Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

15 pages match
  1. Page 27 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-530 Page 2 of 3 The target of 8.43 for the Post Transaction Survey – CSR Attributes does not represent the threshold at which the company would earn an incentive. The target represents the level of performance the Company seeks to maintain (equal to 2025 actual). On-target performance in this metric itself doesn’t guarantee an incentive, as it would require exemplary above-target performance in the other metrics included in the Composite Index of the Customer PIM Suite. Customer perception of a customer service representative’s courtesy, friendliness, knowledge, and concern for customer needs are strongly correlated with their overall satisfaction with their phone interaction. Correlation measures the degree to which variables are related and tend to change together. A strong correlation is generally indicated by a correlation coefficient close to +1.00 or -1.00. All four customer service representative attributes in question have a correlation coefficient of +0.77 to +0.84, demonstrating a strong correlation. The benefit of utilizing these attributes is that they are all an indication of the Company’s success in training customer service representatives to successfully assist customers with their questions or concerns. Prior Referenced Response: i OCC-527 Question: Exhibit CLP-CUSTOMER-1: Customer PIM Suite (Level 1 DER Interconnection Processing) The RE02 Performance Evaluation System identifies Level 1 DER Interconnection as a standalone potential PIM. The Company instead proposes to include Level 1 DER Interconnection Processing as one of five components of its Customer PIM Suite. Please explain why the Company selected a composite structure rather than the standalone PIM identified in RE02, including how incorporating Level 1 DER Interconnection performance into the Customer PIM Suite is expected to improve interconnection performance. OCC-527 Response: The Company selected a composite PIM structure for its customer metrics, including Level 1 DER interconnection processing, because customer experience is multidimensional and more appropriately evaluated through a balanced set of performance measures rather than singularly measuring customer metrics in isolation. The five components of the customer PIM suite collectively reflect different aspects of the Company’s service to customers and provide a more comprehensive measure of customer performance. Including Level 1 DER interconnection processing as one component of the composite PIM suite recognizes the importance of timely and effective interconnections processing, while avoiding placing disproportional emphasis on a single customer facing operational measure. A standalone PIM for Level 1 DER interconnection processing could inadvertently prioritize focus on performance for this metric at the possible expense of other important customer outcomes. The composite structure instead encourages the Company to maintain balanced performance across a full range of customer-focused objectives. The use of the composite PIM does not diminish the significance of Level 1 DER interconnection processing performance but rather recognizes that it is one of several important dimensions of customer service. The composite
  2. Page 28 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-530 Page 3 of 3 approach provides a more comprehensive performance framework that is less susceptible to unintended consequences for measuring, penalizing and/or rewarding customer performance versus a stand-alone PIM approach.
  3. Page 29 of 73Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-531 Page 1 of 2 Date Filed: September 15, 2026 Witness: Jessica B. Cain and Daniel M. Traynor Request from: Office of Consumer Counsel Question: Exhibit CLP-CUSTOMER-1: Customer PIM Suite (Average Discount Rate Enrollment Time) Please explain why a financial incentive for faster manual LIDR enrollment is necessary to advance customer affordability given the substantial enrollment already achieved through DSS data sharing and automatic enrollment. Please identify any analysis showing that faster manual processing would materially increase LIDR participation beyond levels achieved through those enrollment pathways. Response: Timely processing of proof of eligibility for, and enrollment in, the low-income discount rate (“LIDR”) is important for eligible customers. The Company’s proposed “Average Discount Rate Enrollment Time” metric 1 intends to measure and incentivize prompt LIDR enrollment for customers who provide proof of eligibility directly to the Company for manual review and processing. Achieving the proposed two-day turnaround takes a significant amount of resources and forecasting to plan for surge staff resources during annual peak times of year. The Company clarifies this proposed metric: • is not intended (or expected) to have any impact on LIDR participation and; • would not include LIDR enrollment performed through DSS data-matching or Community Action Agencies (via Social Agency portal or receipt of LIHEAP) because those are automated and do not require a team of Company resources for manual review and processing. Including the “Average Discount Rate Enrollment Time” measure within the PIM suite, and allowing for a positive financial incentive, as well as financial penalty, is appropriate because it provides the Company with an additional mechanism to encourage continuous improvement in the quality of customer interactions and reinforce behaviors that contribute to a positive customer experience. The five components of the customer PIM suite collectively reflect different aspects of the Company’s service to customers and provide a more comprehensive measure of customer performance as discussed in response to OCC 527 i. 1 The Company notes that it has this as a PBR metric in one if its Massachusetts Companies as well.
  4. Page 30 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-531 Page 2 of 2 Prior Referenced Response: i OCC-527 Question: Exhibit CLP-CUSTOMER-1: Customer PIM Suite (Level 1 DER Interconnection Processing) The RE02 Performance Evaluation System identifies Level 1 DER Interconnection as a standalone potential PIM. The Company instead proposes to include Level 1 DER Interconnection Processing as one of five components of its Customer PIM Suite. Please explain why the Company selected a composite structure rather than the standalone PIM identified in RE02, including how incorporating Level 1 DER Interconnection performance into the Customer PIM Suite is expected to improve interconnection performance. OCC-527 Response: The Company selected a composite PIM structure for its customer metrics, including Level 1 DER interconnection processing, because customer experience is multidimensional and more appropriately evaluated through a balanced set of performance measures rather than singularly measuring customer metrics in isolation. The five components of the customer PIM suite collectively reflect different aspects of the Company’s service to customers and provide a more comprehensive measure of customer performance. Including Level 1 DER interconnection processing as one component of the composite PIM suite recognizes the importance of timely and effective interconnections processing, while avoiding placing disproportional emphasis on a single customer facing operational measure. A standalone PIM for Level 1 DER interconnection processing could inadvertently prioritize focus on performance for this metric at the possible expense of other important customer outcomes. The composite structure instead encourages the Company to maintain balanced performance across a full range of customer-focused objectives. The use of the composite PIM does not diminish the significance of Level 1 DER interconnection processing performance but rather recognizes that it is one of several important dimensions of customer service. The composite approach provides a more comprehensive performance framework that is less susceptible to unintended consequences for measuring, penalizing and/or rewarding customer performance versus a stand-alone PIM approach.
  5. Page 31 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-532 Page 1 of 2 Date Filed: September 15, 2026 Witness: Jared A. Lawrence, Jessica B. Cain and Andrew C. Belden Request from: Office of Consumer Counsel Question: Exhibit CLP-CUSTOMER-1: Customer PIM Suite (Customer PIM Suite Composite Index) The Company proposes to determine incentives and penalties based on the average of the five component index. Please identify whether performance above target on one or more Customer PIM Suite components could offset performance below target on another component, including Level 1 DER Interconnection Processing or Average Discount Rate Enrollment Time, such that the Company would avoid a penalty or earn an incentive. If so, please provide illustrative examples and explain why the Company considers such outcomes appropriate given the objectives of the affected components. Response: As the Customer PIM Suite evaluates financial penalty or incentive based on a Composite Index reflecting the average performance for the entire Customer PIM Suite, it is possible that above average or below average performance in one component could offset the below or above average performance of other components within the Customer PIM Suite. An illustrative example was included in Exhibit CLP-CUSTOMER-1, page 43, in which above target performance in Level 1 DER Interconnection Processing was offset by below target performance in Controllable Average Call Handle Time and Average Discount Rate Enrollment (Days). The Customer PIM Suite is intended to provide a holistic assessment of the Company’s performance across a variety of customer engagement points to ensure focus on continuing to provide a high-level of customer service across its breadth of customers. If using the same illustrative example provided in the Exhibit noted and only changing the actual performance for Level 1 DER Interconnection Processing, performance for that one component would have to improve to an index of 188 before the Company could offset the on target and below target performance of the other four (4) components enough to trigger an incentive. The index of 188 for this measure represents actual performance of 4.3 average days against the target of 35.0 average days.
  6. Page 32 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-532 Page 2 of 2 Level 1 DER Interconnection Processing Digital Customer Engagement Controllable Average Call Handle Time Post Transaction Survey - CSR Attributes Average Discount Rate Enrollment Time (Days) Total Score Performance Actual Target Direction Index 35.0 Down is Good 188 4.3 100 92.18% 92.18% Up is Good 86.2 76 Down is Good 87 8.43 8.43 Up is Good 100 2.5 2.0 Down is Good 75 550 Composite Index 110 With regard to the offset, it is worth noting that Digital Customer Engagement cannot achieve an index greater than 108, as this measure cannot exceed 100% in actual performance. This limits the above target offset potential for this component.
  7. Page 33 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-533 Page 1 of 1 Date Filed: September 15, 2026 Witness: Jessica B. Cain and Daniel M. Traynor Request from: Office of Consumer Counsel Question: Exhibit CLP-CUSTOMER-1: Customer PIM Suite (Customer Receivables Greater than 60 Days) RE02’s Accounts Receivable and Uncollectibles Scorecard includes five sub-metrics addressing residential arrears, accounts receivable, write-offs, and uncollectibles. The Company instead proposes to report only receivables greater than 60 days and to exclude hardship accounts. Please explain the basis for this narrower approach, including why the Company excludes hardship accounts and the other RE02 sub-metrics. Response: For the purposes of the metric, in the arrears area the Company’s proposal focused on “NonHardship Receivables Greater than 60 Days” as a percentage of 60-day lagged revenue because sixty days of aging provides a more consistent indication of delinquency. Ultimately, unpaid bills measured in arrears will be written off if not paid overtime. However, while write-offs are measured and reported across docketsError! Bookmark not defined., write-offs occur much later than sixtyday old arrears and consider whether service is active or not. Generally, in a metric intended to evaluate arrears trends, collection effectiveness over financial hardship and/or medical protected customer arrears primarily reflects Connecticut’s legislative and regulatory policies, which are outside the Company’s control and became even more restricted in recent years. For these reasons, the Company focused on non-hardship arrears as a metric.
  8. Page 34 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-534 Page 1 of 3 Date Filed: September 15, 2026 Witness: Julia Frayer Request from: Office of Consumer Counsel Question: Performance Based Ratemaking Panel Exhibit CLP-PBR-1 Please explain the statement in Exhibit CLP-PBR-1, that the average OM&A PFP growth rate for 2015–2024 is -0.03% (page 64), with the results reported in Figure 5, LEI’s Industry TFP results (2005-2024), which report an average OM&A PFP growth rate of -0.03% for 2005–2024, 0.30% for 2010–2024, and -0.35% for 2015–2024. In your response: a. Identify the study period and OM&A PFP result actually relied upon to establish the proposed -0.03% X Factor; b. Explain the basis for selecting that study period over the alternative periods presented in Exhibit CLP-PBR-1; c. State whether the reference to 2015–2024 in Exhibit CLP-PBR-1, is an error and, if so, provide the corrected testimony; and d. Explain whether selection of a different study period would change the Company’s proposed X Factor and, if not, why not. e. Please provide all calculations, workpapers, and supporting data used to derive the –0.03% X Factor in an Excel format. Response: a. The Company relied on the 20-calendar-year period from 2005 through 2024, which encompasses a total of 19 annual year-over-year growth observations. Please refer to Figure 22, on page 47, of Exhibit CLP-PBR-2. b. As stated in Section 2.4, of Exhibit CLP-PBR 2, “the 20-year study period overcomes the high variability of year-on-year trends but is also not so long term as to capture “stale” industry trends that would not likely repeat themselves in the future.” Further, as discussed in that section, the “last 20 years reflect the changing business circumstances in the electric distribution industry, which are also going to continue to drive productivity in the next several years.” Please also refer to OCC-441 i.
  9. Page 35 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-534 Page 2 of 3 c. Yes. The phrase “2015-2024” in the identified sentence contains a typographical error. The corrected sentence should read: “Based on LEI's Industry TFP Study, the average OM&A PFP growth rate for 2005-2024 is negative 0.03% (or -0.03%), which is the proposed X Factor.” No numerical correction to the proposed X Factor is required. d. A different study period would produce a different measured historical OM&A PFP rate, as shown in Figure 22, of Exhibit CLP-PBR-2. However, LEI would not recommend using a different study period for purposes of setting the X Factor. As discussed in response to part (b) and Section 2.4, of Exhibit CLP-PBR-2, LEI considers the 2005–2024 period appropriate because it is sufficiently long enough to reduce the influence of short-term volatility and one-off events, while remaining recent enough to reflect industry conditions relevant to the prospective PBR term. Accordingly, LEI continues to recommend a -0.03% value for the X factor that would be applied to the OM&A portion of revenue requirement. e. Please refer to Exhibit CLP-PBR-2a, the native workpapers supporting the Industry TFP Study. Prior Referenced Response: i OCC-441 Question: Exhibit CLP-PBR-1 PBR Testimony Please explain in detail why LEI and the Company rely on the national 2005– 2024 OM&A PFP estimate of -0.03% to establish the proposed X Factor rather than the Northeast Region OM&A PFP estimates presented in Exhibit CLP-PBR-2. a. Exhibit CLP-PBR-2, (page 23), states: “However, if the range of data is too long, the estimated average trend may be irrelevant for the purposes of informing future ratemaking initiatives. The timeframe should ideally incorporate more recent data that captures the latest trends in the industry while eliminating earlier time periods with productivity growth drivers that are no longer relevant.” Please explain why the 2005–2024 period is more representative of expected OM&A productivity during the proposed PBMRP term than the more recent periods. OCC-441 Response: As described in Section 2.4, of Exhibit CLP-PBR-2, TFP studies for electric distribution utility sector are typically covering a timeframe of the most recent 20 years (subject to data availability) in order to capture a complete spending and investment cycle. The use of a long-term horizon is also important because it allows for averaging and normalization of the productivity trend for outliers that can occur in costs (inputs) or customer trends (output) over shorter periods of time. LEI used comprehensive data spanning 20 years for the bulk of investor-owned utilities operating in the U.S., to perform the productivity study. In addition to trends in TFP over time, the study yielded partial factor trends for OM&A and capital. LEI concluded that the conditions reflected in the 2005–2024 period—including aging infrastructure replacement, grid
  10. Page 36 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-534 Page 3 of 3 modernization, resilience investment, renewable integration, electrification, and load growth—remain relevant to the prospective PBMRP term. Accordingly, the 20-year period captures recent industry experience while reducing shortterm volatility without extending so far back as to incorporate “stale” trends unlikely to recur. LEI’s national sample consists of 88 EDCs representing approximately 90% of customers served by U.S. investorowned electric utilities (as of 2024). As explained in Exhibit CLP-PBR-1, (page 29), “[f]or an industry TFP to be useful for PBR formula design purposes, it should capture the trends in productivity across all EDCs,” rather than the historical productivity experience of a particular utility or a narrower subset of utilities. Exhibit CLP-PBR-2, (page 13), similarly explains that EDCs “can vary widely in size, efficiency, and operational practices” and that a broad sample makes the analysis more representative of the diversity of the EDC industry and supports more reliable conclusions regarding industry trends. LEI evaluated the Northeast Region as a sensitivity to the national Industry TFP Study, which provides useful information regarding whether the estimated productivity trends are sensitive to geographic scope. The national 2005–2024 OM&A PFP estimate of -0.03% indicates a less negative OM&A PFP trend than the directly comparable Northeast region PFP for this same period (estimate of -0.45%).

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)