crews are used for double the time, or twice the crews are used for half the time. Again, the cost is a function of the number, type and location of damage events.

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)