Compilations of discovery responses
Files31
Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
PDF · 161 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Discovery Compilations September 29 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
ALLCO Set 5_COMBINED.pdf
PDF · 669 KB · 36 pagesText searchable
Download ALLCO Set 5_COMBINED.pdfRead the text of ALLCO Set 5_COMBINED.pdf
ALLCO Set 4_COMBINED.pdf
PDF · 133 KB · 4 pagesText searchable
Download ALLCO Set 4_COMBINED.pdfRead the text of ALLCO Set 4_COMBINED.pdf
ALLCO Set 3_COMBINED.pdf
PDF · 346 KB · 23 pagesText searchable
Download ALLCO Set 3_COMBINED.pdfRead the text of ALLCO Set 3_COMBINED.pdf
ALLCO Set 2_COMBINED.pdf
PDF · 576 KB · 38 pagesText searchable
Download ALLCO Set 2_COMBINED.pdfRead the text of ALLCO Set 2_COMBINED.pdf
ALLCO Set 1_COMBINED.pdf
PDF · 458 KB · 27 pagesText searchable
Download ALLCO Set 1_COMBINED.pdfRead the text of ALLCO Set 1_COMBINED.pdf
ALLCO Set 6_COMBINED.pdf
PDF · 332 KB · 9 pagesText searchable
Download ALLCO Set 6_COMBINED.pdfRead the text of ALLCO Set 6_COMBINED.pdf
AMTRAK Set 2_COMBINED.pdf
PDF · 123 KB · 2 pagesText searchable
Download AMTRAK Set 2_COMBINED.pdfRead the text of AMTRAK Set 2_COMBINED.pdf
AMTRAK Set 1_COMBINED.pdf
PDF · 190 KB · 5 pagesText searchable
Download AMTRAK Set 1_COMBINED.pdfRead the text of AMTRAK Set 1_COMBINED.pdf
AMTRAK Set 3_COMBINED.pdf
PDF · 649 KB · 34 pagesText searchable
Download AMTRAK Set 3_COMBINED.pdfRead the text of AMTRAK Set 3_COMBINED.pdf
CIEC Set 2_COMBINED.pdf
PDF · 85 KB · 1 pageText searchable
Download CIEC Set 2_COMBINED.pdfRead the text of CIEC Set 2_COMBINED.pdf
CIEC Set 1_COMBINED.pdf
PDF · 351 KB · 19 pagesText searchable
Download CIEC Set 1_COMBINED.pdfRead the text of CIEC Set 1_COMBINED.pdf
CIEC Set 3_COMBINED.pdf
PDF · 188 KB · 4 pagesText searchable
Download CIEC Set 3_COMBINED.pdfRead the text of CIEC Set 3_COMBINED.pdf
CLF-SC Set 1_COMBINED.pdf
PDF · 611 KB · 56 pagesText searchable
Download CLF-SC Set 1_COMBINED.pdfRead the text of CLF-SC Set 1_COMBINED.pdf
CLF Set 1_ COMBINED.pdf
PDF · 289 KB · 20 pagesText searchable
Download CLF Set 1_ COMBINED.pdfRead the text of CLF Set 1_ COMBINED.pdf
CLF-SC Set 2_COMBINED.pdf
PDF · 182 KB · 7 pagesText searchable
Download CLF-SC Set 2_COMBINED.pdfRead the text of CLF-SC Set 2_COMBINED.pdf
EOE Set 3_COMBINED.pdf
PDF · 237 KB · 11 pagesText searchable
Download EOE Set 3_COMBINED.pdfRead the text of EOE Set 3_COMBINED.pdf
EOE Set 2_COMBINED.pdf
PDF · 417 KB · 22 pagesText searchable
Download EOE Set 2_COMBINED.pdfRead the text of EOE Set 2_COMBINED.pdf
EOE Set 1_COMBINED.pdf
PDF · 1.7 MB · 200 pagesText searchable
Download EOE Set 1_COMBINED.pdfRead the text of EOE Set 1_COMBINED.pdf
EOE Set 4_COMBINED.pdf
PDF · 836 KB · 70 pagesText searchable
Download EOE Set 4_COMBINED.pdfRead the text of EOE Set 4_COMBINED.pdf
ICC Set 1_COMBINED.pdf
PDF · 466 KB · 30 pagesText searchable
Download ICC Set 1_COMBINED.pdfRead the text of ICC Set 1_COMBINED.pdf
OCC Set 13_COMBINED.pdf
PDF · 484 KB · 30 pagesText searchable
Download OCC Set 13_COMBINED.pdfRead the text of OCC Set 13_COMBINED.pdf
OCC Set 12_COMBINED.pdf
PDF · 1.0 MB · 73 pagesText searchable
Download OCC Set 12_COMBINED.pdfRead the text of OCC Set 12_COMBINED.pdf
OCC Set 11_COMBINED.pdf
PDF · 482 KB · 48 pagesText searchable
Download OCC Set 11_COMBINED.pdfRead the text of OCC Set 11_COMBINED.pdf
OCC Set 10_COMBINED.pdf
PDF · 542 KB · 51 pagesText searchable
Download OCC Set 10_COMBINED.pdfRead the text of OCC Set 10_COMBINED.pdf
OCC Set 5_COMBINED.pdf
PDF · 511 KB · 46 pagesText searchable
Download OCC Set 5_COMBINED.pdfRead the text of OCC Set 5_COMBINED.pdf
OCC Set 4_COMBINED.pdf
PDF · 1.3 MB · 159 pagesText searchable
Download OCC Set 4_COMBINED.pdfRead the text of OCC Set 4_COMBINED.pdf
OCC Set 3_COMBINED.pdf
PDF · 1.2 MB · 93 pagesText searchable
Download OCC Set 3_COMBINED.pdfRead the text of OCC Set 3_COMBINED.pdf
OCC Set 2_COMBINED.pdf
PDF · 1.7 MB · 68 pagesText searchable
Download OCC Set 2_COMBINED.pdfRead the text of OCC Set 2_COMBINED.pdf
OCC Set 1_COMBINED.pdf
PDF · 7.0 MB · 139 pagesText searchable
Download OCC Set 1_COMBINED.pdfRead the text of OCC Set 1_COMBINED.pdf
OCC Set 14_COMBINED.pdf
PDF · 880 KB · 66 pagesText searchable
Download OCC Set 14_COMBINED.pdfRead the text of OCC Set 14_COMBINED.pdf
Text of ALLCO Set 3_COMBINED.pdf
Extracted from the file · 23 pages · 55,777 characters
Text of ALLCO Set 2_COMBINED.pdf
Extracted from the file · 38 pages · 81,182 characters
Text of ALLCO Set 1_COMBINED.pdf
Extracted from the file · 27 pages · 46,644 characters
Text of ALLCO Set 6_COMBINED.pdf
Extracted from the file · 9 pages · 18,340 characters
Text of AMTRAK Set 2_COMBINED.pdf
Extracted from the file · 2 pages · 3,025 characters
Text of AMTRAK Set 1_COMBINED.pdf
Extracted from the file · 5 pages · 4,881 characters
Text of AMTRAK Set 3_COMBINED.pdf
Extracted from the file · 34 pages · 101,991 characters
Text of CIEC Set 2_COMBINED.pdf
Extracted from the file · 1 page · 1,005 characters
Text of CIEC Set 1_COMBINED.pdf
Extracted from the file · 19 pages · 26,023 characters
Text of CIEC Set 3_COMBINED.pdf
Extracted from the file · 4 pages · 5,355 characters
Text of CLF-SC Set 1_COMBINED.pdf
Extracted from the file · 56 pages · 132,578 characters
Text of CLF Set 1_ COMBINED.pdf
Extracted from the file · 20 pages · 38,243 characters
Text of CLF-SC Set 2_COMBINED.pdf
Extracted from the file · 7 pages · 17,131 characters
Text of EOE Set 3_COMBINED.pdf
Extracted from the file · 11 pages · 23,418 characters
Text of EOE Set 2_COMBINED.pdf
Extracted from the file · 22 pages · 42,455 characters
Text of EOE Set 1_COMBINED.pdf
Extracted from the file · 200 pages · 332,382 characters
Text of EOE Set 4_COMBINED.pdf
Extracted from the file · 70 pages · 139,575 characters
Text of ICC Set 1_COMBINED.pdf
Extracted from the file · 30 pages · 51,093 characters
Text of OCC Set 13_COMBINED.pdf
Extracted from the file · 30 pages · 61,971 characters
Text of OCC Set 12_COMBINED.pdf
Extracted from the file · 73 pages · 193,636 characters
Text of OCC Set 11_COMBINED.pdf
Extracted from the file · 48 pages · 62,469 characters
Text of OCC Set 10_COMBINED.pdf
Extracted from the file · 51 pages · 90,368 characters
Page 16 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-05 Date Issued August 12, 2026 OCC-375 Page 1 of 3 Date Filed: August 28, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-REVREQ-3. Provide the following: a. Compensation Payroll Expense. Explain the reason for the increased spending in 2024 and 2025 over the prior years. b. Field Operations (Overhead Lines-Operation & Maintenance) Explain the reason for increase in spending in the Rate Year as this expense has declined from 2023-2025. Provide supporting documentation (invoices, contracts, quotes) c. Employee Benefits. Explain why the expense was negative in CY 2022. d. Materials and Supplies. Explain why the expense was negative in CY 2024. e. Residual O&M. Explain why the expense was negative in CY 2024. f. Vegetation Management. Explain the reason for the decrease in spending in 2025 over the prior years amounts. g. Human Resources, Education and Training. Explain why this expense has declined each year from 2022-2025. Does the Company expect further decreases in the Rate Year? If not, explain why not. h. Legal. Explain the reason for the increased spending in 2025 over the prior years and why the Company expects this level to continue in the Rate Year. i. Field Operations (Underground Lines-Operation & Maintenance) Explain the reason the overall decline in spending during the years shown. j. Field Operations (Underground Lines-Operation & Maintenance) Explain why the Company expects this expense to increase in the Rate Year. Provide supporting documentation (invoices, contracts, quotes) Response: As discussed in OCC-374, the amounts presented within Exhibit CLP-REVREQ-3 are not precise representations of actual costs (other than for the test year, calendar year 2025). The Company’s actual costs are not recorded in the format presented within Exhibit CLP-REVREQ-3, and for the purposes of the rate case, the Company undertakes an extensive, labor-intensive process to assign the actual Test Year operating costs to each of the categories presented within Schedule C-3.0.Page 17 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-05 Date Issued August 12, 2026 OCC-375 Page 2 of 3 The Company is not able to undertake the same process to organize and re-categorize all actual costs for all other years included within CLP-REVREQ-3, which can produce some classification variances between the Test Year and all preceding years. a. The Company’s payroll data consists of hundreds of thousands of individual transactions that are unique. The payroll data fluctuates each year as a function of numerous conditions that affect the number of positions, FTE headcount, categories of employees, the percentages and timing of merit increases, hiring processes and the amount of labor allocated to CL&P. A contributing factor for the increased spending in 2024 and 2025 is due to the increase in non-storm overtime payroll, as identified in OCC-051, Attachment 1. In addition, the Company’s policy shift in non-storm field-related work from contractor crews to internal crews as discussed in subpart (b), resulted in an increase in internal payroll costs in 2024 and 2025, with a reduction in outside vendor costs. Further, the total payroll expense proposed in this case is derived through an independent evaluation calculating a normalized Test Year level, utilizing actual employee salary information and FTE headcount as of the end of the Test Year. Please refer to OCC-332, for greater detail regarding how this analysis is performed. b. The decline in Field Operations (Overhead Line – Operation & Maintenance) expenses from 2023 to 2025 is primarily due to the Company’s policy shift to significantly reduce the number of contractor dock crews working on the system. The 2025 Test Year reflects a typical level of Field Operations – Overhead costs. Excluding the change in policy, the Company has experienced an overall increase in Field Operation - Overhead expenses during the 2023–2025 period. Therefore, applying GDP inflation to the Field Operation – Overhead Test Year expenses is a reasonable method to estimate costs into the Rate Year. c. Please refer to the Company’s response to OCC-372, for an explanation regarding the overall credit (negative) amount for Employee Benefits Schedule in CY 2022. d. The Materials and Supplies schedule contains “Miscellaneous Distribution Expense Capitalization” (MDEC) overhead credits that are used to offset a portion of expenses related to CL&P’s capitalized construction activities. For the period 2021 to 2024, the Company experienced an increased level of capitalized expense, thereby increasing the associated credits (negative) in the Materials and Supplies schedule. e. The Company performed a detailed review of the Test Year data in preparing the cost of service. This detailed review is not performed for historical years where that data does not impact the Company’s Test Year, nor the proposed cost of service for the Rate Year. For purposes of this response, the Company identified two primary drivers. First, the O&M residual schedule contains a negative -$2M dollar credit in 2024, related to distribution substation work that generally would have been moved to the Field Operations O&M schedules had a detailed analysis been performed, and also, a negative credit of -$7MPage 18 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-05 Date Issued August 12, 2026 OCC-375 Page 3 of 3 dollars related to an “Administrative Salaries & Expense” overhead, cost element “ZAS.” During the 2025 Test Year, the Company performed the analysis of allocating portions of this credit to the appropriate schedules throughout the cost of service; however this level of analysis is not performed for historical years. f. The decrease in spending in 2025 is attributable to the optimization of O&M throughout Connecticut Operations, during which time the Vegetation Management spending was reduced to the rate-recoverable amount. g. Beginning in 2024, the Company undertook an effort to minimize the use of contractors with regard to Company-staffing responsibilities. Oftentimes, outside contractor services require payment of a fee for placement of staffing needs in addition to hourly charges for the contracted resources. As a result, the Company has shifted to utilizing more internal full-time employees, which enabled the Company to reduce the cost of Company staffing responsibilities. h. The increase in legal service costs in 2025 over the prior years is related to additional legal support for CT PURA dockets and appeals; executive order legal analysis and guidance; and increased collections activities. Given the nature of the changes in the requirements for compliance, collections and regulatory participation, among other factors, these costs are expected to remain at least consistent with current (2025) levels. As a result, the level of legal fees in 2025 is representative of the legal expense that the Company expects to incur routinely due to the increased number of CT regulatory proceedings, continued collections activities and the rising cost of legal service providers. i. The decline in Field Operations (Underground Line – Operation & Maintenance) expenses is attributable to three factors. First, the Company’s policy adjustment to reduce the number of contractor dock crews occurred prior to 2025, making 2025 representative of a typical level of annual contractor expenses. Second, the Company has increased the quantity of transformers it purchases. Transformers are capitalized and any associated labor is accounted for as a credit to Field Operation expenses. Third, the Company has experienced an increase in the number of reimbursable damage claims. Damage claims are credits applied to Field Operations expenses. j. The level of Field Operations (Underground Line – Operation & Maintenance) expenses, excluding the items referenced in subpart (i) have gradually increased. To normalize this amount, the Company has reasonably applied GDP inflation to the normalized 2025 Test Year Pro Forma.Page 19 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-05 Date Issued August 12, 2026 OCC-376 Page 1 of 1 Date Filed: August 28, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Denise Cosentino Request from: Office of Consumer Counsel Question: Insurance. Refer to WP C-3.19. a. Provide documentation supporting the general liability, workers compensation premium and the public liability expense Rate Year adjustments (quotes, invoices, etc.) b. Provide the loyalty credits received in each of the years 2021, 2022, 2023, 2024, and 2025. c. Provide the actual amount of insurance expense, by insurance type shown for each year 2021, 2022, 2023, 2024, 2025, and included in the Rate Year. Response: a. Please refer to OCC-376, Attachment 1, for the calculation of the Rate Year expense of general liability, workers compensation premium, and public liability expense. Please refer to OCC- 376, Attachment 2 CONFIDENTIAL, for the documentation supporting the general liability, workers’ compensation premium and public liability Rate Year adjustments. In preparing this response, the Company identified a $3,000 downward adjustment to the Workers Compensation Premium Test Year Pro Forma amount that was included in the Rate Year, and will reflect this adjustment in the next cost of service update. b. Please refer to OCC-376, Attachment 3, specifically line 29 for the loyalty credits received for years 2021 through 2025. c. Please see OCC-376, Attachment 3, for the actual amount of insurance expense by type for years 2021 through 2025 and the Rate Year.Page 20 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-05 Date Issued August 12, 2026 OCC-377 Page 1 of 4 Date Filed: August 28, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, John P. DiPaola-Tromba, Sean D. Redding and Jenna M. Turner Request from: Office of Consumer Counsel Question: Vegetation Management. Refer to WP C-3.31. a. Provide the actual amounts in the same format for each of the years 2021, 2022, 2023, 2024, 2025 and the Rate Year. b. Provide an explanation and calculations showing how each rate year adjustment was derived. c. Provide documentation (contracts, invoices, quotes) supporting each of the Rate Year increases in Column E. Response: a. Please refer to OCC-377, Attachment 1, for the actual amounts provided for each of the years 2021-2025 and the Rate Year: b. Please refer to WP C-3.31, columns I, K, and M. The calculations for the Rate Year adjustments (column M) were derived by subtracting the Rate Year 1 Ending 6/30/28 amount (column K) by the Test Year Pro Forma amount (Column I). c. Please refer to the response to OCC-102 i for the drivers of the proposed increases from the test year to the proposed budget in the Rate Year. The Company is currently under the final year of a four-year contract covering the term 2023-2026. Contracts, invoices, and quotes cannot be provided for the proposed Rate Year ending 6/30/2028. In May 2026, the Company commenced the RFP process for the next multi-year contract commencing January 1, 2027. Vendors are currently preparing their bid submissions. The Company anticipates finalizing its VMP contract by November 2026 and will update its proposed VMP work plan in this case based on that final contract pricing (Exhibit CLP-VMP-1, page 39, lines 11-16). Prior Referenced Response: i OCC-102 Question: (VMP/Budget) Provide a budget breakdown, including allocation and actuals, for prior years, across the same line items provided in the proposed program budget for 2027 as outlined in Exhibit CLP-VMP-2 page 25 of 29 (noting that there is a VMP costs by program component on page 26 of Exhibit CLP-VMP-1, but it does not use all the same line items makingPage 21 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-05 Date Issued August 12, 2026 OCC-377 Page 2 of 4 comparison a challenge). a. For each line item with an increase in the proposed 2027 from the actual 2025 expenditure, explain and qualify all the drivers of the proposed increase. b. The 2027 budget breakdown, provided on Exhibit CLP-VMP-2 page 25 of 29, totals 89.6mill, the same as the total request in the . What will the contribution from Frontier of 13.5M be spent on? c. Please provide the Company’s analysis demonstrating that the proposed budget does not result in diminishing returns each year? d. Provide any analyses comparing the benefits achieved during the initial ETT cycle to those achieved during subsequent cycles. OCC-102 Response: Please refer to Exhibit OCC-102, Attachment 1, for the requested breakdown of the 2025 cost (Exhibit CLP-VMP-1, page 26) and the proposed budget for 2027 (Exhibit CLP-VMP-2, page 25). a. The following program components are new programs and do not have a direct Test Year comparison: Risk Tree Removals (“RTR”), Reliability Tree Work (“RTW”), and LiDAR. The following programs had increases from the Test Year actual in 2025 to the proposed budget in 2027: • The Roadside Schedule Maintenance increase reflects the estimated costs for a four-year scheduled maintenance cycle with contractor increases due to inflation. The proposed plan shifts away from prioritization and field assessment towards a strategy of maintaining the entire circuits all at once. This approach is driven by the LiDAR pilot results showing high levels of vegetation encroachment 3 years post trimming on circuits due for scheduled maintenance the following year. The budget was developed using cost per mile estimates that include contractor rate increases. Actual costs will be updated at the completion of the current RFP for 2027-2030 vegetation management pricing. • The RTR budget is converted funds from previous Enhanced Tree Removal (“ETR”) capital dollars to expense dollars. • Distribution Rights-of-Way (“D ROW”) is being funded with previous Customer Focus Enhanced Tree Trimming (“ETT”) and Expense funds to support the scheduled distribution ROWs cycle for side trimming and brush control, including maintenance ETT where ETT specification was achieved. • Emergency is a planned budget to cover blue sky emergency tree contractor call outs to outage and non-outage tree OMS events. The 2027 proposed budget is an increase over the 2025 actual, however the proposed budget has remained steady at $2,000,000 for several years. The emergency program spend is highly weather dependent and the budget must account for busier years. • Vines was increased to allow for two years of backbone circuit miles to be treated instead of one year. The circuit backbones that are not due for mid-cycle or scheduled maintenance will be treated for vines each year. Through this approach, all backbone miles will be covered for vine treatment every year. • Emergent Work has been increased to support the volume of customer and tree warden inquiries regarding dead and declining trees and in anticipation of increased tree stress and mortality due to beech leaf disease and spotted lanternfly.Page 22 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-05 Date Issued August 12, 2026 OCC-377 Page 3 of 4 • Mid-Cycle is a historic program that is being funded again given the results of the LiDAR analysis. The LiDAR analysis shows there is encroachment across the system that should be addressed sooner due to consent limitations and varying tree growth rates. The program will support hot spot trimming across approximately 1,000 to 1,200 miles of backbone each year. • CT DOT Program is moving from Capital to Expense and has increased due to projected increases in contractor costs. • LiDAR is a new remote sensing technology program that will facilitate the annual collection of ground-based LiDAR collection of the upcoming year’s scheduled maintenance circuits as well as off-cycle backbone miles for Midcycle and RTW prioritization. This program has been added following a successful pilot of ground based LiDAR highlighting how this data-driven approach can improve prioritization of the VMP. • Other expenses has been increased to support Energy Saving Trees Arbor Day locations, right-tree, right-place education, transformer enclosure maintenance, and other smaller programs. b. Please refer to Exhibit CLP-VMP-1 at page 44 on lines 16-21. The Company is presenting the total VMP annual budget that aligns with its workplan. However, a portion of this annual budget will be recovered from Frontier Communications. Pursuant to the agreement between Eversource and Frontier Communications, the Company is reimbursed for 15 percent of all vegetation management O&M costs. This reduces the total annual VMP costs to be recovered from customers in base rates from $89.6 million to approximately $77 million. c. The nature of utility vegetation management is to remove and maintain encroaching vegetation within defined and approved specifications along the electric system to maintain system reliability; however, due to the natural system in which the VMP operates, and the continual growth of vegetation in CT, the cost of maintaining the encroachment is incurred annually through the Scheduled Maintenance Trimming (“SMT”) program. Trees removed through the proposed Risk Tree Removal (“RTR”) and Reliability Tree Work (“RTW”) programs would no longer need to be maintained in future cycles and would not result in diminishing returns. d. Please refer to Exhibit CLP-VMP-4. The University of Connecticut 2022 Study, A Statistical Framework for Evaluating the Effectiveness of Vegetation Management in Reducing Power Outages Caused during Storms in Distribution Networks, demonstrates that, “enhanced vegetation management is particularly helpful in reducing trouble spots for lower severity storms, with reductions between 45.8% and 63.8%, and substantially reduces trouble spots during the most severe events when vegetation management is particularly comprehensive, demonstrating a 37.3% reduction when compared with circuits with little to no enhanced tree trimming.” (Exhibit CLP-VMP-4, at 15). The reliability improvements indicated were observed in individual storm events as well as in annual totals. The University of Connecticut 2022 study further elaborates that, “this analysis provides a better understanding of how more rigorous vegetation management standards (applying ETT) help reduce outages at an individual event level, for both the more frequent events and those less frequent, stronger storms, which may also occur more frequently in the future due to climate change.” (id.). The Company’s redesigned RTW program will allow the Company to address the locations on scheduled circuits where overhang and ETT clearances were not previously achieved on the portion of those circuitsPage 23 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-05 Date Issued August 12, 2026 OCC-377 Page 4 of 4 that serve the most customers and are highly susceptible to tree-related outages, particularly in relation to circuit backbones that were addressed through the ETT program over 20 years ago. Please refer to Exhibit CLP-VMP-2, on page 19, where the Company summarized aspects of the RTW program. Previous ETT programs between 2004 and 2026 did not allow for previously completed zones to be readdressed if full clearance was limited by permissions. The RTW program will be key in preventing vegetation outages from outside zone overhanging limb fall-in and inside zone tree fall-in on high priority line segments with the goal of achieving clearance of 10 ft of vegetation from ground to sky where permission allows. By targeting the zones with overhang that serve the highest number of customers through the RTW program, risk will be mitigated.Page 24 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-05 Date Issued August 12, 2026 OCC-378 Page 1 of 4 Date Filed: August 26, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: Vegetation Management. Refer to CLP-REVREQ-1 pages 113-115. Will the increases in vegetation management spending reduce future storm recovery costs? If so, has the company reflected the reductions in the revenue requirement for such savings? Identify the estimated savings and where they are reflected. If none are reflected, explain why not. Response: No, the company cannot quantify the reduction in future storm recovery costs that may be attributed to increases in Vegetation Management Spending due to the variability in the frequency and severity of storm events and the resulting impacts to the vast expanse of Connecticut roadside forests and resulting impacts to the distribution system. However, the changes to the VMP will directly benefit customers through maintaining and improving system performance on blue sky days (i.e., under normal operations) and during storm events. Please refer to the Company’s response to information request OCC-102 i, which quantifies and qualifies each proposed program budget increase from the Test Year to the Rate Year, and CLPVMP-2, at pages 18-20, for the justification of how each proposed program (e.g., Scheduled Maintenance Trimming, Reliability Tree Work, and Reliability Tree Removals) may prevent treerelated outages and the associated percentage of tree-related outages that may be mitigated through each program. In addition to the program justifications provided in CLP-VMP-2, transitioning from a targeted 4year cycle to trimming every mile on the 4-year cycle under the Scheduled Maintenance Trimming program will more uniformly assist Electric Operations in assuring that infrastructure is unencumbered by vegetation near the lines, facilitating their ability to find and repair issues when an outage does occur. More uniform clearances will also assist Engineering as it evaluates outage mitigation initiatives, as well as providing a better foundation for vegetation management conditions pre- and post-storm. Prior Referenced Response: i OCC-102 Question: (VMP/Budget)Page 25 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-05 Date Issued August 12, 2026 OCC-378 Page 2 of 4 Provide a budget breakdown, including allocation and actuals, for prior years, across the same line items provided in the proposed program budget for 2027 as outlined in Exhibit CLP-VMP-2 page 25 of 29 (noting that there is a VMP costs by program component on page 26 of Exhibit CLP-VMP-1, but it does not use all the same line items making comparison a challenge). a. For each line item with an increase in the proposed 2027 from the actual 2025 expenditure, explain and qualify all the drivers of the proposed increase. b. The 2027 budget breakdown, provided on Exhibit CLP-VMP-2 page 25 of 29, totals 89.6mill, the same as the total request in the . What will the contribution from Frontier of 13.5M be spent on? c. Please provide the Company’s analysis demonstrating that the proposed budget does not result in diminishing returns each year? d. Provide any analyses comparing the benefits achieved during the initial ETT cycle to those achieved during subsequent cycles. OCC-102 Response: Please refer to Exhibit OCC-102, Attachment 1, for the requested breakdown of the 2025 cost (Exhibit CLP-VMP-1, page 26) and the proposed budget for 2027 (Exhibit CLP-VMP-2, page 25). a. The following program components are new programs and do not have a direct Test Year comparison: Risk Tree Removals (“RTR”), Reliability Tree Work (“RTW”), and LiDAR. The following programs had increases from the Test Year actual in 2025 to the proposed budget in 2027: • • • • • • The Roadside Schedule Maintenance increase reflects the estimated costs for a four-year scheduled maintenance cycle with contractor increases due to inflation. The proposed plan shifts away from prioritization and field assessment towards a strategy of maintaining the entire circuits all at once. This approach is driven by the LiDAR pilot results showing high levels of vegetation encroachment 3 years post trimming on circuits due for scheduled maintenance the following year. The budget was developed using cost per mile estimates that include contractor rate increases. Actual costs will be updated at the completion of the current RFP for 2027-2030 vegetation management pricing. The RTR budget is converted funds from previous Enhanced Tree Removal (“ETR”) capital dollars to expense dollars. Distribution Rights-of-Way (“D ROW”) is being funded with previous Customer Focus Enhanced Tree Trimming (“ETT”) and Expense funds to support the scheduled distribution ROWs cycle for side trimming and brush control, including maintenance ETT where ETT specification was achieved. Emergency is a planned budget to cover blue sky emergency tree contractor call outs to outage and non-outage tree OMS events. The 2027 proposed budget is an increase over the 2025 actual, however the proposed budget has remained steady at $2,000,000 for several years. The emergency program spend is highly weather dependent and the budget must account for busier years. Vines was increased to allow for two years of backbone circuit miles to be treated instead of one year. The circuit backbones that are not due for mid-cycle or scheduled maintenance will be treated for vines each year. Through this approach, all backbone miles will be covered for vine treatment every year. Emergent Work has been increased to support the volume of customer and tree warden inquiries regarding dead and declining trees and in anticipation of increased tree stress and mortality due to beech leaf disease and spotted lanternfly.
Text of OCC Set 4_COMBINED.pdf
Extracted from the file · 159 pages · 268,038 characters
Text of OCC Set 3_COMBINED.pdf
Extracted from the file · 93 pages · 113,517 characters
Text of OCC Set 2_COMBINED.pdf
Extracted from the file · 68 pages · 113,929 characters
Text of OCC Set 1_COMBINED.pdf
Extracted from the file · 139 pages · 225,320 characters
Text of OCC Set 14_COMBINED.pdf
Extracted from the file · 66 pages · 143,197 characters
As listed on the current system
Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses