Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Search terms highlighted
Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

5 pages match
  1. Page 31 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-569 Page 3 of 3 that can be completed under the annual funding policies and within a shorter time period than a typical project. Environmental Equipment Replacements: This investment category includes projects to specifically replace aging oil filled substation equipment such as oil filled circuit breakers and oil filled substation reclosers. If a circuit breaker or recloser does not operate properly, the consequences can include serious safety risks for workers, reduced system reliability, environmental impacts such as oil leaks or spills, and damage to nearby equipment. In the case of a circuit breaker failure, failure to interrupt a fault, or experiences internal failure, the next available circuit breaker must operate. Depending on the design of the substation where the circuit breaker is installed, the severity of its unavailability will vary. When a recloser does not work properly, it can prevent automated systems from responding to problems leading to increased Customer Average Interruption Duration Index (CAIDI) and System Average Interruption Duration Index (SAIDI) minutes. A failed circuit breaker or recloser can also affect planned work, including efforts to safely isolate or restore power to lines and substations. Substation Capacity/System Planning: This investment category includes projects to address normal and emergency substation overloads within the 10-year planning horizon and those created to resolve violations of the Distribution System Planning Guide (DSPG). 1 Solution alternatives are developed with varying levels of complexity and may include a combination of balancing loading across the system, replacing or upgrading limiting equipment, adding new equipment or expanding an existing substation, installing non-wires alternatives, and/or developing a new substation to support the identified needs of the area. Incremental Aging Infrastructure Replacements: This investment category is the incremental funding required to replace additional aging substation equipment beyond what is included in the Sustained Performance Plan to achieve the Targeted System Performance Plan investment. Incremental Substation Transformer Asset Health: This investment category is the incremental funding required to replace additional aging substation transformers beyond what is included in the Sustained Performance Plan to achieve the Targeted System Performance Plan investment. 1 Refer to CLF-SC-023, Attachment 1, for the Eversource Distribution System Planning Guide 2020 Rev. 0.
  2. Page 32 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-570 Page 1 of 2 Date Filed: September 22, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Office of Consumer Counsel Question: In Exhibit CLP-TSP-3, Pages 40, 46, and 50 Eversource lists forecasted impacts to the system by spending scenario. For each listed impact on slides 40, 46, and 50, please share how Eversource plans to measure and monitor the impact over the 5-year spending period? Response: For reliability performance, the Company will measure and monitor reliability performance using standard and emerging reliability metrics, like SAIDI, SAIFI, CEMI and CELID. These metrics can be calculated with multiple different methodologies; for example, there is a CT-specific calculation for blue-sky SAIDI and SAIFI based on a certain method of delineating major storms. Eversource’s Outage Management System retains all interruption records, with the impacts to these metrics; Customers Impacted and Customer Minutes of Interruption per event. These metrics that measure and monitor reliability performance will be compared to the targets for PBR. For example, SAIDI and SAIFI will be compared to the 2022-2026 historical average plus one standard deviation. Accelerated investments in asset health (replacement of bare overhead Cu conductor, right-of-way rebuilds, and underground paper-in-lead-cable replacement), smart switches and resiliency combined with The Company’s core investment to mitigate SAIDI and SAIFI will drive improvements in reliability for both blue sky and storm performance. For resilience, the Company will monitor performance during major storms, measuring using metrics like all-in SAIDI and number of events. Importantly, major storm performance is a multiinput function where Company actions as well as exogenous factors drive system performance. Other aspects of TSP are also intended to improve storm performance and may be difficult to delineate the impacts of those to resilience metrics. For example, the Company’s proposed routing optimization for storm crews and for its outage prediction models critically impact storm performance. It is important to note that as performance improves, the threshold for major storms becomes higher (i.e., less storms will qualify as major storms), so a normalization to account for the sliding threshold may be required to baseline and compare performance. For distribution automation, the Company will estimate performance benefits of reclosing devices by assuming that each momentary event on these devices would have been a sustained interruption if the protective device was not capable of reclosing automatically. For example, in CLP-TSP-2 p.
  3. Page 33 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-570 Page 2 of 2 30, it is estimated that 1.1M customers were spared from experiencing a sustained interruption in 2025 due to reclosers. Exhibit CLP-TSP-3, Page 46 provides information describing the different investment levels and their general impact to the distribution substation project portfolio. The projects within the Targeted System Performance Plan will be budgeted and monitored throughout their life cycle. The projects initiated will be reviewed against the initiatives noted and tracked through the project approval processes through to completion. Additionally, the transformer average fleet age and oldest age objectives will be tracked periodically to confirm the projects created and completed are moving us toward the set goals.
  4. Page 34 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-571 Page 1 of 2 Date Filed: September 22, 2026 Witness: Douglas P. Horton Request from: Office of Consumer Counsel Question: In Exhibit CLP-AMI-1, Page 27, Eversource “proposes to include AMI capital costs as eligible capital costs to be recovered and reconciled in the proposed PBMRP capital funding mechanism.” However, it proposes to recover incremental O&M costs and legacy meter infrastructure costs using securitization. Please explain why AMI capital costs should not also be recovered using securitization. Response: Please refer to OCC-571, Attachment 1 and OCC-571, Attachment 2, for a comprehensive discussion on the benefits, costs and appropriate use of securitization as a financing instrument for utility costs. Attachment 1 is a report prepared by Atrium Economics that was jointly sponsored by the Company’s Massachusetts operating affiliates and other Massachusetts LDCs. The report was prepared for the purpose of explaining why securitization financing is not an appropriate or viable financing vehicle for ongoing utility investments. Attachment 2 is a legal memorandum prepared by the Company in relation to draft legislation in Massachusetts contemplating the securitization of electric-system upgrades to support electrification and grid-modernization assets. Both reports explain the reasons that securitization is generally not appropriate when costs are ongoing, operational, or “business-as-usual.” Examples include routine capital investments, annual maintenance, or safety-related replacements that occur every year, which would encompass the new metering system and associated back-office information systems that will constitute Advanced Metering Infrastructure on the Company’s system in Connecticut. Outside of certain extraordinary circumstances, operating utility assets cannot be securitized. As explained most directly in Attachment 2, securitization requires establishment of a bankruptcyremote special purpose entity (an “SPE”) that acquires the right to impose and collection the rate reduction bond charge from the related utility through a true sale and then issues bonds secured by a first-priority lien on that right. An investor-owned utility cannot transfer physical assets to a securitization SPE because those assets require continuous capital investment that a passive, limited-purpose entity cannot fund. Instead, securitization is a solution that involves an intangible cash flow right that requires no maintenance or reinvestment, such as in the circumstances of storm
  5. Page 35 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-571 Page 2 of 2 restoration costs, stranded meter costs, stranded generating assets or other costs that are essentially one-time costs that constitute a debt owed by customers to the utility with no ongoing maintenance, repair or investment required or applicable. The primary barrier to the securitization of utility operating assets is the capital maintenance problem. Physical utility infrastructure requires continuous capital investment to maintain operational capability and regulatory compliance. A securitization SPE cannot fund such capital because it cannot raise equity, issue additional debt, borrow, retain earnings, or contract for maintenance work. Physical assets placed in an SPE would inevitably deteriorate and Moody’s has specifically identified asset deterioration as a critical credit risk for utility systems. However, transferring assets to an SPE that are required for a utility to operate would prevent the utility from providing service using assets it controls. Moreover, even if physical assets were placed in the SPE, the SPE would not obtain the AAA credit rating that makes it possible to achieve the beneficial cost for customers. Attachment 1 explains other impacts that would occur for the utility’s cost of capital in the event that this type of financing would apply for utility assets. The transfer to an SPE of the intangible property to the rate reduction bond charge right works in relation to large deferred expenses that a utility may have, such as storm costs or the costs of “stranded” assets, no longer used and useful for utility ratepayers because these types of “assets” do not depreciate, require no maintenance or capital and can be cleanly transferred through a true sale, thereby allowing the SPE to remain purely passive—all while the utility retains and continues to operate its physical system. For AMI, this means that securitization is a possibility for the relatively significant one-time operating expenses that must be incurred to implement AMI across the State of Connecticut, as well as the costs of stranded meter investment. For the remainder of the cost that comes in the form of capital investment, it will not be possible to use securitization as the funding mechanism for that portion of the cost.
  6. Page 36 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OOC-572 Page 1 of 2 Date Filed: September 22, 2026 Witness: Douglas P. Horton and Jared A. Lawrence Request from: Office of Consumer Counsel Question: In Exhibit CLP-AMI-2, Page 87, Eversource states that "Recognizing that the AMI program requires sizable investments, Eversource embraces accountability for executing the program effectively and delivering the expected benefits to customers. Accordingly, Eversource proposes a performance metrics framework to provide transparency into both the success of the AMI deployment and the realization of benefits. In each category, the Company is proposing to report annually on a slate of metrics.” a. Given Eversource’s stated commitment to accountability, please explain what would happen if the company does not achieve the expected performance metrics in the proposed time horizon. Response: As an initial matter, Eversource is fully committed to accountability and expects to have performance metrics that apply to the AMI implementation once it is clear that the AMI implementation plan will move forward and on what terms. In the event that PURA approves the AMI implementation plan on reasonable terms that the Company can work with, then it would be appropriate to structure a performance mechanism around a subset of the scorecard metrics described in pages 87-89 of the Company’s AMI Plan. In particular, the scorecard referenced on page 87 of the AMI Plan will provide transparency for the Company, PURA and other stakeholders to determine what stage the program has reached in relation to expected value; where alternative sources of value may be occurring; and whether program changes need to be made in response to changing conditions. In addition, the Company is interested in exploring a symmetrical incentive/penalty mechanism that would incorporate project milestones and operational success components. The AMI deployment success mechanism would be evaluated by PURA at the completion of the last program milestone included in the mechanism. Milestones to be included in the AMI Deployment Success mechanism could incorporate the following: • CIS Deployment • MDMS Deployment
  7. Page 37 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OOC-572 Page 2 of 2 • Commence Meter Deployment • Complete Meter Deployment • Customer Alerts Enabled • Customer Data Sharing Enabled • Outage System Integration • TVR capability For the operational success, the Company is interested in exploring a “meter-to-cash” metric that would compare various performance points to pre-AMI levels. For clarity and to ensure that all customers continue to experience strong operational performance, the metrics would be calculated on the entire customer base (i.e. not limited to customers that have received their AMI meters). The measures included in the AMI Operational Success mechanism could be incorporated as follows: • Meter Read Rate • Bill Timeliness • Bill Accuracy In addition, the Company expects that there would be a customer outreach and education plan that could have symmetrical penalties and incentives surrounding the Company’s efforts to communicate and influence customers in the ways that they can use AMI to achieve anticipated benefits. At the same time, the Company cannot be accountable for factors and outcomes beyond its control, such as the extent to which customers actually adopt and utilize AMI features to achieve the full range of benefits enabled by AMI implementation. Applicable performance metrics pertaining to project milestones and operational success components would need to be designed to exclude the impact of factors outside of the Company’s control and, conversely, to hold the Company accountable for those factors and outcomes that it does control. The Company’s expectation is that additional discussion will occur on these types of metrics once it is determined that AMI implementation will move forward and on what terms and timelines.
  8. Page 38 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-573 Page 1 of 1 Date Filed: September 22, 2026 Witness: Lavelle A. Freeman and Juan F. Martinez Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-2 at 24, “At the bulk substation level, the Distribution System Planning Guide (DSPG) establishes criteria and guidelines for planning and design of bulk substations and distribution facilities.” a. Please provide a copy of the Distribution System Planning Guide (DSPG). Response: Please refer to CLF-SC-023, Attachment 1, for the Eversource Distribution System Planning Guide (DSPG) 2020 Rev. 0. The DSPG Rev.1.0 is currently under review and expected to be completed in 2026. The Company will supplement this response with Rev. 1.0 once finalized.
  9. Page 39 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-574 Page 1 of 1 Date Filed: September 21, 2026 Witness: Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-2 at 21-22, “Load Forecasting Data and Analytics.” a. Does the Company develop load forecasts at the substation, feeder or both? b. Does the Company currently develop hourly load forecasts for its substations and feeders? If not, please describe the granularity of the Company’s forecasts for substations and feeders. c. Does the Company currently develop multiple scenarios for its load forecast? If so, please describe each of the scenarios. Response: a. The Company currently develops load forecasts at the substation level. b. The Company currently develops an annual load forecast at the substation level based on the annual peak load hour for each substation. If a capacity need is identified based on that peak load forecast the Company creates a 24-hour load profile for each of the forecast years as needed. c. The Company currently develops two scenarios for its load forecast. The Company produces a ‘50/50’ and a ‘90/10’ peak demand forecast. The ’50/50’ forecast is based on normal 10-year weather and has a 50 percent chance of being exceeded. The 90/10 forecast is the extreme weather scenario that only has a 10 percent chance of being exceeded. Only the 90/10 peak demand forecast is utilized for system planning.
  10. Page 40 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-575 Page 1 of 2 Date Filed: September 22, 2026 Witness: Lavelle A. Freeman, Gerhard Walker, and Juan F. Martinez Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-2 at 21-22, “Historical System Load Analysis.” a. Please describe the temporal granularity (i.e hourly etc.) of the historical loading information used to inform the Company’s load forecast and whether this varies depending on location and data availability. b. Please describe the percentage of substations and associated feeders with available 8760 hourly profiles. If some or all of the substations and associated feeders do not have 8760 hourly profiles, please describe whether and when the Company plans to have 8760 profiles available. Response: a. To create the substation peak forecast the Company relies on the peak hour values which are determined from 15 min SCADA data by substation and at the system level. b. Please refer to the Company’s response to information request OCC-587 i. The Company currently does not create 8760 load forecast profiles. Where SCADA data is available 1, the Company does have historical 8760 “as measured” data. The Company currently has no plans absent approval of requested resources as presented in the Exhibit CLP-TSP-3 at 138. Here, the Company has outlined a pathway to develop the resources needed for the full capabilities to provide 8760 data within 18 to 24 months. Prior Referenced Response: i OCC-587 Question: Refer to Exhibit CLP-TSP-3 at 138, “Advancing the Grid, Planning Analytics - Advanced Forecasting Tools.” a. b. 1 Please describe the milestones and timelines to integrate this tool into distribution planning if approved. Please explain why existing forecasting tools cannot generate forecasted 8760 load shapes across all levels: substation, transformer, and at circuit levels Currently, all CT bulk transformers have available SCADA data.

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)