Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Page 13 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-009 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Data) Regarding the last field inventory of Company distribution poles conducted by or on behalf of the Company, provide a complete copy of the results of the field inventory, including: a. The date the field inventory was conducted; b. The universe of poles surveyed; c. The percentage of total poles; d. The type of information collected about each pole; e. The height of each surveyed pole; f. The average height of all surveyed poles; g. Age of each pole; h. The number of attachments, other than Eversource facilities, on each pole. Response: The Company is providing a copy of the results of its 2025 pole inspection program. The field inventory includes inspection results for approximately 32,894 custodial poles located across 9 of Connecticut’s 157 towns, based on a 15-year inspection cycle. Effectively in 2026, the Company transitioned to a 10-year inspection cycle to evaluate each pole every 10 years, allowing issues to be identified earlier and addressing them more proactively. The Company expects to evaluate 40,000 to 42,000 poles, or 10% of its custodial wooden pole population. a. Please refer to NECTA-009, Attachment 1, tab named “Results”, showing the dates that the inventory was conducted. Usually, the Pole inspection process starts in mid-April and ends towards the end of October. b. In 2025, the Company inspected 32,894 custodial poles. c. In 2025, the Company inspected 7.8% of the Company’s wooden pole population based on a 15 year-inspection cycle. d. Please refer to NECTA-009, Attachment 1, tab named “results” showing all the information collected from each pole inspected in 2025.Page 14 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-009 Page 2 of 2 e. Please refer to NECTA-009, Attachment 2, for the height and age of each pole inspected in 2025. The height is shown in column “u”, and the age of each pole is shown in column “T “of each town where custodial poles were inspected. f. Please refer to NECTA-009, Attachment 2, tab “2025 Pole Inspection General Information”, showing the average height for all custodial poles inspected in 2025. The average height is 37.7 ft. g. Please refer to subpart (e), above. h. Please refer to NECTA-008, Attachment 1, for the number of attachments on each custodial pole. NECTA-008, Attachment 1 will be provided on September 30, 2026, due to an extension being requested. The Company does not collect attachment information during the pole inspection process.Page 15 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-010 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Data) Referring to Exhibit CLP-ELP-1 at pp. 42-43, what is the basis for the statement that “Most of the wood-pole fleet comprises legacy poles that fail to meet current strength standard.”? a. Identify and provide a copy of current pole strength standards, and all prior pole strength standards used by Eversource since 1990. b. Identify and provide all studies, surveys, assumptions, etc. that are relied upon as support. c. Has the Company identified a complete list of legacy wood-poles that fail to meet strength standards? If so, provide the list. Response: The basis for the statement that “Most of the wood-pole fleet comprises legacy poles that fail to meet current strength standard.” is in reference to the Company’s current minimum pole class requirements when setting new poles. The statement does not refer to any pole testing performed under the pole integrity program. The original statement indicated 76% of the distribution poles did not meet the current minimum pole class standard. Since then, the Company has completed a deeper review of its asset records and identified that 37% distribution poles do not have a verified class rating in company records and were identified as not meeting the Company’s current minimum pole class requirement. Please refer to the following breakdown: • 39% of distribution poles do not meet The Company’s current minimum pole class standard • 37% of distribution poles do not have a verified class rating in our asset records • 24% of distribution poles meet The Company’s current minimum pole class standard a. Refer to NECTA-010, Attachment 1, Pole Class Size, for The Company’s current standards related to minimum pole class requirements from the Distribution System Engineering Manual.Page 16 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-010 Page 2 of 3 b. The minimum pole class requirements were established based on industry knowledge to ensure all new construction was built to a higher resiliency standard to minimize the impacts of major storm events on the system. c. The Company’s pole integrity program is the basis for determining if poles no longer have sufficient strength to remain in-service. Please refer to the Company’s response to information request NECTA-016 i for the Company’s pole inspection process. Prior Referenced Response: i NECTA-016 Question: (Pole Management & SPA) Refer to Exhibit CLP-ADDITIONS-1 at p. 64 (“Replacements are based on annual inspections”). Provide the following: a. b. Describe the Company’s annual inspection process, including the number of poles inspected each year, the data collected during the inspection, the criteria used to determine the integrity of the pole, who performs the inspections, and how the information collected during the inspections is used. Provide all data collected during the most recent annual inspection. NECTA-016 Response: a. The Company performs its routine and annual pole inspection to its custodial wooden poles following a 15year inspection cycle which ended in 2025. This cycle ensured that every custodial pole across 157 towns in Connecticut was inspected at least once within the time frame. Approximately 29,000 to 32,000 poles were inspected using the 15-year cycle. In 2025, the Company reviewed its wood-pole inspection standards and decided to shorten the inspection cycle from 15 years to 10 years. By adopting a more frequent inspection schedule, the Company aims to evaluate each custodial pole every 10 years, allowing issues to be identified earlier and addressing them more proactively. Under the revised 10-year cycle, approximately 41,000 to 42,500 poles will be inspected starting in 2026 and moving forward. The inspection process is based on the age of the pole. A visual inspection is completed for poles with less than 20 years of service. For poles with more than 20 years in service the inspection will include a visual, sound and bore, resistograph testing also known as IML testing, and the application of preservatives “treatment” required to maintain the structural integrity of the pole, and ensure continuous serviceability until the subsequent inspection interval. The number of poles replaced each year due to age, structural deterioration, damage, or end-of-life conditions varies based on the number of rejected poles identified through the annual pole inspection program. Poles classified as "Rejects" cannot remain in service because their remaining strength has fallen below 67% of their original strength or because they exhibit structural or mechanical damage that compromises safe operation. These poles are scheduled for replacement within one year of identification.Page 17 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-010 Page 3 of 3 Poles classified as "Priority Rejects" represent the most critical conditions and cannot remain in service because their remaining strength has fallen below 25% of their original strength and/or they exhibit severe structural or mechanical deterioration that presents an immediate public safety risk and reliability. Priority Reject poles are made safe within 48 hours of identification and are replaced as soon as practicable. Poles classified as "Leaning" are poles that are susceptible to failure and may pose risks to public safety and electric system reliability. Leaning poles occur when soil disturbances, loading from pole attachments, or other external forces alter the pole's original alignment. These conditions are commonly caused by soil saturation and moisture accumulation, excessive structural loading, vehicle impacts, severe weather, or storm-related damage. Depending on the severity of the condition, findings from the pole inspection process are communicated to the Company on a daily, weekly, or immediate basis to ensure appropriate corrective actions are taken. Currently, GeoForce Utility Technologies is the contractor responsible for performing all pole inspections throughout Connecticut during the 2024-2026 period. The selection of pole inspection contractors follows a competitive bidding process, with the successful bidder typically awarded a three-year inspection cycle contract. b. Please refer to NECTA-009i for the data collected during the most recent pole inspection.Page 18 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-011 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Data) Refer to Exhibit CLP-TSP-1, p. 27. Provide all supporting studies and documentation for the statement that “approximately 76% of the wood-pole fleet are legacy poles that do not meet current strength standards.” Response: The following statement “approximately 76% of the wood-pole fleet are legacy poles that do not meet current strength standards.” is in reference to The Company’s current minimum pole class requirements when setting new poles. The statement does not refer to any pole testing performed under the pole integrity program. Please refer to NECTA-010, Attachment 1, for the Company’s current standards related to minimum pole class requirements from the Distribution System Engineering Manual.Page 19 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-012 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey, Jeffrey Richard, Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: (Pole Data) Refer to The Connecticut Light & Power dba Eversource Energy Usable Space Study as filed on August 14, 2017 in Docket 14-05-06. Has the Company updated this study or conducted a new, more recent Usable Space Study since 2017? If so, please provide a complete copy of the study and all documents, inputs and assumptions identified or relied upon in the preparation of the Usable Space Study. Response: The Company has not updated this study or conducted a new, more recent Usable Space Study since 2017.Page 20 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-013 Page 1 of 2 Date Filed: September 23, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: (Pole Data) Explain the process the Company undertakes to add a new or replacement pole to the pole count for purposes of calculating the pole attachment rate, including the timing of any pole count changes. Response: Poles are recorded into the Company’s plant accounting Continuing Property Records (CPR) as a matter of conducting normal operations, as they are classified into the appropriate retirement unit categories. Please refer to the Company’s response to NECTA-075 i for a discussion on the standard FERC account and CPR procedures on recognition and designation of plant assets. The Company utilizes pole data from the CPR as of a point in time for purposes of calculating the pole attachment rate. The Company does not adjust its plant accounting CPR to record poles for the express purpose of calculating the pole attachment rate. Prior Referenced Response: i NECTA-075 Question: (FERC Accounts) Select a 2025 Work Order and provide a discussion and timeline for the assignment of costs to the different FERC accounts beginning with the opening of the Work Order and the initial incurrence of costs to the closing of the Work Order. As part of this response, please indicate whether all costs are held in Account 365 until the Work Order is closed, or are costs assigned based on when proper account designation is determined. NECTA-075 Response: Work order 80364832 was initiated in July 2025 for the replacement of a recloser and recloser control. The Operations department wrote this new work order in the Company’s work management system, ensuring the correct work order type was established based on the type of work being performed. The estimates were then entered for the work order by selecting the Compatible Units (assets) planned to be installed and removed, which created the FERC Split. The combination of the Work Order Type and FERC Split chosen for work order 80364832 determined the correct Utility Accounts were utilized and ensured the appropriate allocation of charges between FERC accounts 107010 (Construction Work in Progress) and 108030 (Cost of Removal). The work order was set to “open” status in July 2025, work began, and capital expenditures were charged to FERC accounts 107010 and 108030. While in FERC account 107, the capital expenditures are appropriately not disseminated at the Utility Account (365 - Overhead Conductors and Devices) level in the Company’s plant asset records.Page 21 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-013 Page 2 of 2 When the installed assets were deemed “used and useful” later in July 2025, the Operations department moved the work order to “in-service” status and the capital expenditures in FERC account 107 were moved to FERC account 106 (Completed Construction not Classified), while the charges in FERC account 108030 remained unchanged. At that time, the assets placed in service began to depreciate in their assigned Utility Account (365), while the Operations department continued to work on finalizing all costs to the work order. In December 2025, after all invoices were received, drawings were finalized, the pre-requisites/tasks in the work management system were completed, final costs appropriately flow through the FERC Split, the work order was closed/posted to the CPR (Continuing Property Records). Once this work order was closed, the final costs of the asset in FERC account 106 were moved to FERC account 101010 (Plant in Service) and unitized/posted to the CPR with their specific retirement units in Utility Account 365 based on final costs. The final cost of removal in FERC account 108030 was then moved to FERC account 108010 (Accumulated Provision for Depreciation).Page 22 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-014 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Data) Reference Exhibit CLP-TSP-2, pp. 2, 18. Provide the following: a. Identify the average height of the 561,179 poles in the Connecticut System that are Class 3 or lower. b. Identify the average height of the 179,419 poles in the Connecticut System, that are Class 2 or higher. c. Identify the date on which the Company updated its standard to require a minimum of Class 2 pole for new installations. Response: a. The average height of the 561,163 poles identified in Exhibit CLP-TSP-2, pages 2, and 18, for Class 3 or lower poles in the Connecticut System is 36.4 ft. Any minor variance from prior filings reflects refinements made during a subsequent review of the Connecticut System pole population, which led to adjustments in the population analysis and corresponding average height calculations. b. The average height of the 179,054 poles identified in Exhibit CLP-TSP-2, pages 2, and 18, for Class 2 or higher poles in the Connecticut System is 42.01 ft. Any minor variance from prior filings reflects refinements made during a subsequent review of the Connecticut System pole population, which led to adjustments in the population analysis and corresponding average height calculations. c. The Company first updated its Storm Resiliency Standard in June 2016 to require a minimum 45-foot Class 2 pole for three-phase applications and a minimum 40-foot Class 2 pole for single-phase applications. However, implementation of this standard did not occur until the Company received approval from the Authority pursuant to PURA Docket 17-10-46 “Settlement Agreement”, which was signed on January 11, 2018. Please note that other pole owners in Connecticut are not required to abide by Company’ standard and continue installing class 3 and lower poles.
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.