Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Page 21 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-013 Page 2 of 2 When the installed assets were deemed “used and useful” later in July 2025, the Operations department moved the work order to “in-service” status and the capital expenditures in FERC account 107 were moved to FERC account 106 (Completed Construction not Classified), while the charges in FERC account 108030 remained unchanged. At that time, the assets placed in service began to depreciate in their assigned Utility Account (365), while the Operations department continued to work on finalizing all costs to the work order. In December 2025, after all invoices were received, drawings were finalized, the pre-requisites/tasks in the work management system were completed, final costs appropriately flow through the FERC Split, the work order was closed/posted to the CPR (Continuing Property Records). Once this work order was closed, the final costs of the asset in FERC account 106 were moved to FERC account 101010 (Plant in Service) and unitized/posted to the CPR with their specific retirement units in Utility Account 365 based on final costs. The final cost of removal in FERC account 108030 was then moved to FERC account 108010 (Accumulated Provision for Depreciation).Page 22 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-014 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Data) Reference Exhibit CLP-TSP-2, pp. 2, 18. Provide the following: a. Identify the average height of the 561,179 poles in the Connecticut System that are Class 3 or lower. b. Identify the average height of the 179,419 poles in the Connecticut System, that are Class 2 or higher. c. Identify the date on which the Company updated its standard to require a minimum of Class 2 pole for new installations. Response: a. The average height of the 561,163 poles identified in Exhibit CLP-TSP-2, pages 2, and 18, for Class 3 or lower poles in the Connecticut System is 36.4 ft. Any minor variance from prior filings reflects refinements made during a subsequent review of the Connecticut System pole population, which led to adjustments in the population analysis and corresponding average height calculations. b. The average height of the 179,054 poles identified in Exhibit CLP-TSP-2, pages 2, and 18, for Class 2 or higher poles in the Connecticut System is 42.01 ft. Any minor variance from prior filings reflects refinements made during a subsequent review of the Connecticut System pole population, which led to adjustments in the population analysis and corresponding average height calculations. c. The Company first updated its Storm Resiliency Standard in June 2016 to require a minimum 45-foot Class 2 pole for three-phase applications and a minimum 40-foot Class 2 pole for single-phase applications. However, implementation of this standard did not occur until the Company received approval from the Authority pursuant to PURA Docket 17-10-46 “Settlement Agreement”, which was signed on January 11, 2018. Please note that other pole owners in Connecticut are not required to abide by Company’ standard and continue installing class 3 and lower poles.Page 23 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-015 Page 1 of 3 Date Filed: September 28, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Refer to Exhibit CLP-ADDITIONS-1 pp. 63-64, discussing the Pole Integrity Program. Provide the following information: a. All documents comprising the Pole Integrity Program; b. The date that the Pole Integrity Program commenced; c. The number, height and class of poles that have been replaced under the Pole Integrity Program each year (indicating the number of jointly-owned and the number of solelyowned poles); d. The number of poles that have been reinforced under the Pole Integrity Program each year, indicating the number of jointly-owned and the number of solely-owned poles. e. For each year of the Pole Integrity Program, provide the total capital and overhead and maintenance expenditure. f. For each year of the Pole Integrity Program, provide the capital and overhead and maintenance spent on (i) replacement poles, and (ii) crossarms. g. Regarding the “new standards to help identify pole replacements,” (i) provide all such standards, (ii) describe when the new standards were incorporated by the Company, (iii) explain how the Company decided upon the new standards, and (iv) define the term “reject poles.” h. Explain how the Company has applied pole loading criteria that exceed NESC Grade B construction and whether such standards apply to the pole or to the facilities attached to the pole, or both. i. List the height, class, location and pole number of all poles installed under the Company’s Pole Integrity Program. Response: a. The Company has provided to the Authority all documents in regard to its Pole Integrity Program in the following dockets: 12-07-06RE01, 17-10-46, 14-05-06 and 23-01-03 b. The Company received approval of its long-term System Resiliency Program in PURA Docket 12-07-06RE01 in 2015. The Company’s Pole Integrity Program commenced in 2015.Page 24 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-015 Page 2 of 3 c. Please refer to Table 1, which summarizes the number of poles replaced under the Pole Integrity Program by pole class and height. In this context, the term "replaced" denotes the replacement of an existing reject lower-class pole (e.g., Class 3 through Class 7) with a higher-capacity pole, generally Class 2 or above (e.g., Class 1, H1, H2, or H9), consistent with the Company's pole standards and system resiliency objectives. Table 1. Poles replaced under Pole Integrity 2015-2025 2015 20 621 0 0 0 0 0 641 2016 20 762 0 0 0 0 0 782 2017 11 358 1 1 1 0 0 372 2018 17 387 0 0 0 0 0 404 2019 23 834 0 0 0 0 0 857 2020 35 767 0 0 0 0 0 802 2021 30 508 0 0 1 0 0 539 2022 76 554 0 0 0 0 0 630 2023 406 424 0 8 2 0 0 840 2024 85 301 0 0 1 0 0 387 2025 70 824 0 10 1 1 3 909 18 30 35 40 45 50 55 60 65 75 0 0 91 425 125 1 0 0 0 0 641 0 5 217 454 102 4 0 0 0 0 782 0 0 57 257 56 1 1 0 0 0 372 4 1 99 208 84 7 0 1 0 0 404 17 0 228 469 138 3 2 0 0 0 857 1 0 187 420 176 16 1 1 0 0 802 0 0 125 330 78 6 0 0 0 0 539 0 0 51 343 223 13 0 0 0 0 630 0 0 92 387 330 23 8 0 0 0 840 0 0 101 200 78 6 2 0 0 0 387 1 0 193 480 215 9 2 2 3 4 909 Jointly Solely 559 82 641 741 41 782 354 18 372 328 76 404 717 140 857 710 92 802 461 78 539 574 56 630 768 72 840 344 43 387 763 147 909 Class 1 2 4 H1 H2 H3 H9 Total Height d. From 2015 through 2020, the Company reinforced 269 custodial wood poles as part of its ongoing Pole Integrity program. In 2021, the Company adopted a revised asset management strategy that shifted its focus from pole reinforcement to proactive pole replacement. This change was driven by the Company’s determination that replacing aging poles with stronger, more resilient class 2 poles provides greater long-term reliability and resilience. As a result, only 1 custodial pole was reinforced in 2021, bringing the total number of reinforced custodial wood poles to 270 during the 2015 to 2021 period. e. Please refer to NECTA-015, Attachment 1, which provides a summary of the associated Capital and O&M expenditures per year. f. Please refer to NECTA-015, Attachment 1, subitem (e), which provides a summary of the associated Capital and O&M expenditures. The Company does not separately track or allocate costs between poles and crossarms, as these expenditures are recorded and managed as part of the overall project scope.Page 25 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-015 Page 3 of 3 The cost to replace a pole involves the replacement of a crossarm as applicable. The Company does not separate the cost in the replacement of poles and crossarms. g. The Company's updated pole inspection standard was implemented on January 7, 2025. The Company routinely reviews and evaluates its engineering and maintenance standards to ensure that its practices remain aligned with current industry requirements and emerging best practices. As part of this process, Company representatives participate in industry conferences and technical forums sponsored by the American National Standards Institute (ANSI) and engage with peer utilities to gain insight into evolving technical, operational, and material-related issues. Based on these evaluations and industry benchmarking efforts, the Company periodically updates its standards and procedures to incorporate the best applicable practices and enhance system reliability and asset management. The Company's current pole replacement standard is provided in NECTA-015, Attachment 2. Please refer to Section. 4 for the definition of a normal reject pole. h. Grade B construction is applied in locations where a pole failure could present an elevated risk to public safety, critical infrastructure, or service reliability. Grade B construction is applicable to Pole class size and guying requirements. When determining the appropriate pole class, the Company evaluates several factors, including the number and type of attachments supported by the pole. The Company's Grade B construction standards meet or exceed the requirements of the National Electrical Safety Code (NESC) and are typically applied at highway and railroad crossings, where enhanced structural performance is warranted. For all other applications, the Company's standard construction practice is generally based on NESC Grade C requirements. i. Please refer to NECTA-015, Attachment 3 for the list of poles replaced under the pole integrity program. In this context, the term "replaced" denotes the replacement of an existing lower-class pole (e.g., Class 3 through Class 7) with a higher-capacity pole, generally Class 2 or above (e.g., Class 2, Class 1, H1, H2, …), consistent with the Company's pole standards and system resiliency objectives.Page 26 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-016 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Refer to Exhibit CLP-ADDITIONS-1 at p. 64 (“Replacements are based on annual inspections”). Provide the following: a. Describe the Company’s annual inspection process, including the number of poles inspected each year, the data collected during the inspection, the criteria used to determine the integrity of the pole, who performs the inspections, and how the information collected during the inspections is used. b. Provide all data collected during the most recent annual inspection. Response: a. The Company performs its routine and annual pole inspection to its custodial wooden poles following a 15-year inspection cycle which ended in 2025. This cycle ensured that every custodial pole across 157 towns in Connecticut was inspected at least once within the time frame. Approximately 29,000 to 32,000 poles were inspected using the 15-year cycle. In 2025, the Company reviewed its wood-pole inspection standards and decided to shorten the inspection cycle from 15 years to 10 years. By adopting a more frequent inspection schedule, the Company aims to evaluate each custodial pole every 10 years, allowing issues to be identified earlier and addressing them more proactively. Under the revised 10-year cycle, approximately 41,000 to 42,500 poles will be inspected starting in 2026 and moving forward. The inspection process is based on the age of the pole. A visual inspection is completed for poles with less than 20 years of service. For poles with more than 20 years in service the inspection will include a visual, sound and bore, resistograph testing also known as IML testing, and the application of preservatives “treatment” required to maintain the structural integrity of the pole, and ensure continuous serviceability until the subsequent inspection interval. The number of poles replaced each year due to age, structural deterioration, damage, or end-of-life conditions varies based on the number of rejected poles identified through the annual pole inspection program. Poles classified as "Rejects" cannot remain in servicePage 27 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-016 Page 2 of 3 because their remaining strength has fallen below 67% of their original strength or because they exhibit structural or mechanical damage that compromises safe operation. These poles are scheduled for replacement within one year of identification. Poles classified as "Priority Rejects" represent the most critical conditions and cannot remain in service because their remaining strength has fallen below 25% of their original strength and/or they exhibit severe structural or mechanical deterioration that presents an immediate public safety risk and reliability. Priority Reject poles are made safe within 48 hours of identification and are replaced as soon as practicable. Poles classified as "Leaning" are poles that are susceptible to failure and may pose risks to public safety and electric system reliability. Leaning poles occur when soil disturbances, loading from pole attachments, or other external forces alter the pole's original alignment. These conditions are commonly caused by soil saturation and moisture accumulation, excessive structural loading, vehicle impacts, severe weather, or storm-related damage. Depending on the severity of the condition, findings from the pole inspection process are communicated to the Company on a daily, weekly, or immediate basis to ensure appropriate corrective actions are taken. Currently, GeoForce Utility Technologies is the contractor responsible for performing all pole inspections throughout Connecticut during the 2024-2026 period. The selection of pole inspection contractors follows a competitive bidding process, with the successful bidder typically awarded a three-year inspection cycle contract. b. Please refer to NECTA-009 i for the data collected during the most recent pole inspection. Prior Referenced Response: i NECTA-009 Question: (Pole Data) Regarding the last field inventory of Company distribution poles conducted by or on behalf of the Company, provide a complete copy of the results of the field inventory, including: a. The date the field inventory was conducted; b. The universe of poles surveyed; c. The percentage of total poles; d. The type of information collected about each pole; e. The height of each surveyed pole; f. The average height of all surveyed poles; g. Age of each pole; h. The number of attachments, other than Eversource facilities, on each pole.Page 28 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-016 Page 3 of 3 NECTA-009 Response: The Company is providing a copy of the results of its 2025 pole inspection program. The field inventory includes inspection results for approximately 32,894 custodial poles located across 9 of Connecticut’s 157 towns, based on a 15-year inspection cycle. Effectively in 2026, the Company transitioned to a 10-year inspection cycle to evaluate each pole every 10 years, allowing issues to be identified earlier and addressing them more proactively. The Company expects to evaluate 40,000 to 42,000 poles, or 10% of its custodial wooden pole population. a. Please refer to NECTA-009, Attachment 1, tab named “Results”, showing the dates that the inventory was conducted. Usually, the Pole inspection process starts in mid-April and ends towards the end of October. b. In 2025, the Company inspected 32,894 custodial poles c. In 2025, the Company inspected 7.8% of the Company’s wooden pole population based on a 15 yearinspection cycle. d. Please refer to NECTA-009, Attachment 1, tab named “results” showing all the information collected from each pole inspected in 2025. e. Please refer to NECTA-009, Attachment 2, for the height and age of each pole inspected in 2025. The height is shown in column “u”, and the age of each pole is shown in column “T “of each town where custodial poles were inspected. f. Please refer to NECTA-009, Attachment 2, tab “2025 Pole Inspection General Information”, showing the average height for all custodial poles inspected in 2025. The average height is 37.7 ft. g. Please refer to subpart (e), above. h. Please refer to NECTA-008, Attachment 1, for the number of attachments on each custodial pole. NECTA008 Attachment 1 will be provided on September 30, 2026, due to an extension being requested. The Company does not collect attachment information during the pole inspection process.Page 29 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-017 Page 1 of 2 Date Filed: September 28, 2026 Witness: David L. Gladey, Steven Lamontagne, Leanne M. Landry and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Refer to Exhibit CLP-ADDITIONS-1 at p. 64, discussing the Right of Way Program. Provide the following: a. All documents comprising the Right of Way Program. b. The date that the Right of Way Program commenced. c. The number, height and class of poles that have been replaced under the Right of Way Program each year (indicating the number of jointly-owned and the number of solelyowned poles). d. For each year of the Right of Way Program, provide the total capital and overhead and maintenance expenditures. e. For each year of the Right of Way Program, provide the capital and overhead and maintenance spent on (i) replacement poles, and (ii) crossarms. f. List the height, class, location and pole number of all poles installed under the Company’s Right of Way Program. Response: a. The Company has provided the Authority with all documents regarding its Right of Way (ROW) Program in the following Dockets: 17-10-46, 14-05-06, and 23-01-03 b. The Company received approval of its extended System Resiliency Plan including its ROW program in Docket 17-10-46 in 2017. c. Please refer to Table 1, for the number of poles that have been installed under the Right of Way ProgramPage 30 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-017 Page 2 of 2 TABLE 1. Poles replaced under the ROW Program Class Height ft. 1 2 4 H1 H2 H3 H9 18 30 35 40 45 50 55 60 65 70 75 80 Jointly Solely 2017 27 36 5 3 2018 2 2019 2020 11 4 2 2017 5 10 40 14 1 1 2018 2 1 3 2019 1 2020 1 2 5 1 1 2 2017 41 30 2018 1 7 2021 89 169 2022 257 90 2023 285 24 2024 251 7 2025 44 2 3 23 12 7 7 3 1 1 9 10 2021 8 2022 2 2023 2024 2025 7 64 138 38 5 2 5 2 10 84 136 118 12 9 1 48 169 91 19 3 19 147 93 3 5 1 2 1 1 18 27 4 2 2023 39 289 2024 58 215 2025 3 50 2 2019 11 2020 2021 38 233 1 2022 124 248 3 d. Please refer to NECTA-017, Attachment 1, for the capital and overhead and maintenance expenditures. e. The cost to replace a pole involves the replacement of a crossarm. The Company does not separate the cost in the replacement of poles and crossarms. f. Please refer to NECTA-017, Attachment 2, for the list of poles by height, class and location that were replaced under the ROW program.
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.