Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

  1. Page 54 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-539 Page 9 of 15 than historical levels of depreciation, and because revenue decoupling ensures that even if load growth exists (and even if such load growth is enabled by the Company’s increased level of capital expenditures) the Company is unable to retain additional revenues contributed by new customers, or new load. 4) Positive #4: CT-Bar was designed to align capital revenue support with the DSP. Ignoring its deficiencies, the CT-Bar’s connection to the Distribution System Plan (“DSP”) constituted an essential link between ongoing system investments necessary to meet the objectives of the DSP with the revenues necessary to support those investments. Throughout Docket No. 21-05-15RE01, the Company advocated strongly for clearly defined linkages across all three tracks (RE01, RE02 and RE03), including proposing what would be the final technical session touching upon revenue requirements, in which those linkages were discussed. The Company’s F-Factor is similarly aligned with the capital investment forecast provided in this proceeding for the DSP. The Company’s capital investment forecast serves as the basis for a cap on the level of investment for the F-Factor. Unworkable Features of PURA’s RE01-PFD: 1) Negative #1: No recovery of cost of capital in the revenue requirement for capital investment between rate cases. The single-most problematic feature of the CT-Bar was its intentional exclusion of the cost of capital associated with completing capital plant additions to the benefit of customers. Costs of capital are real costs of providing electric distribution service to customers in the State of Connecticut (or anywhere) and are recognized in statute. Although the cost of capital may be a more challenging cost to conceptualize, it is nonetheless as real as vegetation management, insurance, customer service, or any other cost of service. Cash is not free, a fact arising from its scarcity. Fundamentally, capital markets are where people, banks, corporations and other institutions provide their surplus of cash -- which is limited, to those entities that have cash needs -- which are generally unlimited. Consequently, and unsurprisingly, those entities providing the cash for some period of time expect to be compensated for providing it, thus establishing real cost to acquire capital. The Company, operating in the capital-intensive industry of regulated utilities, is one of those entities that needs to acquire cash to operate its business. As annual capital investments regularly exceed its net cash from operations (i.e. cash from customers), the Company must look to other sources to fund those investments. Those sources are the debt and equity investors supplying the cash to capital markets. This means the Company must compete with ALL other entities participating in those markets. It is simply not possible for the Company to go to those markets and demand cash for free (or for below-market rates, relative to market expectations of risk and reward) when other entities participating in those capital markets offer adequate compensation for the use of funds over time. Therefore, there is a real and tangible cost to acquiring that capital. Please refer to the Company’s pre-filed cost of capital testimony for in-depth discussion of the cost of capital. The Company provided extensive analysis and discussion on the cost of capital throughout Docket No. 21-05-15RE01, including specifically as it relates to CT-Bar. PURA’s treatment with respect to going-in revenue requirements as well as any ongoing capital revenue support mechanism, such as CT-Bar, is paramount to whether the Company, with effective management and sound decision-making, has the opportunity, but not a guarantee, to cover its cost of service to customers, and to earn its allowed return. The absence of the cost of capital from the CT-Bar, particularly in the present environment where significant increases in the level of necessary system investments are expected, prevents the Company from having any practical opportunity to commit to a stay-out to avoid the next rate case. As discussed in the Company’s response to OCC-435, based on the Company’s current assessment of system investment needs in the near future, the revenue requirement associated exclusively with the cost of capital pertaining to future capital additions (excluding GET and Uncollectible) would amount to an incremental $15.6 million for Rate
  2. Page 55 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-539 Page 10 of 15 Year 1; an incremental $32.8 million for Rate Year 2; an incremental $36.4 million for Rate Year 3; and an incremental $39.5 million for Rate Year 4, or $124.1 million in total. This means that -- even if 100% of those future plant additions were only partially supported with CT-Bar revenues (i.e. revenue covering depreciation expense and property taxes only); and even if the Company’s future cost of service otherwise was 100% supported with rates; and even with perfect operational decision making -- the Company would still need to find $124.1 million of annual savings by Rate Year 4 in order to offset the loss of revenue associated with carrying costs on incremental investment over the term of the PBMRP, which would be necessary to commit to a stayout term. For perspective, the total O&M expense included in the Company’s cost of service filed in this proceeding is $547.5 million. Thus, to earn its authorized ROE, all else equal, the Company would have to generate cost savings amounting to $124.1 million, or nearly 23%, of its Rate Year O&M level by Year 4, to offset the impact of the accumulating carrying costs on the incremental capital additions completed on the system after base rates are set in this case. This is nearly 34% of operating expense, excluding vegetation management and storm restoration costs, which is a very substantial proportion of the cost of service. For example, the amount of $124M is nearly two-thirds of the Company’s labor and labor-related operating expense, or 60% more than the entire vegetation management program. It simply is not possible for the Company to cut this level of O&M expense without grossly debilitating the Company’s ability to provide service to customers. In fact, it is not plausible to expect that the Company could generate even 10% in annual incremental O&M savings in the face of 2-3% annual inflation and, as a result, the Company could not agree to a stay out under circumstances where there is no recovery of the cost of capital on incremental investment over the PBMRP term. Moreover, even if the Company were somehow able to find such remarkable cost savings, the going-in revenue requirement of the subsequent multi-year rate plan would capture those cost savings. Assuming continuation of the same PBR framework and required system investment, the Company would again be in the position of having to find an additional 34% of O&M savings (i.e. more than 60% cumulatively from Rate Year 1) in order to sustain itself over the next PBR term. Clearly, a framework that does not provide revenue supporting the full cost of incremental investment over a four-year period, as well as the next four-year period, is not a plausible or lasting framework. Thus, exclusion of the cost of capital from a capital support mechanism in an environment in which significant increases in capital investments are expected all but ensures the Company has no realistic opportunity to survive the PBR term without a critical need for a rate case to realign costs and rates. Consequently, the overall framework as outlined in the REO1-PFD had no practical chance of sustaining the Company financially for the four-year term, nor would the Company have been able to even agree to a stay-out. To address this indelible flaw, the Company’s proposed PBMRP in this docket is designed to produce the revenue necessary to support ongoing system investment through the F-Factor, which calculates a revenue requirement inclusive of the costs of capital unlike the CT-Bar, while preserving the customer benefits and inherent incentives of a PBR plan. 2) Negative #2: Exclusion of cost of removal from the revenue requirement on capital investment between rate cases. CT-Bar excluded the cost of removal, which is a real cost for all utilities. As a simple example, to install a new utility pole where there is an existing one that needs replacement, the Company must first remove the existing utility pole. That cost is separate and distinct from the cost of the utility pole itself; yet, similarly recovered (as an estimate) over the life a utility pole. The Company’s capital investment forecast in the present docket includes approximately $136 million of cost of removal for January 1, 2026 through June 30, 2028, and approximately $60-70 million per year
  3. Page 56 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-539 Page 11 of 15 thereafter. A total of $60-70 million in annual investment equates to pre-tax cost of capital of $6-7 million annual incremental revenue requirement (e.g. $6 million year 1, $12 million year 2, $18 million year 3, etc.). The CT-Bar revenue requirement intentionally excluded this component of the capital investment revenue requirement. The Company’s proposed F-Factor calculation properly restores this component to the rate base computation. 3) Negative #3: Depreciation expense is used as a reduction to plant additions rather than to total rate base, consistent with fundamental ratemaking principles. CT-Bar’s calculation treats depreciation expense as a net against plant additions. Although the Company appreciated that PURA found it important to capture ongoing depreciation expense in the annual revenue requirement calculations, the overall execution of the computation was not correct. The Company’s F-Factor corrects for this methodological error. Please refer to the example below outlining the mathematical problem The table above is a simplified example of CT-Bar’s improper incorporation of ongoing depreciation in a revenuerequirement calculation. Effectively, the CT-Bar reduces plant additions by depreciation expense, which improperly reduces the total amount of plant to be depreciated, thereby reducing the incremental depreciation expense to be supported by the rate mechanism. The correct approach is to handle the plant additions separately from accumulated depreciation (see lines 4 and 6 in the table above). Note that both methods result in the same return on rate base, demonstrating that both calculations reflect the reduction to return on rate base resulting from ongoing/accumulating depreciation. The error is limited to the resulting new depreciation expense reflected in the revenue requirement, which is understated in the above example by $10.8 million in Year 1 and $21.6 million in Year 2 under the CT-Bar as compared to the Company’s proposal in this proceeding, which mirrors in concept to how the Company records depreciation expense on gross plant additions (not on net plant additions, as in the CT-Bar). ⇒ Characteristics of the Company’s Proposed F-Factor (same as CT-Bar, except for three features).
  4. Page 57 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-539 Page 12 of 15 The Company is proposing a capital support mechanism (the “F” factor in the formula) that tracks as close as possible to PURA’s CT-Bar, except that it addresses the three major impairments described above, which would prevent the Company from being able to agree to a stay-out. These three items are the exclusion of the cost of capital in the revenue-requirement computation for incremental plant additions, the cost of removal and the mechanical deduction of depreciation expense from plant additions instead of rate base. In the Company’s F-Factor, these first two items are included in the formula and the third mechanical process is addressed. Beyond that, the F Factor would operate from a fixed annual capital investment level for each year of the PBMRP, with reconciliation through PURA’s annual RAM proceedings. The fixed annual investment level would be set at the Company’s capital forecast, as approved in this proceeding. As described previously, the Company has presented different investment trajectories in the Company’s 5-Year TSP and is proposing to establish the capital support mechanism of the PBR adjustment consistent with the annual capital funding requirements presented in Figure 7 of Exhibit CLP-ELP-1. Consistent with the structure of the CT-Bar in the RE01-PFD, the F-Factor would commence on July 1, 2027, coincident with new base rates, collecting an allowance developed from the Company’s capital forecast presented in Exhibit CLP-TSP-3. In this proceeding, the Company has proposed base rates that include capital additions through the Rate Year. This means that the F-Factor implemented on July 1, 2027 (commensurate with new rates in this proceeding) would be set to zero at that time, since base rates would be set to collect the revenue requirement on capital placed into service in the rate year. However, if PURA declines to incorporate rate-year capital additions into base rates in this proceeding, the F-Factor taking effect on July 1, 2027, would reflect the revenue requirement for the period July 1, 2027 through June 30, 2028 on capital additions placed in service (or estimated to be placed in service) from the point in time where PURA cuts off capital for inclusion in base rates and through June 30, 2028.1 In the next year, as part of the Company’s annual RAM compliance filing, actual plant additions placed in service during the applicable plan year would be reconciled against the F-Factor allowance put into rates on July 1, 2027. In that reconciliation, the Company would present its project document for a prudence review and, based on PURA’s findings in that prudence review, the cost of actual plant additions for calendar year 2027, less whatever PURA has already included in rates for capital additions in 2027, would be actually incorporated into rate base at that point. Following PURA’s determination that the Company’s actual plant additions are prudent, used and useful, the Company’s rate base would be adjusted and associated revenue requirement allowed for recovery that would be limited to the lesser of: 1. The total revenue requirement for the forecasted capital approved in this proceeding for the first implementation of the F Factor; or 2. The total revenue requirement for the actual plant in service. If the cost of the Company’s actual capital additions were to exceed the forecasted amount approved in this proceeding, the Company would not be permitted to obtain recovery of the incremental investment during the initial four-year PBMRP Term. Instead, any such investment would remain subject to review and consideration in a subsequent base rate proceeding or successor PBMRP Term. This Company’s proposed capital funding mechanism sets a defined cap on capital recovery during the plan term, providing customers with greater rate certainty and placing the risk of excess capital spending requirements on the Company. The annual reconciliation further protects customers by blocking recovery of investments that are delayed, deferred, canceled, or not placed in service, since those costs would not be reflected in the F factor, which is based on plant in service. For these reasons, the proposal aligns cost recovery with prudent investment, promotes accurate capital forecasting, and incentivizes efficient execution of the capital program, all while preventing customer overcollection.
  5. Page 58 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-539 Page 13 of 15 III. Specific Responses to Parts (a), (b) and (c), above. (a) Why are O&M expenses appropriately subject to an externally indexed revenue cap, while capital expenditures require separate recovery through an F-Factor based on a fixed annual capital investment forecast? The capital investments the Company must make to provide electric service to customers in the State of Connecticut is a “local” concept. Those investments are driven by the circumstances and objectives of the State of Connecticut and the history and current status of the distribution grid in Connecticut. Those circumstances and objectives, which require long-term system planning and appropriate capital resources, are not encapsulated by a single index. O&M, though it is similarly influenced by local circumstances, does not change at the same rate as capital investment. For example, the Company’s annual capital investment is expected to increase nearly 40% from $549 million in 2025 to $758 million by 2028, or more than 11% annually, on average. In contrast, over the same timeframe O&M (excluding storm funding and vegetation management) is projected to increase approximately 3-4% annually. The Company’s proposed PBMRP aligns revenues with drivers of cost while maintaining the incentive to control costs. In addition, under PBR theory, where capital inputs are contemplated in the indexed formula, then the X factor is negative, implying that the annual adjustment is inflation plus an additional factor. The testimony of London Economics in Exhibit CLP-PBR-1 reviews the results of their total factor productivity study producing this result. In this case, the Company elected to adhere as closely as possible to PURA’s (draft) CT-Bar in order to remain synched with PURA’s policy direction. (b) How will the Company's proposed treatment of capital expenditures be expected to produce customer cost savings or otherwise improve customer affordability relative to including capital expenditures within a revenue cap formula. There are three main opportunities for customer benefit in the PBR framework, which are: (1) the opportunity to leverage the stay-out term to drive operational efficiency and cost savings; (2) the opportunity to spread rate changes out over time to smooth impacts for customers and employ the concept of gradualism rather than promoting the cost and inefficiency of a traditional rate-case cycle; and (2) the opportunity to develop a systematic investment plan that promotes operational efficiency and cost-saving procurement strategies, while taking advantage of the smoothing impacts of the PBR framework to mitigate cost impacts. The Company has submitted substantial testimony and documentation in this proceeding to provide insight into the level of capital investment that is needed on the system to provide adequate service to customers and to support the economic vitality of the State of Connecticut. Customers benefit directly when investment can be undertaken on a planned, systematic and consistent basis over time because (1) it is consistently more expensive to complete infrastructure projects tomorrow rather than today due to price inflation and other factors; and (2) the Company’s process inputs (i.e., primarily labor and materials) cost less when procured on a planned and systematic basis rather than on an emergent basis. Although difficult to define in terms of the overall cost trends, there are significant benefits for customers in an operating approach that is consistent, systematic, planned and carefully managed, which is an outcome that the Company is hoping to promote with its proposals in this proceeding. Bottomline – the Company is looking to establish a ratemaking framework that will promote efficiency of operations for the benefit of customers and the F-Factor is the optimal mechanism for that purpose. Assuming that OCC’s referenced alternative for a capital-cost mechanism “within a revenue cap formula,” means that the PBMRP would rely exclusively on an “I-X” revenue cap formula, with or without X defined with a negative factor,
  6. Page 59 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-539 Page 14 of 15 the Company’s experience is that it is not adequate to support necessary capital investment, while raising issues for stakeholders. With the negative X factor, there is no direct link between the actual cost of capital plant additions and the revenue collection through customer rates, leaving it to be insufficient to support necessary capital investments and unsatisfactory for stakeholders that want transparency between the costs collected in rates and the rates that customers pay. As a result, achieving the efficiency needed to support a cost-effective capital plan is illusory in this model. (c) How does the proposed F-Factor mitigate or avoid any incentive to favor capital expenditures over O&M solutions, including in circumstances where either a capital or O&M solution could be used to address the same system need? In the Company’s experience, implementation of the X factor mechanism (with a negative X factor) to cover capital investment was thought to be a mechanism that would promote efficient solutions between capital and O&M because the revenue allowance was not predicated on actual plant additions; rather, was simply formulaic. In 2017, the Massachusetts Department of Public Utilities (“MDPU”) approved a negative X factor within a revenue cap for NSTAR Electric Company d/b/a Eversource Energy – and it remained operative for the five-year term of the plan. However, the fact is that – during an extended stay-out period, there is no incentive to incur any greater level of expense than is absolutely necessary to run the business. Therefore, there is no greater impetus than would exist in any event to make the optimal choice between expense and capitalization, where such a choice exists. And again, with the negative X factor, the MDPU felt it had no line of sight as to whether funds allowed to NSTAR Electric through the annual PBR allowance were, indeed, being leveraged for system investment. Therefore, in 2022, the MDPU instituted the K-Bar providing an allowance for system infrastructure projects, coupled with reporting requirements on investment levels. The MDPU maintained the I-X formula to cover the O&M portion of the approved revenue requirement, which is what the Company is proposing in this case. In reality, there are very few instances when system needs can be easily transitioned between a capital-work solution or a work solution that can be expense. The prudence review is the primary and most effective tool that regulators possess for evaluating these situations. iv OCC-432 Question: Exhibit CLP-ELP-1 Please provide a historical calculation of the S-Factor for each of the last 20 years using the methodology proposed by the Company. For each year, provide (a) the Company’s Core Operating Expense per customer; (b) the applicable inflation-adjusted benchmark; (c) the percentage by which Core Operating Expense per customer was above or below the benchmark; and (d) the resulting S-Factor that would have applied under the Company’s proposed methodology. Please provide all calculations in an unlocked Excel workbook with formulas intact. OCC-432 Response: Please refer to OCC-432, Attachment 1. This Attachment provides a historical calculation of the S-Factor for each of the years 2018 through 2025 using the methodology proposed by the Company in this rate case. Any hypothetical calculations going back beyond 2018, the time of the last rate case, would not provide reliable data and would be difficult to create. Financial definitions and systems change over time, as well as base assumptions. The methodology to derive an S factor for O&M needs to be anchored to a rate-case-approved Core Operating Expense level. It can only be built consistently from the current chart of accounts and current tracker structure (i.e., cost categories cannot accurately be compared if cost categories have changed). Since the recovery mechanism and accounting treatment of
  7. Page 60 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-539 Page 15 of 15 various costs changed materially over the prior decade (e.g., storm reserve, vegetation management program), a pre2018 Core Operating Expense would be based on a different set of assumptions and could not be compared. The hypothetical calculation assumes two 4-year PBMRP plan terms during the 8-year period. The benchmark for the consumer dividend uses the Company’s Core Operating Expense and customer count based on the data from the most recent rate case in Docket No. 17-10-46. The benchmark is then reset in 2022 for the next four years based on actual 2022 data. In the attached spreadsheet, a floor of 0.30% is set for each PBR term as proposed in the Company’s filing. There are three sheets in the Excel version of OCC-432, Attachment 1, that provide: At Page 1, INPUTS: For each year 2018 through 2025: the historical customer count, core operating Expense, and inflation adjustments. In addition, this section provides a list of any other assumptions used. At Page 2, O&M TRIGGER: Calculates the applicable inflation-adjusted benchmark, the annual Core Operating Expense per customer for each year 2018 through 2025, and determines whether the Core Operating Expense is above or below the benchmark. At Page 3, RACHET ENGINE: Illustrative calculation of the S Factor for each year of the two hypothetical rate plan terms and the $/customer incurred each year.
  8. Page 61 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-540 Page 1 of 2 Date Filed: September 15, 2026 Witness: Julia Frayer Request from: Office of Consumer Counsel Question: Performance Based Ratemaking Panel Exhibit CLP-PBR-1 Please identify which of the 88 EDCs included in LEI’s Industry TFP and PFP Study operated under a performance-based regulation (PBR) framework, as opposed to traditional cost-of-service regulation, during the 2005–2024 study period, including the applicable years for each regulatory framework. Response: As explained in Exhibit CLP-PBR-1, pages 11–12, and Figure 1, specifically, PBR is best understood as a continuum rather than a single, uniform regulatory regime. PBR mechanisms can range from performance targets and earnings-sharing mechanisms to more comprehensive multiyear price or revenue cap frameworks. Accordingly, PBR and traditional cost-of-service (“COS”) regulation are not mutually exclusive, because PBR mechanisms may be incorporated within an otherwise traditional rate-proceeding framework. Only a few jurisdictions in the U.S. have had a formal PBR framework from 2005-2024. For example, Hawaiian Electric Companies (not included in LEI’s Industry TFP Study), NSTAR Electric Company, and Massachusetts Electric Company, have been under a comprehensive indexbased price or revenue cap framework in recent years. In addition, LEI identified the following utilities included in the Industry TFP Study as having operated under multi-year regulatory arrangements incorporating PBR components during at least part of the 2005–2024 study period:
  9. Page 62 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-540 Page 2 of 2 The regulatory framework applicable to an individual EDC was not an input to, or criterion for, inclusion in LEI’s Industry TFP Study. As explained in Exhibit CLP-PBR-2, Section 1.4, the Industry TFP Study uses a broad sample of 88 EDCs representing approximately 90% of customers served by U.S. investor-owned utilities to capture the diversity of the electric distribution industry and estimate industry-average productivity trends. Accordingly, differences in regulatory framework do not, by themselves, provide a basis for excluding an EDC from an Industry TFP Study.
  10. Page 63 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-12 Date Issued September 01, 2026 OCC-541 Page 1 of 3 Date Filed: September 15, 2026 Witness: Julia Frayer Request from: Office of Consumer Counsel Question: Performance Based Ratemaking Panel Exhibit CLP-PBR-1 Please state whether LEI evaluated whether OM&A PFP trends differed between utilities operating under the PBR and utilities operating under traditional cost-of-service regulation, and whether utilities’ OM&A PFP trends differed between periods before PBR application and under PBR application. If so, please provide the results of the analysis. If not, please explain why such an analysis was not performed and provide, if available, the OM&A PFP growth rates separately for the two different groups. Response: This would be an interesting analysis, but there are several empirical challenges to conducting it reliably. First, incentives to pursue efficiency improvements can arise from a range of formal and informal features of a regulatory regime, including stay-out provisions, multi-year rate plans, voluntary rate freezes, and regulatory lag between rate cases. As noted in our response to OCC540, a number of utilities have operated, or currently operate, under some form of PBR (formula based or MYRP), while others have experienced extended periods of rate freezes or regulatory lag, such as MidAmerican Energy in Iowa (who went for 10 years without a rate case). LEI has not undertaken an exhaustive review of the regulatory regimes applicable to every utility over the study period. The sub-sample of companies identified in that Response is unlikely to cover the entire industry, and an analysis limited to it would therefore not constitute an industry-wide study. Second, and more fundamentally, the strength of the incentive to improve efficiency depends on multiple, interacting features of a regulatory regime rather than on any single characteristic. Distribution ratemaking in the U.S. is the domain of state regulators, so there are diverse regulatory mechanisms in place. For example, one utility may be subject to a formal stay out provision, others may be under voluntary rate freeze, while another may have an earnings sharing mechanism, or a forecast-based multi-year plan with advance ratemaking treatment for certain investments, variance accounts or other mechanisms. Cost and productivity outcomes may also be affected by factors unrelated to PBR, such as corporate restructuring or merger-related synergies. As a result, regulatory regimes that appear similar at a high level may create materially different efficiency incentives. Given the diversity of regulatory frameworks across U.S., a simple classification based

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

Text of OCC Set 14_COMBINED.pdf

Extracted from the file · 66 pages · 143,197 characters

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)