Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.
Files6
Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
PDF · 156 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilations September 30 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilations September 30 2026.pdf
CIEC Set 4_COMBINED.pdf
PDF · 146 KB · 2 pagesText searchable
Download CIEC Set 4_COMBINED.pdfRead the text of CIEC Set 4_COMBINED.pdf
NECTA Set 1_COMBINED.pdf
PDF · 1.2 MB · 126 pagesText searchable
Download NECTA Set 1_COMBINED.pdfRead the text of NECTA Set 1_COMBINED.pdf
OCC Set 15_COMBINED.pdf
PDF · 362 KB · 31 pagesText searchable
Download OCC Set 15_COMBINED.pdfRead the text of OCC Set 15_COMBINED.pdf
OCC Set 17_COMBINED.pdf
PDF · 711 KB · 45 pagesText searchable
Download OCC Set 17_COMBINED.pdfRead the text of OCC Set 17_COMBINED.pdf
OCC Set 18_COMBINED.pdf
PDF · 376 KB · 24 pagesText searchable
Download OCC Set 18_COMBINED.pdfRead the text of OCC Set 18_COMBINED.pdf
Page 73 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-050 Page 2 of 2 maintain the integrity of cost tracking and supports the accurate allocation of make-ready costs between attachers and the Company's own service requirements. As a result, non-billable make-ready costs are identified through the Company's project scoping, engineering review, and work order management processes, which are intended to segregate work performed for Company operational needs from work performed in support of attachment-related make-ready activities.Page 74 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-051 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey, Jeffrey Richard, Leanne M. Landry and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Reference Decision dated May 11, 2022 in Docket No. 1901-52RE01, p. 45 (“The Authority will consider the recovery of reasonable and prudently-incurred non-billable make-ready costs in future rate case proceedings; although, such recovery may be balanced against the reasonable achievement of the timelines and faithful implementation of the strategies intended to alleviate the backlog of attachment applications, as approved in this Decision.”) Provide the following: a. On what date did the Company begin tracking its costs for performing non-billable makeready work? b. Identify the timelines referenced in the excerpt above. c. Describe and provide supporting data regarding the Company’s performance in achieving the timelines referenced in subpart (b) since the date identified in subpart (a). d. Describe in detail each step taken by the Company to implement strategies to alleviate the backlog of attachment applications. e. Each month since the date identified in subpart (a), provide: i. the number of pending attachment applications and their age; ii. the number of new attachment applications received that month. Response: a. The Company began tracking costs associated with non-billable make ready work on May 11, 2022, the date of PURA’s Decision in Docket No. 19-01-52RE01. In that Decision, PURA stated that it would consider recovery of reasonable and prudently incurred nonbillable make ready costs in future rate proceedings. Consistent with that directive, the Company began separately tracking such costs for future recovery. b. The timelines referenced in the May 11, 2022 Decision are the PURA-established pole attachment processing and make ready completion intervals applicable to attachment applications, including application review, engineering and design activities, make ready notifications, payment processing, and completion of make ready work by pole owners and attaching entities. These timelines are intended to facilitate timely processing of attachment requests and reduce attachment application backlogs.Page 75 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-051 Page 2 of 3 c. Since May 11, 2022, the Company has continued to process attachment applications and make ready work while managing a significant volume of pending applications and outstanding make ready obligations. During this period, the company receives new applications each month while also working through a substantial inventory of pending applications. As reflected in NECTA-051 Attachment 1, pending applications have increased from approximately 2,473 in May 2022 to approximately 4,995 as of September 2026. A substantial portion of pending applications are associated with overdue make ready work by third party attachers. As of September 1, 2026, approximately 33,972 poles remained assigned for make ready work, with the majority of them significantly past due. Eversource assigned make ready work accounts for approximately 2,071 poles, or approximately 6% of the total assigned poles. In addition, approximately 6,200 poles remain in SPA review where the Eversource review has been completed, but the joint pole owner review remains outstanding. The Company continues to work with attachers to address these aged applications and facilitate completion of required make ready work. d. Since the issuance of the May 11, 2022 Decision, the Company has undertaken numerous measures intended to alleviate the attachment application backlog, including: • Continued administration of the Single Pole Administration (SPA) process • Ongoing review and processing of attachment applications • Engineering review and design activities to support attachment requests • Identification and tracking of overdue make ready assignments • Coordination with third party attachers regarding outstanding make ready obligations • Assignment and reassignment of make ready work among attachers as work progresses on individual poles • Monitoring and reporting of engineering phase and make ready phase overdue applications • Efforts to resolve aged SPA reviews and engineering reviewsPage 76 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-051 Page 3 of 3 • Continued engagement with attachers to address long-outstanding applications and facilitate completion of required pole work The Company has also maintained reporting and tracking tools to identify aged applications, overdue make ready work, and engineering phase delays in order to prioritize resolution efforts and reduce overall backlog levels. e. (i) Please refer to NECTA-051, Attachment 1, for new attachment applications received monthly. (ii) Please refer to NECTA-051, Attachment 1, for the monthly pending application counts. Application age information is provided in the detailed pending application listing included, which identifies open applications and associated days open as of the report date. It’s important to note that a substantial portion of pending applications are associated with overdue make ready work assigned to third party attachers. As of September 1, 2026, approximately 33,972 poles remained assigned for make ready work, with the majority significantly past due. Applications are not automatically cancelled solely because assigned make ready work is overdue, as the underlying attachment requests remain pending and may still be completed by the attacher. Eversource assigned make ready work accounts for approximately 2,071 poles, or approximately 6% of the total assigned poles.Page 77 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-052 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Each year for the past five years, provide the average makeready work interval (from application to close-out) separately for solely-owned poles and jointlyowned poles. Response: The table below provides the average number of days between receipt of a completed application (including payment of applicable application fees) and issuance of the license for power only solely owned poles and jointly owned poles. The Company notes that these intervals represent the total elapsed time between receipt of a completed application and issuance of a license, not solely the duration of make ready construction activities. As a result, the reported intervals encompass multiple stages of the pole attachment process, including application review, survey and engineering activities, telecommunication survey and engineering for jointly owned poles, coordination and concurrence among pole owners, make ready billing, receipt of make ready payment by Eversource, Frontier, or both as applicable, make ready construction, and final licensing. Accordingly, the reported intervals are influenced by numerous factors, many of which are outside of Eversource’s control and vary significantly by project.Page 78 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-052 Page 2 of 2 These factors include, but are not limited to: • Delays in payment by requesting attachers or other parties • Delays associated with third party attachers completing required transfer or make ready work • Coordination requirements among multiple entities on jointly owned pole lines • Delays in obtaining permits, municipal approvals or traffic control requirements • Customer driven schedule changes or project modifications • Contractor availability and scheduling constraints • Weather events, emergency restoration activities, and other unforeseen field conditions • Delays associated with obtaining access to private property or rights-of-way • Disputes regarding responsibility for make ready work or associated costs Because these and other factors can materially affect the time between application and licensing, without reflecting Eversource’s own performance, any calculated average would be skewed and potentially misleading.Page 79 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-053 Page 1 of 1 Date Filed: September 23, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Timothy J. Griffin Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Reference Exhibit CLP REVREQ-2, Schedule B 6.2 (Deferred Assets), please discuss how the Accumulated Deferred Income Taxes for each deferred asset on lines 29 – 39 were determined, and show the calculation for deferred third party make ready pole work as an example. Response: Accumulated Deferred Income Taxes for each deferred asset on lines 29 – 39 of Exhibit CLP REVREQ-2, Schedule B-6.2 were determined by applying the statutory tax rate in effect during the rate year, or 27.5175%, to the 12/31/2025 balance. Using the deferred pole make ready 12/31/2025 balance of $16,581,000 as an example, the calculation is as follows: $16,581,000 multiplied by (1 - 27.5175%, or 72.4825%) tax rate to come to the after-tax amount of $12,018,000 as seen on line 44 of Schedule B-6.2.Page 80 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-054 Page 1 of 4 Date Filed: September 23, 2026 Witness: David L. Gladey, Jeffrey Richard, Brendan J. O’Brien, Timothy J. Griffin and Garrett J. Murray Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Reference Exhibit CLP REVREQ-4 (Third Party Pole Make Ready Costs). Provide the following: a. Line 7552, Notes, indicates that Eversource began maintaining detailed records of both billable and non-billable make costs consistent with Order No. 15 in the Final Decision in 19-01-52 RE01. Please confirm that the figure of $16,580,868 includes only non-billable costs. b. Discuss whether (i) the non-compliance issues that led to the costs incurred by the company as shown in this exhibit were discovered by the company as a result of a new attacher requesting to attach, (ii) for each pole in the exhibit, the company has a record of when the last attacher attached to the pole and when the pole was last inspected. c. Confirm that the headings for columns F through Y are the FERC accounts to which the third party pole make ready costs were assigned; d. Provide a description of the subaccounts for Accounts 593 and 594. e. Discuss why all the costs are in O&M accounts and there are no costs in capital accounts at page 41 of Exhibit CLP REVREQ-1. f. For entries indicating “Pole replacement – Pole defective”, explain why if the pole is already defective, it would not be the company’s or the joint pole owner’s responsibility to replace the pole. g. With reference to line 7030 which explains that Frontier will set a new 40-foot class 2 pole and remove the 35-foot class 4 pole, explain *D&D*Conv and discuss how the capital costs associated with the pole replacement were treated in the FERC Form 1. h. Provide an allocation of the amount of $16,580,868 into calendars years, meaning the portion allocable to each year starting with 2017 and ending with 2025 and indicate where the allocations appear in the FERC Form 1 for those years. i. Explain line 7548, the removal of 2023-2025 Amounts in Distribution Rates of $2,408,607. Explain how that amount was added to distribution rates since the last rate case in Docket 17-10-46.Page 81 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-054 Page 2 of 4 Response: a. Confirmed. The amount of $16,580,868 shown on line 7552 includes only non-billable third party make ready costs. As noted in Exhibit CLP-REVREQ-4, Eversource began maintaining detailed records of both billable and non-billable make ready costs consistent with the Docket 10-01-52RE01 Decision. The amount reflected in this exhibit represents costs that were classified as non-billable and therefore were not invoiced to attaching entities. b. (i) The non-compliance conditions reflected in Exhibit CLP-REVREQ-4 were identified during the engineering phase associated with attachment requests. (ii) Eversource maintains records related to pole inspections and attachment activity. The availability of records identifying the most recent attachment date and inspection date varies based on the specific pole and historical record availability. c. Yes, columns F through Y are the FERC accounts to which the third party pole make ready costs were assigned. d. Below is a description of the subaccounts for FERC 593 and 594. 593000 – Distribution Maintenance of Overhead Lines 593010 – Poles and Fixtures 593020 – Overhead Construction Transfer 593040 – Overhead Corrective Maintenance Repairs 593050 – Overhead Service Maintenance Repairs 593100 – Tree Trimming Vegetation Control 594000 – Distribution Maintenance of Underground Lines 594010 – Underground Conduit Maintenance 594020 – Manhole Regulating 594030 – Underground Corrective and Emergent Maintenance 594260 – Maintenance of Manholes e. In Docket No. 19-01-52RE01, PURA directed the Company to defer incremental nonbillable make-ready costs (see Docket No. 19-01-52RE01 Final Decision dated May 11, 2022 at page 45). Consistent with this directive, the Company deferred incremental nonbillable O&M make-ready costs to a regulatory asset which is being sought for recovery in this rate amendment application as supported by Exhibit CLP-REVREQ-4. The capital costs for non-billable third party market ready pole work is included for recovery in the Company’s rate amendment application consistent with all other in-service capital and is supported in Exhibit CLP-ADDITIONS-9.Page 82 of 126
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-054 Page 3 of 4 f. For entries indicating “Pole replacement – Pole defective”, if the pole was found during survey to already be defective, it would be the Company’s or the joint pole owner’s responsibility to replace the pole. g. With reference to Exhibit CLP REVREQ-4 (Third Party Make Ready Costs), line 7030, “D&D Conv” is part of the Field Work Order description. The entire Field Work Order description for this line is “*D&D*Conv. 1635692 - Make Ready Non” which is used internally to communicate the contractor assigned to the work order, the Alden One conversation number, the type of work and billing classification. Therefore, “D&D” refers to D&D Contractors, “Conv. 1635692” is the Alden One conversation number, “Make Ready Non” indicates this is for make ready work and is ‘non’ billable. The capital costs associated with the additions and retirements related to the pole replacement were included on lines 64, 65 and 67 of pages 204-207 in the Company’s 2025 Ferc Form 1 filing. h. The table below shows the $16,580,868 by year. The amounts are included in the FERC Form 1 under Electric Operation and Maintenance Expenses under their respective FERC account number (583, 584, 587, 590, 593, 594, 595, 596, and 598) by year.
Text of OCC Set 17_COMBINED.pdf
Extracted from the file · 45 pages · 69,741 characters
Text of OCC Set 18_COMBINED.pdf
Extracted from the file · 24 pages · 49,328 characters
As listed on the current system
Corres. 09/30/2026 [26-05-10] (Keegan Werlin LLP) - Discovery compilation for CIEC Set 4, NECTA Set 1, OCC Set 15, OCC Set 17, and OCC Set 18.