Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Page 7 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-006 Page 1 of 1 Date Filed: September 23, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: (Model Inputs & Assumptions) Refer to Exhibit CLP-Rates-2.14, Pole Attachment Rate Calculations, p. 3 of 7. Provide the following: a. Identify and provide the appurtenance factor utilized in pole attachment rental rate formulas by each electric utility affiliate of Connecticut Light and Power Company. b. For the appurtenance factors identified in subpart (a) above, describe how the factor was determined and provide supporting documentation. Response: Eversource Energy Service Company’s other electric distribution companies utilize the 15% appurtenance factor (rebuttable presumption) as established by the New Hampshire Public Utilities Commission (“PUC”) and the Massachusetts Department of Public Utilities (“DPU”) / Department of Telecommunications and Cable (“DTC”) when calculating pole attachment rates in those jurisdictions.Page 8 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-007 Page 1 of 1 Date Filed: September 23, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: New England Connectivity and Telecommunications Association Question: (Model Inputs & Assumptions) Provide the most recent rate of return approved for the Company by PURA. A complete response will identify the relevant docket number, order, and date associated with the approved rate of return. Response: The Final Decision in Docket No. 17-10.46, dated April 18, 2018, at page 19, authorized a rate of return of 7.09%. Please see the screenshot below showing the authorized return as filed in Appendix A, Attachment 6, to the Final Decision. Calendar Year 2020 Long-Term Debt Preferred Stock Common Equity Total Capital Weight 45.38% 1.62% 53.00% 100.00% Embedded Cost 4.64% 4.75% 9.25% Calendar Year 2020 Weighted Cost 2.11% 0.08% 4.90% 7.09%Page 9 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-008 Page 1 of 4 Date Filed: September 28, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: Question: (Pole Data) Provide a complete inventory of Eversource’s pole fleet in Connecticut, along with all information about each of the poles retained by the Company. A complete response will include, but is not limited to: a. total pole count, b. solely versus jointly owned poles, c. joint owners, d. pole height, e. wood versus other material, f. age, g. pole ID number, h. class, i. number of attachers, j. date placed/removed, k. city, and l. notes. Response: The following responses were generated out of the Company’s pole fleet in Connecticut according to its Geographic Information System (GIS), with the exception of NECTA-008, Attachment 1, which was generated out of AldenOne. Because AldenOne and GIS use different data sources and maintain different types of information, pole fleet counts may not exactly match. In addition, the Company provided pole data in FERC Utility Account 364 (Poles, Towers, and Fixtures) from plant accounting’s Continuing Property Records (CPR) in NECTA-059, Attachment 1, which provides the pole counts used in the third party pole attachment rental rate calculation and includes only those poles that are unitized, classified, and recorded to FERC Account 101010 (Utility Plant in Service). Because the CPR also includes poles not yet unitized in FERC Account 106010 (Completed Construction not Classified), and poles in FERC Account 107 (Construction Work in Progress) not yet functionalized to FERC Utility Account 364, the pole counts in GIS will not tie due to timing of recognition in the CPR. a. The total pole count in the Company’s pole fleet in Connecticut is 730,325 poles.Page 10 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-008 Page 2 of 4 b. The number of solely owned poles is 94,686, compared to 635,639 poles that are jointly owned with Verizon. c. Please refer to the Company’s response to subpart (b), above. d. Please refer to Table 1, showing the height of the Company’s pole fleet. Pole Height (blank) 10 ft. 11 ft. 12 ft. 13 ft. 14 ft. 15 ft. Pole Count Pole Height 17 ft. 18,787 18 ft. 109 20 ft. 64 1,003 21 ft. 25 ft. 2 27 ft. 703 185 30 ft. Table 1 Pole Count Pole Height 74 35 ft. 5,215 40 ft. 45 ft. 1,517 50 ft. 36 55 ft. 4,151 60 ft. 3 65 ft. 52,284 Pole Count Pole Height 259,730 70 ft. 290,229 75 ft. 80 ft. 83,744 85 ft. 10,909 895 90 ft. 324 95 ft. 134 100 ft. Pole Count 44 46 39 31 23 21 23 Grand Total 730,325 e. The total number of wood power poles is 705,400, compared to 24,925 poles built with other materials. f. Please refer to Chart 1, showing the age of the Company’s pole fleet. Chart 1 g. Please refer to NECTA-008, Attachment 1, showing the Company’s pole ID numbers.Page 11 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-008 Page 3 of 4 h. Please refer to Table 2, showing the Company’s pole fleet by pole class. Table 2 Pole by Pole Class Pole Class 1 2 3 4 5 6 7 9 A H1 H2 H3 Unknown Pole Count 20,609 158,367 114,353 136,468 34,554 2,187 1,956 333 2 477 185 28 260,806 i. Please refer to NECTA-008, Attachment 1, for the number of attachers. j. Please refer to Table 3, for the Company’s pole fleet date placed in service. Table 3 Pole Fleet in Service Dates Decade Pole Count 3,528 1880s 1890s 4 1900s 92,748 1910s 35 1920s 817 1930s 13,862 1940s 24,074 1950s 58,223 Decade Pole Count 1960s 94,923 1970s 69,138 70,531 1980s 1990s 76,457 2000s 89,611 2010s 90,370 2020s 45,990 Unknown 14 k. Please refer to NECTA-008, Attachment 1, for the city.Page 12 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-008 Page 4 of 4 l. Notes are not reflected in our GIS system of record.Page 13 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-009 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Data) Regarding the last field inventory of Company distribution poles conducted by or on behalf of the Company, provide a complete copy of the results of the field inventory, including: a. The date the field inventory was conducted; b. The universe of poles surveyed; c. The percentage of total poles; d. The type of information collected about each pole; e. The height of each surveyed pole; f. The average height of all surveyed poles; g. Age of each pole; h. The number of attachments, other than Eversource facilities, on each pole. Response: The Company is providing a copy of the results of its 2025 pole inspection program. The field inventory includes inspection results for approximately 32,894 custodial poles located across 9 of Connecticut’s 157 towns, based on a 15-year inspection cycle. Effectively in 2026, the Company transitioned to a 10-year inspection cycle to evaluate each pole every 10 years, allowing issues to be identified earlier and addressing them more proactively. The Company expects to evaluate 40,000 to 42,000 poles, or 10% of its custodial wooden pole population. a. Please refer to NECTA-009, Attachment 1, tab named “Results”, showing the dates that the inventory was conducted. Usually, the Pole inspection process starts in mid-April and ends towards the end of October. b. In 2025, the Company inspected 32,894 custodial poles. c. In 2025, the Company inspected 7.8% of the Company’s wooden pole population based on a 15 year-inspection cycle. d. Please refer to NECTA-009, Attachment 1, tab named “results” showing all the information collected from each pole inspected in 2025.Page 14 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-009 Page 2 of 2 e. Please refer to NECTA-009, Attachment 2, for the height and age of each pole inspected in 2025. The height is shown in column “u”, and the age of each pole is shown in column “T “of each town where custodial poles were inspected. f. Please refer to NECTA-009, Attachment 2, tab “2025 Pole Inspection General Information”, showing the average height for all custodial poles inspected in 2025. The average height is 37.7 ft. g. Please refer to subpart (e), above. h. Please refer to NECTA-008, Attachment 1, for the number of attachments on each custodial pole. NECTA-008, Attachment 1 will be provided on September 30, 2026, due to an extension being requested. The Company does not collect attachment information during the pole inspection process.Page 15 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-010 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Data) Referring to Exhibit CLP-ELP-1 at pp. 42-43, what is the basis for the statement that “Most of the wood-pole fleet comprises legacy poles that fail to meet current strength standard.”? a. Identify and provide a copy of current pole strength standards, and all prior pole strength standards used by Eversource since 1990. b. Identify and provide all studies, surveys, assumptions, etc. that are relied upon as support. c. Has the Company identified a complete list of legacy wood-poles that fail to meet strength standards? If so, provide the list. Response: The basis for the statement that “Most of the wood-pole fleet comprises legacy poles that fail to meet current strength standard.” is in reference to the Company’s current minimum pole class requirements when setting new poles. The statement does not refer to any pole testing performed under the pole integrity program. The original statement indicated 76% of the distribution poles did not meet the current minimum pole class standard. Since then, the Company has completed a deeper review of its asset records and identified that 37% distribution poles do not have a verified class rating in company records and were identified as not meeting the Company’s current minimum pole class requirement. Please refer to the following breakdown: • 39% of distribution poles do not meet The Company’s current minimum pole class standard • 37% of distribution poles do not have a verified class rating in our asset records • 24% of distribution poles meet The Company’s current minimum pole class standard a. Refer to NECTA-010, Attachment 1, Pole Class Size, for The Company’s current standards related to minimum pole class requirements from the Distribution System Engineering Manual.Page 16 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-010 Page 2 of 3 b. The minimum pole class requirements were established based on industry knowledge to ensure all new construction was built to a higher resiliency standard to minimize the impacts of major storm events on the system. c. The Company’s pole integrity program is the basis for determining if poles no longer have sufficient strength to remain in-service. Please refer to the Company’s response to information request NECTA-016 i for the Company’s pole inspection process. Prior Referenced Response: i NECTA-016 Question: (Pole Management & SPA) Refer to Exhibit CLP-ADDITIONS-1 at p. 64 (“Replacements are based on annual inspections”). Provide the following: a. b. Describe the Company’s annual inspection process, including the number of poles inspected each year, the data collected during the inspection, the criteria used to determine the integrity of the pole, who performs the inspections, and how the information collected during the inspections is used. Provide all data collected during the most recent annual inspection. NECTA-016 Response: a. The Company performs its routine and annual pole inspection to its custodial wooden poles following a 15year inspection cycle which ended in 2025. This cycle ensured that every custodial pole across 157 towns in Connecticut was inspected at least once within the time frame. Approximately 29,000 to 32,000 poles were inspected using the 15-year cycle. In 2025, the Company reviewed its wood-pole inspection standards and decided to shorten the inspection cycle from 15 years to 10 years. By adopting a more frequent inspection schedule, the Company aims to evaluate each custodial pole every 10 years, allowing issues to be identified earlier and addressing them more proactively. Under the revised 10-year cycle, approximately 41,000 to 42,500 poles will be inspected starting in 2026 and moving forward. The inspection process is based on the age of the pole. A visual inspection is completed for poles with less than 20 years of service. For poles with more than 20 years in service the inspection will include a visual, sound and bore, resistograph testing also known as IML testing, and the application of preservatives “treatment” required to maintain the structural integrity of the pole, and ensure continuous serviceability until the subsequent inspection interval. The number of poles replaced each year due to age, structural deterioration, damage, or end-of-life conditions varies based on the number of rejected poles identified through the annual pole inspection program. Poles classified as "Rejects" cannot remain in service because their remaining strength has fallen below 67% of their original strength or because they exhibit structural or mechanical damage that compromises safe operation. These poles are scheduled for replacement within one year of identification.
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.