Compilations of discovery responses
Files31
Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
PDF · 161 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Discovery Compilations September 29 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
ALLCO Set 5_COMBINED.pdf
PDF · 669 KB · 36 pagesText searchable
Download ALLCO Set 5_COMBINED.pdfRead the text of ALLCO Set 5_COMBINED.pdf
ALLCO Set 4_COMBINED.pdf
PDF · 133 KB · 4 pagesText searchable
Download ALLCO Set 4_COMBINED.pdfRead the text of ALLCO Set 4_COMBINED.pdf
ALLCO Set 3_COMBINED.pdf
PDF · 346 KB · 23 pagesText searchable
Download ALLCO Set 3_COMBINED.pdfRead the text of ALLCO Set 3_COMBINED.pdf
ALLCO Set 2_COMBINED.pdf
PDF · 576 KB · 38 pagesText searchable
Download ALLCO Set 2_COMBINED.pdfRead the text of ALLCO Set 2_COMBINED.pdf
ALLCO Set 1_COMBINED.pdf
PDF · 458 KB · 27 pagesText searchable
Download ALLCO Set 1_COMBINED.pdfRead the text of ALLCO Set 1_COMBINED.pdf
ALLCO Set 6_COMBINED.pdf
PDF · 332 KB · 9 pagesText searchable
Download ALLCO Set 6_COMBINED.pdfRead the text of ALLCO Set 6_COMBINED.pdf
AMTRAK Set 2_COMBINED.pdf
PDF · 123 KB · 2 pagesText searchable
Download AMTRAK Set 2_COMBINED.pdfRead the text of AMTRAK Set 2_COMBINED.pdf
AMTRAK Set 1_COMBINED.pdf
PDF · 190 KB · 5 pagesText searchable
Download AMTRAK Set 1_COMBINED.pdfRead the text of AMTRAK Set 1_COMBINED.pdf
AMTRAK Set 3_COMBINED.pdf
PDF · 649 KB · 34 pagesText searchable
Download AMTRAK Set 3_COMBINED.pdfRead the text of AMTRAK Set 3_COMBINED.pdf
CIEC Set 2_COMBINED.pdf
PDF · 85 KB · 1 pageText searchable
Download CIEC Set 2_COMBINED.pdfRead the text of CIEC Set 2_COMBINED.pdf
CIEC Set 1_COMBINED.pdf
PDF · 351 KB · 19 pagesText searchable
Download CIEC Set 1_COMBINED.pdfRead the text of CIEC Set 1_COMBINED.pdf
CIEC Set 3_COMBINED.pdf
PDF · 188 KB · 4 pagesText searchable
Download CIEC Set 3_COMBINED.pdfRead the text of CIEC Set 3_COMBINED.pdf
CLF-SC Set 1_COMBINED.pdf
PDF · 611 KB · 56 pagesText searchable
Download CLF-SC Set 1_COMBINED.pdfRead the text of CLF-SC Set 1_COMBINED.pdf
CLF Set 1_ COMBINED.pdf
PDF · 289 KB · 20 pagesText searchable
Download CLF Set 1_ COMBINED.pdfRead the text of CLF Set 1_ COMBINED.pdf
CLF-SC Set 2_COMBINED.pdf
PDF · 182 KB · 7 pagesText searchable
Download CLF-SC Set 2_COMBINED.pdfRead the text of CLF-SC Set 2_COMBINED.pdf
EOE Set 3_COMBINED.pdf
PDF · 237 KB · 11 pagesText searchable
Download EOE Set 3_COMBINED.pdfRead the text of EOE Set 3_COMBINED.pdf
EOE Set 2_COMBINED.pdf
PDF · 417 KB · 22 pagesText searchable
Download EOE Set 2_COMBINED.pdfRead the text of EOE Set 2_COMBINED.pdf
EOE Set 1_COMBINED.pdf
PDF · 1.7 MB · 200 pagesText searchable
Download EOE Set 1_COMBINED.pdfRead the text of EOE Set 1_COMBINED.pdf
EOE Set 4_COMBINED.pdf
PDF · 836 KB · 70 pagesText searchable
Download EOE Set 4_COMBINED.pdfRead the text of EOE Set 4_COMBINED.pdf
ICC Set 1_COMBINED.pdf
PDF · 466 KB · 30 pagesText searchable
Download ICC Set 1_COMBINED.pdfRead the text of ICC Set 1_COMBINED.pdf
OCC Set 13_COMBINED.pdf
PDF · 484 KB · 30 pagesText searchable
Download OCC Set 13_COMBINED.pdfRead the text of OCC Set 13_COMBINED.pdf
OCC Set 12_COMBINED.pdf
PDF · 1.0 MB · 73 pagesText searchable
Download OCC Set 12_COMBINED.pdfRead the text of OCC Set 12_COMBINED.pdf
OCC Set 11_COMBINED.pdf
PDF · 482 KB · 48 pagesText searchable
Download OCC Set 11_COMBINED.pdfRead the text of OCC Set 11_COMBINED.pdf
OCC Set 10_COMBINED.pdf
PDF · 542 KB · 51 pagesText searchable
Download OCC Set 10_COMBINED.pdfRead the text of OCC Set 10_COMBINED.pdf
OCC Set 5_COMBINED.pdf
PDF · 511 KB · 46 pagesText searchable
Download OCC Set 5_COMBINED.pdfRead the text of OCC Set 5_COMBINED.pdf
OCC Set 4_COMBINED.pdf
PDF · 1.3 MB · 159 pagesText searchable
Download OCC Set 4_COMBINED.pdfRead the text of OCC Set 4_COMBINED.pdf
OCC Set 3_COMBINED.pdf
PDF · 1.2 MB · 93 pagesText searchable
Download OCC Set 3_COMBINED.pdfRead the text of OCC Set 3_COMBINED.pdf
OCC Set 2_COMBINED.pdf
PDF · 1.7 MB · 68 pagesText searchable
Download OCC Set 2_COMBINED.pdfRead the text of OCC Set 2_COMBINED.pdf
OCC Set 1_COMBINED.pdf
PDF · 7.0 MB · 139 pagesText searchable
Download OCC Set 1_COMBINED.pdfRead the text of OCC Set 1_COMBINED.pdf
OCC Set 14_COMBINED.pdf
PDF · 880 KB · 66 pagesText searchable
Download OCC Set 14_COMBINED.pdfRead the text of OCC Set 14_COMBINED.pdf
Text of ALLCO Set 3_COMBINED.pdf
Extracted from the file · 23 pages · 55,777 characters
Text of ALLCO Set 2_COMBINED.pdf
Extracted from the file · 38 pages · 81,182 characters
Text of ALLCO Set 1_COMBINED.pdf
Extracted from the file · 27 pages · 46,644 characters
Text of ALLCO Set 6_COMBINED.pdf
Extracted from the file · 9 pages · 18,340 characters
Text of AMTRAK Set 2_COMBINED.pdf
Extracted from the file · 2 pages · 3,025 characters
Text of AMTRAK Set 1_COMBINED.pdf
Extracted from the file · 5 pages · 4,881 characters
Text of AMTRAK Set 3_COMBINED.pdf
Extracted from the file · 34 pages · 101,991 characters
Text of CIEC Set 2_COMBINED.pdf
Extracted from the file · 1 page · 1,005 characters
Text of CIEC Set 1_COMBINED.pdf
Extracted from the file · 19 pages · 26,023 characters
Text of CIEC Set 3_COMBINED.pdf
Extracted from the file · 4 pages · 5,355 characters
Text of CLF-SC Set 1_COMBINED.pdf
Extracted from the file · 56 pages · 132,578 characters
Text of CLF Set 1_ COMBINED.pdf
Extracted from the file · 20 pages · 38,243 characters
Text of CLF-SC Set 2_COMBINED.pdf
Extracted from the file · 7 pages · 17,131 characters
Text of EOE Set 3_COMBINED.pdf
Extracted from the file · 11 pages · 23,418 characters
Text of EOE Set 2_COMBINED.pdf
Extracted from the file · 22 pages · 42,455 characters
Text of EOE Set 1_COMBINED.pdf
Extracted from the file · 200 pages · 332,382 characters
Text of EOE Set 4_COMBINED.pdf
Extracted from the file · 70 pages · 139,575 characters
Text of ICC Set 1_COMBINED.pdf
Extracted from the file · 30 pages · 51,093 characters
Text of OCC Set 13_COMBINED.pdf
Extracted from the file · 30 pages · 61,971 characters
Text of OCC Set 12_COMBINED.pdf
Extracted from the file · 73 pages · 193,636 characters
Text of OCC Set 11_COMBINED.pdf
Extracted from the file · 48 pages · 62,469 characters
Text of OCC Set 10_COMBINED.pdf
Extracted from the file · 51 pages · 90,368 characters
Text of OCC Set 5_COMBINED.pdf
Extracted from the file · 46 pages · 88,105 characters
Text of OCC Set 4_COMBINED.pdf
Extracted from the file · 159 pages · 268,038 characters
Text of OCC Set 3_COMBINED.pdf
Extracted from the file · 93 pages · 113,517 characters
Page 41 of 68
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-02 Date Issued July 30, 2026 OCC-172 Page 2 of 2 The SPA tracks the labor associated with supporting the SVT pilot through periodic reporting of SPA labor time devoted to program administration and coordination activities. Reported labor hours include coordination meetings, contractor oversight, project administration, reporting, and related support activities. As the pilot expanded into additional municipalities simultaneously and multiple contractors worked concurrently, the level of SPA coordination and administrative oversight increased, resulting in increasing reported labor hours. Reported SPA labor hours associated with the pilot are approximated in the table below: Outside of the SVT Pilot Program, administrative activities such as responding to complaints or coordinating communications attachers are performed as part of SPA’s normal responsibilities and are not separately tracked by activity or cost.Page 42 of 68
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-02 Date Issued July 30, 2026 OCC-173 Page 1 of 1 Date Filed: August 13, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: Office of Consumer Counsel Question: (Poles) Did Eversource collect any pole-related revenue from ILECs in Connecticut in 2021, 2022, 2023, 2024, and/or 2025? If yes, please provide a chart by company reflecting the amount of such revenue by year and the category of the revenue remitted to Eversource. Response: No, the Company did not receive any revenue from ILECs in CT between 2021-2025.Page 43 of 68
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-02 Date Issued July 30, 2026 OCC-174 Page 1 of 1 Date Filed: August 13, 2026 Witness: Timothy J. Griffin Request from: Office of Consumer Counsel Question: (Poles) How much was Eversource liable for state and federal taxes related to pole revenue it collected from attachers, by year, in 2021, 2022, 2023, 2024, and/or 2025? Response: For the years 2021, 2022, 2023, 2024 and 2025, the pole revenue the Company received from the semi-annual pole attachment rental rates billed to communication attachers was included in “other revenue.” The allowed distribution revenue requirement in the 2018 Rate Settlement in Docket No. 17-10-46 is the basis for the distribution revenue decoupling target, which compares actual total revenue (the sum of distribution revenue billed to customers plus “other revenue”) to the allowed revenue requirement target during the 12-month rate reconciliation period. Under the revenue decoupling mechanism (“RDM”), an increase in total communication attachers’ pole revenue received from pole attachment rental rates by the Company, as compared to the total communication attachers’ pole revenue embedded in the Company’s allowed distribution revenue requirement, as approved in Docket No. 17-10-46, are returned to customers through the RDM at the time the Company files its annual rate reconciliation filing in Docket Nos. 2X-01-03, PURA Annual Review of the Rate Adjustment Mechanisms. The semi-annual pole attachment rental rates are charged to communication attachers to reimburse the Company for the cost of providing one foot of rental space on a utility pole. The types of costs that the semi-annual pole attachment rental rates are designed to recover are shown in the Carrying Charge portion of the rental rate calculation disclosed in Exhibit CLP-RATES-2.14, page 4 of 7, Pole Attachment Rate Calculations - Carrying Charge Calculation, which was filed in the Company’s Application. The Carrying Charge portion of the rental rate calculation includes a formula for a Taxes Element, which is shown online 44 of Exhibit CLP-RATES-2.14, page 4 of 7, and a Return Element, which is shown on line 56 of Exhibit CLP-RATES-2.14, page 4 of 7. The Taxes Element formula reflects all state and federal taxes related to poles, and the Return Element formula reflects the return on pole plant. Because the total pole revenue the Company received from the pole attachers for the years 2021 2025 was included in “other revenue,” Eversource was not liable for state or federal taxes related to pole revenue as the “other revenue” was a reconciling item in the annual RDM rate reconciliation that adjusted rates to ensure the Company was allowed to recover the allowed revenue target, no more and no less, as approved in Docket No. 17-10-46.Page 44 of 68
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-02 Date Issued July 30, 2026 OCC-175 Page 1 of 1 Date Filed: August 13, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: Office of Consumer Counsel Question: (Poles) What percentage of the overall cost of pole management does the ILEC bear versus the electric ratepayer in Connecticut? Response: Eversource is not aware of any fixed percentage allocations of overall pole management costs between the Incumbent Local Exchange Carrier (“ILEC”) and electric customers in Connecticut. Pole management costs are not allocated on a statewide percentage basis. Each pole owner is responsible for costs associated with the poles for which it serves as custodian and for carrying out its respective responsibilities under applicable joint ownership agreements, pole attachment agreements, and regulatory requirements. Accordingly, Eversource does not allocate or track those costs on a percentage basis between the ILEC and electric operations, and Eversource does not know the overall cost of pole management that the ILEC bears to be able to perform such an analysis. To the extent this question is intended to address Single Pole Administration (“SPA”) costs, PURA recognized in Docket No. 19-01-52RE01 that application-related reimbursements were not intended to recover all SPA administrative costs. Consistent with PURA's order, Eversource seeks recovery of reasonable and prudently incurred costs through its general distribution rate proceedings.Page 45 of 68
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-02 Date Issued July 30, 2026 OCC-176 Page 1 of 1 Date Filed: August 13, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: Office of Consumer Counsel Question: (Poles) How much has Eversource been billed for legal and lobbying fees to address proposed legislation related to poles in Connecticut in FY 2026? Does Eversource attribute that expense to be covered by revenue it receives from pole attachment fees or charges for other pole attachment work. Response: Eversource did not use external resources to address proposed legislation related to poles in Connecticut in FY 2026 and, therefore, did not incur any legal or lobbying expenses in connection with this legislation.Page 46 of 68
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-02 Date Issued July 30, 2026 OCC-177 Page 1 of 1 Date Filed: August 13, 2026 Witness: David L. Gladey, Jeffrey Richard, Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: (Poles) Please reference Exhibit CLP-REVREQ-4 (Make-Ready Pole Work). Please confirm if the total amount of cost identified in field D7, $16,580,868, is to be recovered from the ratepayer due to being non-billable to any third party. Response: The amount referenced in Exhibit CLP-REVREQ-4 (Make-Ready Pole Work), page 541 in Column (D), Line 7548, of $16,580,868 represents the actual Test Year ending balance for Third Party Make Ready Pole Work Costs that is proposed to be recovered from ratepayers. As noted in Exhibit CLP-REVREQ-1, page 44 through 46, the Company is requesting total recovery of $23.579 million. The total Third Party Make Ready Pole Work Costs of $23.579 million is comprised of the actual Test Year balance of $16.581 million, plus actual activity from January 1, 2026 through February 28, 2026 of $0.118 million and an estimated non-billable cost for the period March 1, 2026 through June 30, 2027 of $6.880 million. The total Third Party Make Ready Pole Work Costs of $23.579 million is proposed to be amortized in rates over 4 years, resulting in an annual amortization of $5.895 million in base distribution rates.Page 47 of 68
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-02 Date Issued July 30, 2026 OCC-178 Page 1 of 1 Date Filed: August 13, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: Office of Consumer Counsel Question: (Poles) Please reference Exhibit CLP-REVREQ-4 (Make-Ready Pole Work). Please confirm if any of the Third Party Pole Make Ready costs in Column D that are deemed to have a nonbillable reason such as “correct pre-existing condition/violation” in Column E are caused by temporary attachments. Response: When determining make-ready work based on the field surveys, Eversource’s responsibility lies within the power space clearance in meeting NESC criteria. Temporary attachments on jointly owned poles are placed within the communications space and fall under the responsibility of the ILEC. As a result, the ILEC is responsible for any field surveys in the communications space to verify NESC clearance. During the concurrence step of the third-party attachment process, Eversource and the ILEC concur on the required make-ready work. However, since temporary attachments on jointly poles are managed and surveyed by the ILEC, Eversource does not determine if a violation is a result of a temporary attachment. Therefore, Eversource is unable to attribute any non-billable make-ready cost to temporary attachers. For solely-owned Eversource poles, temporary attachments to the pole are reviewed by Eversource. The Company is not aware of any non-billable work as a result of temporary attachments to solely-owned Eversource poles. Eversource and UI jointly filed a motion to re-open Docket No. 19-01-52RE01 to reevaluate, among other things, the cost allocation policy for non-billable make ready work. See Docket No. 19-01-52RE01, Motion No. 044, at 3-5 (Apr. 22, 2026).Page 48 of 68
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-02 Date Issued July 30, 2026 OCC-179 Page 1 of 2 Date Filed: August 13, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: Office of Consumer Counsel Question: (Poles) Please reference Exhibit CLP-REVREQ-4 (Make-Ready Pole Work). Please provide a real-world example of each type of non-billable reason code. Examples from the Exhibit include: Make Ready - Correct pre-existing condition/violation - Clearance; Make Ready - Correct preexisting condition/violation - Loading; Pole replacement - Pole Clearance (pre-existing condition/violation); Pole replacement - Pole defective (pre-existing condition/violation). Response: Conditions identified during field surveys are reviewed by the Eversource Engineering Group to evaluate adherence to the safety standards that the Company complies with, including National Electric Safety Code (NESC) standards, in order to determine the make-ready work that is necessary to ensure safe and compliant attachment to poles. In addition, today’s capabilities using newer pole loading analysis is applied to verify existing pole loading. Please note that Eversource and UI have jointly filed a motion to re-open Docket No. 19-0152RE01 to re-evaluate, among other things, the cost allocation policy for non-billable make ready work. See Docket No. 19-01-52RE01, Motion No. 044, at 3-5 (Apr. 22, 2026). Examples of “real world” conditions, include the following: 1. Make Ready Actions needed to correct pre-existing conditions and/or violations – Clearance - Correct existing NESC clearance violations prior to new attachment without the need for pole replacement. - Example – Insufficient clearance between existing communications attachments and power space as a result of secondary power causing NESC violation. 2. Make Ready - Correct pre-existing condition/violation – Loading - Correct existing pole loading condition prior to new attachment without the need for pole replacement. - Example – Existing pole loading condition determined using current industry standards and loading analysis that can be resolved with the additional guying.Page 49 of 68
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-02 Date Issued July 30, 2026 OCC-179 Page 2 of 2 3. Pole Replacement – Actions to Address Pole Clearance (pre-existing condition and/or violation) - Correct existing NESC clearance violation prior to new attachment when pre-existing violation cannot be corrected without a pole replacement. - Example – Insufficient clearance between existing communications attachments and power when insufficient space exists on the pole to correct the clearance violation without installing a taller pole. 4. Pole Replacement – Actions to Address Defective Pole (pre-existing condition and/or violation) - Replacement of an existing defective pole. - Example – Existing pole with split top requires replacement. 5. Pole Replacement - Actions to Address Pole Loading (pre-existing condition and/or violation) - Represents replacements of an existing pole when necessitated by a pole loading condition that cannot be resolved via additional guying or other means. - Example - Existing pole loading condition(s) at a location where rights for additional guying cannot be obtained. Pole loading conditions are resolved by replacement with a higher-class pole. 6. Pole Replacement - Actions to Address Make Ready at Adjacent Pole (5 foot rule) - Represents work necessitated by non-billable make-ready work at an adjacent pole. - Example - Non-billable pole replacement with a new pole of increased height may necessitate replacement of an adjacent pole due to excessive height differential (5 foot rule). 7. Other - Provide Comment - Represents work necessitated by non-billable make-ready work that is not a full pole replacement. - Example – Cracked crossarm was replaced with new crossarm.Page 50 of 68
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-02 Date Issued July 30, 2026 OCC-180 Page 1 of 1 Date Filed: August 13, 2026 Witness: David L. Gladey, Steven Lamontagne and Jeffrey Richard Request from: Office of Consumer Counsel Question: (Poles) Please provide a spreadsheet identifying each pole owned and/or co-owned by Eversource, its location, the date of its last inspection, whether it is currently identified as compliant or noncompliant. If the pole is identified as noncompliant in any way, specify when it was discovered to be noncompliant by Eversource. Response: Please refer to OCC-180, Attachments 1 through 13, showing each custodial pole owned and/or co-owned by Eversource, its location and year inspected. The question requests a large volume of spreadsheet information. Therefore, the Company is providing the information disaggregated into 13 spreadsheets organized by Area Work Center, with each spreadsheet encompassing the towns where the Company is responsible for custodial poles. Please note that the Company’s process is to replace poles identified as non-compliant on a best efforts basis because non-compliant poles need to be addressed.
Text of OCC Set 1_COMBINED.pdf
Extracted from the file · 139 pages · 225,320 characters
Text of OCC Set 14_COMBINED.pdf
Extracted from the file · 66 pages · 143,197 characters
As listed on the current system
Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses