Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Page 33 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-020 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Provide all technical documentation maintained by the Company about the Alden One Software used in the Single Pole Administration process. Response: Please refer to the following attachments listed below for the requested documentation: • NECTA-020, Attachment 1, for Alden One Data Solution Design. • NECTA-020, Attachment 2, for ETL Analysis Maximo to Alden One to Maximo instructions. • NECTA-020, Attachment 3 CONFIDENTIAL, Alden One Data Load for CT – Technical Design Document. • NECTA-020, Attachment 4, GIS ArcFM – Alden One Integration. • NECTA-020, Attachment 5, Maximo to Alden One Interface Anlaysis. • NECTA-020, Attachment 6, Key Design Decision MX Alden One MD Pole Work Details, Pole Work Status Updates 2/20/2023.Page 34 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-021 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Provide all technical documentation maintained by the Company about the PoleForman Software used in the Single Pole Administration process. Response: Please refer to NECTA-021, Attachment 1 CONFIDENTIAL, for the document Eversource uses for PoleForeman DSEM 06.715 - PoleForeman Guidelines. This document provides applications details of when to use the PoleForeman line design program as well as pre-run scenarios of common pole top construction types. The formal training of how to use the software comes directly from the company who created Poleforeman, ikeGPS.Page 35 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-022 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Provide all technical documentation maintained by the Company about the IML tool (Resistograph) used in the Pole Integrity Program. Response: There are two documents that the Company maintains related to the IML tool. The first is the work method document. Please refer to NECTA-022, Attachment 1 CONFIDENTIAL, WMS 08.14 - Wood Pole Inspection Using the IML Inspection Drill, which details the drill setup, operation, testing methods, maintenance, and exporting of the data from the tool. The second document, NECTA-022, Attachment 2 CONFIDENTIAL, WMS 08.15 - Distribution Wood Pole Inspection, Testing, and Restoration Requirements, makes reference to the IML tester in a couple sections, but this work method document outlines the full testing process of our distribution wood poles. More specifically, it covers the steps to test, inspect, and treat and/or replace, Eversource owned and jointly owned wood poles on public or private property.Page 36 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-023 Page 1 of 1 Date Filed: September 28, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Identify all electronic databases used by the Company to track or monitor its fixed network assets, and provide a detailed description of the information pertaining to bare poles and appurtenances accessible and/or potentially retrievable from these databases. Response: The primary electronic database used by the Company to track and monitor our fixed network assets is our GIS system, ESRI 10.8.1 (ArcGIS). Please refer to NECTA-023, Attachment 1, for a list of pole attributes that could be retrieved, if available, from our GIS system. AldenOne is the primary database for the third-party attachment process. AldenOne is updated based on the information from the GIS system.Page 37 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-024 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) From January 2021 to the current date, identify and produce copies of agreements governing Eversource joint-ownership of poles. A complete response will (i) identify the specific language in such pole agreements that pertains to: Eversource’s ownership interests in the pole, including but not limited to the specific percentage parity relationship between the Company and any other pole owner, (ii) identify the reimbursement amount between owners for installing poles, (iii) identify the areas where Eversource manages and maintains jointly owned poles and where the joint owner(s) manage and maintain jointly owned poles, and (iv) identify how Eversource and joint owner(s) reimburse each other for pole management and maintenance and the reimbursement amounts. Response: The Company did not enter into any new joint-ownership agreements between January 2021 and the current date. Please refer to NECTA-024, Attachment 1, for the Joint Line Agreement between CL&P and The Southern New England Telephone Company, which is owned and controlled by Verizon, and NECTA-024, Attachment 2, for the Agreement between CL&P and Verizon, which is the successor to The New York Telephone Company. These agreements have been previously submitted in Docket No. 14-05-06.Page 38 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-025 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Describe and produce all instructions, guidelines or policies related to pole setting depth. Response: The following documents provide instructions and guidelines related to pole setting depth: • NECTA-025, Attachment 1 - DTR 05.041 – Wood Pole Setting • NECTA-025, Attachment 2 CONFIDENTIAL - DTR 05.316 - Pole Selection Guide Eversource sets distribution wood poles in accordance with ANSI O5.1 recommended setting depths, generally following the guideline of approximately 10% of pole length plus 2 feet. Where design conditions warrant additional embedment, the Eversource’s Design Engineering teams will specify the required setting depth within the construction design.Page 39 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-026 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey, Jeffrey Richard, Leanne M. Landry and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Provide the total pole application and pole survey fees paid by third party attachers each year for the past five years. Response: Please refer to the Company’s response to OCC-163 i for total pole application and survey fees for each year 2021 through 2025. Prior References Response: i OCC-163 Question: (Poles) In its role as Single Pole Administrator: a. Please provide data explaining whether and how much pole attachment fees collected offset the cost of pole management, by year, in 2021, 2022, 2023, 2024, and 2025. b. Please also specify how much cost of pole management was not offset by attachment fees for each of those years, and why the whole cost was not fully offset, as applicable. OCC-163 Response: a. 2021 2022 2023 2024 2025 Annual SPA Costs $ 4,413,900 Annual SPA Survey and application fees $(1,357,377) $ 5,495,014 $ 7,835,668 $ 7,765,348 $ 5,573,314 $(4,794,254) $(5,215,802) $(6,810,455) $(1,337,125) Total Costs Net $ 700,760 $ 2,619,866 $ $ 4,236,189 b. As PURA has previously stated, application and survey fees are not designed to offset all SPA costs. See Docket No. 19-01-52RE01, May 11, 2022, Final Decision (“Docket No. 19-01-52RE01 Decision”) at 34. PURA last increased pole owner survey fees in the Docket No. 19-01-52RE01 Decision. See id. at 38 (PURA “reviewed the record evidence and will direct the pole owners to increase the per pole survey fee from $50 to $125.”). PURA declined to increase the application fee at that time. See id. PURA set the new $125 survey fee amount based on data provided by The United Illuminating Company (“UI”). See id. The record evidence in Docket No. 19-01-52RE01 SPA $ 3,056,523 954,893Page 40 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-026 Page 2 of 2 demonstrates that this increased survey fee amount was not enough to offset Eversource’s SPA costs. See id. at 36, Table 11. Eversource and UI jointly filed a motion to re-open Docket No. 1901-52RE01 to reevaluate, among other things, survey fees. See Docket No. 19-01-52RE01, Motion No. 044, at 2 (Apr. 22, 2026).Page 41 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-027 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey, Steven Lamontagne and Marisa B. Paruta Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Describe with specificity the company’s process or procedure, and timing for entering information concerning pole height, class, and cost for each purchased pole into the company’s records. A complete response will (a) identify each type of company record containing information on pole height(s), and (b) provide any records or database reflecting a breakdown of pole heights in 5-foot increments. Response: (a) The Company maintains its information on pole heights in the CPR (Continuing Property Records). Please refer to the response in NECTA-075 i, for the process, procedure and timing for entering asset information into the company’s records. (b) Please refer to NECTA-059, Attachment 1, for the company’s CPR records of FERC Account 364, Poles, Towers, and Equipment, reflecting a breakdown of pole heights based on the unit of property. Prior Referenced Response: i NECTA-075 Question: (FERC Accounts) Select a 2025 Work Order and provide a discussion and timeline for the assignment of costs to the different FERC accounts beginning with the opening of the Work Order and the initial incurrence of costs to the closing of the Work Order. As part of this response, please indicate whether all costs are held in Account 365 until the Work Order is closed, or are costs assigned based on when proper account designation is determined. NECTA-075 Response: Work order 80364832 was initiated in July 2025 for the replacement of a recloser and recloser control. The Operations department wrote this new work order in the Company’s work management system, ensuring the correct work order type was established based on the type of work being performed. The estimates were then entered for the work order by selecting the Compatible Units (assets) planned to be installed and removed, which created the FERC Split. The combination of the Work Order Type and FERC Split chosen for work order 80364832 determined the correct Utility Accounts were utilized and ensured the appropriate allocation of charges between FERC accounts 107010 (Construction Work in Progress) and 108030 (Cost of Removal). The work order was set to “open” status in July 2025, work began, and capital expenditures were charged to FERC accounts 107010 and 108030. While in FERCPage 42 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-027 Page 2 of 2 account 107, the capital expenditures are appropriately not disseminated at the Utility Account (365 - Overhead Conductors and Devices) level in the Company’s plant asset records. When the installed assets were deemed “used and useful” later in July 2025, the Operations department moved the work order to “in-service” status and the capital expenditures in FERC account 107 were moved to FERC account 106 (Completed Construction not Classified), while the charges in FERC account 108030 remained unchanged. At that time, the assets placed in service began to depreciate in their assigned Utility Account (365), while the Operations department continued to work on finalizing all costs to the work order. In December 2025, after all invoices were received, drawings were finalized, the pre-requisites/tasks in the work management system were completed, final costs appropriately flow through the FERC Split, the work order was closed/posted to the CPR (Continuing Property Records). Once this work order was closed, the final costs of the asset in FERC account 106 were moved to FERC account 101010 (Plant in Service) and unitized/posted to the CPR with their specific retirement units in Utility Account 365 based on final costs. The final cost of removal in FERC account 108030 was then moved to FERC account 108010 (Accumulated Provision for Depreciation).
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.