Compilations of discovery responses
Files31
Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
PDF · 161 KB · 2 pagesText searchable
Download Docket No. 26-05-10 Discovery Compilations September 29 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 29 2026.pdf
ALLCO Set 5_COMBINED.pdf
PDF · 669 KB · 36 pagesText searchable
Download ALLCO Set 5_COMBINED.pdfRead the text of ALLCO Set 5_COMBINED.pdf
ALLCO Set 4_COMBINED.pdf
PDF · 133 KB · 4 pagesText searchable
Download ALLCO Set 4_COMBINED.pdfRead the text of ALLCO Set 4_COMBINED.pdf
ALLCO Set 3_COMBINED.pdf
PDF · 346 KB · 23 pagesText searchable
Download ALLCO Set 3_COMBINED.pdfRead the text of ALLCO Set 3_COMBINED.pdf
ALLCO Set 2_COMBINED.pdf
PDF · 576 KB · 38 pagesText searchable
Download ALLCO Set 2_COMBINED.pdfRead the text of ALLCO Set 2_COMBINED.pdf
ALLCO Set 1_COMBINED.pdf
PDF · 458 KB · 27 pagesText searchable
Download ALLCO Set 1_COMBINED.pdfRead the text of ALLCO Set 1_COMBINED.pdf
ALLCO Set 6_COMBINED.pdf
PDF · 332 KB · 9 pagesText searchable
Download ALLCO Set 6_COMBINED.pdfRead the text of ALLCO Set 6_COMBINED.pdf
AMTRAK Set 2_COMBINED.pdf
PDF · 123 KB · 2 pagesText searchable
Download AMTRAK Set 2_COMBINED.pdfRead the text of AMTRAK Set 2_COMBINED.pdf
AMTRAK Set 1_COMBINED.pdf
PDF · 190 KB · 5 pagesText searchable
Download AMTRAK Set 1_COMBINED.pdfRead the text of AMTRAK Set 1_COMBINED.pdf
AMTRAK Set 3_COMBINED.pdf
PDF · 649 KB · 34 pagesText searchable
Download AMTRAK Set 3_COMBINED.pdfRead the text of AMTRAK Set 3_COMBINED.pdf
CIEC Set 2_COMBINED.pdf
PDF · 85 KB · 1 pageText searchable
Download CIEC Set 2_COMBINED.pdfRead the text of CIEC Set 2_COMBINED.pdf
CIEC Set 1_COMBINED.pdf
PDF · 351 KB · 19 pagesText searchable
Download CIEC Set 1_COMBINED.pdfRead the text of CIEC Set 1_COMBINED.pdf
CIEC Set 3_COMBINED.pdf
PDF · 188 KB · 4 pagesText searchable
Download CIEC Set 3_COMBINED.pdfRead the text of CIEC Set 3_COMBINED.pdf
CLF-SC Set 1_COMBINED.pdf
PDF · 611 KB · 56 pagesText searchable
Download CLF-SC Set 1_COMBINED.pdfRead the text of CLF-SC Set 1_COMBINED.pdf
CLF Set 1_ COMBINED.pdf
PDF · 289 KB · 20 pagesText searchable
Download CLF Set 1_ COMBINED.pdfRead the text of CLF Set 1_ COMBINED.pdf
CLF-SC Set 2_COMBINED.pdf
PDF · 182 KB · 7 pagesText searchable
Download CLF-SC Set 2_COMBINED.pdfRead the text of CLF-SC Set 2_COMBINED.pdf
EOE Set 3_COMBINED.pdf
PDF · 237 KB · 11 pagesText searchable
Download EOE Set 3_COMBINED.pdfRead the text of EOE Set 3_COMBINED.pdf
EOE Set 2_COMBINED.pdf
PDF · 417 KB · 22 pagesText searchable
Download EOE Set 2_COMBINED.pdfRead the text of EOE Set 2_COMBINED.pdf
EOE Set 1_COMBINED.pdf
PDF · 1.7 MB · 200 pagesText searchable
Download EOE Set 1_COMBINED.pdfRead the text of EOE Set 1_COMBINED.pdf
EOE Set 4_COMBINED.pdf
PDF · 836 KB · 70 pagesText searchable
Download EOE Set 4_COMBINED.pdfRead the text of EOE Set 4_COMBINED.pdf
ICC Set 1_COMBINED.pdf
PDF · 466 KB · 30 pagesText searchable
Download ICC Set 1_COMBINED.pdfRead the text of ICC Set 1_COMBINED.pdf
OCC Set 13_COMBINED.pdf
PDF · 484 KB · 30 pagesText searchable
Download OCC Set 13_COMBINED.pdfRead the text of OCC Set 13_COMBINED.pdf
OCC Set 12_COMBINED.pdf
PDF · 1.0 MB · 73 pagesText searchable
Download OCC Set 12_COMBINED.pdfRead the text of OCC Set 12_COMBINED.pdf
OCC Set 11_COMBINED.pdf
PDF · 482 KB · 48 pagesText searchable
Download OCC Set 11_COMBINED.pdfRead the text of OCC Set 11_COMBINED.pdf
OCC Set 10_COMBINED.pdf
PDF · 542 KB · 51 pagesText searchable
Download OCC Set 10_COMBINED.pdfRead the text of OCC Set 10_COMBINED.pdf
OCC Set 5_COMBINED.pdf
PDF · 511 KB · 46 pagesText searchable
Download OCC Set 5_COMBINED.pdfRead the text of OCC Set 5_COMBINED.pdf
OCC Set 4_COMBINED.pdf
PDF · 1.3 MB · 159 pagesText searchable
Download OCC Set 4_COMBINED.pdfRead the text of OCC Set 4_COMBINED.pdf
OCC Set 3_COMBINED.pdf
PDF · 1.2 MB · 93 pagesText searchable
Download OCC Set 3_COMBINED.pdfRead the text of OCC Set 3_COMBINED.pdf
OCC Set 2_COMBINED.pdf
PDF · 1.7 MB · 68 pagesText searchable
Download OCC Set 2_COMBINED.pdfRead the text of OCC Set 2_COMBINED.pdf
OCC Set 1_COMBINED.pdf
PDF · 7.0 MB · 139 pagesText searchable
Download OCC Set 1_COMBINED.pdfRead the text of OCC Set 1_COMBINED.pdf
OCC Set 14_COMBINED.pdf
PDF · 880 KB · 66 pagesText searchable
Download OCC Set 14_COMBINED.pdfRead the text of OCC Set 14_COMBINED.pdf
Text of ALLCO Set 3_COMBINED.pdf
Extracted from the file · 23 pages · 55,777 characters
Text of ALLCO Set 2_COMBINED.pdf
Extracted from the file · 38 pages · 81,182 characters
Text of ALLCO Set 1_COMBINED.pdf
Extracted from the file · 27 pages · 46,644 characters
Text of ALLCO Set 6_COMBINED.pdf
Extracted from the file · 9 pages · 18,340 characters
Text of AMTRAK Set 2_COMBINED.pdf
Extracted from the file · 2 pages · 3,025 characters
Text of AMTRAK Set 1_COMBINED.pdf
Extracted from the file · 5 pages · 4,881 characters
Text of AMTRAK Set 3_COMBINED.pdf
Extracted from the file · 34 pages · 101,991 characters
Text of CIEC Set 2_COMBINED.pdf
Extracted from the file · 1 page · 1,005 characters
Text of CIEC Set 1_COMBINED.pdf
Extracted from the file · 19 pages · 26,023 characters
Text of CIEC Set 3_COMBINED.pdf
Extracted from the file · 4 pages · 5,355 characters
Text of CLF-SC Set 1_COMBINED.pdf
Extracted from the file · 56 pages · 132,578 characters
Text of CLF Set 1_ COMBINED.pdf
Extracted from the file · 20 pages · 38,243 characters
Text of CLF-SC Set 2_COMBINED.pdf
Extracted from the file · 7 pages · 17,131 characters
Text of EOE Set 3_COMBINED.pdf
Extracted from the file · 11 pages · 23,418 characters
Text of EOE Set 2_COMBINED.pdf
Extracted from the file · 22 pages · 42,455 characters
Text of EOE Set 1_COMBINED.pdf
Extracted from the file · 200 pages · 332,382 characters
Text of EOE Set 4_COMBINED.pdf
Extracted from the file · 70 pages · 139,575 characters
Text of ICC Set 1_COMBINED.pdf
Extracted from the file · 30 pages · 51,093 characters
Text of OCC Set 13_COMBINED.pdf
Extracted from the file · 30 pages · 61,971 characters
Text of OCC Set 12_COMBINED.pdf
Extracted from the file · 73 pages · 193,636 characters
Text of OCC Set 11_COMBINED.pdf
Extracted from the file · 48 pages · 62,469 characters
Text of OCC Set 10_COMBINED.pdf
Extracted from the file · 51 pages · 90,368 characters
Text of OCC Set 5_COMBINED.pdf
Extracted from the file · 46 pages · 88,105 characters
Text of OCC Set 4_COMBINED.pdf
Extracted from the file · 159 pages · 268,038 characters
Text of OCC Set 3_COMBINED.pdf
Extracted from the file · 93 pages · 113,517 characters
Text of OCC Set 2_COMBINED.pdf
Extracted from the file · 68 pages · 113,929 characters
Text of OCC Set 1_COMBINED.pdf
Extracted from the file · 139 pages · 225,320 characters
Page 56 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-583 Page 2 of 2 This differs from the SHARE program where a window will be opened, and the group studied solution will factor all group study participants in aggregate and produce a solution that allows their project to operate at or near their intended capacity within the limitations of the upgrades we determine are feasible for the group study itself. These upgrade costs are then shared by the DER developers, avoiding the first to build funding future DER at that site. The SHARE project site selection will consider a maximum distribution system benefit component, when plausible, which is why the Company shows capital project cost component for projects proposed in Exhibit CLP-TSP-3 at pages 146-149. The total project would be a net reduction for each stakeholder for distribution system needs and DER project funded needs.Page 57 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-584 Page 1 of 3 Date Filed: September 21, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Elli Ntakou and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1 at 68, “DERMS Demonstration – Demonstrate the value proposition of advanced DERMS capabilities, including (1) use of DER to increase system efficiency and reduce line losses; (2) integration of multiple types of DER in a microgrid application for critical load; and (3) investigation of lower cost approaches to communication and control of stand-alone solar and storage facilities integrated into the Company’s centralized DERMS system.” a. Has the Company deployed DERMS and implemented any DERMS use cases to date? b. Please describe how this DERMS demonstration will be coordinated with the implementation of the Grid Services Compensation Fund and Dynamic Flexible Interconnection. Response: a. Other than the use of its aggregator DERMS utilized for an ISO-New England system peak load reduction use case through the ConnectedSolutions program, the Company has not deployed DERMS or implemented DERMS use cases in its Connecticut service territory. In its western Massachusetts service territory, the Company deployed the first phase of a grid DERMS at the end of 2025 and is currently completing the second phase of the grid DERMS project with a target in-service date at the end of 2026. The Company is currently implementing foundational upgrades to its SCADA eECS and DMS systems in Eastern Massachusetts and is expecting to start a grid DERMS project there in early 2027. With respect to use cases, in western Massachusetts, the Company is currently utilizing its grid DERMS for weather-based operational forecasting, providing real time system operators with hour- and day-ahead visibility into the impact of DER on power flows, including the impact of solar generation on equipment loading. In eastern Massachusetts, the Company conducted its first locational demand response program in Summer 2026, utilizing its aggregator DERMS to reduce load during peak events at three substations in the Boston area with identified risk of overload. The Boston substation peak load reduction program was implemented in coordination with the Company’s Massachusetts GridPage 58 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-584 Page 2 of 3 Services Compensation Fund, increasing incentives for participating customers served by the targeted substations. (Referred to as the “ConnectedSolutions+” program.) The Company also actively utilizes its 34-MWh stand-alone battery in Provincetown Massachusetts in a complex microgrid configuration able to supply up to 11,000 customers solely with the battery upon loss of traditional grid supply. This microgrid is currently operated with a dedicated microgrid control scheme. In the longer term, the Company plans to integrate operation of the Provincetown battery with a grid DERMS capability to coordinate dispatch of the Eversource battery with customer DER to cost-effectively increase the duration of the microgrid. Also in process is a project at the Company’s Roosevelt solar facility to utilize DERMS to support voltage management use cases. The scope of the Roosevelt project incorporates investigation into lower-cost options for DER communication and control through a centralized grid DERMS. The Company is also planning to implement a ConnectedSolutions+ program in targeted locations in southeastern MA, an area with high solar penetration, for a managed EV charging use case to reduce the risk of reverse flow overloads by charging EV batteries during periods of high solar output. b. The DERMS demonstration program is designed to implement multiple DERMSdependent use cases in a targeted location to demonstrate the multiple benefits of different approaches, both independently and in coordination. The intent is to show the full potential of DERMS technology to inform efforts to deploy at scale across Connecticut. The Grid Services Compensation Fund is an important enabler of the DERMS demonstration, enabling the Company to increase incentives for DER customers supporting one or more use cases. For example, the Company would use the Grid Services Compensation Fund to provide incentives in exchange for a customer allowing use of an advanced inverter for a voltage management use case. Currently, the Company has no mechanism to compensate customers for this or any locally-targeted capacity or voltage use cases. The DERMS demonstration could also incorporate the use of dynamic flexible interconnections. Using DERMS technology, a dynamic flexible interconnection allows larger-scale DER facilities an increased operating envelope (i.e., greater charge and discharge levels) based on real-time operating conditions. For example, a fixed operating envelope may restrict battery discharge to 25 percent of nameplate in Spring and Fall seasons when load is relatively low and solar output is high. A dynamic flexible interconnection could relax this restriction and allow more discharge based on real-time grid conditions (i.e., cloudy warm days when solar output is lower and load is higher.) The DERMS demonstration could incorporate the concept of dynamic flexible interconnectionPage 59 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-584 Page 3 of 3 to show the incremental value of an expanded operating envelope for capacity and/or voltage related DERMS use cases.Page 60 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-585 Page 1 of 1 Date Filed: September 22, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Elli Ntakou and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 134, “The DERMS demonstration location will be determined based on further study; preliminary assessment indicates the potential of coordinating with other programs planned at Triangle, Frybrook, and Campville.” a. Please describe the “other programs” planned at Triangle. b. Please confirm the other programs planned at Frybrook, and Campville are the NWA projects. If not, please describe the other programs planned. Response: a. Triangle substation was identified as an opportunity for a DERMS demonstration due to the following conditions: 1) A large BESS DER is in the queue at this substation 2) This substation has undergone recent upgrades and has switchgear and relays suitable for use by a DERMS system without this incremental expense 3) This substation is experiencing an overload that currently requires mitigation during peak load events, creating an opportunity to study the efficacy of using DERMS, in coordination with the Grid Services Compensation Fund, to mitigate or defer more costly solutions at the substation . b. The projects at Frybrook and Campville are the same projects the Company has identified in testimony as opportunities for Non-Wires Alternatives (NWAs) and are driven by forecasted overloads as well as reliability concerns. To date these projects have received initial funding in the capital plan but have not yet undergone detailed NWA engineering analysis.Page 61 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-586 Page 1 of 1 Date Filed: September 22, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Elli Ntakou and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 134, “Advancing the Grid, Overview.” a. Please provide a line budget breaking down the proposed costs annually and in total across the “Advancing the Grid” program by asset health, communications, grid operations technology, planning analytics, sensors and SHARE. b. Please also provide a line-item budget breakdown for the grid operations technology category. Response: a. Please refer to OCC-586, Attachment 1, for the requested information. b. Please refer to OCC-586, Attachment 1, for the requested information.Page 62 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-587 Page 1 of 2 Date Filed: September 22, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Elli Ntakou and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 138, “Advancing the Grid, Planning Analytics - Advanced Forecasting Tools.” a. Please describe the milestones and timelines to integrate this tool into distribution planning if approved. b. Please explain why existing forecasting tools cannot generate forecasted 8760 load shapes across all levels: substation, transformer, and at circuit levels Response: a. Based on the Company’s experience, the procurement and deployment process will take 12-18 months from approval, and an addition 6 months to get the tools into full production. b. Historically, time-series profile forecasts were not necessary to review capital projects and the single system peak was the most reliable forecast that could be produced. This is still valid today as the key input to capacity planning remains the magnitude of the peak, regardless of its time or date. As iterated in the Company’s responses to 21-05-15RE03 IDSP, there are also critical questions on the validity and cost benefit of creating an 8760 forecast as an 8760 forecast, by its very nature, not only forecasts the peak load and time of that peak load, but also the weather and load over the entire year. While such profiles are useful for evaluating and sizing certain solutions (e.g., battery storage as an NWA, for which the Company can and does create 24-hour load profiles) they do not provide any incremental value for determining the scope of a substation project, and incur not insignificant incremental effort both on a technology and labor side. The Company has therefore not undertaken the full effort of creating such profiles given the incremental resources needed. The existing tools the Company has in place were never designed nor intended to produce 8760 forecasts. This does not represent an insurmountable barrier but requires additional investments as the Company outlined in its comments to 21-05-15RE03 IDSP, which,Page 63 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-587 Page 2 of 2 without there being any documented proof in either proceeding that 8760 forecasts would quantifiably benefit the customer in a manner offsetting additional costs, requires the Authority to lay out cost recovery pathways for such efforts.Page 64 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-588 Page 1 of 1 Date Filed: September 22, 2026 Witness: Lavelle A. Freeman, Gerhard Walker, and Juan F. Martinez Request from: Office of Consumer Counsel Question: In Exhibit CLP-TSP-3, Page 29, Eversource shares that the “greatest large DER potential is in rural areas where native load is light (Eastern, Northern and Northwest).” a. Please provide your forecasted solar capacity by region over the 10-year forecast period (2026-2035). Response: a. In reference to the slide Exhibit CLP-TSP-3, Page 29 the Company is interpreting the request to ask about the forecasted system capacity available for solar to interconnect in the regions outlined (Eastern, Northern and Northwest). The Company currently has a constraint in its system capacity to interconnect any more solar in those regions (Exhibit CLP-TSP-3, Page 145), not a forecasted issue. Without the SHARE proposal, DER customer are obligated to pay for the upgrades while projects at a later point in the queue would be the beneficiary of such investments effectively stalling solar development. Please refer to OCC-588, Attachment 1, for the Company’s solar forecast data. These values are incremental to the base year (2025). However, it must be noted that the solar forecasts created by the Company are “infrastructure constraint”, meaning they consider the cost to upgrade as they prioritize regions to forecast solar into. Therefore, these values are not indicative of a future adoption under SHARE, where those costs would be mitigated. The Company would develop these updated forecasts at such time when costs and cost allocation under SHARE are known.Page 65 of 66
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-589 Page 1 of 2 Date Filed: September 22, 2026 Witness: Lavelle A. Freeman, Gerhard Walker and Juan F. Martinez Request from: Office of Consumer Counsel Question: In Exhibit CLP-TSP-3, Page 87, Eversource indicates that it uses top-down forecasting for electric vehicle, solar, and energy efficiency adoption for its 10-year distribution planning horizon, and bottom-up forecasting for electric vehicle, solar, and energy efficiency adoption for its long-term demand assessment. a. Please identify what specific legislation or state policy objectives, if any, informed your forecast for the distribution planning horizon and what specific legislation or state policy objectives, if any, informed your forecast for the long-term demand assessment. b. Please explain your rationale for using a top-down forecast for the distribution planning assessment, and a bottom-up forecast for the long-term demand assessment. c. Please identify what data is included in the “Socio – Economic Modelling based on Customer Reference Classes” referenced for the bottom-up forecast for the long-term demand assessment. d. Please provide the following from your top-down forecast: i. Annual forecasted electric vehicle adoption from 2027-2036, by region ii. Forecasted impact on peak from electric vehicle adoption from 2027-2036, by region iii. Forecasted impact on peak from energy efficiency from 2027-2036, by region iv. Forecasted impact on peak from solar adoption from 2027-2037, by region Response: The two referenced processes for the 10-year forecast and the Long-Term Demand Assessment (LTDA) are fundamentally different as they serve a different purpose – the 10-year forecast’s objective is to provide the Company with an outlook on system needs that are firm enough that the Company can make capital decisions based on this forecast. The LTDA does not trigger capital projects and can include a wide array of scenarios and assumptions around policies, technologies, adoptions, and programs which might be implemented and serves as a tool to evaluate such approaches. It also helps the Company understand how to ensure that a proposed project triggered within the 10-year horizon is developed in a manner that supports the Company’s ability to accommodate a long-term need. As a result, the nature of the inputs to both forecast processes vary.
As listed on the current system
Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses