Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Page 27 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-016 Page 2 of 3 because their remaining strength has fallen below 67% of their original strength or because they exhibit structural or mechanical damage that compromises safe operation. These poles are scheduled for replacement within one year of identification. Poles classified as "Priority Rejects" represent the most critical conditions and cannot remain in service because their remaining strength has fallen below 25% of their original strength and/or they exhibit severe structural or mechanical deterioration that presents an immediate public safety risk and reliability. Priority Reject poles are made safe within 48 hours of identification and are replaced as soon as practicable. Poles classified as "Leaning" are poles that are susceptible to failure and may pose risks to public safety and electric system reliability. Leaning poles occur when soil disturbances, loading from pole attachments, or other external forces alter the pole's original alignment. These conditions are commonly caused by soil saturation and moisture accumulation, excessive structural loading, vehicle impacts, severe weather, or storm-related damage. Depending on the severity of the condition, findings from the pole inspection process are communicated to the Company on a daily, weekly, or immediate basis to ensure appropriate corrective actions are taken. Currently, GeoForce Utility Technologies is the contractor responsible for performing all pole inspections throughout Connecticut during the 2024-2026 period. The selection of pole inspection contractors follows a competitive bidding process, with the successful bidder typically awarded a three-year inspection cycle contract. b. Please refer to NECTA-009 i for the data collected during the most recent pole inspection. Prior Referenced Response: i NECTA-009 Question: (Pole Data) Regarding the last field inventory of Company distribution poles conducted by or on behalf of the Company, provide a complete copy of the results of the field inventory, including: a. The date the field inventory was conducted; b. The universe of poles surveyed; c. The percentage of total poles; d. The type of information collected about each pole; e. The height of each surveyed pole; f. The average height of all surveyed poles; g. Age of each pole; h. The number of attachments, other than Eversource facilities, on each pole.Page 28 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-016 Page 3 of 3 NECTA-009 Response: The Company is providing a copy of the results of its 2025 pole inspection program. The field inventory includes inspection results for approximately 32,894 custodial poles located across 9 of Connecticut’s 157 towns, based on a 15-year inspection cycle. Effectively in 2026, the Company transitioned to a 10-year inspection cycle to evaluate each pole every 10 years, allowing issues to be identified earlier and addressing them more proactively. The Company expects to evaluate 40,000 to 42,000 poles, or 10% of its custodial wooden pole population. a. Please refer to NECTA-009, Attachment 1, tab named “Results”, showing the dates that the inventory was conducted. Usually, the Pole inspection process starts in mid-April and ends towards the end of October. b. In 2025, the Company inspected 32,894 custodial poles c. In 2025, the Company inspected 7.8% of the Company’s wooden pole population based on a 15 yearinspection cycle. d. Please refer to NECTA-009, Attachment 1, tab named “results” showing all the information collected from each pole inspected in 2025. e. Please refer to NECTA-009, Attachment 2, for the height and age of each pole inspected in 2025. The height is shown in column “u”, and the age of each pole is shown in column “T “of each town where custodial poles were inspected. f. Please refer to NECTA-009, Attachment 2, tab “2025 Pole Inspection General Information”, showing the average height for all custodial poles inspected in 2025. The average height is 37.7 ft. g. Please refer to subpart (e), above. h. Please refer to NECTA-008, Attachment 1, for the number of attachments on each custodial pole. NECTA008 Attachment 1 will be provided on September 30, 2026, due to an extension being requested. The Company does not collect attachment information during the pole inspection process.Page 29 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-017 Page 1 of 2 Date Filed: September 28, 2026 Witness: David L. Gladey, Steven Lamontagne, Leanne M. Landry and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Refer to Exhibit CLP-ADDITIONS-1 at p. 64, discussing the Right of Way Program. Provide the following: a. All documents comprising the Right of Way Program. b. The date that the Right of Way Program commenced. c. The number, height and class of poles that have been replaced under the Right of Way Program each year (indicating the number of jointly-owned and the number of solelyowned poles). d. For each year of the Right of Way Program, provide the total capital and overhead and maintenance expenditures. e. For each year of the Right of Way Program, provide the capital and overhead and maintenance spent on (i) replacement poles, and (ii) crossarms. f. List the height, class, location and pole number of all poles installed under the Company’s Right of Way Program. Response: a. The Company has provided the Authority with all documents regarding its Right of Way (ROW) Program in the following Dockets: 17-10-46, 14-05-06, and 23-01-03 b. The Company received approval of its extended System Resiliency Plan including its ROW program in Docket 17-10-46 in 2017. c. Please refer to Table 1, for the number of poles that have been installed under the Right of Way ProgramPage 30 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-017 Page 2 of 2 TABLE 1. Poles replaced under the ROW Program Class Height ft. 1 2 4 H1 H2 H3 H9 18 30 35 40 45 50 55 60 65 70 75 80 Jointly Solely 2017 27 36 5 3 2018 2 2019 2020 11 4 2 2017 5 10 40 14 1 1 2018 2 1 3 2019 1 2020 1 2 5 1 1 2 2017 41 30 2018 1 7 2021 89 169 2022 257 90 2023 285 24 2024 251 7 2025 44 2 3 23 12 7 7 3 1 1 9 10 2021 8 2022 2 2023 2024 2025 7 64 138 38 5 2 5 2 10 84 136 118 12 9 1 48 169 91 19 3 19 147 93 3 5 1 2 1 1 18 27 4 2 2023 39 289 2024 58 215 2025 3 50 2 2019 11 2020 2021 38 233 1 2022 124 248 3 d. Please refer to NECTA-017, Attachment 1, for the capital and overhead and maintenance expenditures. e. The cost to replace a pole involves the replacement of a crossarm. The Company does not separate the cost in the replacement of poles and crossarms. f. Please refer to NECTA-017, Attachment 2, for the list of poles by height, class and location that were replaced under the ROW program.Page 31 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-018 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Refer to Exhibit CLP-ADDITIONS-1, at pp. 66-67. Provide all methods and procedures documents and process flow diagrams related to the Single Pole Administration’s oversight and management of third party attachments. Response: The Company is providing the following documents in response to this request: • NECTA-018, Attachment 1 CONFIDENTIAL: TD-038, Revision 3, “Administration of Third-Party Attachments to Eversource CT Poles, effective 03/21/2024 • NECTA-018, Attachment 2: Alden One Third-Party Attachment Workflow Process Diagram Please refer to NECTA-018, Attachment 1 CONFIDENTIAL, and NECTA-018, Attachment 2. These documents describe the Single Pole Administration’s responsibilities and workflow for processing third-party pole attachment applications, administering applicable attachment agreements, coordinating and tracking make-ready activities, issuing and tracking applicable invoices and payments, maintaining attachment records, monitoring application status, and monitoring compliance with applicable regulatory requirements and timelines. The Single Pole Administration’s role with respect to field surveys, engineering determinations, and construction activities is limited to administrative coordination, and workflow and status management. The underlying technical review, engineering determinations, and field work are performed by the responsible engineering, operations, contractor or joint pole owner organizations, as applicable.Page 32 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-019 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Refer to Exhibit CLP-ADDITIONS-1 at p. 67. Identify the PURA directives regarding pole attachments referred to on line 4. Response: Exhibit CLP-ADDITIONS-1, at page 67, states, “Consistent with PURA’s directives regarding pole attachments, the Company utilizes Alden Systems, a joint use utility pole management platform.” The PURA directives referenced in the testimony are PURA’s October 8, 2014, Decision in Docket No. 11-03-07 1, and its November 27, 2019, Decision in Docket No. 11-03-07RE02 2. The 2014 Decision designated the EDCs as Single Pole Administrators in their respective service territories and established the use of the NOTIFY system, or a comparable common pole management system, for pole attachment licensing, administration, tracking and notifications. The 2019 Decision addressed the continued utilization and standardization of the existing pole attachment management system. Alden Systems’ Alden One platform is the successor to the NOTIFY system and is the platform currently used by the Company to administer and track third-party pole attachment applications and associated make ready activities in accordance with these directives. https://www.dpuc.state.ct.us/dockhistpost2000.nsf/8e6fc37a54110e3e852576190052b64d/6c03866a8be3eb9b8525 829c0076a777?OpenDocument 1 https://www.dpuc.state.ct.us/dockhistpost2000.nsf/8e6fc37a54110e3e852576190052b64d/ee7714694f9f42c985258 68f00623fe3?OpenDocument 2Page 33 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-020 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Provide all technical documentation maintained by the Company about the Alden One Software used in the Single Pole Administration process. Response: Please refer to the following attachments listed below for the requested documentation: • NECTA-020, Attachment 1, for Alden One Data Solution Design. • NECTA-020, Attachment 2, for ETL Analysis Maximo to Alden One to Maximo instructions. • NECTA-020, Attachment 3 CONFIDENTIAL, Alden One Data Load for CT – Technical Design Document. • NECTA-020, Attachment 4, GIS ArcFM – Alden One Integration. • NECTA-020, Attachment 5, Maximo to Alden One Interface Anlaysis. • NECTA-020, Attachment 6, Key Design Decision MX Alden One MD Pole Work Details, Pole Work Status Updates 2/20/2023.Page 34 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-021 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Provide all technical documentation maintained by the Company about the PoleForman Software used in the Single Pole Administration process. Response: Please refer to NECTA-021, Attachment 1 CONFIDENTIAL, for the document Eversource uses for PoleForeman DSEM 06.715 - PoleForeman Guidelines. This document provides applications details of when to use the PoleForeman line design program as well as pre-run scenarios of common pole top construction types. The formal training of how to use the software comes directly from the company who created Poleforeman, ikeGPS.Page 35 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-022 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Provide all technical documentation maintained by the Company about the IML tool (Resistograph) used in the Pole Integrity Program. Response: There are two documents that the Company maintains related to the IML tool. The first is the work method document. Please refer to NECTA-022, Attachment 1 CONFIDENTIAL, WMS 08.14 - Wood Pole Inspection Using the IML Inspection Drill, which details the drill setup, operation, testing methods, maintenance, and exporting of the data from the tool. The second document, NECTA-022, Attachment 2 CONFIDENTIAL, WMS 08.15 - Distribution Wood Pole Inspection, Testing, and Restoration Requirements, makes reference to the IML tester in a couple sections, but this work method document outlines the full testing process of our distribution wood poles. More specifically, it covers the steps to test, inspect, and treat and/or replace, Eversource owned and jointly owned wood poles on public or private property.Page 36 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-023 Page 1 of 1 Date Filed: September 28, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Identify all electronic databases used by the Company to track or monitor its fixed network assets, and provide a detailed description of the information pertaining to bare poles and appurtenances accessible and/or potentially retrievable from these databases. Response: The primary electronic database used by the Company to track and monitor our fixed network assets is our GIS system, ESRI 10.8.1 (ArcGIS). Please refer to NECTA-023, Attachment 1, for a list of pole attributes that could be retrieved, if available, from our GIS system. AldenOne is the primary database for the third-party attachment process. AldenOne is updated based on the information from the GIS system.
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.