Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Page 53 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-036 Page 1 of 1 Date Filed: September 24, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Timothy J. Griffin Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Reference Exhibit CL&P REVREQ-2, Schedule B 6.2 (Deferred Assets), please indicate where the balances at 12/31/2025 for each of the deferred assets on lines 15 – 25 appear in the FERC Form 1 for 2025. Response: Please refer to NECTA-036, Attachment 1, for additional information regarding where each deferred asset included within Exhibit CL&P REVREQ-2, Schedule B 6.2 is presented within the FERC Form 1 for 2025.Page 54 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-037 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Select one solely-owned pole for which the Company recently received a pole attachment application that required Make Ready Work. Provide the following information: (i) all information retained within Alden One related to the attachment request, (ii) application, (iii) proof of payment of the application and pole survey fees, (iv) completeness and compliance checks performed by the Company and its third party contractors, (v) field study results (vi) measures needed to accommodate the attachment, (vii) PoleForeman output, (viii) the Make Ready solution, (ix) make ready work estimate, (x) estimate acceptance and proof of payment, (xi) details related to work completion and close-out. Response: For purposes of this response, the Company selected Pole Attachment Application No. 1958946. This application was submitted by Comcast, concerning a proposed attachment to eight (8) solely owned poles located in Bristol, CT, which required make ready work. (i) All information retained within Alden One related to the attachment request: • Applicant: Comcast • Application No. 1958946 (Parent Conversation) • Power Survey conversation No. 1987334 (Child conversation) • Make Ready conversation pole #12530 No. 2035688 • Make Ready conversation pole #12529 No. 2035689 • Make Ready conversation pole #12532 No. 2035690 • Town: Bristol • Number of poles included in the application: 8 • Application documentation submitted with the application o Strand map (Please refer to NECTA-037, Attachment 1) o Tension and loading file (Please refer to NECTA-037, Attachment 2) o Please refer to NECTA-037, Attachment 3 Structure Access Request o Please refer to NECTA-037, Attachment 4– Pole Data Sheet – Connecticut (ii) Application: • Alden One Application Number: 1958946.Page 55 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-037 Page 2 of 3 Applications are submitted electronically through Alden One. (iii) Proof of payment of the application and pole survey fees: The Company records indicate that the payment associated with the application and pole survey fees was received from Comcast on February 2, 2026. • Check number: 9000002822 • Amount $1,150.00 o Application Fee: $150.00 o Survey and engineering fee: $1,000.00 (iv) Completeness and compliance checks performed by the Company and its third-party contractors: The initial application is reviewed by SPA for completeness. Upon vendor work order preparation and submission, Distribution Engineering performs a design review prior to approval. Upon work order approval, SPA reviews the application for invoicing and construction readiness. (v) Field study results: Please refer to NECTA-037, Attachment 5, 1958946 Field Results.pdf (vi) Measures needed to accommodate the attachment: Please refer to NECTA-037, Attachment 6, 1958946 Power Make Ready .pdf (vii) PoleForeman output: Please refer to NECTA-037, Attachment 7, 1958946 PoleForeman Output.pdf (viii) Make Ready solution: Please refer to NECTA-037, Attachment 6, 1958946 Power Make Ready .pdf (ix) Make ready work estimate: Engineering review of application 1958946 determined that Make Ready work was required on three (3) of the eight (8) poles included in the application. The Company developed a Make Ready estimate for the work required and provided the estimate to Comcast for review, acceptance and payment. Please refer to NECTA-037, Attachment 8, for the Make Ready Estimate invoice and NECTA-037, Attachment 6, for the Make Ready work details. (x) Estimate acceptance and proof of payment: Pursuant to the Pole Attachment Agreement, the attacher is required to pay the Make Ready estimate and is afforded a specified period to dispute the estimate. If the attacher submits payment and does not dispute the estimate within the applicable timeframe, thePage 56 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-037 Page 3 of 3 Company treats the payment as acceptance of the estimate. Upon receipt, the payment is applied to the associated work order and through an interface, the Alden One conversation is updated and allows the project to proceed to the construction phase. (xi) Details related to work completion and close-out: Work was completed on 7/1/26 and is currently in the close-out process.Page 57 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-038 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Select one jointly-owned pole for which the Company recently received a pole attachment application that required Make Ready Work. Provide the following information: (i) all information retained within Alden One related to the attachment request, (ii) application, (iii) proof of payment of the application and pole survey fees by the attacher, (iv) proof of remittance of fees to joint owner by the Company, (v) completeness and compliance checks performed by the Company and its third party contractors, (vi) field study results, (vii) information related to joint owner’s evaluation of the communications space, (viii) measures needed to accommodate the attachment, (ix) PoleForeman output,(x) information related to coordination with the joint pole owner in developing the make ready solution, (xi) the Make Ready solution, (xii) make ready work estimate, (xiii) estimate acceptance and proof of payment to both pole owners, (xiv) details related to work completion and close-out. Response: For purposes of this response, the Company selected Pole Attachment Application No. 1906851. This application was submitted by New Cingular Wireless, concerning a proposed attachment to one (1) jointly owned pole located in Danbury, CT, which required make ready work. (i) All information retained within Alden One related to the attachment request: • Applicant: New Cingular Wireless • Application No. 1906851 (Parent Conversation) • Power Survey conversation No. 1923366 (Child Conversation) • Make Ready conversation pole #869 No. 2028565 • Town: Danbury • Number of poles included in the application: 1 • Application documentation submitted with the application: o Elevation & Key Plan, and Equipment Details (Please refer to NECTA-038, Attachment 1) o Please refer to NECTA-038, Attachment 2, Structure Access Request o Please refer to NECTA-038, Attachment 3 – Pole Data Sheet – Connecticut (ii) Application: • Alden One Application Number: 1906851Page 58 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-038 Page 2 of 3 Applications are submitted electronically through Alden One. (iii) Proof of payment of the application and pole survey fees by the attacher: The Company records indicate that the payment associated with the application and pole survey fees was received from New Cingular Wireless on August 20, 2025. • Check number: 0023 • Amount: $600.00 o Application Fee: $150.00 o Survey and Engineering fee: $50.00 o Frontier application, survey and engineering fee: $400.00 (iv) Proof of remittance of fees to joint owner by the Company: The Company records indicate that the $400 fee collected on behalf of Frontier from New Cingular Wireless was remitted to Frontier on October 13, 2025, as part of the Company’s monthly consolidated remittance. • Check number: 82051 • Total check amount: $76,075.00 • Amount remitted for this application: $400.00 • Payment clearing date: 10/15/25 • Bank reference number: 051000015711531 (v) Completeness and compliance checks performed by the Company and its third party contractors: The initial application is reviewed by SPA for completeness. Upon vendor work order preparation and submission, Distribution Engineering performs a design review prior to approval. Once an approved work order has been prepared SPA reviews the application for invoicing and construction readiness. (vi) Field study results: Please refer to NECTA-038, Attachment 4, 1906851 Field Result (vii) Information related to joint owner’s evaluation of the communications space: The joint owner advised that there was insufficient space to accommodate the attachment under existing conditions. (viii) Measures needed to accommodate the attachment: Replace 40’ pole with 45’ pole. (ix) PoleForeman output: Please refer to NECTA-038, Attachment 5, PoleForeman Pole 869Page 59 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-038 Page 3 of 3 (x) Information related to coordination with the joint pole owner in developing the make ready solution: Please refer to NECTA-038, Attachment 6, Final 1906851 ES FTR MR Notes (Concurrence) (xi) The Make Ready solution: Replace 40’ pole with 45’ pole. (xii) Make ready work estimate: Engineering review of application 1906851 determined that Make Ready work was required on (1) pole included in the application. The Company developed a make ready estimate for the required work and provided the estimate to New Cingular Wireless for review, acceptance, and payment. Please refer to NECTA-038, Attachment 7, for the Make Ready Estimate invoice and please refer to NECTA-038, Attachment 8, for the Make Ready work details. (xiii) Estimate acceptance and proof of payment to both pole owners: Pursuant to the Pole Attachment Agreement, the attacher is required to pay the Make Ready estimate and is afforded a specified period to dispute the estimate. If the attacher submits payment and does not dispute the estimate within the applicable timeframe, the Company treats the payment as acceptance of the estimate. Upon receipt, the payment is applied to the associated work order and through an interface, the Alden One conversation is updated. Because the pole is jointly owned, Frontier separately administers make ready work attributable to Frontier. Eversource does not receive Frontier’s make ready payment or maintain Frontier’s underlying payment records. When Frontier records receipt of its payment in Alden One, the Frontier payment requirement is reflected as satisfied. However, for this specific application, Frontier’s Make Ready work was non-billable. The attacher was required to pay only Eversource’s make ready estimate because Frontier classified its make ready work as non-billable. Once Eversource’s payment was received, the project was eligible to advance to the construction phase. Accordingly, proof of payment to Frontier is not applicable. (xiv) Details related to work completion and close-out: Work was completed on 7/6/26 and is currently in the close-out process.Page 60 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-039 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at p. 69. Provide all Company documentation, manuals, training materials, policy documents, methods and procedures, or similar documentation used to determine whether make ready work is billable or non-billable. Response: The SPA Make Ready Billable Matrix is the document used by the Company to determine whether make ready work associated with third party attachments is classified as billable or non-billable. The matrix reflects the criteria and decision-making framework applied in making such determinations. The matrix was previously provided as RRU-002, Attachment 1. Following a reasonable inquiry, the Company is not aware of any additional manuals, training materials, policy documents, methods, procedures, or similar documentation specifically addressing or governing billable versus non-billable make ready determinations. To the extent that Company personnel consult engineering standards, survey requirements, construction specifications, safety requirements, or NESC standards in evaluating field conditions, such documents provide general engineering and compliance guidance and do not independently establish whether make ready work is billable or non-billable. The Company’s billable/nonbillable determinations are governed by the attached matrix.Page 61 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-040 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at pp. 67-71. Describe the following: a. At what point in the Single Pole Administration process is the attacher informed that make ready work is required or not? b. At what point in the Single Pole Administration process is the attacher informed that make ready work is billable or non-billable? c. When informed that make ready work is billable, does an attacher have an opportunity to challenge the billable determination and, if so, how? Response: a. The attacher is informed that make ready work is required when the SPA engineering review is complete and the application status is updated in Alden. Alden notifies the applicant of the status change and indicates that make ready work is required. b. The attacher is informed whether make ready work is billable or non-billable when the application status is updated in Alden following completion of the SPA engineering review. For billable make ready work, the applicant receives an invoice, and the application status reflects that make ready payment is required. For non-billable make ready work, no invoice is issued and the application proceeds to the next phase of the process with the make ready work identified in Alden. c. Yes. Pursuant to the PURA-approved form of Pole Attachment Agreement, an attacher receiving a make ready invoice may dispute the charges associated with the make ready work. The Agreement requires the attacher to pay the invoiced amount and provides that the attacher may dispute the amount within ninety (90) days after payment by submitting written notice with any supporting documentation identifying the disputed amount. The parties then work together to resolve the dispute. If the dispute cannot be resolved through normal business discussions, the Agreement together with Appendix C to PURA’s May 11, 2022, Decision in Docket No. 19-01-52RE01 provide a dispute resolution process that includes executive-level negotiations and, if necessary, submission of the dispute to PURA.Page 62 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-041 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey, Jeffrey Richard, Leanne M. Landry, Marisa B. Paruta and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at p. 69 (“The Company documents the basis for clarifying such work as billable or non-billable.”) a. List and explain each and every reason used by the Company to find make ready work billable, and for each reason describe how make ready costs are treated and recorded. b. List and explain each and every reason used by the Company to find make ready work nonbillable, and for each reason describe how make ready costs are treated and recorded. Response: a. The Company determines whether make-ready work is billable by applying the billable/non-billable matrix provided in NECTA-043 Attachment 1. The matrix identifies the circumstances under which make-ready work is the responsibility of the attaching entity and therefore classified as billable. When a work order is created, Company personnel and, where applicable, vendors apply the appropriate sub-work type based on the nature of the work and the billable/non-billable matrix. The selected sub-work type identifies the work as billable. Costs associated with the make-ready work are charged to the applicable work order and recorded in accordance with the Company's accounting practices and applicable FERC accounting requirements. The costs remain attributable to the work order through completion of the project, at which time the Company ensures all billable costs have been charged to the appropriate party. Such billable costs are offset to the applicable make-ready work order. b. The Company determines whether make-ready work is non-billable by applying the billable/non-billable matrix provided in NECTA-043, Attachment 1. The matrix identifies the circumstances under which make-ready work is not the responsibility of the attaching entity and therefore classified as non-billable. When a work order is created, Company personnel select the appropriate sub-work type based on the nature of the work and the billable/non-billable matrix. The selected subwork type identifies the work as non-billable. Costs associated with the make-ready work
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.