  1. Page 63 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-041 Page 2 of 2 are charged to the applicable work order and recorded in accordance with the Company's accounting practices and applicable FERC accounting requirements. The costs remain attributable to the work order through completion of the project. For non-billable make ready costs that are not capitalized, these costs are recorded to FERC Account 186MRC the Non-Billable Make Ready Deferred Regulatory Asset, only to the extent that such incremental annual costs incurred exceed the annual make-ready costs included in base distribution rates, as approved in the Company’s last base distribution rate case settlement in Docket No. 17-10-46. For non-billable make ready work that qualifies as a capital investment, these costs are recorded to FERC Account 107, Construction Work in Progress, while the work is being performed. At the time the assets are placed in service, those costs are moved to FERC Account 106, Completed Construction Not Classified, and later to FERC Account 101, Electric Plant In Service, once the asset costs are fully unitized and functionalized.
  2. Page 64 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-042 Page 1 of 1 Date Filed: September 23, 2026 Witness: Leanne M. Landry, Jeffrey Richard and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at pp. 70-71. Describe in detail the Company’s implementation of procedures to identify and track billable and nonbillable make ready costs. A complete response will explain the tracking process, when it began, and provide all Company documentation/procedures related to tracking billable and non-billable make ready costs. Response: Consistent with the directives set forth in PURA’s final decision in Docket No. 19-01-52RE01, on May 11, 2022, the Company implemented procedures to identify and track billable and nonbillable make ready costs associated with pole attachment work. As described in Exhibit CLPADDITIONS-1, these procedures included implementation of a billable/non-billable determination matrix (provided in RRU-002, Attachment 1), standardized documentation requirements, and tracking of billable and non-billable determinations within the Company’s systems. The determination of whether make ready work is billable or non-billable is made during the engineering survey and review process using the Company’s billable/non-billable matrix. Based on that determination, a work order is created for the required make ready work and designated as billable or non-billable. The work order information is subsequently interfaced with Alden One, which is used to manage pole attachment applications and related make ready activities. Costs associated with the work are charged to the applicable work order and recorded in accordance with the Company’s accounting practices and applicable FERC accounting requirements. Documentation maintained as part of this process includes the Company’s billable/non-billable determination matrix (provided in RRU-002, Attachment 1), work order records, Alden One application records, and supporting documentation maintained for the applicable make ready work.
  3. Page 65 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-043 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Reference Exhibit CLP REVREQ-1. Provide the billable/non-billable determination matrix discussed on page 71. Response: Please refer to RRU-002, Attachment 1, for the requested information.
  4. Page 66 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-044 Page 1 of 1 Date Filed: September 24, 2026 Witness: David L. Gladey, Jeffrey Richard, Craig Dikeman and Matthew J. Correia Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at pp. 72-73. Identify the third-party contractors the Company uses for make ready work, and provide (i) copies of the contracts between the Company and the contractors and (ii) all instructions, guidelines, and training materials related to contractors performing make ready work. Response: The Company currently uses D&D Power and Asplundh Construction to conduct all Make Ready line work. Riggs Distler & Company and Elecnor Hawkeye also have a contract and were utilized during the current contract period. Please refer to NECTA-044, Attachment 1, for a listing of third party Make Ready contractors. Please refer to NECTA-044, Attachment 2 CONFIDENTIAL, for third party Make Ready contracts. The contractors identified above are fully qualified line contractors employing personnel represented by Local 42 and are responsible for ensuring that their employees are appropriately trained and qualified to perform the work. The Company provides work orders that identify the specific scope and location of the Make Ready work to be completed and expects contractors to perform such work in accordance with applicable Company construction standards and requirements. The Company does not provide formal training materials to these contractors. Contractor personnel are expected to possess the requisite qualifications, certifications, and training necessary to perform line work safely and in compliance with applicable industry standards, regulatory requirements, and Company specifications.
  5. Page 67 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-045 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at pp. 73-74. Provide the results of the three most recent Company assessments and ratings of the sampled work orders and sampled make ready capital work outsourced to third party contractors. Response: Refer to NECTA-045, Attachment 1 CONFIDENTIAL (Scorecard 26406205), NECTA-045, Attachment 2 CONFIDENTIAL (Scorecard 27104945) and NECTA-045, Attachment 3 CONFIDENTIAL (Scorecard 27295888) for the requested information.
  6. Page 68 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-046 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at p. 74. Define the term “non-SPA pole owners”. Response: The term “non-SPA pole owners” refers to entities that own or jointly own utility poles but do not serve as the designated Single Pole Administrator and that may receive services or benefits from the SPA’s administration of pole-attachment applications. The referenced directive concerns the allocation of an appropriate proportionate share of the SPA’s all-in costs to those pole owners, as well as to attachers.
  7. Page 69 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-047 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at p.75. Provide the following information: a. List and identify all instances where municipalities and CDOT failed to utilize the AldenOne application process and attached without permission/notice. A complete response will identify each pole by pole number. b. Are unauthorized attachments considered within the Company’s determination of whether make ready costs are billable or non-billable and, if so, how? Response: a. The Company cannot track instances where municipalities and CDOT failed to utilize AldenOne (i.e., the system of record) and attach without notifying the Company. To answer this question, Eversource would need to hire a vendor to conduct an unauthorized attachment audit of the Company’s poles in its service territory. b. The PURA-approved form of Pole Attachment Agreement requires Licensees to submit a pole attachment application for all unauthorized attachments. Consequently, any such make-ready costs are billable to the Licensee.
  8. Page 70 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-048 Page 1 of 1 Date Filed: September 23, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Reference Exhibit CLP-REVREQ-1, pp. 44-46. Reconcile the statement that “the Company has not included any pole make-ready costs within base distribution rates in this proceeding…” (p. 46) with PURA’s statement in Docket No. 19-0152RE01 that “EDCs received some level of recovery in base distribution rates to perform nonbillable make-ready work…” A complete response will explain the steps taken by the Company to ensure that there is no double-recovery of non-billable make-ready costs in base rates versus in the deferred regulatory asset for non-billable make-ready costs. Response: As noted in Exhibit CLP-REVREQ-1 at 44, lines 12 through 15, the Company states “The costs recorded to this deferred asset are associated with the costs of performing non-billable make-ready pole work not recovered in base distribution rates [emphasis added] to meet established standards, as approved in Docket No. 19-01-52RE01…” Further, in Late File Exhibit-01 in Docket No. 19-01-52RE01, the Company notes there is $803 thousand recovered in base distribution rates, annually, that are netted against cumulative non-billable make-ready costs. Therefore, providing assurance that the Company is not double-recovering non-billable makeready costs in base distribution rates. Refer to Exhibit CLP-REVREQ-4 (Make Ready Pole Work), line 7548 in tab “Non-Billable Reason” for the Removal of 2023-2025 Amounts in Distribution Rates totaling $2.4 million.
  9. Page 71 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-049 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Reference Exhibit CLP REV-REQ-4. When tracking nonbillable make-ready costs, explain how the Company identifies and attributes all pole capital and maintenance work required to be performed by Eversource in its ordinary course of business to its own service requirements. Response: The Company identifies and attributes non-billable make-ready costs through its established work management and work order processes. Work orders are created based on the specific project or work type being performed, with defined scopes that distinguish whether the work is customerdriven, make-ready activities (billable or non-billable), capital improvement, etc. from work required by the Company to meet its own service, safety, reliability, and operational obligations. During project development, engineering personnel review the required work and assign activities to the appropriate work order based on the nature and purpose of the work. Work that is necessary to accommodate a third-party attachment request is tracked separately from work that would be performed by the Company in the ordinary course of business to maintain, replace, or enhance its electric distribution infrastructure. The Company's work order structure, estimating process, and project oversight practices are designed to ensure that only work directly related to the applicable project scope is charged to that work order. Throughout project execution, the scope of work is monitored and managed to minimize scope creep and to ensure that Company-initiated capital or maintenance activities are appropriately identified and attributed to separate work orders. This approach helps maintain the integrity of cost tracking and supports the accurate allocation of make-ready costs between attachers and the Company's own service requirements. As a result, non-billable make-ready costs are identified through the Company's project scoping, engineering review, and work order management processes, which are intended to segregate work performed for Company operational needs from work performed in support of attachment-related make-ready activities.
  10. Page 72 of 126

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-050 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Each year for the past five years, identify and quantify all pole capital and maintenance work that the Company identified and performed at the time an attachment was made that was attributed to the Company’s own service requirements (instead of third party attachers) because the work was needed in the ordinary course of business. Response: Please refer to the response for NECTA-049 i for a description of how the Company identifies the type of work to be performed. The Company does not base the need for work to be completed to facilitate its capital plan based on where and when an attachment request is made. Prior Referenced Response: i NECTA-049 Question: (Make Ready Work & Related Costs) Reference Exhibit CLP REV-REQ-4. When tracking non-billable make-ready costs, explain how the Company identifies and attributes all pole capital and maintenance work required to be performed by Eversource in its ordinary course of business to its own service requirements. NECTA-049 Response: The Company identifies and attributes non-billable make-ready costs through its established work management and work order processes. Work orders are created based on the specific project or work type being performed, with defined scopes that distinguish whether the work is customer-driven, make-ready activities (billable or non-billable), capital improvement, etc. from work required by the Company to meet its own service, safety, reliability, and operational obligations. During project development, engineering personnel review the required work and assign activities to the appropriate work order based on the nature and purpose of the work. Work that is necessary to accommodate a third-party attachment request is tracked separately from work that would be performed by the Company in the ordinary course of business to maintain, replace, or enhance its electric distribution infrastructure. The Company's work order structure, estimating process, and project oversight practices are designed to ensure that only work directly related to the applicable project scope is charged to that work order. Throughout project execution, the scope of work is monitored and managed to minimize scope creep and to ensure that Company-initiated capital or maintenance activities are appropriately identified and attributed to separate work orders. This approach helps
8 pages match

Text of OCC Set 17_COMBINED.pdf

Extracted from the file · 45 pages · 69,741 characters

Text of OCC Set 18_COMBINED.pdf

Extracted from the file · 24 pages · 49,328 characters

As listed on the current system

Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.

This filing on the current system (opens in a new tab)