Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

Files6

Search terms highlighted
Eversource rate increase is on 10 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 3 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-002 Page 1 of 1 Date Filed: September 23, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: (Model Inputs & Assumptions) Regarding pole attachment rental rate formula inputs used in Exhibit CLP-Rates 2.14, did the Company examine any records or files, including but not limited to AldenOne, in determining its proposed inputs (e.g., number of attaching entities, pole height, etc.)? If so, identify those inputs and provide the data relied upon. Response: No. The Company did not propose any changes to the pole attachment rental rate formula inputs used in Exhibit CLP-Rates 2.14. The inputs are the same as those agreed upon in the Settlement Agreement between Eversource, NECTA and the NECTA operators that was approved by PURA in Docket No. 17-10-46.
  2. Page 4 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-003 Page 1 of 1 Date Filed: September 23, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: (Model Inputs & Assumptions) Did the Company include municipal, State of Connecticut, or other government agency-owned attachments that occupy space on solely owned or jointly owned poles in its presumption of the number of attaching entities (urban and non-urban)? Response: The Company utilized the FCC rebuttable presumptions for the number of attaching entities in urban (5 attachers) and non-urban (3 attachers) areas. Please see the following excerpt from FCC Docket No. 01-170 as to how these averages were created: 71. Based on the expanded record, we establish presumptive average numbers of attaching entities in a non-urbanized (less than 50,000 population) area to be three (3) attaching entities, based on information presented in the record and the expectation that on a pole or in a conduit, for instance, there would be electric, telephone and cable attachers. It is estimated that cable systems now provide access to cable television services to over 97% of all households with a television. Electric power and telephone service is even more universal. The record supports a presumptive average of three attaching entities in non-urbanized areas. 72. In an urbanized area that is more densely populated (50,000 or higher population), more developed commercially than a non-urbanized area, and in which we expect both residential and business commercial competition to flourish, we set a presumptive average number of attaching entities at five (5) to reflect the inclusion of, but not limited to, the following possible attaching entities: electric, telephone, cable, competitive telecommunications service providers and governmental agencies. Advanced telecommunications capability is being deployed throughout the country. As noted above, competitive services are increasing. The record supports a presumptive average number of five attachers in urbanized areas.
  3. Page 5 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-004 Page 1 of 1 Date Filed: September 23, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: (Model Inputs & Assumptions) Refer to Exhibit CLP-Rates-2.14, Pole Attachment Rate Calculations, p. 5 of 7, Note A. Provide all supporting documentation, work papers, calculations and assumptions used to develop the $933,329,049 adjustment related to the Tax Cuts and Jobs Act. Response: As explained in footnote A, the adjustment related to the Tax Cuts & Jobs Act (“TCJA”) in the amount of $933,329,049, can be found in the Company’s 2025 FERC Form 1 filing on Page 278, Line 10, Column F. Please refer to NECTA-004, Attachment 1, for the page from the FERC Form 1 that shows the amount of Excess Accumulated Deferred Income Taxes (“EDIT”) related to the TCJA.
  4. Page 6 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-005 Page 1 of 1 Date Filed: September 23, 2026 Witness: Marisa B. Paruta Request from: New England Connectivity and Telecommunications Association Question: (Model Inputs & Assumptions) Refer to Exhibit CLP-Rates-2.14, Pole Attachment Rate Calculations, p. 5 of 7, Line 24. Provide the derivation and source documents supporting the depreciation rate applied to gross pole investment in the pole rate formula. Response: Please refer to NECTA-005, Attachment 1, line 24, Utility Account 364, Poles, Towers and Fixtures, for the source document supporting the depreciation rate applied to gross pole investment in the pole rate formula. This source document, which is a schedule of the Company’s current plant utility accounts and applicable depreciation rates, is the original Attachment 4 of the Settlement Agreement (as described in Section 6(a)) of the Company’s last base distribution rate case, as approved by PURA in Docket No. 17-10-46 on April 18, 2018.
  5. Page 7 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-006 Page 1 of 1 Date Filed: September 23, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: (Model Inputs & Assumptions) Refer to Exhibit CLP-Rates-2.14, Pole Attachment Rate Calculations, p. 3 of 7. Provide the following: a. Identify and provide the appurtenance factor utilized in pole attachment rental rate formulas by each electric utility affiliate of Connecticut Light and Power Company. b. For the appurtenance factors identified in subpart (a) above, describe how the factor was determined and provide supporting documentation. Response: Eversource Energy Service Company’s other electric distribution companies utilize the 15% appurtenance factor (rebuttable presumption) as established by the New Hampshire Public Utilities Commission (“PUC”) and the Massachusetts Department of Public Utilities (“DPU”) / Department of Telecommunications and Cable (“DTC”) when calculating pole attachment rates in those jurisdictions.
  6. Page 8 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-007 Page 1 of 1 Date Filed: September 23, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: New England Connectivity and Telecommunications Association Question: (Model Inputs & Assumptions) Provide the most recent rate of return approved for the Company by PURA. A complete response will identify the relevant docket number, order, and date associated with the approved rate of return. Response: The Final Decision in Docket No. 17-10.46, dated April 18, 2018, at page 19, authorized a rate of return of 7.09%. Please see the screenshot below showing the authorized return as filed in Appendix A, Attachment 6, to the Final Decision. Calendar Year 2020 Long-Term Debt Preferred Stock Common Equity Total Capital Weight 45.38% 1.62% 53.00% 100.00% Embedded Cost 4.64% 4.75% 9.25% Calendar Year 2020 Weighted Cost 2.11% 0.08% 4.90% 7.09%
  7. Page 9 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-008 Page 1 of 4 Date Filed: September 28, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: Question: (Pole Data) Provide a complete inventory of Eversource’s pole fleet in Connecticut, along with all information about each of the poles retained by the Company. A complete response will include, but is not limited to: a. total pole count, b. solely versus jointly owned poles, c. joint owners, d. pole height, e. wood versus other material, f. age, g. pole ID number, h. class, i. number of attachers, j. date placed/removed, k. city, and l. notes. Response: The following responses were generated out of the Company’s pole fleet in Connecticut according to its Geographic Information System (GIS), with the exception of NECTA-008, Attachment 1, which was generated out of AldenOne. Because AldenOne and GIS use different data sources and maintain different types of information, pole fleet counts may not exactly match. In addition, the Company provided pole data in FERC Utility Account 364 (Poles, Towers, and Fixtures) from plant accounting’s Continuing Property Records (CPR) in NECTA-059, Attachment 1, which provides the pole counts used in the third party pole attachment rental rate calculation and includes only those poles that are unitized, classified, and recorded to FERC Account 101010 (Utility Plant in Service). Because the CPR also includes poles not yet unitized in FERC Account 106010 (Completed Construction not Classified), and poles in FERC Account 107 (Construction Work in Progress) not yet functionalized to FERC Utility Account 364, the pole counts in GIS will not tie due to timing of recognition in the CPR. a. The total pole count in the Company’s pole fleet in Connecticut is 730,325 poles.
  8. Page 10 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-008 Page 2 of 4 b. The number of solely owned poles is 94,686, compared to 635,639 poles that are jointly owned with Verizon. c. Please refer to the Company’s response to subpart (b), above. d. Please refer to Table 1, showing the height of the Company’s pole fleet. Pole Height (blank) 10 ft. 11 ft. 12 ft. 13 ft. 14 ft. 15 ft. Pole Count Pole Height 17 ft. 18,787 18 ft. 109 20 ft. 64 1,003 21 ft. 25 ft. 2 27 ft. 703 185 30 ft. Table 1 Pole Count Pole Height 74 35 ft. 5,215 40 ft. 45 ft. 1,517 50 ft. 36 55 ft. 4,151 60 ft. 3 65 ft. 52,284 Pole Count Pole Height 259,730 70 ft. 290,229 75 ft. 80 ft. 83,744 85 ft. 10,909 895 90 ft. 324 95 ft. 134 100 ft. Pole Count 44 46 39 31 23 21 23 Grand Total 730,325 e. The total number of wood power poles is 705,400, compared to 24,925 poles built with other materials. f. Please refer to Chart 1, showing the age of the Company’s pole fleet. Chart 1 g. Please refer to NECTA-008, Attachment 1, showing the Company’s pole ID numbers.
  9. Page 11 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-008 Page 3 of 4 h. Please refer to Table 2, showing the Company’s pole fleet by pole class. Table 2 Pole by Pole Class Pole Class 1 2 3 4 5 6 7 9 A H1 H2 H3 Unknown Pole Count 20,609 158,367 114,353 136,468 34,554 2,187 1,956 333 2 477 185 28 260,806 i. Please refer to NECTA-008, Attachment 1, for the number of attachers. j. Please refer to Table 3, for the Company’s pole fleet date placed in service. Table 3 Pole Fleet in Service Dates Decade Pole Count 3,528 1880s 1890s 4 1900s 92,748 1910s 35 1920s 817 1930s 13,862 1940s 24,074 1950s 58,223 Decade Pole Count 1960s 94,923 1970s 69,138 70,531 1980s 1990s 76,457 2000s 89,611 2010s 90,370 2020s 45,990 Unknown 14 k. Please refer to NECTA-008, Attachment 1, for the city.
  10. Page 12 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-008 Page 4 of 4 l. Notes are not reflected in our GIS system of record.
8 pages match

Text of OCC Set 17_COMBINED.pdf

Extracted from the file · 45 pages · 69,741 characters

Text of OCC Set 18_COMBINED.pdf

Extracted from the file · 24 pages · 49,328 characters

As listed on the current system

Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

This filing on the current system (opens in a new tab)