Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compilations of discovery responses

Files31

Search terms highlighted
Eversource rate increase is on 144 pages across 21 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
15 pages match
Words on different pages

Text of ALLCO Set 3_COMBINED.pdf

Extracted from the file · 23 pages · 55,777 characters

Text of ALLCO Set 2_COMBINED.pdf

Extracted from the file · 38 pages · 81,182 characters

Text of ALLCO Set 1_COMBINED.pdf

Extracted from the file · 27 pages · 46,644 characters

Text of ALLCO Set 6_COMBINED.pdf

Extracted from the file · 9 pages · 18,340 characters

Text of AMTRAK Set 2_COMBINED.pdf

Extracted from the file · 2 pages · 3,025 characters

Text of AMTRAK Set 1_COMBINED.pdf

Extracted from the file · 5 pages · 4,881 characters

Text of AMTRAK Set 3_COMBINED.pdf

Extracted from the file · 34 pages · 101,991 characters

Text of CIEC Set 2_COMBINED.pdf

Extracted from the file · 1 page · 1,005 characters

Text of CIEC Set 1_COMBINED.pdf

Extracted from the file · 19 pages · 26,023 characters

Text of CIEC Set 3_COMBINED.pdf

Extracted from the file · 4 pages · 5,355 characters

Text of CLF-SC Set 1_COMBINED.pdf

Extracted from the file · 56 pages · 132,578 characters

Text of CLF Set 1_ COMBINED.pdf

Extracted from the file · 20 pages · 38,243 characters

Text of CLF-SC Set 2_COMBINED.pdf

Extracted from the file · 7 pages · 17,131 characters

Text of EOE Set 3_COMBINED.pdf

Extracted from the file · 11 pages · 23,418 characters

Text of EOE Set 2_COMBINED.pdf

Extracted from the file · 22 pages · 42,455 characters

Text of EOE Set 1_COMBINED.pdf

Extracted from the file · 200 pages · 332,382 characters

Text of EOE Set 4_COMBINED.pdf

Extracted from the file · 70 pages · 139,575 characters

Text of ICC Set 1_COMBINED.pdf

Extracted from the file · 30 pages · 51,093 characters

Text of OCC Set 13_COMBINED.pdf

Extracted from the file · 30 pages · 61,971 characters

Text of OCC Set 12_COMBINED.pdf

Extracted from the file · 73 pages · 193,636 characters

Text of OCC Set 11_COMBINED.pdf

Extracted from the file · 48 pages · 62,469 characters

Text of OCC Set 10_COMBINED.pdf

Extracted from the file · 51 pages · 90,368 characters

Text of OCC Set 5_COMBINED.pdf

Extracted from the file · 46 pages · 88,105 characters

Text of OCC Set 4_COMBINED.pdf

Extracted from the file · 159 pages · 268,038 characters

Text of OCC Set 3_COMBINED.pdf

Extracted from the file · 93 pages · 113,517 characters

Text of OCC Set 2_COMBINED.pdf

Extracted from the file · 68 pages · 113,929 characters

Text of OCC Set 1_COMBINED.pdf

Extracted from the file · 139 pages · 225,320 characters

5 pages match
  1. Page 5 of 66Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-559 Page 5 of 7 would not be methodologically appropriate because the benchmarking analysis looks at various measures of productivity at a given point of time, and does not say anything about the prospective rate at which cost differences can reasonably and sustainably be eliminated over the next few years. LEI used the benchmarking results as empirical evidence of relative efficiency and confirmation that there is some room for improvement. LEI then considered regulatory precedent for Consumer Dividends and stretch factors, which suggested that regulators have used values ranging from 0.15% to 0.60% for other EDCs, with lower values for those that are more efficient and higher values for those that are very inefficient. LEI then finds the value of 0.30% as a reasonable starting point for the Company’s proposed Consumer Dividend. Two further points place the proposed 0.30 percent in context. First, as shown in Figure 16 of Exhibit CLP-PBR-3, the Consumer Dividends and stretch factors approved in other jurisdictions range from 0.15 percent to 0.60 percent. The Massachusetts consumer dividends in Figure 16 are also conditional on inflation: those mechanisms pay 0.25 to 0.40 percent only when inflation exceeds two percent, reduced amounts at lower inflation, and nothing in low inflation years. The Company's proposed 0.30 percent applies in all inflation conditions, so the guaranteed minimum benefit to customers is at or above the effective minimum of every mechanism in the comparison. Second, the comparison is most direct when each mechanism is measured against the base to which it applies. The Company's S-Factor applies to the Core Operating Expense revenue requirement only, because capital is recovered through the separate Capital Funding Mechanism (Exhibit CLP-IAP-1 at 73). The most directly similar plans — an apples-to-apples comparison — are those in which regulators approved an OM&A-only revenue cap: National Grid in Massachusetts, with a 0.40 percent consumer dividend payable only when inflation is at least two percent, and FortisBC in British Columbia, with a 0.25 percent stretch factor (Exhibit CLP-PBR-1 at 47; Exhibit CLP-PBR-3, Figure 16). Finally, the proposed design bounds its own ceiling. Because the S-Factor begins the first rate year at 0.30 percent and each year's result adjusts the level applied in the following rate year, the level can adjust no more than three times over the four-year term, and the highest level the mechanism can reach is 0.60 percent. The illustrative calculation of how the Consumer Dividend operates over the PBMRP term is provided in OCC-432, Attachment 1. [e] Q: Please explain why the widening gap does not support a Consumer Dividend greater than 0.30%, and provide all analyses relied upon in reaching that conclusion. As discussed above in a – d, a benchmarking difference represents a measure of relative cost performance and should not be translated directly into an annual Consumer Dividend. Finally, 0.30% is the floor, not the ceiling, under CL&P's proposed mechanism. As explained in Exhibit CLP-PBR-1 at page 64, the Consumer Dividend can increase during the PBMRP term if the Company outperforms the applicable controllable O&M benchmark. Thus, the proposed design provides customers with additional benefits if CL&P achieves greater operating efficiencies than assumed in establishing the initial Consumer Dividend. The Consumer Dividend is an affordability mechanism. As such, it must be evaluated for both providing a benefit to customers, as well as for sustainability. A dividend set too low forgoes customer benefit, while a dividend set beyond sustainably achievable efficiency would function as a rate reduction unsupported by actual cost performance. The proposed design addresses the scale question through movement rather than starting magnitude. The level begins at 0.30 percent, can never fall below that level or become a surcharge (Exhibit CLP PBR-1 at 64), rises automatically as the Company demonstrates efficiency, and is applied against the Company’s O&M revenue requirement under the PBMRP. Unlike an earning sharing mechanism, which provides customer benefits only when earnings exceed the allowed return on equity, this mechanism will share the costs the Company controls, even when under its allowed rate
  2. Page 6 of 66Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-559 Page 6 of 7 of return. The consumer dividend design provides customers with efficiency gains during the plan term without waiting for the next rate case, and at the next rate case all achieved efficiencies are reflected in rebased rates in full. ii OCC-539 Question: Performance Based Ratemaking Panel Exhibit CLP-PBR-1 Please explain the relationship, under the Company’s proposed framework, between a utility’s relative cost efficiency and the appropriate level of the Consumer Dividend. a. Specifically, all else equal, would a utility whose OM&A costs are materially above its peer benchmark warrant a higher, lower, or unchanged Consumer Dividend relative to a utility whose OM&A costs are below its benchmark? b. Please explain the economic rationale for the Company’s answer and how that rationale was applied to the Company’s proposal. OCC-539 Response: a. All else equal, a utility whose OM&A costs are materially above the benchmark would generally warrant a higher Consumer Dividend than a utility whose costs are below benchmark, because the former has greater potential for catch-up efficiency improvements. As explained in Section 2 of Exhibit CLP-PBR-3 and illustrated in Figure 4, a relatively less efficient utility may have greater opportunities to “catch up” to the industry’s efficiency trajectory by adopting technologies or practices already implemented by more efficient peers. The Consumer Dividend reflects the potential for such improvements beyond the industry productivity trend. However, the “benchmark gap” or the percentage difference between CL&P’s actual costs and the applicable benchmark cost, does not mechanically determine the annual Consumer Dividend. As explained in Section 5 of Exhibit CLP-PBR-3, benchmarking identifies relative cost performance and potential opportunities for improvement; it does not establish the annual rate at which those improvements can reasonably be achieved or that the entire gap can be eliminated within a single PBR term. For CL&P, the above-benchmark OM&A results support a modest Consumer Dividend in its OM&A-only revenue adjustment mechanism, as discussed in Exhibit CLP-PBR-3. In determining the appropriate magnitude, LEI also considered CL&P’s favorable overall cost performance and relevant regulatory precedents. Please refer also to the Company's responses to OCC-431i and OCC-443ii. b. The economic rationale for this response is that benchmarking identifies relative cost performance and potential opportunities for improvement, but the actual Consumer Dividend earned is based on measured results. The Company applied this rationale in two steps, because the proposed Consumer Dividend is not a fixed number. The Company’s relative cost position determined where the dividend starts, as described in part (a) and in the Company's responses to OCC-431 and OCC-443. The Company’s actual performance as part of a performance-based rate determines whether it increases or stays at the floor. The dividend begins at 0.30 percent and moves each year based on measured results: up 0.10 percentage points in a year when the Company’s Core Operating Expense per customer is below the inflation-adjusted benchmark, down 0.05 percentage points when it is not, and never below the 0.30 percent floor. The steps are deliberately asymmetric in customers’ favor: the dividend rises twice as fast on demonstrated efficiency as it declines otherwise, and it can never fall below its starting level. The level customers receive therefore reflects how the Company actually performs, not a one-time judgment made before the period begins. An
  3. Page 7 of 66Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-559 Page 7 of 7 illustration of the mechanism’s operation is provided in the Company’s response to OCC-423iii, and a historical illustration in the Company’s response to OCC-432iv. The efficiency incentive in the Revenue Cap Formula is the I minus X structure, combined with the power of the stayout requirement. The Consumer Dividend supplements that structure and is deliberately sized small enough to preserve the incentive that produces the gains to be shared. The design shares efficiency -- as it is demonstrated -- rather than assuming it in advance. If the Company outperforms the benchmark, the dividend rises automatically during the term, up to the top of the approved range; if it does not, customers keep the guaranteed minimum every year. Because the rate at which efficiency gains can be sustainably achieved cannot responsibly be set in advance (please refer to OCC443, parts (d) and (e)), the mechanism determines it from actual results, and an efficiently operating company returns more to customers than a fixed value would, both during the term and through the full rebasing of its relatively lower cost level at the next rate case. The design protects customers on the downside, and any reduction in Core Operating Expense per customer that improved near-term earnings would register against the benchmark and increase the dividend, converting that reduction into an automatic, growing customer credit.
  4. Page 8 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-560 Page 1 of 4 Date Filed: September 22, 2026 Witness: Julia Frayer Request from: Office of Consumer Counsel Question: (Total factor productivity) In Exhibit CLP-PBR-1, Page 32, LEI states that “On the other hand, a longer term (e.g., more than 20 years) would also not capture significant changes in the industry such as widespread AMI deployment, distributed energy resources (“DERs”), increased cybersecurity requirements, resilience and climate adaptation investments, and modern vegetation management practices.”. a. Please identify each formal statistical test for structural breaks or parameter instability performed by LEI across the 2005–2024 study period to evaluate the timing and statistical significance of the alleged structural breaks. If no such tests were conducted, please explain the empirical basis for LEI’s assertion. b. Please provide any empirical or quantitative analysis performed by LEI or the Company evaluating the specific impact of AMI deployment, automation, and DER integration on OM&A efficiency and labor productivity. c. Given that large-scale AMI deployment, advanced DER integration, and heightened cybersecurity requirements emerged primarily within the last 5 to 10 years, please explain why a 20-year historical average (2005–2024)—which incorporates a decade of preAMI/pre-DER data—is more representative of forward-looking operating conditions than a 5- or 10-year period. Response: a. LEI did not perform a formal statistical test for structural breaks or parameter instability in selecting the 2005–2024 study period, as previously stated in the Company’s response to information request OCC-538 i, in subpart d. The Industry TFP Study uses index-number techniques to measure changes in aggregate industry inputs and outputs over time; it does not estimate statistical relationships or coefficients whose stability would need to be tested. The statement in Exhibit CLP-PBR-1, was not intended to assert that a discrete statistical structural break occurred in 2005, or in any other particular year. Rather, the cited developments-such as AMI deployment, DER integration, cybersecurity requirements, resilience and climate-adaptation investments, and modern vegetation-management
  5. Page 9 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-560 Page 2 of 4 practices-were examples of material changes in industry operating conditions that have occurred over time. As explained in the responses to OCC-534 ii and OCC-538 and in Section 2.4 of Exhibit CLP-PBR-2, LEI selected the 2005-2024 period to balance the benefits of a sufficiently long period for measuring long-run industry productivity trends with the relevance of the historical period to current and prospective industry conditions. LEI also evaluated 10-, 15, and 20-year productivity trends as sensitivity periods. b. LEI did not perform a causal or econometric analysis that separately quantified the effect of AMI deployment, distribution automation, or DER integration on OM&A efficiency or labor productivity. Based on information LEI has available, it would not be possible to pinpoint in time when these specific events and changes occurred for every individual EDC and therefore make it intractable to perform such a study. The Industry TFP Study was designed to measure the aggregate historical productivity trend of the electric distribution industry, rather than to attribute that trend to individual technologies or operational initiatives. OM&A includes both labor and non-labor costs, and the available FERC Form 1 data do not separately identify the labor and non-labor costs attributable to AMI, distribution automation, or DER integration. As a result, LEI could not isolate the effects of those individual initiatives on labor productivity. c. LEI does not contend that every year from 2005 through 2024 is equally representative of each technology or operating practice expected during the PBMRP term. Rather, the purpose of the selected period is to estimate a representative long-run industry productivity trend. As explained in response to part (a) and in the Company’s responses to OCC-534 and OCC-538, LEI selected the 20-year period to balance relevance to current industry conditions with the need to reduce sensitivity to short-term volatility and one-off events. For the overall TFP analysis, a longer period also reduces the influence of uneven capitalinvestment timing, while for OM&A productivity it reduces sensitivity to unusual expense years or unusual operating circumstances. The selected period remains recent enough to reflect evolving industry conditions while providing a broader basis for estimating the long-run productivity trend. A five-year period would contain only four annual year-over-year productivity observations, and a ten-year period would contain nine data points, making those estimates more sensitive to individual years and short-term conditions. In contrast, the selected 2005– 2024 period contains 19 annual growth observations. LEI nevertheless presented shorterperiod results as sensitivities rather than selecting among time periods after observing their results.
  6. Page 10 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-560 Page 3 of 4 Prior Referenced Response: OCC-538 Question: i Performance Based Ratemaking Panel Exhibit CLP-PBR-1 Please provide a sensitivity analysis showing the effect of unusually volatile pandemic-period observations on LEI’s reported 2005–2024 average OM&A PFP growth rate of -0.03%. At a minimum, please provide: a. b. c. d. The average OM&A PFP growth rate excluding the 2019–2020 observation; The average OM&A PFP growth rate excluding both the 2019–2020 and 2020–2021 observations; The median annual OM&A PFP growth rate over the 2005–2024 study period; and An explanation of whether LEI performed any outlier, structural-break, or other sensitivity analysis to determine whether the long-run OM&A PFP result is representative of expected productivity during the Company’s proposed PBMRP term. OCC-538 Response: a. b. c. d. ii Please refer to OCC-445i. As mentioned, “LEI does not consider excluding the 2019–2020 observation to be an appropriate sensitivity for purposes of estimating the industry OM&A PFP trend. The purpose of the TFP/PFP study is to measure industry productivity performance over time”. Please refer to the response to subpart (a). The median annual OM&A PFP observation over the time horizon of 2005 to 2024 is approximately 0.02%. Please refer to Exhibit CLP-PBR-2A, TFP_Calc tab, cells BN16:BN34. LEI did not perform a formal structural-break or outlier test for the TFP study. As explained in OCC-445, and OCC-446ii, LEI does not consider selective exclusion of individual observations as an appropriate basis for estimating the long-run industry productivity trend. OCC-534 Question: Please explain the statement in Exhibit CLP-PBR-1, that the average OM&A PFP growth rate for 2015–2024 is 0.03% (page 64), with the results reported in Figure 5, LEI’s Industry TFP results (2005-2024), which report an average OM&A PFP growth rate of -0.03% for 2005–2024, 0.30% for 2010–2024, and -0.35% for 2015–2024. In your response: a. b. c. d. e. Identify the study period and OM&A PFP result actually relied upon to establish the proposed -0.03% X Factor; Explain the basis for selecting that study period over the alternative periods presented in Exhibit CLP-PBR1; State whether the reference to 2015–2024 in Exhibit CLP-PBR-1, is an error and, if so, provide the corrected testimony; and Explain whether selection of a different study period would change the Company’s proposed X Factor and, if not, why not. Please provide all calculations, workpapers, and supporting data used to derive the –0.03% X Factor in an Excel format.
  7. Page 11 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-560 Page 4 of 4 OCC-534 Response: a. b. c. d. e. The Company relied on the 20-calendar-year period from 2005 through 2024, which encompasses a total of 19 annual year-over-year growth observations. Please refer to Figure 22, on page 47, of Exhibit CLP-PBR2. As stated in Section 2.4, of Exhibit CLP-PBR 2, “the 20-year study period overcomes the high variability of year-on-year trends but is also not so long term as to capture “stale” industry trends that would not likely repeat themselves in the future.” Further, as discussed in that section, the “last 20 years reflect the changing business circumstances in the electric distribution industry, which are also going to continue to drive productivity in the next several years.” Please also refer to OCC-441. Yes. The phrase “2015-2024” in the identified sentence contains a typographical error. The corrected sentence should read: “Based on LEI's Industry TFP Study, the average OM&A PFP growth rate for 20052024 is negative 0.03% (or -0.03%), which is the proposed X Factor.” No numerical correction to the proposed X Factor is required. A different study period would produce a different measured historical OM&A PFP rate, as shown in Figure 22, of Exhibit CLP-PBR-2. However, LEI would not recommend using a different study period for purposes of setting the X Factor. As discussed in response to part (b) and Section 2.4, of Exhibit CLP-PBR-2, LEI considers the 2005–2024 period appropriate because it is sufficiently long enough to reduce the influence of short-term volatility and one-off events, while remaining recent enough to reflect industry conditions relevant to the prospective PBR term. Accordingly, LEI continues to recommend a -0.03% value for the X factor that would be applied to the OM&A portion of revenue requirement. Please refer to Exhibit CLP-PBR-2a, the native workpapers supporting the Industry TFP Study.
  8. Page 12 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-561 Page 1 of 1 Date Filed: September 21, 2026 Witness: Julia Frayer Request from: Office of Consumer Counsel Question: (Total factor productivity) Refer to Exhibit CLP-PBR-1, pp. 43-44. Testimony suggests that the LEI’s industry TFP study is aligned with TFPs for the EDC sector in New Hampshire, Alberta, and Massachusetts. Explain whether each of the x-factors provided for these three examples were calculated for O&M only or both O&M and capex. Response: The industry TFP measures cited for New Hampshire, Alberta, and Massachusetts on pages 43-44 in Exhibit CLP-PBR-1 were total factor productivity measures that included both O&M and capital inputs; they were not O&M-only partial factor productivity measures. LEI cited these studies to demonstrate that negative industry-wide TFP trends have also been observed in other recent electric distribution TFP studies. LEI did not cite these other studies to suggest that the design or scope of the X Factor in each jurisdiction was identical to CL&P’s proposal. Under CL&P’s PBMRP proposal, the X Factor is applied only to OM&A, and LEI therefore recommends using the long term industry OM&A PFP trend of -0.03% from its industry TFP study to calibrate the X Factor.
  9. Page 13 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-562 Page 1 of 2 Date Filed: September 21, 2026 Witness: Douglas P. Horton Request from: Office of Consumer Counsel Question: (Performance incentive mechanisms) Refer to Exhibit CLP-PBR-1, p. 66. As stated, the Company’s PIM proposal for exposure to financial penalties is limited to an amount equal to 0.5% of the Company’s total distribution revenues. How was this limit determined to be the maximum reasonable threshold for penalty exposure? Response: As explained in Exhibit CLP-ELP-1, at page 115, the Company proposes to establish a maximum financial penalty that is allocated to each PIM, annually. The maximum financial penalty pool is $10 million annually, which is equal to the exogenous cost threshold. The exogenous cost threshold of $10 million is intended to represent a point at which the exogenous cost change is significant to the Company in a given year. Setting the maximum financial penalty equal to the exogenous cost threshold ensures that the maximum penalty pool represents a significant financial risk but not an overly burdensome amount that may unnecessarily jeopardize the overall financial health of the Company. For context, the Company’s total level of operating and maintenance (“O&M”) expense included in the cost of service is approximately $350 million, net of vegetation management expense and storm fund contributions. Thus, the amount of $10 million is approximately three percent of total O&M expense, which is comparable to the annual adjustment that would be allowed under the PBMRP at a three percent inflation rate. A single cost change rising to the level of three percent of total O&M expense would be a substantial change in circumstances and the Company does not expect to encounter singular cost changes equal to the rate of inflation on the total base of O&M expense on a regular or recurring basis. The Company’s proposed use of an exogenous cost materiality threshold in establishing the financial exposure associated with the proposed PIM framework is consistent with principles employed in PBR frameworks in other jurisdictions. Exogenous cost, or “Z-Factor”, thresholds are commonly used to establish the level of financial materiality at which an event warrants extraordinary treatment, thereby distinguishing material impacts from the ordinary operating and business risks that a utility is expected to manage.
  10. Page 14 of 66

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-562 Page 2 of 2 Please refer to the Company’s response to information request OCC-430 i for further information on the Company’s proposed exogenous cost threshold. Prior Referenced Response: i OCC-430 Question: Exhibit CLP-ELP-1 Please explain in detail how the Company determined that a threshold significance of 0.5% of total distribution revenue is appropriate for Z-Factor eligibility. Please explain why the Company proposes a 0.5% threshold rather than the 0.75% threshold proposed in the Docket No. 21-05-15RE01, Proposed Final Decision, and provide all analyses, calculations, benchmarks, or other information relied upon in selecting the proposed 0.5% threshold. OCC-430 Response: The 0.75% materiality threshold proposed in the Docket No. 21-05-15RE01, Proposed Final Decision is unnecessarily high, and inconsistent with other jurisdictions. Although the Company supports the intention of establishing a materiality threshold as a means of balancing administrative burden with the Company’s need to cover the costs of service, including those over which it has no control, a materiality threshold set too high actually renders the mechanism increasingly ineffective, raising the likelihood that the utility cannot commit to the PBR stay-out because it will be unable to obtain a fair or reasonable level of recovery of its operating costs, also barring customers from benefitting from the efficiency gains that come from an extended stay-out.1 In the extreme, a materiality threshold of 10%, for example, would indicate that for an event to qualify as exogenous in terms of its materiality, it must be at least $192.19 million ($1,921.9 million revenue requirement x 10%, using the Company’s cost of service filed in this proceeding). The likelihood of a single event meeting this criteria is exceedingly rare, meaning the Z-factor, in practice, would be effectively rendered moot. Additionally, PURA provided no basis for how it determined a threshold of 0.75% was appropriate. In fact, in its proposed final decision, PURA stated, “[t]he threshold [of 0.75%] better aligns with the thresholds established in other PBR jurisdictions,” and then provided the following footnote referencing those other jurisdictions, each one of which is substantially below the 0.75% it proposed: “Hawaii set thresholds equivalent to 0.2%, 0.25%, and 0.28%; Ontario set a threshold equivalent to 0.5%; Massachusetts set a threshold equivalent to 0.37%; and Alberta Utilities Commission set a threshold equivalent to 0.25%.”2 The Company’s proposed Z-Factor of 0.5% is more closely aligned to those other jurisdictions.

As listed on the current system

Corres. 09/29/2026 [26-05-10] (Keegan Werlin LLP) - Compilations of discovery responses

This filing on the current system (opens in a new tab)