Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Page 57 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-038 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Select one jointly-owned pole for which the Company recently received a pole attachment application that required Make Ready Work. Provide the following information: (i) all information retained within Alden One related to the attachment request, (ii) application, (iii) proof of payment of the application and pole survey fees by the attacher, (iv) proof of remittance of fees to joint owner by the Company, (v) completeness and compliance checks performed by the Company and its third party contractors, (vi) field study results, (vii) information related to joint owner’s evaluation of the communications space, (viii) measures needed to accommodate the attachment, (ix) PoleForeman output,(x) information related to coordination with the joint pole owner in developing the make ready solution, (xi) the Make Ready solution, (xii) make ready work estimate, (xiii) estimate acceptance and proof of payment to both pole owners, (xiv) details related to work completion and close-out. Response: For purposes of this response, the Company selected Pole Attachment Application No. 1906851. This application was submitted by New Cingular Wireless, concerning a proposed attachment to one (1) jointly owned pole located in Danbury, CT, which required make ready work. (i) All information retained within Alden One related to the attachment request: • Applicant: New Cingular Wireless • Application No. 1906851 (Parent Conversation) • Power Survey conversation No. 1923366 (Child Conversation) • Make Ready conversation pole #869 No. 2028565 • Town: Danbury • Number of poles included in the application: 1 • Application documentation submitted with the application: o Elevation & Key Plan, and Equipment Details (Please refer to NECTA-038, Attachment 1) o Please refer to NECTA-038, Attachment 2, Structure Access Request o Please refer to NECTA-038, Attachment 3 – Pole Data Sheet – Connecticut (ii) Application: • Alden One Application Number: 1906851Page 58 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-038 Page 2 of 3 Applications are submitted electronically through Alden One. (iii) Proof of payment of the application and pole survey fees by the attacher: The Company records indicate that the payment associated with the application and pole survey fees was received from New Cingular Wireless on August 20, 2025. • Check number: 0023 • Amount: $600.00 o Application Fee: $150.00 o Survey and Engineering fee: $50.00 o Frontier application, survey and engineering fee: $400.00 (iv) Proof of remittance of fees to joint owner by the Company: The Company records indicate that the $400 fee collected on behalf of Frontier from New Cingular Wireless was remitted to Frontier on October 13, 2025, as part of the Company’s monthly consolidated remittance. • Check number: 82051 • Total check amount: $76,075.00 • Amount remitted for this application: $400.00 • Payment clearing date: 10/15/25 • Bank reference number: 051000015711531 (v) Completeness and compliance checks performed by the Company and its third party contractors: The initial application is reviewed by SPA for completeness. Upon vendor work order preparation and submission, Distribution Engineering performs a design review prior to approval. Once an approved work order has been prepared SPA reviews the application for invoicing and construction readiness. (vi) Field study results: Please refer to NECTA-038, Attachment 4, 1906851 Field Result (vii) Information related to joint owner’s evaluation of the communications space: The joint owner advised that there was insufficient space to accommodate the attachment under existing conditions. (viii) Measures needed to accommodate the attachment: Replace 40’ pole with 45’ pole. (ix) PoleForeman output: Please refer to NECTA-038, Attachment 5, PoleForeman Pole 869Page 59 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-038 Page 3 of 3 (x) Information related to coordination with the joint pole owner in developing the make ready solution: Please refer to NECTA-038, Attachment 6, Final 1906851 ES FTR MR Notes (Concurrence) (xi) The Make Ready solution: Replace 40’ pole with 45’ pole. (xii) Make ready work estimate: Engineering review of application 1906851 determined that Make Ready work was required on (1) pole included in the application. The Company developed a make ready estimate for the required work and provided the estimate to New Cingular Wireless for review, acceptance, and payment. Please refer to NECTA-038, Attachment 7, for the Make Ready Estimate invoice and please refer to NECTA-038, Attachment 8, for the Make Ready work details. (xiii) Estimate acceptance and proof of payment to both pole owners: Pursuant to the Pole Attachment Agreement, the attacher is required to pay the Make Ready estimate and is afforded a specified period to dispute the estimate. If the attacher submits payment and does not dispute the estimate within the applicable timeframe, the Company treats the payment as acceptance of the estimate. Upon receipt, the payment is applied to the associated work order and through an interface, the Alden One conversation is updated. Because the pole is jointly owned, Frontier separately administers make ready work attributable to Frontier. Eversource does not receive Frontier’s make ready payment or maintain Frontier’s underlying payment records. When Frontier records receipt of its payment in Alden One, the Frontier payment requirement is reflected as satisfied. However, for this specific application, Frontier’s Make Ready work was non-billable. The attacher was required to pay only Eversource’s make ready estimate because Frontier classified its make ready work as non-billable. Once Eversource’s payment was received, the project was eligible to advance to the construction phase. Accordingly, proof of payment to Frontier is not applicable. (xiv) Details related to work completion and close-out: Work was completed on 7/6/26 and is currently in the close-out process.Page 60 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-039 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at p. 69. Provide all Company documentation, manuals, training materials, policy documents, methods and procedures, or similar documentation used to determine whether make ready work is billable or non-billable. Response: The SPA Make Ready Billable Matrix is the document used by the Company to determine whether make ready work associated with third party attachments is classified as billable or non-billable. The matrix reflects the criteria and decision-making framework applied in making such determinations. The matrix was previously provided as RRU-002, Attachment 1. Following a reasonable inquiry, the Company is not aware of any additional manuals, training materials, policy documents, methods, procedures, or similar documentation specifically addressing or governing billable versus non-billable make ready determinations. To the extent that Company personnel consult engineering standards, survey requirements, construction specifications, safety requirements, or NESC standards in evaluating field conditions, such documents provide general engineering and compliance guidance and do not independently establish whether make ready work is billable or non-billable. The Company’s billable/nonbillable determinations are governed by the attached matrix.Page 61 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-040 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at pp. 67-71. Describe the following: a. At what point in the Single Pole Administration process is the attacher informed that make ready work is required or not? b. At what point in the Single Pole Administration process is the attacher informed that make ready work is billable or non-billable? c. When informed that make ready work is billable, does an attacher have an opportunity to challenge the billable determination and, if so, how? Response: a. The attacher is informed that make ready work is required when the SPA engineering review is complete and the application status is updated in Alden. Alden notifies the applicant of the status change and indicates that make ready work is required. b. The attacher is informed whether make ready work is billable or non-billable when the application status is updated in Alden following completion of the SPA engineering review. For billable make ready work, the applicant receives an invoice, and the application status reflects that make ready payment is required. For non-billable make ready work, no invoice is issued and the application proceeds to the next phase of the process with the make ready work identified in Alden. c. Yes. Pursuant to the PURA-approved form of Pole Attachment Agreement, an attacher receiving a make ready invoice may dispute the charges associated with the make ready work. The Agreement requires the attacher to pay the invoiced amount and provides that the attacher may dispute the amount within ninety (90) days after payment by submitting written notice with any supporting documentation identifying the disputed amount. The parties then work together to resolve the dispute. If the dispute cannot be resolved through normal business discussions, the Agreement together with Appendix C to PURA’s May 11, 2022, Decision in Docket No. 19-01-52RE01 provide a dispute resolution process that includes executive-level negotiations and, if necessary, submission of the dispute to PURA.Page 62 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-041 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey, Jeffrey Richard, Leanne M. Landry, Marisa B. Paruta and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at p. 69 (“The Company documents the basis for clarifying such work as billable or non-billable.”) a. List and explain each and every reason used by the Company to find make ready work billable, and for each reason describe how make ready costs are treated and recorded. b. List and explain each and every reason used by the Company to find make ready work nonbillable, and for each reason describe how make ready costs are treated and recorded. Response: a. The Company determines whether make-ready work is billable by applying the billable/non-billable matrix provided in NECTA-043 Attachment 1. The matrix identifies the circumstances under which make-ready work is the responsibility of the attaching entity and therefore classified as billable. When a work order is created, Company personnel and, where applicable, vendors apply the appropriate sub-work type based on the nature of the work and the billable/non-billable matrix. The selected sub-work type identifies the work as billable. Costs associated with the make-ready work are charged to the applicable work order and recorded in accordance with the Company's accounting practices and applicable FERC accounting requirements. The costs remain attributable to the work order through completion of the project, at which time the Company ensures all billable costs have been charged to the appropriate party. Such billable costs are offset to the applicable make-ready work order. b. The Company determines whether make-ready work is non-billable by applying the billable/non-billable matrix provided in NECTA-043, Attachment 1. The matrix identifies the circumstances under which make-ready work is not the responsibility of the attaching entity and therefore classified as non-billable. When a work order is created, Company personnel select the appropriate sub-work type based on the nature of the work and the billable/non-billable matrix. The selected subwork type identifies the work as non-billable. Costs associated with the make-ready workPage 63 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-041 Page 2 of 2 are charged to the applicable work order and recorded in accordance with the Company's accounting practices and applicable FERC accounting requirements. The costs remain attributable to the work order through completion of the project. For non-billable make ready costs that are not capitalized, these costs are recorded to FERC Account 186MRC the Non-Billable Make Ready Deferred Regulatory Asset, only to the extent that such incremental annual costs incurred exceed the annual make-ready costs included in base distribution rates, as approved in the Company’s last base distribution rate case settlement in Docket No. 17-10-46. For non-billable make ready work that qualifies as a capital investment, these costs are recorded to FERC Account 107, Construction Work in Progress, while the work is being performed. At the time the assets are placed in service, those costs are moved to FERC Account 106, Completed Construction Not Classified, and later to FERC Account 101, Electric Plant In Service, once the asset costs are fully unitized and functionalized.Page 64 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-042 Page 1 of 1 Date Filed: September 23, 2026 Witness: Leanne M. Landry, Jeffrey Richard and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at pp. 70-71. Describe in detail the Company’s implementation of procedures to identify and track billable and nonbillable make ready costs. A complete response will explain the tracking process, when it began, and provide all Company documentation/procedures related to tracking billable and non-billable make ready costs. Response: Consistent with the directives set forth in PURA’s final decision in Docket No. 19-01-52RE01, on May 11, 2022, the Company implemented procedures to identify and track billable and nonbillable make ready costs associated with pole attachment work. As described in Exhibit CLPADDITIONS-1, these procedures included implementation of a billable/non-billable determination matrix (provided in RRU-002, Attachment 1), standardized documentation requirements, and tracking of billable and non-billable determinations within the Company’s systems. The determination of whether make ready work is billable or non-billable is made during the engineering survey and review process using the Company’s billable/non-billable matrix. Based on that determination, a work order is created for the required make ready work and designated as billable or non-billable. The work order information is subsequently interfaced with Alden One, which is used to manage pole attachment applications and related make ready activities. Costs associated with the work are charged to the applicable work order and recorded in accordance with the Company’s accounting practices and applicable FERC accounting requirements. Documentation maintained as part of this process includes the Company’s billable/non-billable determination matrix (provided in RRU-002, Attachment 1), work order records, Alden One application records, and supporting documentation maintained for the applicable make ready work.Page 65 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-043 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Reference Exhibit CLP REVREQ-1. Provide the billable/non-billable determination matrix discussed on page 71. Response: Please refer to RRU-002, Attachment 1, for the requested information.Page 66 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-044 Page 1 of 1 Date Filed: September 24, 2026 Witness: David L. Gladey, Jeffrey Richard, Craig Dikeman and Matthew J. Correia Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at pp. 72-73. Identify the third-party contractors the Company uses for make ready work, and provide (i) copies of the contracts between the Company and the contractors and (ii) all instructions, guidelines, and training materials related to contractors performing make ready work. Response: The Company currently uses D&D Power and Asplundh Construction to conduct all Make Ready line work. Riggs Distler & Company and Elecnor Hawkeye also have a contract and were utilized during the current contract period. Please refer to NECTA-044, Attachment 1, for a listing of third party Make Ready contractors. Please refer to NECTA-044, Attachment 2 CONFIDENTIAL, for third party Make Ready contracts. The contractors identified above are fully qualified line contractors employing personnel represented by Local 42 and are responsible for ensuring that their employees are appropriately trained and qualified to perform the work. The Company provides work orders that identify the specific scope and location of the Make Ready work to be completed and expects contractors to perform such work in accordance with applicable Company construction standards and requirements. The Company does not provide formal training materials to these contractors. Contractor personnel are expected to possess the requisite qualifications, certifications, and training necessary to perform line work safely and in compliance with applicable industry standards, regulatory requirements, and Company specifications.
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.