Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

5 pages match
  1. Page 16 of 66Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-564 Page 1 of 3 Date Filed: September 22, 2026 Witness: Douglas P. Horton and Julia Frayer Request from: Office of Consumer Counsel Question: (Capital support mechanism) Refer to Exhibit CLP-ELP-1, p.101. “As part of the Company’s annual RAM compliance filing, actual plant additions placed in service during the applicable plan year will be reconciled against the approved forecast.” Provide a list of all instances known to the Company in which approved multiyear rate plans for utilities in other jurisdictions employ downward reconciliation of capital. In each instance, please provide the state, the utility, the applicable Rate Years for the approved multiyear rate plan. For each Rate Year, indicate whether utility costs were lower than what was approved, and how much was reconciled and returned to ratepayers (in dollars). Response: The Company is aware of approved multiyear rate plans for Central Maine Power Company (“CMP”) and certain New York utilities—Consolidated Edison Company of New York, Inc. (“Con Edison”), Central Hudson Gas & Electric Corporation (“Central Hudson”), and Niagara Mohawk Power Corporation d/b/a National Grid (“Niagara Mohawk”)—that include downward reconciliation mechanisms for plant additions or net plant. These mechanisms are not identical in all respects to the Company’s proposed capital support mechanism. CMP’s mechanism compares actual distribution plant additions with the forecast plant additions reflected in rates, while the New York mechanisms generally reconcile actual average net plant and the associated revenue requirement against approved targets. Depending on the particular mechanism, where the relevant actual plant or net-plant measure is below the applicable target or cumulative target, the associated revenue-requirement impact is reflected in a downward rate adjustment or deferred for the benefit of customers. CMP (Maine). The Maine Public Utilities Commission approved a two-year rate plan for CMP covering Rate Year 1, ending July 31, 2024, and Rate Year 2, ending July 31, 2025, that included a downward-only plant addition reconciliation. 1 2 Under the mechanism, actual distribution plant Maine Public Utilities Commission, Central Maine Power Company, Request for Approval of Distribution Rate Increase and Rate Design Changes Pursuant to 35-A M.R.S. § 307, Docket No. 2022-00152, Order Approving Stipulation, June 6, 2023, Attachment 12. 2 Following expiration of the two-year rate plan, CMP proposed a new five-year rate plan in 2025. CMP subsequently withdrew that filing. In April 2026, CMP filed a new distribution rate case in which it proposed to eliminate the reconciliations established under its prior rate plan and proposed a second phase of the proceeding to establish a new multiyear rate plan. As of September 2026, that proceeding remains pending. (Source: Maine Public 1
  2. Page 17 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-564 Page 2 of 3 additions are compared with the forecast plant additions embedded in rates, and a downward revenue-requirement adjustment is calculated if actual plant is below the forecast. 3 For Rate Year 1, CMP reported that its actual average plant balance exceeded the forecast average plant balance used to set distribution rates by approximately $127 million. 4 Accordingly, the downward reconciliation was not triggered and the mechanism had no impact on the distribution rate adjustment effective July 1, 2025. Similarly, for Rate Year 2, CMP reported an actual average plant balance of approximately $2.716 billion compared with a forecast average plant balance of approximately $2.510 billion, or approximately $206 million above forecast. 5 Accordingly, the downward reconciliation was again not triggered, and CMP calculated a $0 revenue-requirement adjustment under the mechanism. 6 Thus, neither Rate Year 1 nor Rate Year 2 resulted in a downward revenue-requirement adjustment under the plant-addition reconciliation mechanism. Con Edison (New York). Con Edison’s approved 2026–2028 three-year electric rate plan includes a downward-only net plant reconciliation. Under the mechanism, Con Edison must defer for the benefit of customers the revenue-requirement impact, including carrying costs and depreciation, where actual expenditures for electric capital programs and projects result in actual average net plant below the applicable average electric plant-in-service balances reflected in rates. The reconciliation for Rate Years 1 through 3 is cumulative, and a downward revenue-requirement deferral is required only if the cumulative result over the 36-month rate-plan period is below the applicable cumulative target. 7 Accordingly, although the rate-year components of the reconciliation are calculated during the plan, any downward revenue-requirement deferral under Utilities Commission, Central Maine Power Company, Request for Approval of Rate Case Filing, Docket No. 202600043, Notice of Proceeding and Opportunity to Intervene, April 22, 2026, 1–2) 3 Ibid. 4 Maine Public Utilities Commission, Central Maine Power Company, Request for Approval of Annual Compliance Filing, Docket No. 2025-00018, Order Approving Stipulation, June 11, 2025, attached Stipulation § 4.P, 8–9; Central Maine Power Company, Stipulation Attachment 20, Plant Addition Reconciliation, 1. https://mpuccms.maine.gov/CQM.Public.WebUI/MatterManagement/MatterFilingItem.aspx?FilingSeq=129743&CaseNumber= 2025-00018 5 Central Maine Power Company, 2026 Annual Compliance Filing Master Exhibits, Maine Public Utilities Commission Docket No. 2026-00011, Attachment 16, “Plant Addition Reconciliation.” P. 1. https://mpuccms.maine.gov/CQM.Public.WebUI/MatterManagement/MatterFilingItem.aspx?FilingSeq=133197&CaseNumber= 2026-00011 6 Central Maine Power Company, 2026 Annual Compliance Filing, Maine Public Utilities Commission Docket No. 2026-00011, February 17, 2026, 12; Central Maine Power Company, 2026 Annual Compliance Filing Master Exhibits, Attachment 16, “Plant Addition Reconciliation,” 1-2. 7 New York State Public Service Commission, Order Adopting Terms of a Joint Proposal and Establishing Electric and Gas Rate Plans, Cases 25-E-0072 and 25-G-0073 (issued and effective January 22, 2026), 55; attached Joint Proposal § D.1.a, 17–19.
  3. Page 18 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-564 Page 3 of 3 this provision is determined based on the cumulative 36-month result rather than on a stand-alone rate-year basis. Central Hudson (New York). Central Hudson’s approved three-year rate plan, approved in August 2025 for the period through June 2028, continues a downward-only net plant reconciliation. 8 Under the mechanism, actual electric and gas net plant and depreciation expense are reconciled against the applicable targets, with the resulting revenue-requirement differences carried forward over the plan term. At the end of Rate Year 3, if the cumulative revenuerequirement impact from net plant and depreciation-expense differences is negative, Central Hudson must defer the amount for the benefit of customers, with carrying charges at the applicable pre-tax authorized rate of return. 9 Because the reconciliation is cumulative over the multiyear rate plan, the final cumulative customer deferral, if any, has not yet been determined. Niagara Mohawk (New York). Niagara Mohawk’s approved three-year rate plan covering April 1, 2025, through March 31, 2028, includes a downward-only electric net utility plant and depreciation expense reconciliation. 10 Each Rate Year, actual electric average net utility plant and the associated depreciation-expense revenue requirement are compared with approved targets, with the differences carried forward and summed at the end of Rate Year 3. If the cumulative reconciliation balance is negative at the end of Rate Year 3, Niagara Mohawk must defer the resulting revenue-requirement impact for the benefit of customers; if the cumulative reconciliation balance is positive, there is no deferral. 11 Accordingly, the final cumulative customer deferral, if any, will not be determined until the conclusion of Rate Year 3. The Company also notes that a downward-only reconciliation was a feature of the incremental capital funding mechanism outlined in the Draft Decision issued in Docket No. 21-05-15RE01. Please refer to Docket No. 21-05-15RE01 Proposed Final Decision issued July 14, 2025, at 33. 12 New York State Public Service Commission, Order Adopting Terms of a Joint Proposal and Establishing Electric and Gas Rate Plans, Cases 24-E-0461 and 24-G-0462 (issued and effective August 14, 2025), 59–60; New York State Department of Public Service Staff, Staff Statement in Support of the Joint Proposal, Cases 24-E-0461 and 24-G-0462 (May 23, 2025), 39–40. 9 Ibid. 10 New York State Public Service Commission, Order Adopting Terms of Joint Proposal and Establishing Rate Plans, Cases 24-E-0322 and 24-G-0323 (issued and effective August 14, 2025); Niagara Mohawk Power Corporation d/b/a National Grid et al., Joint Proposal, Cases 24-E-0322 and 24-G-0323 (April 25, 2025), § IV.11.1.11, 70–71. < https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B20E76D96-0000-C727-A6ABC1690EEB4F65%7>; < https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BE08BA9980000-C031-ABF4-BF2E66669E52%7D> 11 Ibid. 12 Connecticut Public Utilities Regulatory Authority, PURA Investigation into Revenue Adjustment Mechanisms for a Performance-Based Regulation Framework, Docket No. 21-05-15RE01, Draft Decision (July 14, 2025) https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/1555634f73ae53a685258cc7007a6 2fb?OpenDocument 8
  4. Page 19 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-565 Page 1 of 4 Date Filed: September 22, 2026 Witness: Douglas P. Horton, Digaunto Chatterjee, Elli Ntakou, Julia Frayer, Matthew Nelson and Michael Goldman Request from: Office of Consumer Counsel Question: (Total factor productivity) Refer to Exhibit CLP-ELP-2, Page 35, Foot note 52, LEI states that “LEI also evaluated the Handy-Whitman Index (" HWI”) of public utility construction costs as a potential capital price deflator. LEI ultimately selected the BLS Producer Price Index for two primary reasons. First, unlike the PPI, the HWI is proprietary, and its w1derlying methodology and data are not publicly disclosed, making it difficult to independently evaluate or replicate the resulting estimates. Second, sensitivity testing demonstrated that use of the HWI generated implausibly large real retirement values for certain utilities, resulting in negative estimates of real capital stock under the perpetual inventory method. These outcomes are not economically plausible ai1d would have necessitated the exclusion of affected utilities from the sample. The issue became more pronounced under assumptions of longer asset service lives (i.e., 40, 45, and 50 years).” Please explain the Company’s use of the Handy-Whitman Index (“HWI”) in Exhibit CLP-IAP-7 with LEI’s decision not to use HWI as a capital price deflator in Exhibit CLP-PBR2. Specifically: a. Please explain why the Company considers HWI to more accurately reflect how inflation impacts Distribution Companies within the region and to be the appropriate inflation factor for the Exhibit CLP-IAP-7 - RE08 affordability test, while LEI determined that HWI presented methodological and data limitations, including lack of transparency and replicability and, in certain applications, economically implausible estimates of real capital stock. b. Please recalculate Tables 3 and 4 of Exhibit CLP-IAP-7 using a consistent inflation measure for both historical and forecast spending, including, at minimum, HWI and the BLS PPI used by LEI in Exhibit CLP-PBR-2, and provide the resulting affordability threshold and percentage of the threshold represented by the proposed LRP. Response: As stated in Exhibit CLP-IAP-1 and Exhibit CLP-IAP-7, the Company does not agree that the RE08 affordability test is a sound approach for determining whether utility service is affordable. The test is allegedly designed to account for “reasonable escalation factors,” however, determining those “factors” is a difficult exercise and, in any event, would need to account for multiple externalities, such as inflation, infrastructure aging, exogenous grid stressors like weather events and electrification and standardized equipment sizes, among numerous other factors.
  5. Page 20 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-565 Page 2 of 4 The Company’s testimony in CLP-IAP-1 demonstrates that it seeks to balance affordability and reliability, with a recognition that these concepts are inter-related and move together over the relevant time horizon. As previously stated, a system that is allowed to degrade does not become more affordable; it becomes less reliable and, in time, more expensive to maintain and fix. The Company applied the RE08 affordability test illustratively, as a condition of the Order and, as shown in Exhibit CLP-IAP-7, the proposed capital plan is within the resulting threshold. Although the Company complied with the RE08 affordability test requirements, the core premise of the affordability test is that historical spending dictates future spending adjusted for inflation. This does not account for the fact that maintaining historical performance, as the PBMRP performance framework requires, comes at an increasingly higher cost, for a multitude of reasons including inflation. However, even if adjusting inflation provided the Company with additional revenue support to do the same type of project each year as a theoretical matter -- what matters is the scale and magnitude of infrastructure investment or upgrades is needed each year, along with numerous other drivers of infrastructure cost that are not necessarily captured in inflation measures. As infrastructure ages, significantly more assets need to be replaced either proactively or as emergent failures. Short-term underinvestment increases the age and the number of failures of the assets that then need to be replaced as emergent failures. Other important factors that drive costs up are regulatory, safety and environmental constraints and considerations. For example, new equipment and work method standards to promote customer and worker safety and resilience mean that, even if the Company were to perform the same project today as it did years ago, it would cost more today for these reasons, even if the costs were to be adjusted for inflation. To illustrate this practicality, Eversource’s ReBOT tool that determines the optimal reliability mitigation for each eligible zone and thereby constructs a cost-optimal reliability program, demonstrates that the same dollar spend results in progressively lower benefits to reliability metrics. This is because, as zones with multiple events or customers impacted and cheaper solutions are addressed, more costly solutions are the only ways remaining to retain or further improve reliability metrics. For example, the model will prioritize short zones of bare conductor with many events or customers impacted so that a less costly reconductoring project will improve reliability. Once all these opportune zones are addressed, what remains are longer zones, with less events and customers impacted, so cost per unit of reliability improvement will increase. Instead of a singular affordability test, the Company submits that it is more appropriate to review affordability and reliability through a balancing lens, aiming to avoid both overinvestment (which can increase costs without commensurate benefits) and underinvestment (which can erode reliability, create future cost pressures, and ultimately harm customers). Ultimately, while the Company agrees with the overall emphasis on affordability stemming from RE08, as well as RE08’s reliability framework, it does not agree that the inflation-based affordability test is a valid tool for determining the affordability of a capital plan.
  6. Page 21 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-565 Page 3 of 4 With respect to inflation factors, LEI stated a specific concern with the HWI for estimating long term aspects of real capital stock. However, the Company continues to support HWI as the most reliable and appropriate set of inflation factors for the utility sector. The BLS PPI is a broad, national macroeconomic indicator tracking average price changes across thousands of products and industries, and the GDP Deflator Index considers economy-wide measures such as personal consumption expenditures, private domestic investment, exports of goods and services, and government expenditures and consumption. The HWI is a highly specialized index tailored exclusively to the public utility construction sector and to specific regions. Compared to other inflation indices, the HWI more accurately reflects how inflation impacts distribution companies within the region, and therefore, is the appropriate inflation factor for general utility use and any application of the RE08 affordability test. PURA has previously noted that “the HW Index better reflects costs of utilities doing business...” Application of the United Illuminating Company to Amend its Rate Schedule, Docket No. 24-1004, at 43 (October 28, 2025) (“UI 2025 Decision”). As PURA states, “The Handy-Whitman Index reflects escalation of utility costs over time and has an index specific to northeast utilities … the HW Index considers utility construction costs by FERC plant account (e.g., transformers, meters, overhead conductors, station equipment).” Id. There is also no inconsistency between LEI's use of the BLS PPI in the TFP Study and the Company's use of HWI in the affordability analysis because the indices are used for entirely different analytical purposes. HWI is specifically designed to measure changes in utility construction costs and reflects cost trends for utility-specific inputs, including labor, materials, and equipment associated with distribution facilities such as station equipment, poles, conductors, conduit, transformers, and meters. In the Industry TFP study, LEI required a capital price deflator to convert historical nominal capital additions and retirements into a consistent measure of real capital quantity for use in the perpetual inventory method. Because the reported gross book value of utility assets reflects assets acquired in different years and therefore at different historical price levels, the additions and retirements must be deflated before they can be incorporated into the real capital stock calculation. This application requires the price index to be applied over a relatively long historical period and is mathematically sensitive to the interaction among the price index, asset vintages, retirements, and assumed asset service lives. LEI had collected and tested using HWI but found it could result in mathematical irregularities because of the methodology, which would in turn impact the breadth of the industry TFP study (the number of EDCs that could be included). As a consequence, balancing the availability of data with the constraints of the methodology, LEI determined that the BLS PPI was an appropriate index for the specific purpose of constructing a real capital-stock quantity under its TFP methodology. LEI’s use of the BLS PPI, therefore supported expressing the resulting capital quantities in constant 1988 dollars. This is distinctly
  7. Page 22 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-565 Page 4 of 4 different from the analysis being contemplated under RE08 affordability test, which is to inflate capital spending from 2015 to 2025 terms. For most other purposes, including the RE08 affordability test, HWI is the most appropriate inflation index for the industry, as it takes into account utility-specific costs in the Northeast.
  8. Page 23 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-566 Page 1 of 3 Date Filed: September 22, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Office of Consumer Counsel Question: In Exhibit CLP-TSP-1, Page 13, Eversource notes the following: “The purpose of our joint testimony is to present CL&P’s 5-Year Targeted System Performance Plan (the “TSP Plan” or the “Plan”), covering the planning horizon for operations and investment on the Company’s distribution system over the timeframe of January 1, 2027, through December 31, 2031. A summary narrative of CL&P’s State of the System report providing a foundational perspective on the 5-Year Plan is provided herewith as Exhibit CLP-TSP-2. In addition, a detailed presentation of the 5-Year TSP framework is presented as Exhibit CLP-TSP-3.” The proposed decision issued on July 17, 2026, in docket 21-05-15RE03 lists the following content items for inclusion in an IDSP document: a. Executive Summary - identifies key points from each section of the document; b. Planning Policy – discusses relevant state and local goals and policies that inform grid planning; c. Current State of the System – provides an overview of existing grid conditions including but not limited to capacity, reliability, and DER integration issues; d. IDSP Methodology – explains the planning methods used to produce the IDSP; e. Stakeholder Engagement and Social Equity – specifies how stakeholders participate in the IDSP process, as well as social and environmental equity considerations; f. Load Forecasting – consists of all components of peak load; g. Grid Needs Assessment – consists of various capacity, reliability, and resiliency analyses substantiating investment needs; h. Solution Selection Process – provides the criteria and methods used to identify, assess, compare. and select both traditional and non-traditional grid capital investments for implementation; i. Capital Investment Plan – lists, prioritizes, and describes all planned j. investments for a ten-year planning horizon; and k. Long-Term Strategic Plan – provides an overview of strategic plans for the grid beyond a ten-year planning horizon. For each of the content items above, please share what aspects of the submitted TSP Plan represent information that would be included in each of the proposed IDSP sections.
  9. Page 24 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-566 Page 2 of 3 Please include exhibit and slide or page numbers for any content that would belong in each of the content sections. Response: For the purpose of answering this question, the Company is assuming that the IDSP referenced in the question is as described in PURA’s proposed final decision issued on July 17, 2026, in Docket No. 21-05-15RE03, and as proposed and discussed by the EDCs in Technical Meetings #10 to #12. As designed therein, the IDSP is intended to be a cohesive, strategic plan for ensuring safe, reliable and resilient electric service for all customers while supporting state clean energy and decarbonization goals. Given the scope of the proposed IDSP, with expanded requirements for analytics, stakeholder engagement and review, the EDCs expressed concerns about the timeline, process and specific elements in Written Comments and Technical Sessions. Consequently, the TSP Plan aligns generally with the IDSP content, particularly in terms of the state of the system and investment plans to address current and projected needs, while also reflecting practical differences. More specifically, the TSP aligns with proposed IDSP sections, as follows: a. Executive Summary - identifies key points from each section of the document; Please refer to: Exhibit CLP-TSP-1 Exhibit CLP-TSP-3: Page 3-7 b. Planning Policy – discusses relevant state and local goals and policies that inform grid planning; Please refer to: Exhibit CLP-TSP-2: Page 20-21 c. Current State of the System – provides an overview of existing grid conditions including but not limited to capacity, reliability, and DER integration issues; Please refer to: Exhibit CLP-TSP-2 Exhibit CLP-TSP-3: Page 13-38 d. IDSP Methodology – explains the planning methods used to produce the IDSP; Please refer to: Exhibit CLP-TSP-2: Page 9-20, 24-28 Exhibit CLP-TSP-3: Page 33-34, 83-92, 96-120, 138-139, 141-149
  10. Page 25 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-566 Page 3 of 3 e. Stakeholder Engagement and Social Equity – specifies how stakeholders participate in the IDSP process, as well as social and environmental equity considerations; Please refer to: Exhibit CLP-ELP-1: Page 19, 29 f. Load Forecasting – consists of all components of peak load; Please refer to: Exhibit CLP-TSP-2: Page 20-24 Exhibit CLP-TSP-3: Page 18-20, 91-92, 138 g. Grid Needs Assessment – consists of various capacity, reliability, and resiliency analyses substantiating investment needs; Please refer to: Exhibit CLP-TSP-3: Page 51, 56-81, 93-95, 102-106, 114-120, 142-149 h. Solution Selection Process – provides the criteria and methods used to identify, assess, compare. and select both traditional and non-traditional grid capital investments for implementation; Please refer to: Exhibit CLP-TSP-3: Page 88-90 i. Capital Investment Plan – lists, prioritizes, and describes all planned investments for a ten-year planning horizon. Please refer to: Exhibit CLP-TSP-1: Page 40-72; Exhibit CLP-TSP-2: Page 46-48; Exhibit CLP-TSP-3: Page 7-12, 45-81, 102-105, 107-149 j. Long-Term Strategic Plan – provides an overview of strategic plans for the grid beyond a ten-year planning horizon. Please refer to: Exhibit CLP-TSP-2: Page 20-21

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)