Compilations of discovery responses
Files31
Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
PDF · 161 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Discovery Compilations September 29 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
ALLCO Set 5_COMBINED.pdf
PDF · 669 KB · 36 pagesText searchable
Download ALLCO Set 5_COMBINED.pdfRead the text of ALLCO Set 5_COMBINED.pdf
ALLCO Set 4_COMBINED.pdf
PDF · 133 KB · 4 pagesText searchable
Download ALLCO Set 4_COMBINED.pdfRead the text of ALLCO Set 4_COMBINED.pdf
ALLCO Set 3_COMBINED.pdf
PDF · 346 KB · 23 pagesText searchable
Download ALLCO Set 3_COMBINED.pdfRead the text of ALLCO Set 3_COMBINED.pdf
ALLCO Set 2_COMBINED.pdf
PDF · 576 KB · 38 pagesText searchable
Download ALLCO Set 2_COMBINED.pdfRead the text of ALLCO Set 2_COMBINED.pdf
ALLCO Set 1_COMBINED.pdf
PDF · 458 KB · 27 pagesText searchable
Download ALLCO Set 1_COMBINED.pdfRead the text of ALLCO Set 1_COMBINED.pdf
ALLCO Set 6_COMBINED.pdf
PDF · 332 KB · 9 pagesText searchable
Download ALLCO Set 6_COMBINED.pdfRead the text of ALLCO Set 6_COMBINED.pdf
AMTRAK Set 2_COMBINED.pdf
PDF · 123 KB · 2 pagesText searchable
Download AMTRAK Set 2_COMBINED.pdfRead the text of AMTRAK Set 2_COMBINED.pdf
AMTRAK Set 1_COMBINED.pdf
PDF · 190 KB · 5 pagesText searchable
Download AMTRAK Set 1_COMBINED.pdfRead the text of AMTRAK Set 1_COMBINED.pdf
AMTRAK Set 3_COMBINED.pdf
PDF · 649 KB · 34 pagesText searchable
Download AMTRAK Set 3_COMBINED.pdfRead the text of AMTRAK Set 3_COMBINED.pdf
CIEC Set 2_COMBINED.pdf
PDF · 85 KB · 1 pageText searchable
Download CIEC Set 2_COMBINED.pdfRead the text of CIEC Set 2_COMBINED.pdf
CIEC Set 1_COMBINED.pdf
PDF · 351 KB · 19 pagesText searchable
Download CIEC Set 1_COMBINED.pdfRead the text of CIEC Set 1_COMBINED.pdf
CIEC Set 3_COMBINED.pdf
PDF · 188 KB · 4 pagesText searchable
Download CIEC Set 3_COMBINED.pdfRead the text of CIEC Set 3_COMBINED.pdf
CLF-SC Set 1_COMBINED.pdf
PDF · 611 KB · 56 pagesText searchable
Download CLF-SC Set 1_COMBINED.pdfRead the text of CLF-SC Set 1_COMBINED.pdf
CLF Set 1_ COMBINED.pdf
PDF · 289 KB · 20 pagesText searchable
Download CLF Set 1_ COMBINED.pdfRead the text of CLF Set 1_ COMBINED.pdf
CLF-SC Set 2_COMBINED.pdf
PDF · 182 KB · 7 pagesText searchable
Download CLF-SC Set 2_COMBINED.pdfRead the text of CLF-SC Set 2_COMBINED.pdf
EOE Set 3_COMBINED.pdf
PDF · 237 KB · 11 pagesText searchable
Download EOE Set 3_COMBINED.pdfRead the text of EOE Set 3_COMBINED.pdf
EOE Set 2_COMBINED.pdf
PDF · 417 KB · 22 pagesText searchable
Download EOE Set 2_COMBINED.pdfRead the text of EOE Set 2_COMBINED.pdf
EOE Set 1_COMBINED.pdf
PDF · 1.7 MB · 200 pagesText searchable
Download EOE Set 1_COMBINED.pdfRead the text of EOE Set 1_COMBINED.pdf
EOE Set 4_COMBINED.pdf
PDF · 836 KB · 70 pagesText searchable
Download EOE Set 4_COMBINED.pdfRead the text of EOE Set 4_COMBINED.pdf
ICC Set 1_COMBINED.pdf
PDF · 466 KB · 30 pagesText searchable
Download ICC Set 1_COMBINED.pdfRead the text of ICC Set 1_COMBINED.pdf
OCC Set 13_COMBINED.pdf
PDF · 484 KB · 30 pagesText searchable
Download OCC Set 13_COMBINED.pdfRead the text of OCC Set 13_COMBINED.pdf
OCC Set 12_COMBINED.pdf
PDF · 1.0 MB · 73 pagesText searchable
Download OCC Set 12_COMBINED.pdfRead the text of OCC Set 12_COMBINED.pdf
OCC Set 11_COMBINED.pdf
PDF · 482 KB · 48 pagesText searchable
Download OCC Set 11_COMBINED.pdfRead the text of OCC Set 11_COMBINED.pdf
OCC Set 10_COMBINED.pdf
PDF · 542 KB · 51 pagesText searchable
Download OCC Set 10_COMBINED.pdfRead the text of OCC Set 10_COMBINED.pdf
OCC Set 5_COMBINED.pdf
PDF · 511 KB · 46 pagesText searchable
Download OCC Set 5_COMBINED.pdfRead the text of OCC Set 5_COMBINED.pdf
OCC Set 4_COMBINED.pdf
PDF · 1.3 MB · 159 pagesText searchable
Download OCC Set 4_COMBINED.pdfRead the text of OCC Set 4_COMBINED.pdf
OCC Set 3_COMBINED.pdf
PDF · 1.2 MB · 93 pagesText searchable
Download OCC Set 3_COMBINED.pdfRead the text of OCC Set 3_COMBINED.pdf
OCC Set 2_COMBINED.pdf
PDF · 1.7 MB · 68 pagesText searchable
Download OCC Set 2_COMBINED.pdfRead the text of OCC Set 2_COMBINED.pdf
OCC Set 1_COMBINED.pdf
PDF · 7.0 MB · 139 pagesText searchable
Download OCC Set 1_COMBINED.pdfRead the text of OCC Set 1_COMBINED.pdf
OCC Set 14_COMBINED.pdf
PDF · 880 KB · 66 pagesText searchable
Download OCC Set 14_COMBINED.pdfRead the text of OCC Set 14_COMBINED.pdf
Text of ALLCO Set 3_COMBINED.pdf
Extracted from the file · 23 pages · 55,777 characters
Text of ALLCO Set 2_COMBINED.pdf
Extracted from the file · 38 pages · 81,182 characters
Text of ALLCO Set 1_COMBINED.pdf
Extracted from the file · 27 pages · 46,644 characters
Text of ALLCO Set 6_COMBINED.pdf
Extracted from the file · 9 pages · 18,340 characters
Text of AMTRAK Set 2_COMBINED.pdf
Extracted from the file · 2 pages · 3,025 characters
Text of AMTRAK Set 1_COMBINED.pdf
Extracted from the file · 5 pages · 4,881 characters
Text of AMTRAK Set 3_COMBINED.pdf
Extracted from the file · 34 pages · 101,991 characters
Text of CIEC Set 2_COMBINED.pdf
Extracted from the file · 1 page · 1,005 characters
Text of CIEC Set 1_COMBINED.pdf
Extracted from the file · 19 pages · 26,023 characters
Text of CIEC Set 3_COMBINED.pdf
Extracted from the file · 4 pages · 5,355 characters
Text of CLF-SC Set 1_COMBINED.pdf
Extracted from the file · 56 pages · 132,578 characters
Text of CLF Set 1_ COMBINED.pdf
Extracted from the file · 20 pages · 38,243 characters
Text of CLF-SC Set 2_COMBINED.pdf
Extracted from the file · 7 pages · 17,131 characters
Text of EOE Set 3_COMBINED.pdf
Extracted from the file · 11 pages · 23,418 characters
Text of EOE Set 2_COMBINED.pdf
Extracted from the file · 22 pages · 42,455 characters
Text of EOE Set 1_COMBINED.pdf
Extracted from the file · 200 pages · 332,382 characters
Text of EOE Set 4_COMBINED.pdf
Extracted from the file · 70 pages · 139,575 characters
Text of ICC Set 1_COMBINED.pdf
Extracted from the file · 30 pages · 51,093 characters
Text of OCC Set 13_COMBINED.pdf
Extracted from the file · 30 pages · 61,971 characters
Text of OCC Set 12_COMBINED.pdf
Extracted from the file · 73 pages · 193,636 characters
Text of OCC Set 11_COMBINED.pdf
Extracted from the file · 48 pages · 62,469 characters
Text of OCC Set 10_COMBINED.pdf
Extracted from the file · 51 pages · 90,368 characters
Text of OCC Set 5_COMBINED.pdf
Extracted from the file · 46 pages · 88,105 characters
Text of OCC Set 4_COMBINED.pdf
Extracted from the file · 159 pages · 268,038 characters
Text of OCC Set 3_COMBINED.pdf
Extracted from the file · 93 pages · 113,517 characters
Text of OCC Set 2_COMBINED.pdf
Extracted from the file · 68 pages · 113,929 characters
Text of OCC Set 1_COMBINED.pdf
Extracted from the file · 139 pages · 225,320 characters
Page 51 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-582 Page 1 of 4 Date Filed: September 22, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Elli Ntakou and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 107-108, “Grid Modernization, Distributed Energy Resource Management System (DERMS)”. a. Please describe the DERMS capital and O&M spending spent to date and requested as part of the Targeted System Performance Plan. b. Please confirm whether the Company is requesting funding for DERMS from the “Sustained Plan” and/or “Advancing the Grid” plan. If separate funding is requested within each plan, please provide a breakdown of the costs between the Sustained and Advancing the Grid plan. c. Please describe the key milestones, status and estimated timelines for the Company to deploy a grid DERMS including the following: i. Please describe the status of procuring a grid DERMS system and/or aggregator/edge DERMS. ii. Please describe the status of completing the ADMS – DERMS Integration. iii. Please describe the extent to which the Company has established an architecture and technical operational requirements to standardize and implement a DERMS – DER Gateway. iv. Please describe whether the Company has developed a formal architecture for how grid DERMS will interact and integrate with an Aggregator or edge DERMS. Specifically, please indicate whether the Company intends to use a single or multiple aggregator/edge DERMS to dispatch aggregations and virtual power plants. v. Please describe the communications architecture the Company intends to use to communicate directly with third-party DERs and aggregator/edge-DERMS including the communication network and protocol. vi. Please describe whether the Company has a deployment plan for where and when DERMS will be deployed across its system and what use cases will be prioritized.Page 52 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-582 Page 2 of 4 Response: a. There has been no capital or O&M spent on DERMS investments to date. The Company has initiated some enabling DERMS investments including ADMS power flow, aggregator DERMS (funded through the Company’s energy efficiency program and utilized by the ConnectedSolutions program), as well as upgrades to the SCADA system. These investments support and are necessary precursors to the planned DERMS deployment. The Company proposes spending $10.7 million in capital expenditures on its DERMS with no incremental O&M expenditures associated with this program. b. The Company confirms that the proposed DERMS investments are fully included in the Sustained Plan. The same DERMS investments are included in the Targeted System Plan, and the Advancing the Grid Plan. The Advancing the Grid Plan includes incremental investments in a DERMS Demonstration. See the response to OCC-584 i for a description of the DERMS Demonstration investment included in the Advancing the Grid proposal. c. i. The Company has selected GE Vernova as its software provider for enterprise SCADA, ADMS, and DERMS in all its service territories, leveraging the benefits of an integrated real-time operating and control ecosystem. In CT, the Company has implemented the GE Vernova solution for SCADA and is in the process of implementing the integrated GE Vernova ADMS. The Company has not executed an agreement with GE Vernova to procure its DERMS solution for deployment in CT. As a part of its ConnectedSolutions program, the Company has executed agreements with several third-party aggregator DERMS to dispatch behind the meter DER and flexible load in support of ISO-NE system peak load reduction. The Company has not entered into agreements with any third-party aggregator DERMS for integration with a GE Vernova grid DERMS and/or provision of local grid services in CT. ii. The Company plans to integrate its ADMS and DERMS solutions from GE Vernova which are designed to operate as an integrated solution. The ADMS-DERMS integration is currently in the planning stage. iii. The Company intends to leverage a standardized DERMS architecture based on solutions previously deployed in other service territories. The Company is currently evaluating and developing the technical and operational requirements for the DERMSDER gateway, including communication protocols.Page 53 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-582 Page 3 of 4 iv. The Company is currently in the planning stage for designing the formal architecture governing the interaction between the grid DERMS and an aggregator/edge DERMS. The Company intends to leverage a standardized DERMS architecture based on solutions previously deployed in its Massachusetts service territory and is evaluating the use of multiple aggregator/edge DERMS providers. As the Company is in the planning phase, it has not yet finalized its aggregator/edge DERMS partners. v. The Company is currently evaluating the communication architecture that will support direct communication with third-party DERs and aggregator/edge DERMS platforms. The communication network and associated protocols have not yet been finalized. As part of this effort, the Company is evaluating the use of IEEE 2030.5 for communication with both front-of-the-meter and behind-the-meter DERs. vi. The Company estimates it would take approximately 18-months to implement a grid DERMS solution, including integration with third-party aggregator DERMS providers. Assuming a project start in mid-2027, the Company would have a fully functioning DERMS solution at the beginning of 2029. The initial use cases are expected to include flexible interconnection and local capacity relief at substations. The Company is still developing its deployment plan including the locations and sequencing of DERMS deployment across its distribution system in Connecticut. Prior Referenced Response: i OCC-584 Question: Refer to Exhibit CLP-TSP-1 at 68, “DERMS Demonstration – Demonstrate the value proposition of advanced DERMS capabilities, including (1) use of DER to increase system efficiency and reduce line losses; (2) integration of multiple types of DER in a microgrid application for critical load; and (3) investigation of lower cost approaches to communication and control of stand-alone solar and storage facilities integrated into the Company’s centralized DERMS system.” a. Has the Company deployed DERMS and implemented any DERMS use cases to date? b. Please describe how this DERMS demonstration will be coordinated with the implementation of the Grid Services Compensation Fund and Dynamic Flexible Interconnection. OCC-584 Response: a. Other than the use of its aggregator DERMS utilized for an ISO-New England system peak load reduction use case through the ConnectedSolutions program, the Company has not deployed DERMS or implemented DERMS use cases in its Connecticut service territory. In its western Massachusetts service territory, the Company deployed the first phase of a grid DERMS at the end of 2025 and is currently completing the second phase of the grid DERMS project with a target in-service date at the end of 2026. The Company is currently implementing foundational upgrades to its SCADA eECS and DMS systems in Eastern Massachusetts and is expecting to start a grid DERMS project there in early 2027. With respect to use cases, in western Massachusetts, the Company is currently utilizing its grid DERMS for weather-based operational forecasting,Page 54 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-582 Page 4 of 4 providing real time system operators with hour- and day-ahead visibility into the impact of DER on power flows, including the impact of solar generation on equipment loading. In eastern Massachusetts, the Company conducted its first locational demand response program in Summer 2026, utilizing its aggregator DERMS to reduce load during peak events at three substations in the Boston area with identified risk of overload. The Boston substation peak load reduction program was implemented in coordination with the Company’s Massachusetts Grid Services Compensation Fund, increasing incentives for participating customers served by the targeted substations. (Referred to as the “ConnectedSolutions+” program.) The Company also actively utilizes its 34-MWh stand-alone battery in Provincetown Massachusetts in a complex microgrid configuration able to supply up to 11,000 customers solely with the battery upon loss of traditional grid supply. This microgrid is currently operated with a dedicated microgrid control scheme. In the longer term, the Company plans to integrate operation of the Provincetown battery with a grid DERMS capability to coordinate dispatch of the Eversource battery with customer DER to cost-effectively increase the duration of the microgrid. Also in process is a project at the Company’s Roosevelt solar facility to utilize DERMS to support voltage management use cases. The scope of the Roosevelt project incorporates investigation into lower-cost options for DER communication and control through a centralized grid DERMS. The Company is also planning to implement a ConnectedSolutions+ program in targeted locations in southeastern MA, an area with high solar penetration, for a managed EV charging use case to reduce the risk of reverse flow overloads by charging EV batteries during periods of high solar output. b. The DERMS demonstration program is designed to implement multiple DERMS-dependent use cases in a targeted location to demonstrate the multiple benefits of different approaches, both independently and in coordination. The intent is to show the full potential of DERMS technology to inform efforts to deploy at scale across Connecticut. The Grid Services Compensation Fund is an important enabler of the DERMS demonstration, enabling the Company to increase incentives for DER customers supporting one or more use cases. For example, the Company would use the Grid Services Compensation Fund to provide incentives in exchange for a customer allowing use of an advanced inverter for a voltage management use case. Currently, the Company has no mechanism to compensate customers for this or any locally-targeted capacity or voltage use cases. The DERMS demonstration could also incorporate the use of dynamic flexible interconnections. Using DERMS technology, a dynamic flexible interconnection allows larger-scale DER facilities an increased operating envelope (i.e., greater charge and discharge levels) based on real-time operating conditions. For example, a fixed operating envelope may restrict battery discharge to 25 percent of nameplate in Spring and Fall seasons when load is relatively low and solar output is high. A dynamic flexible interconnection could relax this restriction and allow more discharge based on real-time grid conditions (i.e., cloudy warm days when solar output is lower and load is higher.) The DERMS demonstration could incorporate the concept of dynamic flexible interconnection to show the incremental value of an expanded operating envelope for capacity and/or voltage related DERMS use casesPage 55 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-583 Page 1 of 2 Date Filed: September 22, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez, Steven C. Osuch, Andrew C. Belden, Gerhard Walker and Warren R. Boutin Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 107-108, “Enable dynamic flexible interconnections to reduce costs of DER integrations)”. a. Please describe the status of developing a dynamic flexible interconnection program including when the Company expects to conduct its first demonstrations. b. Has the Company evaluated using dynamic flexible interconnection as a way to defer to the proposed upgrades as part of the proposed Shared Hosting for Advancement of Renewable Energy (SHARE) Program? Response: a. Please refer to OCC-583, Attachment 1, for the Joint EDC’s Proposal for Implementing Flexible Interconnections in CT. Specifically, refer to OCC-583 Attachment 1, at 13, for the joint EDC’s plan for implementing Flexible Interconnections across both EDC service territories. Eversource’s plan for enabling flexible interconnections in Connecticut was filed on March 16, 2026, in Docket No. 25-01-27, and at this time does not include dynamic flexible interconnections due to the need to first implement an ADMS system and a DERMS system. b. The Company has not evaluated utilizing dynamic flexible interconnections as a way to defer the upgrades proposed for the SHARE program. Currently, the SHARE program and dynamic flexible interconnection target different needs for DER developers and the Company. The SHARE program is intended to target larger DER development in more rural areas where the available real estate for DER exceeds the load in the region. The Flexible Interconnection program is intended to target underutilized hosting capacity that cannot otherwise be utilized without dynamically controlling a distributed asset. The Company is considering “planned flexibility” as an option in the SHARE program where specific assumptions around curtailment with cosited storage are taken into consideration in the solution design. Flexible interconnections would be offered as a vintaging queue, with a window where all applicants will evenly split the capacity made available by dynamic control of the assets.Page 56 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-583 Page 2 of 2 This differs from the SHARE program where a window will be opened, and the group studied solution will factor all group study participants in aggregate and produce a solution that allows their project to operate at or near their intended capacity within the limitations of the upgrades we determine are feasible for the group study itself. These upgrade costs are then shared by the DER developers, avoiding the first to build funding future DER at that site. The SHARE project site selection will consider a maximum distribution system benefit component, when plausible, which is why the Company shows capital project cost component for projects proposed in Exhibit CLP-TSP-3 at pages 146-149. The total project would be a net reduction for each stakeholder for distribution system needs and DER project funded needs.Page 57 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-584 Page 1 of 3 Date Filed: September 21, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Elli Ntakou and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 68, “DERMS Demonstration – Demonstrate the value proposition of advanced DERMS capabilities, including (1) use of DER to increase system efficiency and reduce line losses; (2) integration of multiple types of DER in a microgrid application for critical load; and (3) investigation of lower cost approaches to communication and control of stand-alone solar and storage facilities integrated into the Company’s centralized DERMS system.” a. Has the Company deployed DERMS and implemented any DERMS use cases to date? b. Please describe how this DERMS demonstration will be coordinated with the implementation of the Grid Services Compensation Fund and Dynamic Flexible Interconnection. Response: a. Other than the use of its aggregator DERMS utilized for an ISO-New England system peak load reduction use case through the ConnectedSolutions program, the Company has not deployed DERMS or implemented DERMS use cases in its Connecticut service territory. In its western Massachusetts service territory, the Company deployed the first phase of a grid DERMS at the end of 2025 and is currently completing the second phase of the grid DERMS project with a target in-service date at the end of 2026. The Company is currently implementing foundational upgrades to its SCADA eECS and DMS systems in Eastern Massachusetts and is expecting to start a grid DERMS project there in early 2027. With respect to use cases, in western Massachusetts, the Company is currently utilizing its grid DERMS for weather-based operational forecasting, providing real time system operators with hour- and day-ahead visibility into the impact of DER on power flows, including the impact of solar generation on equipment loading. In eastern Massachusetts, the Company conducted its first locational demand response program in Summer 2026, utilizing its aggregator DERMS to reduce load during peak events at three substations in the Boston area with identified risk of overload. The Boston substation peak load reduction program was implemented in coordination with the Company’s Massachusetts GridPage 58 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-584 Page 2 of 3 Services Compensation Fund, increasing incentives for participating customers served by the targeted substations. (Referred to as the “ConnectedSolutions+” program.) The Company also actively utilizes its 34-MWh stand-alone battery in Provincetown Massachusetts in a complex microgrid configuration able to supply up to 11,000 customers solely with the battery upon loss of traditional grid supply. This microgrid is currently operated with a dedicated microgrid control scheme. In the longer term, the Company plans to integrate operation of the Provincetown battery with a grid DERMS capability to coordinate dispatch of the Eversource battery with customer DER to cost-effectively increase the duration of the microgrid. Also in process is a project at the Company’s Roosevelt solar facility to utilize DERMS to support voltage management use cases. The scope of the Roosevelt project incorporates investigation into lower-cost options for DER communication and control through a centralized grid DERMS. The Company is also planning to implement a ConnectedSolutions+ program in targeted locations in southeastern MA, an area with high solar penetration, for a managed EV charging use case to reduce the risk of reverse flow overloads by charging EV batteries during periods of high solar output. b. The DERMS demonstration program is designed to implement multiple DERMSdependent use cases in a targeted location to demonstrate the multiple benefits of different approaches, both independently and in coordination. The intent is to show the full potential of DERMS technology to inform efforts to deploy at scale across Connecticut. The Grid Services Compensation Fund is an important enabler of the DERMS demonstration, enabling the Company to increase incentives for DER customers supporting one or more use cases. For example, the Company would use the Grid Services Compensation Fund to provide incentives in exchange for a customer allowing use of an advanced inverter for a voltage management use case. Currently, the Company has no mechanism to compensate customers for this or any locally-targeted capacity or voltage use cases. The DERMS demonstration could also incorporate the use of dynamic flexible interconnections. Using DERMS technology, a dynamic flexible interconnection allows larger-scale DER facilities an increased operating envelope (i.e., greater charge and discharge levels) based on real-time operating conditions. For example, a fixed operating envelope may restrict battery discharge to 25 percent of nameplate in Spring and Fall seasons when load is relatively low and solar output is high. A dynamic flexible interconnection could relax this restriction and allow more discharge based on real-time grid conditions (i.e., cloudy warm days when solar output is lower and load is higher.) The DERMS demonstration could incorporate the concept of dynamic flexible interconnectionPage 59 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-584 Page 3 of 3 to show the incremental value of an expanded operating envelope for capacity and/or voltage related DERMS use cases.Page 60 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-585 Page 1 of 1 Date Filed: September 22, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Elli Ntakou and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 134, “The DERMS demonstration location will be determined based on further study; preliminary assessment indicates the potential of coordinating with other programs planned at Triangle, Frybrook, and Campville.” a. Please describe the “other programs” planned at Triangle. b. Please confirm the other programs planned at Frybrook, and Campville are the NWA projects. If not, please describe the other programs planned. Response: a. Triangle substation was identified as an opportunity for a DERMS demonstration due to the following conditions: 1) A large BESS DER is in the queue at this substation 2) This substation has undergone recent upgrades and has switchgear and relays suitable for use by a DERMS system without this incremental expense 3) This substation is experiencing an overload that currently requires mitigation during peak load events, creating an opportunity to study the efficacy of using DERMS, in coordination with the Grid Services Compensation Fund, to mitigate or defer more costly solutions at the substation . b. The projects at Frybrook and Campville are the same projects the Company has identified in testimony as opportunities for Non-Wires Alternatives (NWAs) and are driven by forecasted overloads as well as reliability concerns. To date these projects have received initial funding in the capital plan but have not yet undergone detailed NWA engineering analysis.
As listed on the current system
Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses