Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Page 117 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-081 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: Reference Exhibit CLP-RATES 3, pp. 162 and 174. Each year for the past five years, identify the number of entities that have paid any third party overlash fees and the total dollar amount of such payments. Provide the data separately by Wire-Based CATV Pole Attachment Tariff versus WireBased Telecom Pole Attachment Tariff. Response: As reflected in the PURA approved Pole Attachment Agreement, Article VIII, Section 3(b): b. The Third Party Overlash Fee will be assessed on a per Pole basis as set forth in the current schedule of rates in Exhibit E. This fee is paid to the Licensor by the Sub Licensee and is in addition to the Pole Attachment License Fee paid by the Licensee. Provided, however, notwithstanding the foregoing provisions in this paragraph or any other provision in this Agreement, (y) Licensor will not charge the Third Party Overlash Fee in Exhibit E when Licensee seeks to overlash another Attachment owned by Licensee or its Affiliate, as long as (i) Licensee complies with the Overlash requirements in Article IV and this Agreement, and (ii) the Licensor determines that the proposed Overlashing does not fall outside of the vertical space or footprint reserved for the Licensee’s original Attachment; and (z) Licensor will charge the Third Party Overlash Fee in Exhibit E when Licensee seeks to overlash another Attachment owned, leased or controlled by an entity other than Licensee or its Affiliate. The Agreement provides for a Third Party Overlash Fee to be assessed on a per-pole basis when a Licensee seeks to overlash an attachment owned, leased, or controlled by an entity other than the Licensee or its affiliate. However, the Agreement further provides in Article VIII, Section 3(b)(y) that no Third Party Overlash Fee will be charged when the Licensee overlashes its own attachment or that of an affiliate, provided the Licensee complies with the Agreement’s overlash requirements and the overlash remains within the vertical space or footprint reserved for the original attachment. Eversource has reviewed its records for the requested period and has identified no instances during the last five years in which a Third Party Overlash Fee was charged or collected under either the Wire-Based CATV Pole Attachment Tariff or the Wire-Based Telecom Pole Attachment Tariff. Accordingly, the number of entities paying Third Party Overlash Fees during the period was zero.Page 118 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-082 Page 1 of 4 Date Filed: September 23, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: Reference Exhibit CLP-RATES 3, p. 162: a. Provide all documentation, calculations, inputs and assumptions supporting the Third Party Overlash Fee. b. Explain the basis for the increase in the Third Party Overlash Fee. c. Explain the basis for the Third Party Overlash Fee, including when the Company assesses this charge. d. Provide all documentation, calculations, inputs and assumptions supporting the Unauthorized Attachment/Overlash Fee. e. Explain the basis for the increase in the Unauthorized Attachment/Overlash Fee. f. Explain the basis for the Unauthorized Attachment/Overlash Fee, including when the Company assesses this charge. g. Provide all documentation, calculations, inputs and assumptions supporting the NonConforming Construction/Shifting Fee. h. Explain the basis for the increase in the Non-Conforming Construction/Shifting Fee. i. Explain the basis for the Non-Conforming Construction/Shifting Fee, including when the Company assesses this charge. Response: Please refer to NECTA-084, Attachment 1 through NECTA-084, Attachment 4, for the CATV, Telecom and Municipal Third Party Pole Attachment Agreements. These documents contain language that defines the fees, when they apply and how they are assessed. Please also refer to the DPUC’s Final Decision (Dated June 30, 2010) in Docket No. 09-12-05 where the Department found that “these fees were established based on the estimated costs that CL&P expects to incur to perform specific pole attachment activities. The Department also finds that these fees are in accordance with fees being charged by other pole owners in Connecticut. The Department therefore finds the fees to be reasonable. Therefore, the fees are approved and will take effect July 1, 2010.” a. Please refer to the Company’s response to NECTA-081 i.Page 119 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-082 Page 2 of 4 b. The Third Party Overlash Fee is equal to the relevant pole attachment rate. As the CATV and Telecom pole attachment rates increase/decrease, the Third Party Overlash Fee increases/decreases as well. c. Please refer to the Company’s response to NECTA-081. d. Please refer to the following: • The Company’s Pole Attachment Agreements. • The DPUC’s Final Decision (Dated June 30, 2010) in Docket No. 09-12-05, where the Unauthorized Attachment/Overlash Fee was defined as a one-time fee that is assessed per pole for each installation of equipment in which the attaching entity failed to seek prior approval. The fee is estimated on the cost associated with updating records and other administrative activities to ensure the Company’s records reflect field conditions and as a penalty to induce compliance. • Public Service Co. of Colorado v. F.C.C., 328 F.3d 675, 679-680 (May 16, 2003), in which the United States Court of Appeals for the District of Columbia Circuit, reviewed the terms of a Colorado utility pole owner’s attachment agreement with a cable company and stated that the FCC’s setting of an “unauthorized attachment” rate at five times the annual pole attachment rental rate plus interest, was not arbitrary or capricious. e. The Unauthorized Attachment/Overlash Fee is set at five times the relevant pole attachment rate. As the CATV and Telecom pole attachment rates increase/decrease, the Unauthorized Attachment/Overlash Fee increases/decreases proportionately. f. The Unauthorized Attachment/Overlash Fee is assessed whenever facilities are attached to Eversource poles without following the pole application process to gain access appropriately. g. Please refer to the following: • The Company’s Pole Attachment Agreements. • The DPUC’s Final Decision (Dated June 30, 2010) in Docket No. 09-12-05, where the Non-Conforming/Shifting Fee is defined as a fee that is assessed per pole, per day for each installation of equipment that does not conform to applicable pole attachment requirements and also is assessed when a pole attacher fails to timely shift its equipment in compliance with the pole shifting time frame.Page 120 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-082 Page 3 of 4 h. Consistent with the Unauthorized Attachment/Overlash Fee, the Non-Conforming Construction/Shifting Fee is set at five times the relevant pole attachment rate. As the CATV and Telecom pole attachment rates increase/decrease, the Non-Conforming Construction/Shifting Fee increases/decreases proportionately. i. Please refer to the Company’s pole attachment agreements. This fee is assessed when an attaching entity fails to perform rearrangement or shifting within the time period specified and/or fails to provide notice to the pole owner of completion within the time period specified. This fee applies on a daily basis, per rearrangement or shift location until notification from the attaching entity that the work has been completed. Prior Referenced Response: i NECTA-081 Question: Reference Exhibit CLP-RATES 3, pp. 162 and 174. Each year for the past five years, identify the number of entities that have paid any third party overlash fees and the total dollar amount of such payments. Provide the data separately by Wire-Based CATV Pole Attachment Tariff versus Wire-Based Telecom Pole Attachment Tariff. NECTA-081 Response: As reflected in the PURA approved Pole Attachment Agreement, Article VIII, Section 3(b): b. The Third Party Overlash Fee will be assessed on a per Pole basis as set forth in the current schedule of rates in Exhibit E. This fee is paid to the Licensor by the Sub Licensee and is in addition to the Pole Attachment License Fee paid by the Licensee. Provided, however, notwithstanding the foregoing provisions in this paragraph or any other provision in this Agreement, (y) Licensor will not charge the Third Party Overlash Fee in Exhibit E when Licensee seeks to overlash another Attachment owned by Licensee or its Affiliate, as long as (i) Licensee complies with the Overlash requirements in Article IV and this Agreement, and (ii) the Licensor determines that the proposed Overlashing does not fall outside of the vertical space or footprint reserved for the Licensee’s original Attachment; and (z) Licensor will charge the Third Party Overlash Fee in Exhibit E when Licensee seeks to overlash another Attachment owned, leased or controlled by an entity other than Licensee or its Affiliate. The Agreement provides for a Third Party Overlash Fee to be assessed on a per-pole basis when a Licensee seeks to overlash an attachment owned, leased, or controlled by an entity other than the Licensee or its affiliate. However, the Agreement further provides in Article VIII, Section 3(b)(y) that no Third Party Overlash Fee will be charged when the Licensee overlashes its own attachment or that of an affiliate, provided the Licensee complies with the Agreement’s overlash requirements and the overlash remains within the vertical space or footprint reserved for the original attachment. Eversource has reviewed its records for the requested period and has identified no instances during the last five years in which a Third Party Overlash Fee was charged or collected under either the Wire-Based CATV Pole AttachmentPage 121 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-082 Page 4 of 4 Tariff or the Wire-Based Telecom Pole Attachment Tariff. Accordingly, the number of entities paying Third Party Overlash Fees during the period was zero.Page 122 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-083 Page 1 of 1 Date Filed: September 23, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: Reference Workpaper C-3.1, p. 2 of 2, Line 29. Identify and list all components included within “Rent from Electric Property + Re + Pole Att.” Response: Please refer to NECTA-083, Attachment 1, for the requested information.Page 123 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-084 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: Provide copies of the Company’s standard Pole Attachment Agreement(s). Response: Please reference the Company’s standard Pole Attachment Agreement templates as follows: • NECTA-084, Attachment 1: Non-Municipal Wireline Agreement • NECTA-084, Attachment 2: Non-Municipal Wireless Agreement • NECTA-084, Attachment 3: Municipal Wireline Agreement • NECTA-084, Attachment 4: Municipal Wireless AgreementPage 124 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-085 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: Provide a spreadsheet of Eversource poles by town, broken down by solely and jointly owned poles. Response: Please refer to NECTA-085, Attachment 1, for the requested information.Page 125 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-086 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: Pursuant to joint ownership agreements or other inter-company documents, please indicate whether there is a standard practice for the parties to install poles of a particular height (e.g., 40 foot or other height) and how long that practice has been in place. Response: Intercompany Operating Procedure (“IOP”) 40.0, dated as of April 2013, requires that the standard pole height for joint poles will be forty (40) feet and that all joint poles shall be a minimum Class 2 size. Eversource interprets this IOP as a baseline. The Company installs poles based on its engineering standards as an electric distribution company, which meet or exceed the requirements of this IOP.Page 126 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-087 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: For each year 2021-2025, provide the number of solely owned and jointly owned poles and the joint owner(s) installed (a) by Eversource and (b) by joint owner(s) in Connecticut by height in 5foot increments (e.g., 40-foot, 45-foot, etc.). Response: Please refer to NECTA-087, Attachment 1, for the requested information.
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.