Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

Files6

Search terms highlighted
Eversource rate increase is on 10 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match
  1. Page 41 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-027 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey, Steven Lamontagne and Marisa B. Paruta Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Describe with specificity the company’s process or procedure, and timing for entering information concerning pole height, class, and cost for each purchased pole into the company’s records. A complete response will (a) identify each type of company record containing information on pole height(s), and (b) provide any records or database reflecting a breakdown of pole heights in 5-foot increments. Response: (a) The Company maintains its information on pole heights in the CPR (Continuing Property Records). Please refer to the response in NECTA-075 i, for the process, procedure and timing for entering asset information into the company’s records. (b) Please refer to NECTA-059, Attachment 1, for the company’s CPR records of FERC Account 364, Poles, Towers, and Equipment, reflecting a breakdown of pole heights based on the unit of property. Prior Referenced Response: i NECTA-075 Question: (FERC Accounts) Select a 2025 Work Order and provide a discussion and timeline for the assignment of costs to the different FERC accounts beginning with the opening of the Work Order and the initial incurrence of costs to the closing of the Work Order. As part of this response, please indicate whether all costs are held in Account 365 until the Work Order is closed, or are costs assigned based on when proper account designation is determined. NECTA-075 Response: Work order 80364832 was initiated in July 2025 for the replacement of a recloser and recloser control. The Operations department wrote this new work order in the Company’s work management system, ensuring the correct work order type was established based on the type of work being performed. The estimates were then entered for the work order by selecting the Compatible Units (assets) planned to be installed and removed, which created the FERC Split. The combination of the Work Order Type and FERC Split chosen for work order 80364832 determined the correct Utility Accounts were utilized and ensured the appropriate allocation of charges between FERC accounts 107010 (Construction Work in Progress) and 108030 (Cost of Removal). The work order was set to “open” status in July 2025, work began, and capital expenditures were charged to FERC accounts 107010 and 108030. While in FERC
  2. Page 42 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-027 Page 2 of 2 account 107, the capital expenditures are appropriately not disseminated at the Utility Account (365 - Overhead Conductors and Devices) level in the Company’s plant asset records. When the installed assets were deemed “used and useful” later in July 2025, the Operations department moved the work order to “in-service” status and the capital expenditures in FERC account 107 were moved to FERC account 106 (Completed Construction not Classified), while the charges in FERC account 108030 remained unchanged. At that time, the assets placed in service began to depreciate in their assigned Utility Account (365), while the Operations department continued to work on finalizing all costs to the work order. In December 2025, after all invoices were received, drawings were finalized, the pre-requisites/tasks in the work management system were completed, final costs appropriately flow through the FERC Split, the work order was closed/posted to the CPR (Continuing Property Records). Once this work order was closed, the final costs of the asset in FERC account 106 were moved to FERC account 101010 (Plant in Service) and unitized/posted to the CPR with their specific retirement units in Utility Account 365 based on final costs. The final cost of removal in FERC account 108030 was then moved to FERC account 108010 (Accumulated Provision for Depreciation).
  3. Page 43 of 126Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-028 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Reference Exhibit CLP-TSP-1, pp. 57-58. Provide a copy of Eversource’s updated construction pole standards. A complete response will identify all updates made in 2025, and explain how those updates better align with industry standards. Response: The referenced update is incorporated in the Eversource Maintenance Plan document, provided at NECTA-028, Attachment 1 CONFIDENTIAL, EMP 5.61- Distribution and Sub-Transmission Wood Poles. Section 4 within this document reflects the change of moving the frequency of inspection intervals from 15 years to 10 years. This particular EMP makes reference to NECTA028, Attachment 2 CONFIDENTIAL, WMS 08.15 - Distribution Wood Pole Inspection, Testing, and Restoration Requirements, which also was revised in the 2025 updates to reflect the new inspection and testing requirements. WMS 08.15 details the full testing process of our distribution wood poles (refer to the Company’s response to NECTA-022 i). Eversource has reviewed its practices across all of its operating regions with respect to pole testing frequency along with industry feedback through various user groups and determined a standard 10-year pole inspection frequency provides a more proactive assessment of a poles structural condition versus 15 years to minimize catastrophic pole failures that could impact public safety. Therefore, in 2025, the decision to decrease the wood pole inspection frequency for distribution operations from 15 years to 10 years was implemented. The new testing methodology has also demonstrated an increased inspection failure rate of wood poles as the Company is now able to see the location of the pole decay and actual remaining strength to meet NESC code requirements. The shorter inspection cycle provides more timely information on changes in pole condition, allowing deteriorated or structurally compromised poles to be identified and addressed earlier to address risk of a public or system safety concern. Eversource updated its testing methodology to using a data driven quantifiable testing methodology by moving to industry technology that adopts a resistive measurement through an IML Resi-Drill in place of non-quantifiable traditional sounding and boring methods because it provides a data driven versus human objective assessment of internal wood deterioration and can identify conditions that may not be apparent through visual inspection or sounding alone. Together, the more frequent inspection cycle and improved testing technology represent a more proactive, data-informed approach to pole management and are consistent with the electric utility
  4. Page 44 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-028 Page 2 of 2 industry’s movement toward enhanced asset inspection, diagnostic testing, and risk-based asset management. Prior Referenced Response: i NECTA-022 Question: (Pole Management & SPA) Provide all technical documentation maintained by the Company about the IML tool (Resistograph) used in the Pole Integrity Program. NECTA-022 Response: There are two documents that the Company maintains related to the IML tool: The first is the work method document. Please refer to NECTA-022, Attachment 1 CONFIDENTIAL, WMS 08.14 Wood Pole Inspection Using the IML Inspection Drill, which details the drill setup, operation, testing methods, maintenance, and exporting of the data from the tool. The second document, NECTA-022, Attachment 2 CONFIDENTIAL, WMS 08.15 - Distribution Wood Pole Inspection, Testing, and Restoration Requirements, makes reference to the IML tester in a couple sections, but this work method document outlines the full testing process of our distribution wood poles. More specifically, it covers the steps to test, inspect, and treat and/or replace, Eversource owned and jointly owned wood poles on public or private property.
  5. Page 45 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-029 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Each year for the past five years, provide the number of poles installed by the Company and the corresponding total investment amount broken down by those installed (i) at the initiation of Eversource for its own network purposes, (ii) to replace deteriorated or structurally unsound poles, (iii) in response to storm or environmental damage, and (iv) in response to third-party pole attachment applications. Response: The Company does not track pole plant investments and units in the categories called out in this question in the Company’s plant accounting Continuing Property Records (CPR). To be responsive to this question, the Company took the total unitized pole plant additions and associated pole counts for each year from the Company’s CPR and prepared the table below. Parts (ii), (iii) and (iv) align with our internal tracking based on pole units completed in the Company’s Work Management System. Part (i) reflects the total pole counts from CPR less the internal tracking of (ii), (iii) and (iv) to calculate the pole counts in part (i). The value of the total unitized plant additions are captured in the total investment column, in millions of dollars, which reflects the total value of the unitized pole plant additions to FERC Account 101010 (Plant in Service) for each year and encompasses all poles installed across these four categories.
  6. Page 46 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-030 Page 1 of 1 Date Filed: September 24, 2026 Witness: David L. Gladey, Jeffrey Richard, Brendan J. O’Brien and Garrett J. Murray Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Provide a full breakdown of all costs associated with Eversource’s status as a single pole administrator, including the date(s) the costs were incurred, and all workpapers. Is the Company seeking recovery of these costs in Docket No. 26-05-10? If so, identify the relevant schedules/work papers. Response: Pursuant to Order No. 10 in Docket 11-03-07, the Company is required to file its annual Single Pole Administration (SPA) costs with PURA on an annual basis. Specifically, Order No. 10 requires the SPA to report its annual SPA costs and any annual SPA costs proposed to be recovered in a future rate case. The Company’s most recent filing submitted March 31, 2026, reports SPA costs incurred during calendar year 2025. The filing identifies the total net annual SPA costs of $4,236,189 and includes a breakdown of those costs by category, including contractor labor, software, internal labor, overhead, reimbursables, and other costs. Please refer to NECTA-034, Attachment 10. The annual SPA O&M costs are recovered in the Company’s Exhibit CLP-REVREQ-2, Schedule C-3.16, with the exception of internal labor costs which is recovered in Schedule C-3.5 of Exhibit CLP-REVREQ-2.
  7. Page 47 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-031 Page 1 of 1 Date Filed: September 24, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Identify annual AldenOne related costs for each year from 2017 through 2025 and provide supporting documentation, including journal entries and invoices. Response: Please refer to NECTA-031, Attachment 1, for a summary of the Alden One expenses for 20172025. Please refer to NECTA-031, Attachment 2 CONFIDENTIAL, for supporting invoices and journal entries.
  8. Page 48 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-032 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Provide annual expenses paid to Alden Systems (as is described at p.67 of Exhibit CLP-ADDITIONS-1) for each year from 2017 through 2025 and provide supporting documentation, including journal entries and invoices. Please also describe where such expenses are booked and from which rates they are recovered. Response: Please refer to the Company’s response to NECTA-031 i for the annual expenses paid to Alden Systems from 2017-2025, along with the journal entries and invoices. These expenses are recorded to FERC 580000. These expenses were included in the Company’s revenue requirement filed in the Company’s last rate case in Docket No. 17-10-46 and were allocated to all distribution rates in the allocated Costof-Service study using the distribution operation labor allocator LABOR_O. Since these expenses are not found in any of the FERC accounts that are used to calculate the annual pole attachment rental rate, NECTA’s members are not paying towards covering these expenses. Therefore, pole attachers are being subsidized by electric distribution rate payers. Prior Referenced Response: i NECTA-031 Question: (Pole Management & SPA) Identify annual AldenOne related costs for each year from 2017 through 2025 and provide supporting documentation, including journal entries and invoices. NECTA-031 Response: Please refer to NECTA-031, Attachment 1, for a summary of the Alden One expenses for 2017-2025. Please refer to NECTA-031, Attachment 2, for supporting invoices and journal entries.
  9. Page 49 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-033 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Please identify the number of applications driving AldenOne costs for each year from 2017-2025 and identify the proportion of those applications that are related to telecommunications carriers, cable providers, state agencies, municipalities and other entities. Response: For each year from 2017 through 2026, the Company’s Alden One costs were not calculated or determined based on the number of pole attachment applications processed through the platform or the type of entity submitting an application. Rather, the Company’s Alden One pricing was based on the number of poles managed within its Connecticut service territory. Accordingly, the number of applications processed during those years did not drive the Company’s Alden One costs, and the requested proportions attributable to telecommunications carriers, cable providers, state agencies, municipalities, and other entities are not applicable. Although applications submitted by these entities are processed through Alden One, neither the volume nor the applicant category composition of those applications affects the Company’s Alden One charges.
  10. Page 50 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-034 Page 1 of 2 Date Filed: September 24, 2026 Witness: David L. Gladey, Jeffrey Richard, Brendan J. O’Brien and Garrett J. Murray Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Provide annual expenses paid to the Single Pole Administration (“SPA”) organization for purposes of joint use utility pole management (as is described at p.66 of Exhibit CLP-ADDITIONS-1) for each year from 2017 through 2025 and provide supporting documentation, including journal entries and invoices. Please also describe where such expenses are booked and from which rates they are recovered. Response: Single Pole Administration (SPA) is an internal Company organization and is not a separate entity to which the Company makes payments. The Company understands this request as seeking the annual costs incurred by the Company to perform its designated SPA functions described at p.66 of Exhibit CLP-ADDITIONS-1. Pursuant to Order No. 10 in Docket No. 11-03-07, the Company reports its annual SPA costs to PURA. The annual SPA costs incurred from 2017 through 2025 are summarized in NECTA-034, Attachment 1 – Docket 11-03-07 Filing Summary and are supported by copies of the Annual Filings in NECTA-034, Attachment 2 through NECTA-034, Attachment 10. The annual SPA cost schedules separately identify the applicable operation and maintenance (O&M) and capital cost components, including contractor labor, survey and design costs, SPA services, software costs, internal labor, overhead costs and other applicable costs. The schedules also identify reimbursements (application and survey fees) collected, which are reflected as offsets in determining the applicable net annual SPA costs. Accordingly, such reimbursements are not expenses paid to SPA, rather, they reduce the costs attributable to the administration of the SPA function. Refer to the Company’s response to NECTA-030 i for where the costs are reflected in the cost of service.
8 pages match

Text of OCC Set 17_COMBINED.pdf

Extracted from the file · 45 pages · 69,741 characters

Text of OCC Set 18_COMBINED.pdf

Extracted from the file · 24 pages · 49,328 characters

As listed on the current system

Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

This filing on the current system (opens in a new tab)