  1. Page 51 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-034 Page 2 of 2 Prior Referenced Response: i NECTA-030 Question: (Pole Management & SPA) Provide a full breakdown of all costs associated with Eversource’s status as a single pole administrator, including the date(s) the costs were incurred, and all workpapers. Is the Company seeking recovery of these costs in Docket No. 26-05-10? If so, identify the relevant schedules/work papers. NECTA-030 Response: Pursuant to Order No. 10 in Docket 11-03-07, the Company is required to file its annual Single Pole Administration (SPA) costs with PURA on an annual basis. Specifically, Order No. 10 requires the SPA to report its annual SPA costs and any annual SPA costs proposed to be recovered in a future rate case. The Company’s most recent filing submitted March 31, 2026, reports SPA costs incurred during calendar year 2025. The filing identifies the total net annual SPA costs of $4,236,189 and includes a breakdown of those costs by category, including contractor labor, software, internal labor, overhead, reimbursables, and other costs. Please refer to NECTA030 Attachment 1. The annual SPA O&M costs are recovered in the Company’s Exhibit CLP-REVREQ-2, Schedule C-3.16, with the exception of internal labor costs which is recovered in Schedule C-3.5 of Exhibit CLP-REVREQ-2.
  2. Page 52 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-035 Page 1 of 1 Date Filed: September 23, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Timothy J. Griffin Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Please confirm that Regulatory Assets appear as entries in the FERC Form 1 for accounting purposes regardless of whether they have been approved for inclusion in rates. Response: Regulatory deferred debits for Pole Make Ready costs are included on FERC Form 1 page 233 Miscellaneous Deferred Debits, Exhibit CLP-REVREQ-2, Schedule H-1.0 page 72, line 14. The December 31, 2025, balance reported on FERC Form 1 page 233 Miscellaneous Deferred Debits, Exhibit CLP-REVREQ-2, Schedule H-1.0 page 72, line 14 of $15,484,268 is different than the balance included for recovery and shown on Exhibit CLP-REVREQ-2, Schedule B-6.2 Deferred Assets line 16 column B of $16,581,000. The change in deferral balance is primarily driven by the inadvertent inclusion of billable work orders prior to calendar year 2026 that were adjusted out of the Test Year balance in preparation of Schedule B-6.2.
  3. Page 53 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-036 Page 1 of 1 Date Filed: September 24, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Timothy J. Griffin Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Reference Exhibit CL&P REVREQ-2, Schedule B 6.2 (Deferred Assets), please indicate where the balances at 12/31/2025 for each of the deferred assets on lines 15 – 25 appear in the FERC Form 1 for 2025. Response: Please refer to NECTA-036, Attachment 1, for additional information regarding where each deferred asset included within Exhibit CL&P REVREQ-2, Schedule B 6.2 is presented within the FERC Form 1 for 2025.
  4. Page 54 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-037 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Select one solely-owned pole for which the Company recently received a pole attachment application that required Make Ready Work. Provide the following information: (i) all information retained within Alden One related to the attachment request, (ii) application, (iii) proof of payment of the application and pole survey fees, (iv) completeness and compliance checks performed by the Company and its third party contractors, (v) field study results (vi) measures needed to accommodate the attachment, (vii) PoleForeman output, (viii) the Make Ready solution, (ix) make ready work estimate, (x) estimate acceptance and proof of payment, (xi) details related to work completion and close-out. Response: For purposes of this response, the Company selected Pole Attachment Application No. 1958946. This application was submitted by Comcast, concerning a proposed attachment to eight (8) solely owned poles located in Bristol, CT, which required make ready work. (i) All information retained within Alden One related to the attachment request: • Applicant: Comcast • Application No. 1958946 (Parent Conversation) • Power Survey conversation No. 1987334 (Child conversation) • Make Ready conversation pole #12530 No. 2035688 • Make Ready conversation pole #12529 No. 2035689 • Make Ready conversation pole #12532 No. 2035690 • Town: Bristol • Number of poles included in the application: 8 • Application documentation submitted with the application o Strand map (Please refer to NECTA-037, Attachment 1) o Tension and loading file (Please refer to NECTA-037, Attachment 2) o Please refer to NECTA-037, Attachment 3 Structure Access Request o Please refer to NECTA-037, Attachment 4– Pole Data Sheet – Connecticut (ii) Application: • Alden One Application Number: 1958946.
  5. Page 55 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-037 Page 2 of 3 Applications are submitted electronically through Alden One. (iii) Proof of payment of the application and pole survey fees: The Company records indicate that the payment associated with the application and pole survey fees was received from Comcast on February 2, 2026. • Check number: 9000002822 • Amount $1,150.00 o Application Fee: $150.00 o Survey and engineering fee: $1,000.00 (iv) Completeness and compliance checks performed by the Company and its third-party contractors: The initial application is reviewed by SPA for completeness. Upon vendor work order preparation and submission, Distribution Engineering performs a design review prior to approval. Upon work order approval, SPA reviews the application for invoicing and construction readiness. (v) Field study results: Please refer to NECTA-037, Attachment 5, 1958946 Field Results.pdf (vi) Measures needed to accommodate the attachment: Please refer to NECTA-037, Attachment 6, 1958946 Power Make Ready .pdf (vii) PoleForeman output: Please refer to NECTA-037, Attachment 7, 1958946 PoleForeman Output.pdf (viii) Make Ready solution: Please refer to NECTA-037, Attachment 6, 1958946 Power Make Ready .pdf (ix) Make ready work estimate: Engineering review of application 1958946 determined that Make Ready work was required on three (3) of the eight (8) poles included in the application. The Company developed a Make Ready estimate for the work required and provided the estimate to Comcast for review, acceptance and payment. Please refer to NECTA-037, Attachment 8, for the Make Ready Estimate invoice and NECTA-037, Attachment 6, for the Make Ready work details. (x) Estimate acceptance and proof of payment: Pursuant to the Pole Attachment Agreement, the attacher is required to pay the Make Ready estimate and is afforded a specified period to dispute the estimate. If the attacher submits payment and does not dispute the estimate within the applicable timeframe, the
  6. Page 56 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-037 Page 3 of 3 Company treats the payment as acceptance of the estimate. Upon receipt, the payment is applied to the associated work order and through an interface, the Alden One conversation is updated and allows the project to proceed to the construction phase. (xi) Details related to work completion and close-out: Work was completed on 7/1/26 and is currently in the close-out process.
  7. Page 57 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-038 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Select one jointly-owned pole for which the Company recently received a pole attachment application that required Make Ready Work. Provide the following information: (i) all information retained within Alden One related to the attachment request, (ii) application, (iii) proof of payment of the application and pole survey fees by the attacher, (iv) proof of remittance of fees to joint owner by the Company, (v) completeness and compliance checks performed by the Company and its third party contractors, (vi) field study results, (vii) information related to joint owner’s evaluation of the communications space, (viii) measures needed to accommodate the attachment, (ix) PoleForeman output,(x) information related to coordination with the joint pole owner in developing the make ready solution, (xi) the Make Ready solution, (xii) make ready work estimate, (xiii) estimate acceptance and proof of payment to both pole owners, (xiv) details related to work completion and close-out. Response: For purposes of this response, the Company selected Pole Attachment Application No. 1906851. This application was submitted by New Cingular Wireless, concerning a proposed attachment to one (1) jointly owned pole located in Danbury, CT, which required make ready work. (i) All information retained within Alden One related to the attachment request: • Applicant: New Cingular Wireless • Application No. 1906851 (Parent Conversation) • Power Survey conversation No. 1923366 (Child Conversation) • Make Ready conversation pole #869 No. 2028565 • Town: Danbury • Number of poles included in the application: 1 • Application documentation submitted with the application: o Elevation & Key Plan, and Equipment Details (Please refer to NECTA-038, Attachment 1) o Please refer to NECTA-038, Attachment 2, Structure Access Request o Please refer to NECTA-038, Attachment 3 – Pole Data Sheet – Connecticut (ii) Application: • Alden One Application Number: 1906851
  8. Page 58 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-038 Page 2 of 3 Applications are submitted electronically through Alden One. (iii) Proof of payment of the application and pole survey fees by the attacher: The Company records indicate that the payment associated with the application and pole survey fees was received from New Cingular Wireless on August 20, 2025. • Check number: 0023 • Amount: $600.00 o Application Fee: $150.00 o Survey and Engineering fee: $50.00 o Frontier application, survey and engineering fee: $400.00 (iv) Proof of remittance of fees to joint owner by the Company: The Company records indicate that the $400 fee collected on behalf of Frontier from New Cingular Wireless was remitted to Frontier on October 13, 2025, as part of the Company’s monthly consolidated remittance. • Check number: 82051 • Total check amount: $76,075.00 • Amount remitted for this application: $400.00 • Payment clearing date: 10/15/25 • Bank reference number: 051000015711531 (v) Completeness and compliance checks performed by the Company and its third party contractors: The initial application is reviewed by SPA for completeness. Upon vendor work order preparation and submission, Distribution Engineering performs a design review prior to approval. Once an approved work order has been prepared SPA reviews the application for invoicing and construction readiness. (vi) Field study results: Please refer to NECTA-038, Attachment 4, 1906851 Field Result (vii) Information related to joint owner’s evaluation of the communications space: The joint owner advised that there was insufficient space to accommodate the attachment under existing conditions. (viii) Measures needed to accommodate the attachment: Replace 40’ pole with 45’ pole. (ix) PoleForeman output: Please refer to NECTA-038, Attachment 5, PoleForeman Pole 869
  9. Page 59 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-038 Page 3 of 3 (x) Information related to coordination with the joint pole owner in developing the make ready solution: Please refer to NECTA-038, Attachment 6, Final 1906851 ES FTR MR Notes (Concurrence) (xi) The Make Ready solution: Replace 40’ pole with 45’ pole. (xii) Make ready work estimate: Engineering review of application 1906851 determined that Make Ready work was required on (1) pole included in the application. The Company developed a make ready estimate for the required work and provided the estimate to New Cingular Wireless for review, acceptance, and payment. Please refer to NECTA-038, Attachment 7, for the Make Ready Estimate invoice and please refer to NECTA-038, Attachment 8, for the Make Ready work details. (xiii) Estimate acceptance and proof of payment to both pole owners: Pursuant to the Pole Attachment Agreement, the attacher is required to pay the Make Ready estimate and is afforded a specified period to dispute the estimate. If the attacher submits payment and does not dispute the estimate within the applicable timeframe, the Company treats the payment as acceptance of the estimate. Upon receipt, the payment is applied to the associated work order and through an interface, the Alden One conversation is updated. Because the pole is jointly owned, Frontier separately administers make ready work attributable to Frontier. Eversource does not receive Frontier’s make ready payment or maintain Frontier’s underlying payment records. When Frontier records receipt of its payment in Alden One, the Frontier payment requirement is reflected as satisfied. However, for this specific application, Frontier’s Make Ready work was non-billable. The attacher was required to pay only Eversource’s make ready estimate because Frontier classified its make ready work as non-billable. Once Eversource’s payment was received, the project was eligible to advance to the construction phase. Accordingly, proof of payment to Frontier is not applicable. (xiv) Details related to work completion and close-out: Work was completed on 7/6/26 and is currently in the close-out process.
  10. Page 60 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-039 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at p. 69. Provide all Company documentation, manuals, training materials, policy documents, methods and procedures, or similar documentation used to determine whether make ready work is billable or non-billable. Response: The SPA Make Ready Billable Matrix is the document used by the Company to determine whether make ready work associated with third party attachments is classified as billable or non-billable. The matrix reflects the criteria and decision-making framework applied in making such determinations. The matrix was previously provided as RRU-002, Attachment 1. Following a reasonable inquiry, the Company is not aware of any additional manuals, training materials, policy documents, methods, procedures, or similar documentation specifically addressing or governing billable versus non-billable make ready determinations. To the extent that Company personnel consult engineering standards, survey requirements, construction specifications, safety requirements, or NESC standards in evaluating field conditions, such documents provide general engineering and compliance guidance and do not independently establish whether make ready work is billable or non-billable. The Company’s billable/nonbillable determinations are governed by the attached matrix.
8 pages match

Text of OCC Set 17_COMBINED.pdf

Extracted from the file · 45 pages · 69,741 characters

Text of OCC Set 18_COMBINED.pdf

Extracted from the file · 24 pages · 49,328 characters