Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Search terms highlighted
Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

5 pages match
  1. Page 46 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-579 Page 1 of 2 Date Filed: September 22, 2026 Witness: Douglas P. Horton, Digaunto Chatterjee, Lavelle A. Freeman, Juan Martinez, and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 101-106, “Non-Wires Alternative Projects, Eversource Battery Storage NWA Projects for Substation Capacity Relief”. a. What is the status of the non-wires alternative projects for Campville 14R and Frybook 14B? i. Have these projects been procured and are they in-service? ii. Is the Company seeking cost recovery for implemented projects or approval for proposed projects? b. Please describe what DER control approach (e.g DERMS) the Company has or plans to use to dispatch battery storage. c. Are the battery storage NWAs utility or third party owned? d. Please describe the BCA methodology including the types of benefits quantified for the cost-effectiveness supplemental analysis. Response: a. i. These projects are still in conceptual status with an internal initial funding request approved. These projects have not yet undergone a full study and solution selection process. As part of this process, the NWA will be revaluated against other solutions to determine the final proposal. ii. These projects have not been implemented. The Company has included funding for the system needs driving these projects within the Sustained Performance capital program found on page 49 of exhibit CLP-TSP-1. As described elsewhere in this filing, the Company’s proposed PBMRP plan is intended to provide revenue support for ongoing capital expenditures through application of the F-Factor in the PBMRP, subject to periodic and ongoing prudence reviews, application of the F-Factor cap, and downward-only reconciliation in the event actual overall plant-in-service is less than the capital expenditure forecast presented in Exhibit CLP-TSP-3.
  2. Page 47 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-579 Page 2 of 2 b. If the NWA solution is selected for either project location, the Company will then determine DER controls during the detailed engineering stage. c. The Company intends to operate the battery as the owner of the asset per PURA’s Docket 24-08-08 Final Decision. 1 However, the Company would solicit proposals through a formal RFP process on a battery storage solution from 3rd party vendors in order to implement the solution at the best available market pricing. d. The benefit-cost model includes the costs and benefits associated with each project Campville14R and Fry brook 13B: • Costs represent estimated Project costs and estimated Energy Markets revenues • Benefits include: o Distribution Benefits: these benefits are associated with deferral of traditional distribution upgrade cost by targeting discharge as needed to resolve the localized distribution constraints. o System benefit: these benefits are related to ESS discharges targeting ISO system peak, which will result in Energy and Capacity benefits derived from the Avoided Energy Supply Cost. https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/0bb69f312fc7124085258bf70055 81c5/$FILE/240808-121824.pdf 1
  3. Page 48 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-580 Page 1 of 1 Date Filed: September 22, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez and Steven C. Osuch Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 11, “DER Enablement.” a. Please confirm the “150 MW from 9 station projects” whether these projects investments the Company is currently making or is requesting approval for in this rate case. b. Please provide the following details regarding the “+110 MW from 7 additional projects.” i. Please identify the 7 projects enabling the additional +110MW of DER capacity and whether these are load driven upgrades. Response: a. The nine station projects that enable 150 MW of DER capacity are currently part of the Company’s long-range investment plan, and are in various stages of development or construction. b. The seven additional projects are capacity (load) driven upgrades. Please see the table below for details on the 7 additional projects: Substation Baldwin 13F Tracy 14M Triangle 11A Frybrook 13B Waterside 22M Flax Hill 24A Williams 9L Total Need Capacity/ Load Capacity/ Load Capacity/ Load Capacity/ Load Capacity/ Load Capacity/ Load Capacity/ Load DER Enabled (MW’s) 15.01 14.74 19.43 15.01 16.75 15.01 15.01 110.96
  4. Page 49 of 66Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-581 Page 1 of 2 Date Filed: September 21, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Elli Ntakou and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 43, “Grid Services Compensation Fund - $38M” a. Is the Grid Services Compensation Fund a new proposal seeking PURA approval as part of the targeted system performance plan? If not, please explain whether the Company has already made investments in this fund and whether it is seeking cost recovery in this rate case. b. Please explain the scope of the Grid Services Compensation fund including what grid services will be procured, how grid services will be valued and compensated, what timeline grid services will be enabled and how stakeholders will be engaged to implement this proposal. c. Please provide a breakdown of how the $38m will be allocated to implement this proposal. Response: a. Yes, the Grid Services Compensation Fund is a new proposal seeking PURA approval as part of the targeted system performance plan. b. The purpose of the Grid Service Compensation Fund (“GSCF”) is to compensate customerowned front of the meter and behind the meter dispatchable DER and flexible loads for providing local grid services dispatched by real-time system operators using the Company’s grid and aggregator Distributed Energy Resource Management System (“DERMS”). These offerings intend to leverage existing DER capacity to reduce distribution system infrastructure costs relative to traditional solutions. Specifically, DERs can provide valuable grid services for 1) deferral of infrastructure investments when DER dispatch can reliably reduce peak demand on local infrastructure that is slated for upgrade due to load growth; 2) for bridge-to-wires opportunities when DERs can provide flexible capacity to mitigate local reliability risks for which traditional infrastructure solutions cannot be deployed in time to meet need; and 3) provide voltage support services in support of increasing electricity delivery efficiency.
  5. Page 50 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-581 Page 2 of 2 Influenced by the Company’s experience with a similar program in Massachusetts as part of the Electric Sector Modernization Plan (“ESMP”), the GSCF would expand on the Company’s successful ConnectedSolutions programs targeting ISO-NE system peak, to initiate offerings based on local system needs at the substation and feeder levels. The GSCF is intended to be implemented over a four-year period during which the Company would collect lessons learned on the efficacy and cost-effectiveness of various approaches to utilizing customer DER for local grid services. These learnings would support regulatory process to develop a longer-term mechanism to compensate customers for providing local grid services. The Company would provide annual updates to PURA and stakeholders on implementation of the GSCF, including amounts spent on incentives and administration relative to the value created by the various use cases, including infrastructure deferral. In Massachusetts, the Company took part in a process led by the Massachusetts Center for Clean Energy (MassCEC) and with stakeholders which led to the release of the Grid Services Compensation Study ultimately informing the level of compensation for grid services. 1 The Company expects to leverage this work to evaluate how grid services will be valued and compensated specifically for CT use cases. c. Costs associated with the GSCF are expected to include labor and outside services related to the administration and marketing of the programs; however, the Company expects that most of the budget will be used to compensate customers for providing local grid services. 1 https://www.masscec.com/resources/grid-services-study
  6. Page 51 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-582 Page 1 of 4 Date Filed: September 22, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Elli Ntakou and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 107-108, “Grid Modernization, Distributed Energy Resource Management System (DERMS)”. a. Please describe the DERMS capital and O&M spending spent to date and requested as part of the Targeted System Performance Plan. b. Please confirm whether the Company is requesting funding for DERMS from the “Sustained Plan” and/or “Advancing the Grid” plan. If separate funding is requested within each plan, please provide a breakdown of the costs between the Sustained and Advancing the Grid plan. c. Please describe the key milestones, status and estimated timelines for the Company to deploy a grid DERMS including the following: i. Please describe the status of procuring a grid DERMS system and/or aggregator/edge DERMS. ii. Please describe the status of completing the ADMS – DERMS Integration. iii. Please describe the extent to which the Company has established an architecture and technical operational requirements to standardize and implement a DERMS – DER Gateway. iv. Please describe whether the Company has developed a formal architecture for how grid DERMS will interact and integrate with an Aggregator or edge DERMS. Specifically, please indicate whether the Company intends to use a single or multiple aggregator/edge DERMS to dispatch aggregations and virtual power plants. v. Please describe the communications architecture the Company intends to use to communicate directly with third-party DERs and aggregator/edge-DERMS including the communication network and protocol. vi. Please describe whether the Company has a deployment plan for where and when DERMS will be deployed across its system and what use cases will be prioritized.
  7. Page 52 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-582 Page 2 of 4 Response: a. There has been no capital or O&M spent on DERMS investments to date. The Company has initiated some enabling DERMS investments including ADMS power flow, aggregator DERMS (funded through the Company’s energy efficiency program and utilized by the ConnectedSolutions program), as well as upgrades to the SCADA system. These investments support and are necessary precursors to the planned DERMS deployment. The Company proposes spending $10.7 million in capital expenditures on its DERMS with no incremental O&M expenditures associated with this program. b. The Company confirms that the proposed DERMS investments are fully included in the Sustained Plan. The same DERMS investments are included in the Targeted System Plan, and the Advancing the Grid Plan. The Advancing the Grid Plan includes incremental investments in a DERMS Demonstration. See the response to OCC-584 i for a description of the DERMS Demonstration investment included in the Advancing the Grid proposal. c. i. The Company has selected GE Vernova as its software provider for enterprise SCADA, ADMS, and DERMS in all its service territories, leveraging the benefits of an integrated real-time operating and control ecosystem. In CT, the Company has implemented the GE Vernova solution for SCADA and is in the process of implementing the integrated GE Vernova ADMS. The Company has not executed an agreement with GE Vernova to procure its DERMS solution for deployment in CT. As a part of its ConnectedSolutions program, the Company has executed agreements with several third-party aggregator DERMS to dispatch behind the meter DER and flexible load in support of ISO-NE system peak load reduction. The Company has not entered into agreements with any third-party aggregator DERMS for integration with a GE Vernova grid DERMS and/or provision of local grid services in CT. ii. The Company plans to integrate its ADMS and DERMS solutions from GE Vernova which are designed to operate as an integrated solution. The ADMS-DERMS integration is currently in the planning stage. iii. The Company intends to leverage a standardized DERMS architecture based on solutions previously deployed in other service territories. The Company is currently evaluating and developing the technical and operational requirements for the DERMSDER gateway, including communication protocols.
  8. Page 53 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-582 Page 3 of 4 iv. The Company is currently in the planning stage for designing the formal architecture governing the interaction between the grid DERMS and an aggregator/edge DERMS. The Company intends to leverage a standardized DERMS architecture based on solutions previously deployed in its Massachusetts service territory and is evaluating the use of multiple aggregator/edge DERMS providers. As the Company is in the planning phase, it has not yet finalized its aggregator/edge DERMS partners. v. The Company is currently evaluating the communication architecture that will support direct communication with third-party DERs and aggregator/edge DERMS platforms. The communication network and associated protocols have not yet been finalized. As part of this effort, the Company is evaluating the use of IEEE 2030.5 for communication with both front-of-the-meter and behind-the-meter DERs. vi. The Company estimates it would take approximately 18-months to implement a grid DERMS solution, including integration with third-party aggregator DERMS providers. Assuming a project start in mid-2027, the Company would have a fully functioning DERMS solution at the beginning of 2029. The initial use cases are expected to include flexible interconnection and local capacity relief at substations. The Company is still developing its deployment plan including the locations and sequencing of DERMS deployment across its distribution system in Connecticut. Prior Referenced Response: i OCC-584 Question: Refer to Exhibit CLP-TSP-1 at 68, “DERMS Demonstration – Demonstrate the value proposition of advanced DERMS capabilities, including (1) use of DER to increase system efficiency and reduce line losses; (2) integration of multiple types of DER in a microgrid application for critical load; and (3) investigation of lower cost approaches to communication and control of stand-alone solar and storage facilities integrated into the Company’s centralized DERMS system.” a. Has the Company deployed DERMS and implemented any DERMS use cases to date? b. Please describe how this DERMS demonstration will be coordinated with the implementation of the Grid Services Compensation Fund and Dynamic Flexible Interconnection. OCC-584 Response: a. Other than the use of its aggregator DERMS utilized for an ISO-New England system peak load reduction use case through the ConnectedSolutions program, the Company has not deployed DERMS or implemented DERMS use cases in its Connecticut service territory. In its western Massachusetts service territory, the Company deployed the first phase of a grid DERMS at the end of 2025 and is currently completing the second phase of the grid DERMS project with a target in-service date at the end of 2026. The Company is currently implementing foundational upgrades to its SCADA eECS and DMS systems in Eastern Massachusetts and is expecting to start a grid DERMS project there in early 2027. With respect to use cases, in western Massachusetts, the Company is currently utilizing its grid DERMS for weather-based operational forecasting,
  9. Page 54 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-582 Page 4 of 4 providing real time system operators with hour- and day-ahead visibility into the impact of DER on power flows, including the impact of solar generation on equipment loading. In eastern Massachusetts, the Company conducted its first locational demand response program in Summer 2026, utilizing its aggregator DERMS to reduce load during peak events at three substations in the Boston area with identified risk of overload. The Boston substation peak load reduction program was implemented in coordination with the Company’s Massachusetts Grid Services Compensation Fund, increasing incentives for participating customers served by the targeted substations. (Referred to as the “ConnectedSolutions+” program.) The Company also actively utilizes its 34-MWh stand-alone battery in Provincetown Massachusetts in a complex microgrid configuration able to supply up to 11,000 customers solely with the battery upon loss of traditional grid supply. This microgrid is currently operated with a dedicated microgrid control scheme. In the longer term, the Company plans to integrate operation of the Provincetown battery with a grid DERMS capability to coordinate dispatch of the Eversource battery with customer DER to cost-effectively increase the duration of the microgrid. Also in process is a project at the Company’s Roosevelt solar facility to utilize DERMS to support voltage management use cases. The scope of the Roosevelt project incorporates investigation into lower-cost options for DER communication and control through a centralized grid DERMS. The Company is also planning to implement a ConnectedSolutions+ program in targeted locations in southeastern MA, an area with high solar penetration, for a managed EV charging use case to reduce the risk of reverse flow overloads by charging EV batteries during periods of high solar output. b. The DERMS demonstration program is designed to implement multiple DERMS-dependent use cases in a targeted location to demonstrate the multiple benefits of different approaches, both independently and in coordination. The intent is to show the full potential of DERMS technology to inform efforts to deploy at scale across Connecticut. The Grid Services Compensation Fund is an important enabler of the DERMS demonstration, enabling the Company to increase incentives for DER customers supporting one or more use cases. For example, the Company would use the Grid Services Compensation Fund to provide incentives in exchange for a customer allowing use of an advanced inverter for a voltage management use case. Currently, the Company has no mechanism to compensate customers for this or any locally-targeted capacity or voltage use cases. The DERMS demonstration could also incorporate the use of dynamic flexible interconnections. Using DERMS technology, a dynamic flexible interconnection allows larger-scale DER facilities an increased operating envelope (i.e., greater charge and discharge levels) based on real-time operating conditions. For example, a fixed operating envelope may restrict battery discharge to 25 percent of nameplate in Spring and Fall seasons when load is relatively low and solar output is high. A dynamic flexible interconnection could relax this restriction and allow more discharge based on real-time grid conditions (i.e., cloudy warm days when solar output is lower and load is higher.) The DERMS demonstration could incorporate the concept of dynamic flexible interconnection to show the incremental value of an expanded operating envelope for capacity and/or voltage related DERMS use cases
  10. Page 55 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-583 Page 1 of 2 Date Filed: September 22, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez, Steven C. Osuch, Andrew C. Belden, Gerhard Walker and Warren R. Boutin Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 107-108, “Enable dynamic flexible interconnections to reduce costs of DER integrations)”. a. Please describe the status of developing a dynamic flexible interconnection program including when the Company expects to conduct its first demonstrations. b. Has the Company evaluated using dynamic flexible interconnection as a way to defer to the proposed upgrades as part of the proposed Shared Hosting for Advancement of Renewable Energy (SHARE) Program? Response: a. Please refer to OCC-583, Attachment 1, for the Joint EDC’s Proposal for Implementing Flexible Interconnections in CT. Specifically, refer to OCC-583 Attachment 1, at 13, for the joint EDC’s plan for implementing Flexible Interconnections across both EDC service territories. Eversource’s plan for enabling flexible interconnections in Connecticut was filed on March 16, 2026, in Docket No. 25-01-27, and at this time does not include dynamic flexible interconnections due to the need to first implement an ADMS system and a DERMS system. b. The Company has not evaluated utilizing dynamic flexible interconnections as a way to defer the upgrades proposed for the SHARE program. Currently, the SHARE program and dynamic flexible interconnection target different needs for DER developers and the Company. The SHARE program is intended to target larger DER development in more rural areas where the available real estate for DER exceeds the load in the region. The Flexible Interconnection program is intended to target underutilized hosting capacity that cannot otherwise be utilized without dynamically controlling a distributed asset. The Company is considering “planned flexibility” as an option in the SHARE program where specific assumptions around curtailment with cosited storage are taken into consideration in the solution design. Flexible interconnections would be offered as a vintaging queue, with a window where all applicants will evenly split the capacity made available by dynamic control of the assets.

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)